This document summarizes a land records correction and khatha drive conducted in Pandavapura Sub-Division of Mandya district from 2010-2012. It involved correcting mistakes in land records like the ROR to reflect actual ownership details, issuing corrected sketches and RTCs, and updating khatas. A team led the effort using a multi-stage process that included checking records village-by-village, notifying individuals, collecting documents, preparing correction lists, getting approvals, and issuing new corrected RTCs. As a result, over 200,000 RTCs were corrected and amalgamated across the sub-division's taluks during this period.
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Land Records Correction & Katha Drive in Mandya district, Karnataka.
1. Suo motu Pahani (land Records) Correction
and Khatha drive
Pandavapura Sub-Division, Mandya district
(2010-2012)
DR. PC Jaffer, DC, Bidar
1
2. Land Records
• Basic documents for people to recognise their
rights/ownership
• Previously, maintenance at the mercy of the
lower revenue officials
• Bhoomi, brought controls and transparency
• Accumulated mistakes still continues
• One time correction drive to clear the
choking .
2
3. Need
• ROR to reflect actuals
• Issue 11e sketch
• Issue Correct R.T.C.
• Updation of katha
3
4. The Team
• Mr. Puttamadaih, Addl DC
• Mr. Prabhu G, AC, Pandavpura
• Shri S. Rangappa, AC, Bidar
• Mr. Ajjappa, DD (Land Records)
• Dr. HL Nagaraj, Tahsildar,
• Mr. Arul Kumar, Tahsildar
• Mr. Shivananda Murthy, Tahsildar
• Dr. Rajendraparasad, Tahsildar
• Ms. Vani B, Tahsildar
4
5. Pre and Post
Sl.NoSl.No Taluk NameTaluk Name Total R.T.C.Total R.T.C.
20092009
Total R.T.C.Total R.T.C.
20122012
TotalTotal
corrected andcorrected and
amalgamatedamalgamated
R.T.C.R.T.C.
11 PandavapuraPandavapura 172371172371 132904132904 5301853018
22 SrirangapatnaSrirangapatna 109581109581 8363983639 3640336403
33 K.R.PeteK.R.Pete 269410269410 222605222605 6907769077
44 NagamangalaNagamangala 361378361378 305036305036 7627176271
TotalTotal 952740952740 744184744184 234769234769
5
6. How we did this?
6
1st
stage
•Checklist from bhoomiChecklist from bhoomi
•Taluk wise
•Hobli wise
•Village wise
•Providing checklist to VA, RI
& Surveyor
•Akarband entry made
•VA verification
•Identification of nature of
correction
2nd
stage
3rd
stage •Awareness campaignAwareness campaign
•Issuing individual noticesIssuing individual notices
7. 7
5th
stage
•Correction approval as perCorrection approval as per
existing MR by ACexisting MR by AC
•Incorporation and
generation of new
corrected R.T.C.
4th
stage
•Collection of relevantCollection of relevant
documentsdocuments
•Village wise preparation ofVillage wise preparation of
correction list withcorrection list with
documentsdocuments
•Office verification &Office verification &
sending proposal to ACsending proposal to AC
8. Pre requisite
8
•All corrections are made as per already
existing MR
•If corrections require setting aside the
MR – court order
• Certifying relevant documents by
Tahsildar
10. 2nd
stage
10
•Providing checklist to VA, RI
& Surveyor
•Akarband entry made
•VA verification
•Identification of nature of
correction
•List – Notice to be issued
Nature of corrections
•Amalgamation of pyaki R.T.C. & correction of hissa number
•Correction of karab A & B as per akarband (Col.3)
•Col.3 & 9 matching - Increase or reducing the extent
•Correction of names etc. in col.9
•Other corrections in col.10, 11
13. 3rd
stage
13
•Issuing individual noticesIssuing individual notices
individual notices toindividual notices to
•Col.3 & 9 mismatching -
Increase or reducing the
extent
•Correction of names etc. in
col.9
15. 15
•Why correction, uses, issues if ROR is not corrected, katha issues,
encroachment, Payment of LR, WR
16. 4th
stage
16
•Collection of relevantCollection of relevant
documentsdocuments
•Village wise preparation ofVillage wise preparation of
correction list withcorrection list with
documentsdocuments
•Office verification &Office verification &
sending proposal to ACsending proposal to AC
Collection : Record room and individual
17. 17
•Village wise preparation of correction list with documentsVillage wise preparation of correction list with documents
•Office verification & sending proposal to ACOffice verification & sending proposal to AC
18. 5th
stage
18
•Correction approval as per existing MR by ACCorrection approval as per existing MR by AC
•Incorporation and generation of new corrected
R.T.C.