Load Shedding in Nepal
Nepal is being ravaged by the electricity crisis. The electricity supply and supply capacity is less
as compared to their respective demand. In 2008, Nepal Government declared National
Electricity Crisis in our country
There was no load shedding through till 2005. Nepal faced the problem of flood in the first week
of August 2008.This severely affected communication network and infrastructure including road
network. NEA used to point out the shortage of water in rivers whenever it came up with a load
shedding schedule, but even in such abundance NEA imposed a load shedding of 2 hours each
day, two days a week. With effect from 27th August, 2008 the load shedding hours was
increased to 16.5 hours/week.
In Nepal, traditional sources like firewood, animal residue, agriculture residue meet bulk of total
energy with an 85% while very few requirements is met by hydroelectricity which is 2.04% as in
2007/08 as suggested by the diagram below:
Figure: Energy consumption in 2007/08
Nepal can generate 83,000 Mega Watts of electricity of which 42,000 MW is commercially
viable capacity. Currently, electricity demand during peak time is around 1000 MW, but supply
is hardly 700 MW during summer and 400MW during winter, which includes total NEA
production from hydro and thermal, purchase from the private sector, and import from India. Of
the total availability, NEA supplies 55 per cent, private sector contributes 27 per cent, and 18 per
cent is imported from India.
The chart below shows the total supply of electricity from 2001-2011.
Figure: Supply side of electricity
NEA experienced a good increment in the no. of consumers from 062/063-065/066 which
accounts to 1.6 million i.e. 25% increment. However, the production side almost remained
stagnant with just 1.3% (7.85 MW) power addition during the same period. This led to huge
pressure in smooth supply of power during the period.
While demand increases by around 100MW every year, electricity production is almost
stagnant. The inadequate supply of electricity in turn will force the firms to depend on petroleum
products. Indeed, most losses of Nepal Oil Corporation is attributed to the shortage of electricity
supply i.e. consumption doubled between 2007-08 and 2010-11 to power up the factories and
offices. This will increase the cost of production and erode competitiveness of Nepali goods and
services since cost of domestic goods might be higher imported goods. This shows how
electricity crisis can indirectly affect other economic sectors.
Demand and supply side of Electricity
Table: Demand and supply forecast (08/09-011/012)
The above table shows the demand and supply forecast made by one of the officials of NEA. The
actual demand and supply of electricity during the particular period were almost similar to the
forecast made. In order to address the problem of mismatches in demand and supply of
electricity, NEA responded with power cuts, in other words load shedding.
Causes of Electricity Crisis
Monopoly of NEA: Production, transmission and even distribution of electricity is the sole
responsibility of NEA. Private sectors participation in the production is very rare. Only few
requirements of electricity are made through imports from India and private sectors.
Inadequate private investment: There is inadequate private investment in production of
electricity. It is why the resource in the private sector needs to be channelized in the productive
sectors including hydroelectricity. Only about 25% of the total installed capacity is carried by
national and international private sector.
Underproduction and lack of timely maintenance: Most hydro-electricity has never attempted
to generate power at its claimed installed capacity. Frequent breakdown of sub-systems and low
generation due to inefficient appliances are collective cause of the crisis.
Seasonal supply variation: During the winter season, the volume of water in the river declines
drastically. This will led to decline in the generation of power as well. This reduction in power
generation puts heavy pressure to manage demand during the period. The water reservoir of
Kulekhani supports only 46 MW of electricity while dry rivers support only 230 MW.
Others: Other reasons for the energy crisis are supply lag over demand and resources deficit.
Supply shortfall over the demand of consumer is the immediate cause of present load shedding.
Demand has inclined sharply in the few past years due to urbanization. The annual demand of
electricity is around 9.3%. In addition, at present demand exceeds over 808 MW.
Effects of Load Shedding on Imports
Due to increasing load shedding in the country since past many years, people have started relying
on alternative sources of energy such as solar power, torch lights, candles, gasoline, firewood,
coals, agriculture and animal residue. There has been significant increase in the imports of
products like batteries, generators, torch lights, inverters, and other varieties of lights from China
and India. Batteries, generators, inverters are usually imported from India while rest of the
products like torch lights and other small led lights are imported from China. This has
significantly boosted the business of small footpath sellers selling such products. The Chinese
products are attractive to the people as they ensure both quality and low prices.
Such alternative sources of energy have helped people to meet their need of energy to a great
extend. The use of alternate sources of energy like batteries, invertors and generators helps to
increase the supply of electricity available to them. This increase in supply is attributed to an
individual/consumer own effort and is not attributable to NEA.
Conclusion:
The government of Nepal launches various strategies to reduce load shedding and makes
various decisions to start hydro power projects, thermal plants etc. However, government
always lacks on the implementation part. Even with the proper planning, it takes several years
to develop necessary infrastructures for power generation and transmission. With Nepal’s never
ending political situation, NEA plans to reduce power shortages may take few more years than
anticipated. Excessive politicization of the hydro sector and inefficiencies within NEA has been
the two biggest hurdles so far. Unless, new investment are encouraged to enter in the, the outlook
remains the same.
Following are some of the ways to cope with the problem of electricity crisis in our country:
 Harvesting solar power and using other alternative sources
 Encouraging public- private partnership to address the resource deficiencies.
 Political commitment
 Infrastructure development such as proper road access and transmission line
 Control electricity leakages and prevent transmission losses.

