Disaster Management Plan for
Thermal Power Plants
By : H.M. Gangopadhyay
Dy. General Manager (Safety)
Corporate Safety Department
NTPC Limited
Presentation Outline
 Classification of Disaster
 Requirement under the Laws
 Objective of the Plan
 Disasters in Thermal Power Plants
 Risk Assessment & Vulnerability Mapping
 Emergency Equipments, Training & Mock Drills
 Disaster Management Organisation
 Responsibilities of Team Members
 Emergency Control Centre (ECC)
 Evacuation and Assembly Points
 Mutual Aid Scheme
• Natural disasters (earth quake, flood, Tsunami
etc.,)
• Technical disasters – collapse of buildings, release
of gases, major fires, explosions.
 A disaster occurring in the plant may affect/cause
 several sections within it
 serious injuries / loss of lives,
 Extensive damage to property
 Serious disruption out side the works area
 It requires the best use of internal resources as well as
outside resources to handle it effectively.
Classification of Disaster
 ON-SITE EMERGENCY : An accident which takes place
in an industry handling hazardous materials and its
effects are confined to the factory premises involving
only the people working in the factory.
 OFF-SITE EMERGENCY: If an accident takes place
in an industry handling hazardous materials and its
effects are felt outside the factory premises, the situation
thus generated is called an Off-Site Emergency
Factories Act Requirement
In accordance with the provision of Section 2 (cb), read
with The Factories Act - 1948, “power generating
industry” is classified as hazardous process under item
5 thereof.
According to Section 41-b, para –4, of Factories Act- 1948,
all factories engaged in hazardous processes must have
Disaster Management Plan.
Every occupier shall, with the approval of the Chief
Inspector, draw up an on site emergency plan and detailed
disaster control measures for his factory and make known
to the workers employed there in and to the general public
living in the vicinity of factory, the safety measures required
to be taken in the event of an accident taking place.
Section 41-b, Para -4 of Factories Act-1948
Approach and Objective of the Plan
The plan is developed to make best possible use of
resources at its command and / or out side agencies
for the following purposes.89
 Prevention, Mitigation & Preparedness (Pre phase)
 Response, Rehabilitation & Recovery (Post phase)
 Safe guard others by evacuating them to safer places;
 Rescue of victims and treating them suitably to effect
speedy recovery at hospital;
 Identify the personnel affected / dead;
 Inform relatives of those deceased / affected;
 Providing relevant records / data needed as evidence
for subsequent enquiry;
 Rehabilitation of the affected persons;
Possible Disasters in Thermal Power Plants
 Fast spreading fires
 Explosions
 Bursting of pipe lines / vessels
 Uncontrolled release of toxic / corrosive / flammable
liquids
 Slow isolated fires
 Breach of dams / ash dykes
 Floods
Fire Hazards In Thermal Power Plants
 Coal handling plant:
 Coal dust accumulation on
 conveyor decks,
 cable trays,
 head & tail pulleys,
 Crusher house and vibrating screen floors,
 Bunker house ,
 Belt sway, belt tension,
 Failure of belt joints,
 Snapping of belts,
 Partially damaged belt in operation,
 Smoldering fire in bunkers,
 Jamming of idlers and pulleys,
Fire Hazards In Thermal Power Plants
 Cables in cable galleries and on trays in all plant
sections,
 Coal dust deposited on cable trays in mill area
 Fuel oil handling and oil tanks (HSD, HFO, Petrol )
 Transformer oil, turbine oil, control fluid, seal oil,
 Electrical system
 Heat path damaged insulation
 Dry grasses
 Accumulation of waste materials etc.
Explosion Hazard In Thermal Power Plant
 Hydrogen plant
 Turbo generators where hydrogen is used for cooling of
TG.
 Transformer (oil cooled).
 Boiler (Coal/Oil fired).
 Coal dust in Mills and Boilers.
Bursting of Pipe Lines, Vessels
 Water / Steam pipes due to high pressure/
temperature
 H2 Gas lines and Acid lines.
 Acid/Alkali tanks
 H2 Gas Cylinders
 Compressed air header.
 Compressed air receivers.
 H2 Gas Holder.
Release of Gases / Dust
 Chlorine in water treatment plant
 Hydrogen in turbo generator area of main plant
 Pulverized coal dust from mills and associated piping
 Fly ash from chimneys and ash ponds, ESP hoppers and
bottom ash system
 Coal dust in transfer points, CHP, Crusher & mill area.
