Livewire Automation recently completed the commissioning scope for the Arrow Energy Daandine expansion project. We would like to thank both Arrow Energy and the technicians that did an excellent job on site.
1. ARROW ENERGY / CPECC WDS JV
Daandine Expansion Project
Electrical / Instrumentation / &
Commissioning Services provided by Livewire
Automation
Dalby, Surat Basin Queensland
Electrical and instrumentation
Livewire Automation was engaged by WDS to
perform the electrical and instrumentation
commissioning scope for the expansion and tie in
of three Ariel reciprocating compressors, one
Generation package, contactor tower, glycol filter,
fuel gas and buffer vessel, inlet coalescer, oil filter,
inlet separation boot and production facility flow
lines. Livewire Automation assisted CEC Electrical
with the electrical and instrumentation installation
for the new compressor packages including
hazardous area auditing, UCP and MCC
installations. Livewire Automation E&I technicians
performed all MCC testing, hazardous area
inspections, instrument inspections, cable tests,
and earth grid tests. All test equipment was
supplied by Livewire Automation.
Electrical & Instrumentation Scope
Modifications to existing MCC-001
Installation of new MCC-002
Installation of power, control and fibre
optic cabling to on-skid junction boxes for
the three new compressors, TEG, Glycol,
Fuel and Oil vendor supplied packages
Re-assembly of compressor packages
including the installation of unit control
panels and two MCC’s to each package
Installation of instrumentation, electric
motors and associated pumps for the
produced water transfer package
Modifications to Braemar 1 and 2
metering stations
Relocation and re-verification to the
moisture analyser
Plant instrumentation and calibrations
Installation of new flame detectors and
plant emergency sirens
New VSD’s for TEG package
Installation of local control stations
Modifications to existing plant lighting
and installation of new plant lighting
Plant earthing
Cable ladder
Commissioning
Livewire Automation was engaged by WDS to
perform the commissioning scope of the Arrow
Energy Daandine expansion project. The scope
included electrical energisation of new and
existing equipment, instrumentation loop checks,
PLC / DCS integration, motor bumping and
alignments. Livewire Automation assisted with
start-up of the new TEG and 3 compressor
packages and 22 wells in the gathering network.
Commissioning Scope
Cause and Effect Testing
Functional Instrument Loop Testing
Allen Bradley PLC Modbus Mapping
Emerson PLC and Delta V HMI Modbus
Mapping
MCC Energisation
Commissioning of three CAT 3612 engines
coupled with Ariel 4 stage reciprocating
compressors, full function testing
including cooler fan, alternator, MCC and
PLC functional testing
Flare control panel commissioning
TEG Dehydration package commissioning
Motor bump testing
Motor coupling alignments
Case Study
Oil & Gas
Facilities & Pipelines