A Training on 3 M’s in
Lean Management
By
Pramod A
Dec 2015
Lean Management
• Lean Management of “Lean” is the optimal way of
managing a process through the removal of wastes and
Implementing a flow.
• More value with Less work
• Lean Manufacturing is mostly derived from Toyota
Production System (TPS) and identified as “Lean” only after
1990.
• Ultimate goal is the removal of all wastes in the Process.
Dec 2015
Toyota Production System
• Make what the customer needs, when it is needed, and
in right amount.
• Minimize Inventories.
• Full utilization of all Potentials.
• Building Quality in the process and Prevent errors from
happening.
• Reduction of through put time.
Dec 2015
Lean Production - TPS
The Main goals of TPS are to eliminate 3 M’s which are,
• Muri (Overburden or stress in the system)
• Mura (Inconsistency, Un-evenness)
• Muda (Waste)
Ultimate Goal is to design a process that runs smoothly, without stress
and eliminates wastes.
Dec 2015
3 M’s
Dec 2015
Muda
What is Muda?...
• Work that does not add any value to the product
or the activities which the customer is not
paying for.
Dec 2015
Economic Value of Muda
• Every Business activities
absorb resources and
each resource has a cost.
• Every waste has a cost
and that is a direct loss to
the company.
• Economic value of the
waste in a process
industry are in the range
of 10% - 35% of annual
turnover
Dec 2015
Types of Muda
7 Types of Muda
Dec 2015
Muda of Motion
Movement that does not add value.
• Searching of Files
• Gathering Information
• Looking through manuals and
catalogs
• Handling Paperwork
“The Movement of People Within the Workspace”
Dec 2015
Muda of Waiting
Waiting constricts smooth flow. it interrupts
the work rhythm
• Job waiting to be loaded into a machine
• Products waiting for inspection
• Waiting for raw materials and parts
• Customer Response
Dec 2015
Muda of Transport
• Transportation adds time to the process
without increasing value, and creates an
opportunity for damage to occur.
• Poor plant layout leads to transportation
wastes, and waste can be removed by
achieving the shortest distance in a
straight line.
"The Unnecessary Movement of Materials"
Some results of unnecessary transportation:
• cost
• damage
• time lost
• spillage
• wasted investment in logistic equipment
Dec 2015
Muda of Over Production
"Producing More than Required Amount"
Overproduction arises from
fear or concerns of stock outs
or a misunderstanding of
demand
• A process that continues
when its output is not
required causes excess
inventory. Over-production
is generally regarded as the
worst type of waste, it leads
to all the other wastes.
• “Produce the right amount
at the right time.”
Dec 2015
Muda of Inventory
Get rid of 'just in case inventory'; it ties
up cash and requires additional storage
facilities. Excess storage can cause
stock damage, and materials can
degrade in store.
• Old stock items that aren’t currently
used in production.
• Needs space.
• Costs money.
• Requires finding.
• Needs intermediate storage and
people to move them.
• can hide problems
"Stock that is Not Required for Customer Orders"
Dec 2015
Muda of Over Processing
"Doing More than needed to Meet the Customer Requirement"
Efforts that create no value from
Customers view point
• Completing two or three
inspections,
• Measuring components more than
once
• Use of Outdated standard forms
Dec 2015
Muda of Defects
Producing parts, products, or services that are
defective results in scrap and rework; it also
wastes supplies and leads to customer
dissatisfaction.
• Making items to the wrong specification
The production of defects or scrap results in:
• additional materials usage
• additional transportation
• additional control
• space for quarantined stores
• space for repairing
Reduce defects and scrap through:
• Search for and elimination of causes
• Build in Quality (QA process sheets)
"Doing Nice or Do It Twice"
Dec 2015
Mura
Eliminating unevenness or irregularities in any
operation or process is one of the main principles of
the Just-In-Time system, the main pillar of the
Toyota Production System.
• Mura is the waste of unevenness or inconsistency.
Dec 2015
Muri
Muri is the Over Burden on equipment, Facilities
& People caused by Muda and Muda.
• Pushing a machine or person beyond its limits.
Dec 2015
Muri
Results
• Overburdening peoples results in safety and
quality problems.
• Overburdening machines causes breakdown
and defects.
Dec 2015
Lean Solutions
• First you must see it – MAKE IT VISIBLE!
Dec 2015
Lean Solutions - Value Stream Mapping
You can See and Identify Waste as you connect
your processes from start to finish
Dec 2015
Lean Solutions
• Problem Solve
Plan Do
CheckAct
Dec 2015
Lean Solutions
• Keep watching