 Flue gas from the ducts
Release Of Liquid
 Acid and alkali tanks in water treatment plants
 Chlorine toners in WTPs
 Fuel oil tanks in fuel oil handling section
 Ash dyke
 Turbine oil and seal oil leakage
Floods
 Breach of balancing reservoir.
 Breach of ash dykes
Sections prone to Emergencies
 Coal handling plant
 Main plant, including Boiler, TG, ESP
 Water treatment plant, use of Chlorine gas
 Hydrogen generation plant
 Fuel Oil Handling areas
Common elements of a model
Disaster Management Plan
Components of Disaster Management Plan
 Plant emergency organization
 Plant & area risk evaluation
 Notification procedures & communication systems
 Emergency equipments and facilities available
 Procedure for returning to normal operations
 Training and mock-drills for specialized services
 Regular tests of emergency organization and procedures
 Review of Plan and updates
 Emergency response procedures
 Detailed operating manual
Risk Assesment & Vulnerability Mapping
Consists of the following components:
 Maximum quantitative and qualitative assessment of
hazards at any given point of time
 Location of hazardous operations and systems
 Properties of hazardous systems (MSDS)
 Location of isolation systems
 Special fire-fighting procedures
 Special handling requirements.
Communication systems
 Alarm systems
 Communication equipments
 Plant management, Local Officials, Response Agencies,
Neighbouring industries, Neighbourhood population
 Names and telephone numbers of the designated officials
and their alternates
 Designated persons for media contacts
 Procedures for notifying families of injured employees
 Central reporting office (ECC).
Emergency equipments & facilities
 Fire-fighting equipment
 Emergency medical supplies
 Toxic gas detectors
 Wind direction (wind sock)/speed indicators
 Self-contained breathing apparatus
 Protective clothings
 Other on-site equipments according to the local conditions
 Containment facilities around tanks/vessels
 Interfaces & lines of communication with off-site officials,
neighbouring industries.
Training, Simulation & Mock Drills
 Knowledge of chemicals (properties, toxicity, etc.)
and procedures for reporting emergencies
 Alarm systems and communication network
 Location of fire-fighting/first-aid equipment
 Use of fire-fighting/first-aid equipment
 Use of protective equipment(respirators, breathing
apparatus, clothing, etc.)
 Decontamination procedure for protective clothing and
equipment; demolition and repair
 Evaluation procedures and rescue services
 Records of documented simulated emergencies which
should be conducted frequently.
 Training and drills for specialized services
 Regular tests of emergency organization and
procedures
 Plan updates
 Emergency response procedures
 Detailed operating manual
Training, Simulation & Mock Drills
Work Incident
Controller
Chief Incident
Controller
Task Force
Team
HR Team
Matls Mgmt.
Team
Rescue Team
Medical team
Autobase
Team Security Team
Support Team
Communication
team
Maint
Team
Support
Team
Disaster Management Organisation
Responsibilities of WIC
The WIC shall identify;
 All probable emergency causing situations and take
proper precautionary measures to prevent / control such
situations;
 Ensure that all emergency team under him are informed
about their functions before and during emergency;
 Direct all operations within the affected area with the
following priority;
 Secure the safety of personnel
 Minimise damage to plant & environment
 Minimise loss of material
Responsibilities of WIC
 Ensure that all non-essential workers in the affected areas
are evacuated to appropriate assembly point.
 Set up communication contact through telephone /
messenger etc. With emergency control centre (ECC).
 Report significant developments to the chief incident
controller.
 Assume duties of chief incident controller pending his arrival
and in particular;
1. Direct the shut down and evacuation of plant and affected
areas likely to be threatened by the emergency.
2. Ensure key personnel are informed and they are called in
Responsibilities of CIC
 Relieve the works incidence controller from the
responsibility of over all main control.
 Declare major emergency, if considered necessary and
ensure out side emergency services are called in and near
by industries are informed.
 Directing shutting down and evacuation of plant, establish
