SlideShare une entreprise Scribd logo
1  sur  11
Pressure Pumping
Internship
Summer 2014
Paul Nepine
About Me
• Attend:
• Montana Tech University,
Butte Montana
 Junior
 BS, Petroleum Engineering
 Memberships:
 SPE, AADE, AISES
 Two Term President: AISES
 Daughter 19 yrs.
 Grand daughter 2 yrs.
 Golfing, Hunting, Fishing,
Community Activities
Baker Hughes’ Core Values
1. Integrity
2. Team Work
3. Performance
4. Learning
San Antonio Operations Facility
 Tool Shop Operations
 Cement Bulk Plant
 Mechanic Bays
 Pressure Testing
 Drilling Fluids Lab
 Frac Fluids Lab
 Cement Lab
 Stim Plus Lab
 Yard Equipment
 Chemical Storage
Frac Field Operations
Tour #1 Stumberg Ranch 39 H
Anadarko:
 Wireline- Plug and Perf
 Coil Tubing 36 H
 Frac
 ACID
 Gel
 Proppant
Equipment:
 Pump Trucks
• Gorillas and Rhinos
 Blender
 Hydration
 Chem Add
 Acid Tanker
 Manifold-”Missile”
 Sand Kings
 Fluid Van
 TMV Van
Frac Field Tour #2
Stumberg Ranch 40H & 41 H
Anadarko:
 Slick Water Frac
• Proppant:
• 100 Mesh Sand
• 40/70 Sand
• Friction Reducer
 2 Blenders
 Equipment Issues
Experiences:
 Truck PTO engagement
 Rig Down Goats Head to swap
iron to new well
 Rig Down Blenders
 Blender and Sand King
 Gel Tanker Straps
 TMV Operator
 Sand Analysis and reporting
Briscoe Ranch Wells 48 & 49 H
Third Tour July 20th-August 7th
SM Energy:
 Multi Stage Frac
 Plug and Perf
 Slick water
 Proppant Laden Linear Gel
 Proppant Laden Viking D 2000
 Proppants 100 and 30/50 Mesh
My Experiences:
 Start Rig up
• Iron
• TMV Communication Cables
 Proposal Review
 Fluid Van
• Gel Analysis
 TMV Operator
• Chemical Strap Inventory
 Consultant Experience
• Asked Questions about Frac
Engineer’s Responsibilities
Engineering:
 Chemical Inventory
 Frac Chemical Control
 Frac Reporting Company Man
 Gel Densities
 Job log and Summary’s
 Point man for Communication
• Operations
• Customer
My Experiences:
 Assisted: Chem Add
• Straps
• Swap Totes during Stage
• Report Straps
 TMV Operator
• Record Chemical Straps
• Recording Stages
• Communication
 See another Frac Operation
• Fine tune and Review
 Cementing Operations (2)
 Obtain Another Internship
With Baker Hughes
Goals for rest of Internship
1. Familiarization with Operations at Yard and Field
2. Hands On in all aspects of internship
3. Challenged myself to learn something everyday.
4. 31 Days Field Experience on 3 Frac Sites
5. Gained Valuable insight of field operations.
6. Experienced different problems in the field for operations and
formed opinions about solutions.
7. Not done yet and want more exposure to Baker Hughes’
Operations
8. Appreciated the Opportunity to Work here!
Summary
References
1. www.bakerhughes.com/
2. Baker Hughes-Frac Proposal
Briscoe Ranch

Contenu connexe

Tendances

Top 10 project engineer interview questions and answers pdf
Top 10 project engineer interview questions and answers pdfTop 10 project engineer interview questions and answers pdf
Top 10 project engineer interview questions and answers pdf
HelenMirren123
 
SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity final
Mohamed Elsadek
 
Top 5 commissioning engineer interview questions with answers
Top 5 commissioning engineer interview questions with answersTop 5 commissioning engineer interview questions with answers
Top 5 commissioning engineer interview questions with answers
bantdaisy35
 
Top 10 area manager interview questions and answers
Top 10 area manager interview questions and answersTop 10 area manager interview questions and answers
Top 10 area manager interview questions and answers
GreenHornet345
 