Contenu connexe

Tendances

Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
manijayjay
 
Muda,muri,mura
Muda,muri,muraMuda,muri,mura
Muda,muri,mura
skolery
 

Tendances (20)

Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Muda,muri,mura
Muda,muri,muraMuda,muri,mura
Muda,muri,mura
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Kaizen training
Kaizen trainingKaizen training
Kaizen training
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
3mu
3mu3mu
3mu
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Lean basics
Lean basicsLean basics
Lean basics
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 

En vedette

Toyota kata – habits for continuous improvements MIX IT 2014-04-29
Toyota kata – habits for continuous improvements MIX IT 2014-04-29Toyota kata – habits for continuous improvements MIX IT 2014-04-29
Toyota kata – habits for continuous improvements MIX IT 2014-04-29
Håkan Forss
 

En vedette (20)

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Deming4[1]
Deming4[1]Deming4[1]
Deming4[1]
 
Tqm
TqmTqm
Tqm
 
Lean Management Review at Volunteer Mauritius
Lean Management Review at Volunteer MauritiusLean Management Review at Volunteer Mauritius
Lean Management Review at Volunteer Mauritius
 
Lean Management System
Lean Management SystemLean Management System
Lean Management System
 
Kaizen eyes
Kaizen eyesKaizen eyes
Kaizen eyes
 
Lean Management Kata Training
Lean Management Kata Training Lean Management Kata Training
Lean Management Kata Training
 
Becoming an Agile Coach
Becoming an Agile CoachBecoming an Agile Coach
Becoming an Agile Coach
 
Smiling Lean Office Introduction (Eng Version)
Smiling Lean Office Introduction (Eng Version)Smiling Lean Office Introduction (Eng Version)
Smiling Lean Office Introduction (Eng Version)
 
Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping ppt
 
5 Games for Effective Agile Coaching
5 Games for Effective Agile Coaching5 Games for Effective Agile Coaching
5 Games for Effective Agile Coaching
 
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh ChandrasekaranMuri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
 
3 MU
3 MU3 MU
3 MU
 
Toyota kata – habits for continuous improvements MIX IT 2014-04-29
Toyota kata – habits for continuous improvements MIX IT 2014-04-29Toyota kata – habits for continuous improvements MIX IT 2014-04-29
Toyota kata – habits for continuous improvements MIX IT 2014-04-29
 
New Lean-Agile Coach self-assessment radars v3.2
New Lean-Agile Coach self-assessment radars v3.2New Lean-Agile Coach self-assessment radars v3.2
New Lean-Agile Coach self-assessment radars v3.2
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 

Similaire à A training on 3 m’s in lean management

Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
Romains Bos, PMP, MBA
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
Blankdevil
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
SabaKhalid48
 

Similaire à A training on 3 m’s in lean management (20)

elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
Waste management
Waste managementWaste management
Waste management
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 
Lean Fundamentals Course Preview
Lean Fundamentals Course PreviewLean Fundamentals Course Preview
Lean Fundamentals Course Preview
 
Introduction to lean thinking
Introduction to lean thinkingIntroduction to lean thinking
Introduction to lean thinking
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing 101
Lean Manufacturing 101Lean Manufacturing 101
Lean Manufacturing 101
 
Just in time
Just in timeJust in time
Just in time
 
Understanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdfUnderstanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdf
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
 
EngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxEngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptx
 
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptxSAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigma
 