liaison with head of fire, safety, medical, HR, security and
local police.
 Arrange for relief of personnel and catering facilities for
affected in emergency.
 Ensure information / reporting to Corporate Office and
Statutory authorities as per provisions of state Factory rules
and Factory Act
Emergency Control Centre (ECC)
 Emergency control centre shall be established and
equipped with adequate means of communication to
areas inside and outside.
 The emergency control room will be manned by the Chief
Incident Controller, Work Incident Controller, key
personnel and Sr.Officers of out side services called for
assistance.
 It should have general map and guide for Assembly
Points, location of Hazardous process/operation
 No other personnel shall have access to the ECC.
Emergency Control Centre (ECC)
ECC must contain the following information:
 Safety data pertaining to all hazardous materials likely to
cause emergency.
 Procedure of major and special fire fighting, rescue
operations, first aid etc.
 Emergency call out list of persons drafted for emergency
control eg key personnel from fire, safety, medical, HR,
security, local police and District Admn. Authorities.
Evacuation And Assembly Points
 In an emergency, it will almost certainly be necessary to
evacuate personnel from affected areas.
 On evacuation, employees shall assemble at assembly
points.
 Assembly point must be shown in Disaster Management
Plan.
Key Personnel
 Apart from WIC and CIC, other works personnel will have
key role to play in providing advice and in implementing
the decisions made by CIC.
 Key personnel includes
1. Incharge of generation, electrical & mechanical
maintenance, C&I, Chemistry (& WTP)
2. Heads of HR, safety, PR, Medical, Security & Fire
Department.
Mutual Aid Scheme
 An understanding for mutual aid between nearby
industries to send assistance to each other in case of an
emergency;
 Details of facilities offered by the mutual aid partners
should be mentioned in the plan;
 Details of contact phone nos. of officers responsible for
emergency action of mutual aid partners should be
mentioned in the plan
Support team to CIC & WIC
 In addition to the teams already mentioned there will be
one additional team known as support team.
 This team will assist CIC & WIC during an emergency.
The responsibilities of the team given below;
 Contacting statutory authorities.
 Arranging for relievers and catering facilities.
 Giving information to media.
Responsibilities Of Support Team
 Arranging shelters for affected persons.
 Contacting medical centres and nursing homes.
 Providing all other support, as necessary.
 Arranging for urgently required materials through cash
purchase or whatever means.
 Arranging funds for various relief measures as
emergency purchase of materials.
 Departmental heads:
 The departmental heads will provide assistance as required
by the works incident controller. They will decide which
members of their departments are required at the incident
site.
 Head of Tech. Services
 On knowing the major emergency, he will proceed to the
site and report to CIC.
 He will provide technical information as required to
CIC/WIC.
 Head of Safety:
 On knowing the emergency, he will immediately report to
site and keep in touch with CIC
 He will make sure that all safety equipments are made
available to the emergency teams.
 Participate in rescue operations.
 Maintain inventory of items in ECC.
Responsibilities of key personnel
Mock Drill
 Mock-drills are conducted to test the effectiveness of
action plan / emergency preparedness.
 Periodicity of mock drill is at least once in every six
months (As per Factories Act-1948).
 Deficiencies found are to be recorded and corrective
actions are to be taken immediately for effectiveness of
the plan.
Emergency Siren
-------------------------------------------------------------------------------------------
T y p e Duration
-------------------------------------------------------------------------------------------
 In case of fire 10 seconds on
05 seconds off,
3 times
 In case of 20 seconds on,
Heavy chlorine leak 10 seconds off,
5 times.
 All clear signal Continuous
siren for 3 min,
only once.
---------------------------------------------------------------------------------
Thank you
Let us develop a positive safety culture
involving all our employees & associates