Effect of Gas Injection Rate on Oil Production Rate
Effect of Gas Injection Rate on Oil Production RateEffect of Gas Injection Rate on Oil Production Rate
Effect of Gas Injection Rate on Oil Production Rate
Asekhame Yadua, GradEI
 

Tendances (20)

Production optimization
Production optimizationProduction optimization
Production optimization
 
Top 10 project engineer interview questions and answers pdf
Top 10 project engineer interview questions and answers pdfTop 10 project engineer interview questions and answers pdf
Top 10 project engineer interview questions and answers pdf
 
Grasping everything
Grasping everythingGrasping everything
Grasping everything
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Grinding Aids for Cement
Grinding Aids for CementGrinding Aids for Cement
Grinding Aids for Cement
 
SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity final
 
Adjustable Chokes, Adjustable Chokes Oilfield Equipment - WOM Group
Adjustable Chokes, Adjustable Chokes Oilfield Equipment - WOM GroupAdjustable Chokes, Adjustable Chokes Oilfield Equipment - WOM Group
Adjustable Chokes, Adjustable Chokes Oilfield Equipment - WOM Group
 
Induction log
Induction logInduction log
Induction log
 
Top 45 johnson johnson internship interview questions and answers pdf
Top 45 johnson johnson internship interview questions and answers pdfTop 45 johnson johnson internship interview questions and answers pdf
Top 45 johnson johnson internship interview questions and answers pdf
 
Diamond core bit set catalog from diamond core bit manufacturer bsptools.com
Diamond core bit set catalog from diamond core bit manufacturer bsptools.comDiamond core bit set catalog from diamond core bit manufacturer bsptools.com
Diamond core bit set catalog from diamond core bit manufacturer bsptools.com
 
Thermal Design Margins for Heat Exchangers
Thermal Design Margins for Heat ExchangersThermal Design Margins for Heat Exchangers
Thermal Design Margins for Heat Exchangers
 
creep deformation of the Materials
 creep deformation of the   Materials creep deformation of the   Materials
creep deformation of the Materials
 
HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)
 
Top 5 commissioning engineer interview questions with answers
Top 5 commissioning engineer interview questions with answersTop 5 commissioning engineer interview questions with answers
Top 5 commissioning engineer interview questions with answers
 
Material Selection
Material SelectionMaterial Selection
Material Selection
 
Electrical Properties of Reservoir Rocks
Electrical Properties of Reservoir RocksElectrical Properties of Reservoir Rocks
Electrical Properties of Reservoir Rocks
 
Top 10 area manager interview questions and answers
Top 10 area manager interview questions and answersTop 10 area manager interview questions and answers
Top 10 area manager interview questions and answers
 
Effect of Gas Injection Rate on Oil Production Rate
Effect of Gas Injection Rate on Oil Production RateEffect of Gas Injection Rate on Oil Production Rate
Effect of Gas Injection Rate on Oil Production Rate
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
 

Similaire à Baker Hughes Powerpoint Presentation

Lou-Rich final presentation
Lou-Rich final presentationLou-Rich final presentation
Lou-Rich final presentation
Carter Tollefson
 
Resume: George LaCasse
Resume: George LaCasseResume: George LaCasse
Resume: George LaCasse
George LaCasse
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014
marketinglbcg
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
Mohammed ali
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
HPHT Wells Summit
 
Dan_sResumerevised2014
Dan_sResumerevised2014Dan_sResumerevised2014
Dan_sResumerevised2014
Daniel Carter
 

Similaire à Baker Hughes Powerpoint Presentation (20)

Jim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track testJim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track test
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
 
Process Qualification Optimization
Process Qualification OptimizationProcess Qualification Optimization
Process Qualification Optimization
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Alliance Internship Great Lakes Poster
Alliance Internship Great Lakes PosterAlliance Internship Great Lakes Poster
Alliance Internship Great Lakes Poster
 