Contenu connexe

Tendances

Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaAditya Goyal
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sectorRahul Gupta
 
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hari Bhusal
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladeshA.S.M. Abdul Hye
 
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...International Hydropower Association
 
Indian energy scenario by saikat ghosh
Indian energy scenario by saikat ghosh Indian energy scenario by saikat ghosh
Indian energy scenario by saikat ghosh Saikat Ghosh
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reformsPSPCL
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in IndiaIndian Energy Sector
 
Bhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power AssessmentBhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power AssessmentVikas Lakhani
 
Power sector in india
Power sector in indiaPower sector in india
Power sector in indiaHarshit Garg
 
Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Samplevandalmax
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power IndustrySiva Konduri
 

Tendances (20)

Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in India
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Power Sector Report - March 2017
Power Sector Report - March 2017Power Sector Report - March 2017
Power Sector Report - March 2017
 
Electricity ppt
Electricity pptElectricity ppt
Electricity ppt
 
Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
 
Energy industry overview
Energy  industry overviewEnergy  industry overview
Energy industry overview
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
 
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Indian power
Indian powerIndian power
Indian power
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
 
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
 
Indian energy scenario by saikat ghosh
Indian energy scenario by saikat ghosh Indian energy scenario by saikat ghosh
Indian energy scenario by saikat ghosh
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
 
Bhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power AssessmentBhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power Assessment
 
Power sector in india
Power sector in indiaPower sector in india
Power sector in india
 
Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Sample
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
 

En vedette

Energy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economyEnergy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economySami Swati
 
Solution of Pakistan's Energy Cricis
Solution of Pakistan's Energy CricisSolution of Pakistan's Energy Cricis
Solution of Pakistan's Energy CricisZain Zafar
 
Energy Crises of Pakistan
Energy Crises of PakistanEnergy Crises of Pakistan
Energy Crises of PakistanSaad Ahmed
 
Electricity CIRSES IN PAKISTAN
Electricity CIRSES IN PAKISTANElectricity CIRSES IN PAKISTAN
Electricity CIRSES IN PAKISTANTOHEED AHMAD
 

En vedette (7)

Energy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economyEnergy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economy
 
Energy crisis ppt
Energy crisis pptEnergy crisis ppt
Energy crisis ppt
 
Solution of Pakistan's Energy Cricis
Solution of Pakistan's Energy CricisSolution of Pakistan's Energy Cricis
Solution of Pakistan's Energy Cricis
 
Energy Crisis Of Pakistan
Energy Crisis Of PakistanEnergy Crisis Of Pakistan
Energy Crisis Of Pakistan
 
Energy Crises of Pakistan
Energy Crises of PakistanEnergy Crises of Pakistan
Energy Crises of Pakistan
 
Electricity CIRSES IN PAKISTAN
Electricity CIRSES IN PAKISTANElectricity CIRSES IN PAKISTAN
Electricity CIRSES IN PAKISTAN
 
Energy Crisis In Pakistan
Energy Crisis In PakistanEnergy Crisis In Pakistan
Energy Crisis In Pakistan
 

Similaire à Prabin kc

energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)Faizan Ahmed
 
energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)Faizan Ahmed
 
Electricity crisis
Electricity crisisElectricity crisis
Electricity crisisshahin6120
 
Pakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsPakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsAmad Ali
 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantSulaman Muhammad
 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17Jhon Smith
 
cost of widening electricity gap
cost of widening electricity gapcost of widening electricity gap
cost of widening electricity gapridazamir
 
Energy crisis in pakistan real
Energy crisis in pakistan realEnergy crisis in pakistan real
Energy crisis in pakistan realSamia Dogar
 
J0364057060
J0364057060J0364057060
J0364057060theijes
 
IRJET- The Power of Electricity and it’s Problems in India
IRJET- The Power of Electricity and it’s Problems in IndiaIRJET- The Power of Electricity and it’s Problems in India
IRJET- The Power of Electricity and it’s Problems in IndiaIRJET Journal
 
160715 China Electricity Sector Transformation Continues_IEEFA
160715 China Electricity Sector Transformation Continues_IEEFA160715 China Electricity Sector Transformation Continues_IEEFA
160715 China Electricity Sector Transformation Continues_IEEFATim Buckley
 
Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...IJAAS Team
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistanShehzad Imran
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentationgoodamazing
 
Impact of covid 19 lockdown on electrical energy sector
Impact of covid 19 lockdown on electrical energy sectorImpact of covid 19 lockdown on electrical energy sector
Impact of covid 19 lockdown on electrical energy sectorTanushree Bhattacharjee
 
POWER FOR ALL:MYTH OR REALITY?
  POWER FOR ALL:MYTH OR REALITY?  POWER FOR ALL:MYTH OR REALITY?
POWER FOR ALL:MYTH OR REALITY?Akshay Lal
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Ahmer Khan
 
International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)inventionjournals
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingPhat Nguyen
 
CO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in LibyaCO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in LibyaHusen E . Bader
 

Similaire à Prabin kc (20)

energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)
 
energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)energy crisis introduction (Autosaved)
energy crisis introduction (Autosaved)
 
Electricity crisis
Electricity crisisElectricity crisis
Electricity crisis
 
Pakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutionsPakistan electric power crisis and its possible solutions
Pakistan electric power crisis and its possible solutions
 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power Plant
 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17
 
cost of widening electricity gap
cost of widening electricity gapcost of widening electricity gap
cost of widening electricity gap
 
Energy crisis in pakistan real
Energy crisis in pakistan realEnergy crisis in pakistan real
Energy crisis in pakistan real
 
J0364057060
J0364057060J0364057060
J0364057060
 
IRJET- The Power of Electricity and it’s Problems in India
IRJET- The Power of Electricity and it’s Problems in IndiaIRJET- The Power of Electricity and it’s Problems in India
IRJET- The Power of Electricity and it’s Problems in India
 
160715 China Electricity Sector Transformation Continues_IEEFA
160715 China Electricity Sector Transformation Continues_IEEFA160715 China Electricity Sector Transformation Continues_IEEFA
160715 China Electricity Sector Transformation Continues_IEEFA
 
Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistan
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
 
Impact of covid 19 lockdown on electrical energy sector
Impact of covid 19 lockdown on electrical energy sectorImpact of covid 19 lockdown on electrical energy sector
Impact of covid 19 lockdown on electrical energy sector
 
POWER FOR ALL:MYTH OR REALITY?
  POWER FOR ALL:MYTH OR REALITY?  POWER FOR ALL:MYTH OR REALITY?
POWER FOR ALL:MYTH OR REALITY?
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
 
International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
 
CO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in LibyaCO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in Libya
 

Dernier

QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 

Dernier (20)

QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 

Prabin kc

  • 1. Load Shedding in Nepal Nepal is being ravaged by the electricity crisis. The electricity supply and supply capacity is less as compared to their respective demand. In 2008, Nepal Government declared National Electricity Crisis in our country There was no load shedding through till 2005. Nepal faced the problem of flood in the first week of August 2008.This severely affected communication network and infrastructure including road network. NEA used to point out the shortage of water in rivers whenever it came up with a load shedding schedule, but even in such abundance NEA imposed a load shedding of 2 hours each day, two days a week. With effect from 27th August, 2008 the load shedding hours was increased to 16.5 hours/week. In Nepal, traditional sources like firewood, animal residue, agriculture residue meet bulk of total energy with an 85% while very few requirements is met by hydroelectricity which is 2.04% as in 2007/08 as suggested by the diagram below: Figure: Energy consumption in 2007/08
  • 2. Nepal can generate 83,000 Mega Watts of electricity of which 42,000 MW is commercially viable capacity. Currently, electricity demand during peak time is around 1000 MW, but supply is hardly 700 MW during summer and 400MW during winter, which includes total NEA production from hydro and thermal, purchase from the private sector, and import from India. Of the total availability, NEA supplies 55 per cent, private sector contributes 27 per cent, and 18 per cent is imported from India. The chart below shows the total supply of electricity from 2001-2011. Figure: Supply side of electricity NEA experienced a good increment in the no. of consumers from 062/063-065/066 which accounts to 1.6 million i.e. 25% increment. However, the production side almost remained stagnant with just 1.3% (7.85 MW) power addition during the same period. This led to huge pressure in smooth supply of power during the period. While demand increases by around 100MW every year, electricity production is almost stagnant. The inadequate supply of electricity in turn will force the firms to depend on petroleum products. Indeed, most losses of Nepal Oil Corporation is attributed to the shortage of electricity supply i.e. consumption doubled between 2007-08 and 2010-11 to power up the factories and offices. This will increase the cost of production and erode competitiveness of Nepali goods and services since cost of domestic goods might be higher imported goods. This shows how electricity crisis can indirectly affect other economic sectors.
  • 3. Demand and supply side of Electricity Table: Demand and supply forecast (08/09-011/012) The above table shows the demand and supply forecast made by one of the officials of NEA. The actual demand and supply of electricity during the particular period were almost similar to the forecast made. In order to address the problem of mismatches in demand and supply of electricity, NEA responded with power cuts, in other words load shedding. Causes of Electricity Crisis Monopoly of NEA: Production, transmission and even distribution of electricity is the sole responsibility of NEA. Private sectors participation in the production is very rare. Only few requirements of electricity are made through imports from India and private sectors. Inadequate private investment: There is inadequate private investment in production of electricity. It is why the resource in the private sector needs to be channelized in the productive sectors including hydroelectricity. Only about 25% of the total installed capacity is carried by national and international private sector. Underproduction and lack of timely maintenance: Most hydro-electricity has never attempted to generate power at its claimed installed capacity. Frequent breakdown of sub-systems and low generation due to inefficient appliances are collective cause of the crisis. Seasonal supply variation: During the winter season, the volume of water in the river declines drastically. This will led to decline in the generation of power as well. This reduction in power generation puts heavy pressure to manage demand during the period. The water reservoir of Kulekhani supports only 46 MW of electricity while dry rivers support only 230 MW.
  • 4. Others: Other reasons for the energy crisis are supply lag over demand and resources deficit. Supply shortfall over the demand of consumer is the immediate cause of present load shedding. Demand has inclined sharply in the few past years due to urbanization. The annual demand of electricity is around 9.3%. In addition, at present demand exceeds over 808 MW. Effects of Load Shedding on Imports Due to increasing load shedding in the country since past many years, people have started relying on alternative sources of energy such as solar power, torch lights, candles, gasoline, firewood, coals, agriculture and animal residue. There has been significant increase in the imports of products like batteries, generators, torch lights, inverters, and other varieties of lights from China and India. Batteries, generators, inverters are usually imported from India while rest of the products like torch lights and other small led lights are imported from China. This has significantly boosted the business of small footpath sellers selling such products. The Chinese products are attractive to the people as they ensure both quality and low prices. Such alternative sources of energy have helped people to meet their need of energy to a great extend. The use of alternate sources of energy like batteries, invertors and generators helps to increase the supply of electricity available to them. This increase in supply is attributed to an individual/consumer own effort and is not attributable to NEA. Conclusion: The government of Nepal launches various strategies to reduce load shedding and makes various decisions to start hydro power projects, thermal plants etc. However, government always lacks on the implementation part. Even with the proper planning, it takes several years to develop necessary infrastructures for power generation and transmission. With Nepal’s never ending political situation, NEA plans to reduce power shortages may take few more years than anticipated. Excessive politicization of the hydro sector and inefficiencies within NEA has been the two biggest hurdles so far. Unless, new investment are encouraged to enter in the, the outlook remains the same. Following are some of the ways to cope with the problem of electricity crisis in our country:  Harvesting solar power and using other alternative sources  Encouraging public- private partnership to address the resource deficiencies.  Political commitment  Infrastructure development such as proper road access and transmission line  Control electricity leakages and prevent transmission losses.