Contenu connexe

Tendances

Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxImtiazHussain312057
 
Emergency response
Emergency responseEmergency response
Emergency responseTeh Beng
 
Anatomy of a process isolation
Anatomy of a process isolationAnatomy of a process isolation
Anatomy of a process isolationMichael Ford
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Opito bosiet safety induction
Opito bosiet safety inductionOpito bosiet safety induction
Opito bosiet safety inductionTejpal Barnela
 
ملصقات السلامة (2).pdf
ملصقات السلامة (2).pdfملصقات السلامة (2).pdf
ملصقات السلامة (2).pdfyousrazeidan1
 
Hazop Hazard and Operability Study
Hazop Hazard and Operability StudyHazop Hazard and Operability Study
Hazop Hazard and Operability StudyAnand kumar
 
Introdution to Accident Investigation Training by ToolBox Topics
Introdution to Accident Investigation Training by ToolBox TopicsIntrodution to Accident Investigation Training by ToolBox Topics
Introdution to Accident Investigation Training by ToolBox TopicsAtlantic Training, LLC.
 
السلامة من الحريق
السلامة من الحريقالسلامة من الحريق
السلامة من الحريقAlbandry al
 
SCBA - self contained breathing apparatus
SCBA - self contained breathing apparatusSCBA - self contained breathing apparatus
SCBA - self contained breathing apparatusMike Leal
 
The Effectiveness of the Hazard and Operability Study Methodology in Process ...
The Effectiveness of the Hazard and Operability Study Methodology in Process ...The Effectiveness of the Hazard and Operability Study Methodology in Process ...
The Effectiveness of the Hazard and Operability Study Methodology in Process ...PECB
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templatesDwarika Bhushan Sharma
 
On site and offsite emergency plans on chemical
On site and offsite emergency plans on chemicalOn site and offsite emergency plans on chemical
On site and offsite emergency plans on chemicalShahrukh Vahora
 

Tendances (20)

Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptx
 
Emergency response
Emergency responseEmergency response
Emergency response
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Emergency Response Plan
Emergency Response PlanEmergency Response Plan
Emergency Response Plan
 
Emergency response planning
Emergency response planningEmergency response planning
Emergency response planning
 
Anatomy of a process isolation
Anatomy of a process isolationAnatomy of a process isolation
Anatomy of a process isolation
 
Confined space
Confined spaceConfined space
Confined space
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Opito bosiet safety induction
Opito bosiet safety inductionOpito bosiet safety induction
Opito bosiet safety induction
 
ملصقات السلامة (2).pdf
ملصقات السلامة (2).pdfملصقات السلامة (2).pdf
ملصقات السلامة (2).pdf
 
Hazop Hazard and Operability Study
Hazop Hazard and Operability StudyHazop Hazard and Operability Study
Hazop Hazard and Operability Study
 
Introdution to Accident Investigation Training by ToolBox Topics
Introdution to Accident Investigation Training by ToolBox TopicsIntrodution to Accident Investigation Training by ToolBox Topics
Introdution to Accident Investigation Training by ToolBox Topics
 
Master Your Emergency Response Mock Drills
Master Your Emergency Response Mock DrillsMaster Your Emergency Response Mock Drills
Master Your Emergency Response Mock Drills
 
H2S Safety Training by Total Safety Inc
H2S Safety Training by Total Safety IncH2S Safety Training by Total Safety Inc
H2S Safety Training by Total Safety Inc
 
HSE Weather working plan
HSE Weather working planHSE Weather working plan
HSE Weather working plan
 
السلامة من الحريق
السلامة من الحريقالسلامة من الحريق
السلامة من الحريق
 
SCBA - self contained breathing apparatus
SCBA - self contained breathing apparatusSCBA - self contained breathing apparatus
SCBA - self contained breathing apparatus
 
The Effectiveness of the Hazard and Operability Study Methodology in Process ...
The Effectiveness of the Hazard and Operability Study Methodology in Process ...The Effectiveness of the Hazard and Operability Study Methodology in Process ...
The Effectiveness of the Hazard and Operability Study Methodology in Process ...
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
On site and offsite emergency plans on chemical
On site and offsite emergency plans on chemicalOn site and offsite emergency plans on chemical
On site and offsite emergency plans on chemical
 

En vedette

En vedette (10)

Fire Safety Guideline
Fire Safety GuidelineFire Safety Guideline
Fire Safety Guideline
 
DOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUMDOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUM
 
Preethi from 6 Patience
Preethi from 6 PatiencePreethi from 6 Patience
Preethi from 6 Patience
 
Unit7 disaster mgmt plan
Unit7 disaster mgmt planUnit7 disaster mgmt plan
Unit7 disaster mgmt plan
 
DOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUMDOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUM
 
Safety And Health In Chemical Industries
Safety And Health In Chemical IndustriesSafety And Health In Chemical Industries
Safety And Health In Chemical Industries
 
Lupin Summer training
Lupin Summer trainingLupin Summer training
Lupin Summer training
 
Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

Similaire à Dmp tpp

Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Industrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdfIndustrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdfUVAS
 
Safety methods in pharmaceutical industry
Safety methods in pharmaceutical industrySafety methods in pharmaceutical industry
Safety methods in pharmaceutical industryImran Nur Manik
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentationernestvictor
 
Business Emergency Response Plans
Business Emergency Response PlansBusiness Emergency Response Plans
Business Emergency Response PlansWBDC of Florida
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureShaileshPal24
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxSnehaGhadigaonkar
 