VAIBHAV RESUME
VAIBHAV RESUMEVAIBHAV RESUME
VAIBHAV RESUME
 
Corun_-_Polymers (1).ppt
Corun_-_Polymers (1).pptCorun_-_Polymers (1).ppt
Corun_-_Polymers (1).ppt
 
Lou-Rich final presentation
Lou-Rich final presentationLou-Rich final presentation
Lou-Rich final presentation
 
Resume: George LaCasse
Resume: George LaCasseResume: George LaCasse
Resume: George LaCasse
 
Resume George LaCasse
Resume George LaCasseResume George LaCasse
Resume George LaCasse
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
PPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdfPPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdf
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
 
MZS umc (4)
MZS umc (4)MZS umc (4)
MZS umc (4)
 
upinder_CV
upinder_CVupinder_CV
upinder_CV
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods
 
Dan_sResumerevised2014
Dan_sResumerevised2014Dan_sResumerevised2014
Dan_sResumerevised2014
 

Baker Hughes Powerpoint Presentation

  • 2. About Me • Attend: • Montana Tech University, Butte Montana  Junior  BS, Petroleum Engineering  Memberships:  SPE, AADE, AISES  Two Term President: AISES  Daughter 19 yrs.  Grand daughter 2 yrs.  Golfing, Hunting, Fishing, Community Activities
  • 3. Baker Hughes’ Core Values 1. Integrity 2. Team Work 3. Performance 4. Learning
  • 4. San Antonio Operations Facility  Tool Shop Operations  Cement Bulk Plant  Mechanic Bays  Pressure Testing  Drilling Fluids Lab  Frac Fluids Lab  Cement Lab  Stim Plus Lab  Yard Equipment  Chemical Storage
  • 5. Frac Field Operations Tour #1 Stumberg Ranch 39 H Anadarko:  Wireline- Plug and Perf  Coil Tubing 36 H  Frac  ACID  Gel  Proppant Equipment:  Pump Trucks • Gorillas and Rhinos  Blender  Hydration  Chem Add  Acid Tanker  Manifold-”Missile”  Sand Kings  Fluid Van  TMV Van
  • 6. Frac Field Tour #2 Stumberg Ranch 40H & 41 H Anadarko:  Slick Water Frac • Proppant: • 100 Mesh Sand • 40/70 Sand • Friction Reducer  2 Blenders  Equipment Issues Experiences:  Truck PTO engagement  Rig Down Goats Head to swap iron to new well  Rig Down Blenders  Blender and Sand King  Gel Tanker Straps  TMV Operator  Sand Analysis and reporting
  • 7. Briscoe Ranch Wells 48 & 49 H Third Tour July 20th-August 7th SM Energy:  Multi Stage Frac  Plug and Perf  Slick water  Proppant Laden Linear Gel  Proppant Laden Viking D 2000  Proppants 100 and 30/50 Mesh My Experiences:  Start Rig up • Iron • TMV Communication Cables  Proposal Review  Fluid Van • Gel Analysis  TMV Operator • Chemical Strap Inventory  Consultant Experience • Asked Questions about Frac
  • 8. Engineer’s Responsibilities Engineering:  Chemical Inventory  Frac Chemical Control  Frac Reporting Company Man  Gel Densities  Job log and Summary’s  Point man for Communication • Operations • Customer My Experiences:  Assisted: Chem Add • Straps • Swap Totes during Stage • Report Straps  TMV Operator • Record Chemical Straps • Recording Stages • Communication
  • 9.  See another Frac Operation • Fine tune and Review  Cementing Operations (2)  Obtain Another Internship With Baker Hughes Goals for rest of Internship
  • 10. 1. Familiarization with Operations at Yard and Field 2. Hands On in all aspects of internship 3. Challenged myself to learn something everyday. 4. 31 Days Field Experience on 3 Frac Sites 5. Gained Valuable insight of field operations. 6. Experienced different problems in the field for operations and formed opinions about solutions. 7. Not done yet and want more exposure to Baker Hughes’ Operations 8. Appreciated the Opportunity to Work here! Summary
  • 11. References 1. www.bakerhughes.com/ 2. Baker Hughes-Frac Proposal Briscoe Ranch