Kaizen
KaizenKaizen
Kaizen
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 

Dernier

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

A training on 3 m’s in lean management

  • 1. A Training on 3 M’s in Lean Management By Pramod A
  • 2. Dec 2015 Lean Management • Lean Management of “Lean” is the optimal way of managing a process through the removal of wastes and Implementing a flow. • More value with Less work • Lean Manufacturing is mostly derived from Toyota Production System (TPS) and identified as “Lean” only after 1990. • Ultimate goal is the removal of all wastes in the Process.
  • 3. Dec 2015 Toyota Production System • Make what the customer needs, when it is needed, and in right amount. • Minimize Inventories. • Full utilization of all Potentials. • Building Quality in the process and Prevent errors from happening. • Reduction of through put time.
  • 4. Dec 2015 Lean Production - TPS The Main goals of TPS are to eliminate 3 M’s which are, • Muri (Overburden or stress in the system) • Mura (Inconsistency, Un-evenness) • Muda (Waste) Ultimate Goal is to design a process that runs smoothly, without stress and eliminates wastes.
  • 6. Dec 2015 Muda What is Muda?... • Work that does not add any value to the product or the activities which the customer is not paying for.
  • 7. Dec 2015 Economic Value of Muda • Every Business activities absorb resources and each resource has a cost. • Every waste has a cost and that is a direct loss to the company. • Economic value of the waste in a process industry are in the range of 10% - 35% of annual turnover
  • 8. Dec 2015 Types of Muda 7 Types of Muda
  • 9. Dec 2015 Muda of Motion Movement that does not add value. • Searching of Files • Gathering Information • Looking through manuals and catalogs • Handling Paperwork “The Movement of People Within the Workspace”
  • 10. Dec 2015 Muda of Waiting Waiting constricts smooth flow. it interrupts the work rhythm • Job waiting to be loaded into a machine • Products waiting for inspection • Waiting for raw materials and parts • Customer Response
  • 11. Dec 2015 Muda of Transport • Transportation adds time to the process without increasing value, and creates an opportunity for damage to occur. • Poor plant layout leads to transportation wastes, and waste can be removed by achieving the shortest distance in a straight line. "The Unnecessary Movement of Materials" Some results of unnecessary transportation: • cost • damage • time lost • spillage • wasted investment in logistic equipment
  • 12. Dec 2015 Muda of Over Production "Producing More than Required Amount" Overproduction arises from fear or concerns of stock outs or a misunderstanding of demand • A process that continues when its output is not required causes excess inventory. Over-production is generally regarded as the worst type of waste, it leads to all the other wastes. • “Produce the right amount at the right time.”
  • 13. Dec 2015 Muda of Inventory Get rid of 'just in case inventory'; it ties up cash and requires additional storage facilities. Excess storage can cause stock damage, and materials can degrade in store. • Old stock items that aren’t currently used in production. • Needs space. • Costs money. • Requires finding. • Needs intermediate storage and people to move them. • can hide problems "Stock that is Not Required for Customer Orders"
  • 14. Dec 2015 Muda of Over Processing "Doing More than needed to Meet the Customer Requirement" Efforts that create no value from Customers view point • Completing two or three inspections, • Measuring components more than once • Use of Outdated standard forms
  • 15. Dec 2015 Muda of Defects Producing parts, products, or services that are defective results in scrap and rework; it also wastes supplies and leads to customer dissatisfaction. • Making items to the wrong specification The production of defects or scrap results in: • additional materials usage • additional transportation • additional control • space for quarantined stores • space for repairing Reduce defects and scrap through: • Search for and elimination of causes • Build in Quality (QA process sheets) "Doing Nice or Do It Twice"
  • 16. Dec 2015 Mura Eliminating unevenness or irregularities in any operation or process is one of the main principles of the Just-In-Time system, the main pillar of the Toyota Production System. • Mura is the waste of unevenness or inconsistency.
  • 17. Dec 2015 Muri Muri is the Over Burden on equipment, Facilities & People caused by Muda and Muda. • Pushing a machine or person beyond its limits.
  • 18. Dec 2015 Muri Results • Overburdening peoples results in safety and quality problems. • Overburdening machines causes breakdown and defects.
  • 19. Dec 2015 Lean Solutions • First you must see it – MAKE IT VISIBLE!
  • 20. Dec 2015 Lean Solutions - Value Stream Mapping You can See and Identify Waste as you connect your processes from start to finish
  • 21. Dec 2015 Lean Solutions • Problem Solve Plan Do CheckAct