Industrial hazards
Industrial hazardsIndustrial hazards
Industrial hazardsKiran Rodge
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jancapstonerx
 
Hazard identification and risk assessment
Hazard identification and risk assessmentHazard identification and risk assessment
Hazard identification and risk assessmentSeshadhiri Palraj
 
Compling with terminal process safety
Compling with terminal process safetyCompling with terminal process safety
Compling with terminal process safetyPreeju Anirudhan
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publishArijit Karmakar
 
Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)bharathbalji
 
Fire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdfFire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdfPremBaboo4
 
Bhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khanBhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khanguestda7ab4
 
Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...H. M. Touhidul Islam
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 

Similaire à Dmp tpp (20)

Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Industrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdfIndustrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdf
 
Safety methods in pharmaceutical industry
Safety methods in pharmaceutical industrySafety methods in pharmaceutical industry
Safety methods in pharmaceutical industry
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentation
 
Business Emergency Response Plans
Business Emergency Response PlansBusiness Emergency Response Plans
Business Emergency Response Plans
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
 
Industrial hazards
Industrial hazardsIndustrial hazards
Industrial hazards
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
 
Hazard identification and risk assessment
Hazard identification and risk assessmentHazard identification and risk assessment
Hazard identification and risk assessment
 
Compling with terminal process safety
Compling with terminal process safetyCompling with terminal process safety
Compling with terminal process safety
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
 
Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)
 
Fire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdfFire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdf
 
Bhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khanBhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khan
 
Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...
 
Reduction of false alarms
Reduction of false alarmsReduction of false alarms
Reduction of false alarms
 
Fire and explosion hazards
Fire and explosion hazardsFire and explosion hazards
Fire and explosion hazards
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 

Dernier

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Dernier (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Dmp tpp

  • 1. Disaster Management Plan for Thermal Power Plants By : H.M. Gangopadhyay Dy. General Manager (Safety) Corporate Safety Department NTPC Limited
  • 2. Presentation Outline  Classification of Disaster  Requirement under the Laws  Objective of the Plan  Disasters in Thermal Power Plants  Risk Assessment & Vulnerability Mapping  Emergency Equipments, Training & Mock Drills  Disaster Management Organisation  Responsibilities of Team Members  Emergency Control Centre (ECC)  Evacuation and Assembly Points  Mutual Aid Scheme
  • 3. • Natural disasters (earth quake, flood, Tsunami etc.,) • Technical disasters – collapse of buildings, release of gases, major fires, explosions.
  • 4.  A disaster occurring in the plant may affect/cause  several sections within it  serious injuries / loss of lives,  Extensive damage to property  Serious disruption out side the works area  It requires the best use of internal resources as well as outside resources to handle it effectively. Classification of Disaster
  • 5.  ON-SITE EMERGENCY : An accident which takes place in an industry handling hazardous materials and its effects are confined to the factory premises involving only the people working in the factory.  OFF-SITE EMERGENCY: If an accident takes place in an industry handling hazardous materials and its effects are felt outside the factory premises, the situation thus generated is called an Off-Site Emergency
  • 6. Factories Act Requirement In accordance with the provision of Section 2 (cb), read with The Factories Act - 1948, “power generating industry” is classified as hazardous process under item 5 thereof. According to Section 41-b, para –4, of Factories Act- 1948, all factories engaged in hazardous processes must have Disaster Management Plan.
  • 7. Every occupier shall, with the approval of the Chief Inspector, draw up an on site emergency plan and detailed disaster control measures for his factory and make known to the workers employed there in and to the general public living in the vicinity of factory, the safety measures required to be taken in the event of an accident taking place. Section 41-b, Para -4 of Factories Act-1948
  • 8. Approach and Objective of the Plan The plan is developed to make best possible use of resources at its command and / or out side agencies for the following purposes.89  Prevention, Mitigation & Preparedness (Pre phase)  Response, Rehabilitation & Recovery (Post phase)  Safe guard others by evacuating them to safer places;  Rescue of victims and treating them suitably to effect speedy recovery at hospital;  Identify the personnel affected / dead;  Inform relatives of those deceased / affected;  Providing relevant records / data needed as evidence for subsequent enquiry;  Rehabilitation of the affected persons;
  • 9. Possible Disasters in Thermal Power Plants  Fast spreading fires  Explosions  Bursting of pipe lines / vessels  Uncontrolled release of toxic / corrosive / flammable liquids  Slow isolated fires  Breach of dams / ash dykes  Floods
  • 10. Fire Hazards In Thermal Power Plants  Coal handling plant:  Coal dust accumulation on  conveyor decks,  cable trays,  head & tail pulleys,  Crusher house and vibrating screen floors,  Bunker house ,  Belt sway, belt tension,  Failure of belt joints,  Snapping of belts,  Partially damaged belt in operation,  Smoldering fire in bunkers,  Jamming of idlers and pulleys,
  • 11. Fire Hazards In Thermal Power Plants  Cables in cable galleries and on trays in all plant sections,  Coal dust deposited on cable trays in mill area  Fuel oil handling and oil tanks (HSD, HFO, Petrol )  Transformer oil, turbine oil, control fluid, seal oil,  Electrical system  Heat path damaged insulation  Dry grasses  Accumulation of waste materials etc.
  • 12. Explosion Hazard In Thermal Power Plant  Hydrogen plant  Turbo generators where hydrogen is used for cooling of TG.  Transformer (oil cooled).  Boiler (Coal/Oil fired).  Coal dust in Mills and Boilers.
  • 13. Bursting of Pipe Lines, Vessels  Water / Steam pipes due to high pressure/ temperature  H2 Gas lines and Acid lines.  Acid/Alkali tanks  H2 Gas Cylinders  Compressed air header.  Compressed air receivers.  H2 Gas Holder.
  • 14. Release of Gases / Dust  Chlorine in water treatment plant  Hydrogen in turbo generator area of main plant  Pulverized coal dust from mills and associated piping  Fly ash from chimneys and ash ponds, ESP hoppers and bottom ash system  Coal dust in transfer points, CHP, Crusher & mill area.  Flue gas from the ducts
  • 15. Release Of Liquid  Acid and alkali tanks in water treatment plants  Chlorine toners in WTPs  Fuel oil tanks in fuel oil handling section  Ash dyke  Turbine oil and seal oil leakage
  • 16. Floods  Breach of balancing reservoir.  Breach of ash dykes
  • 17. Sections prone to Emergencies  Coal handling plant  Main plant, including Boiler, TG, ESP  Water treatment plant, use of Chlorine gas  Hydrogen generation plant  Fuel Oil Handling areas
  • 18. Common elements of a model Disaster Management Plan
  • 19. Components of Disaster Management Plan  Plant emergency organization  Plant & area risk evaluation  Notification procedures & communication systems  Emergency equipments and facilities available  Procedure for returning to normal operations  Training and mock-drills for specialized services  Regular tests of emergency organization and procedures  Review of Plan and updates  Emergency response procedures  Detailed operating manual
  • 20. Risk Assesment & Vulnerability Mapping Consists of the following components:  Maximum quantitative and qualitative assessment of hazards at any given point of time  Location of hazardous operations and systems  Properties of hazardous systems (MSDS)  Location of isolation systems  Special fire-fighting procedures  Special handling requirements.
  • 21. Communication systems  Alarm systems  Communication equipments  Plant management, Local Officials, Response Agencies, Neighbouring industries, Neighbourhood population  Names and telephone numbers of the designated officials and their alternates  Designated persons for media contacts  Procedures for notifying families of injured employees  Central reporting office (ECC).
  • 22. Emergency equipments & facilities  Fire-fighting equipment  Emergency medical supplies  Toxic gas detectors  Wind direction (wind sock)/speed indicators  Self-contained breathing apparatus  Protective clothings  Other on-site equipments according to the local conditions  Containment facilities around tanks/vessels  Interfaces & lines of communication with off-site officials, neighbouring industries.
  • 23. Training, Simulation & Mock Drills  Knowledge of chemicals (properties, toxicity, etc.) and procedures for reporting emergencies  Alarm systems and communication network  Location of fire-fighting/first-aid equipment  Use of fire-fighting/first-aid equipment  Use of protective equipment(respirators, breathing apparatus, clothing, etc.)  Decontamination procedure for protective clothing and equipment; demolition and repair  Evaluation procedures and rescue services  Records of documented simulated emergencies which should be conducted frequently.
  • 24.  Training and drills for specialized services  Regular tests of emergency organization and procedures  Plan updates  Emergency response procedures  Detailed operating manual Training, Simulation & Mock Drills
  • 25. Work Incident Controller Chief Incident Controller Task Force Team HR Team Matls Mgmt. Team Rescue Team Medical team Autobase Team Security Team Support Team Communication team Maint Team Support Team Disaster Management Organisation
  • 26. Responsibilities of WIC The WIC shall identify;  All probable emergency causing situations and take proper precautionary measures to prevent / control such situations;  Ensure that all emergency team under him are informed about their functions before and during emergency;  Direct all operations within the affected area with the following priority;  Secure the safety of personnel  Minimise damage to plant & environment  Minimise loss of material
  • 27. Responsibilities of WIC  Ensure that all non-essential workers in the affected areas are evacuated to appropriate assembly point.  Set up communication contact through telephone / messenger etc. With emergency control centre (ECC).  Report significant developments to the chief incident controller.  Assume duties of chief incident controller pending his arrival and in particular; 1. Direct the shut down and evacuation of plant and affected areas likely to be threatened by the emergency. 2. Ensure key personnel are informed and they are called in
  • 28. Responsibilities of CIC  Relieve the works incidence controller from the responsibility of over all main control.  Declare major emergency, if considered necessary and ensure out side emergency services are called in and near by industries are informed.  Directing shutting down and evacuation of plant, establish liaison with head of fire, safety, medical, HR, security and local police.  Arrange for relief of personnel and catering facilities for affected in emergency.  Ensure information / reporting to Corporate Office and Statutory authorities as per provisions of state Factory rules and Factory Act
  • 29. Emergency Control Centre (ECC)  Emergency control centre shall be established and equipped with adequate means of communication to areas inside and outside.  The emergency control room will be manned by the Chief Incident Controller, Work Incident Controller, key personnel and Sr.Officers of out side services called for assistance.  It should have general map and guide for Assembly Points, location of Hazardous process/operation  No other personnel shall have access to the ECC.
  • 30. Emergency Control Centre (ECC) ECC must contain the following information:  Safety data pertaining to all hazardous materials likely to cause emergency.  Procedure of major and special fire fighting, rescue operations, first aid etc.  Emergency call out list of persons drafted for emergency control eg key personnel from fire, safety, medical, HR, security, local police and District Admn. Authorities.
  • 31. Evacuation And Assembly Points  In an emergency, it will almost certainly be necessary to evacuate personnel from affected areas.  On evacuation, employees shall assemble at assembly points.  Assembly point must be shown in Disaster Management Plan.
  • 32. Key Personnel  Apart from WIC and CIC, other works personnel will have key role to play in providing advice and in implementing the decisions made by CIC.  Key personnel includes 1. Incharge of generation, electrical & mechanical maintenance, C&I, Chemistry (& WTP) 2. Heads of HR, safety, PR, Medical, Security & Fire Department.
  • 33. Mutual Aid Scheme  An understanding for mutual aid between nearby industries to send assistance to each other in case of an emergency;  Details of facilities offered by the mutual aid partners should be mentioned in the plan;  Details of contact phone nos. of officers responsible for emergency action of mutual aid partners should be mentioned in the plan
  • 34. Support team to CIC & WIC  In addition to the teams already mentioned there will be one additional team known as support team.  This team will assist CIC & WIC during an emergency. The responsibilities of the team given below;  Contacting statutory authorities.  Arranging for relievers and catering facilities.  Giving information to media.
  • 35. Responsibilities Of Support Team  Arranging shelters for affected persons.  Contacting medical centres and nursing homes.  Providing all other support, as necessary.  Arranging for urgently required materials through cash purchase or whatever means.  Arranging funds for various relief measures as emergency purchase of materials.
  • 36.  Departmental heads:  The departmental heads will provide assistance as required by the works incident controller. They will decide which members of their departments are required at the incident site.  Head of Tech. Services  On knowing the major emergency, he will proceed to the site and report to CIC.  He will provide technical information as required to CIC/WIC.  Head of Safety:  On knowing the emergency, he will immediately report to site and keep in touch with CIC  He will make sure that all safety equipments are made available to the emergency teams.  Participate in rescue operations.  Maintain inventory of items in ECC. Responsibilities of key personnel
  • 37. Mock Drill  Mock-drills are conducted to test the effectiveness of action plan / emergency preparedness.  Periodicity of mock drill is at least once in every six months (As per Factories Act-1948).  Deficiencies found are to be recorded and corrective actions are to be taken immediately for effectiveness of the plan.
  • 38. Emergency Siren ------------------------------------------------------------------------------------------- T y p e Duration -------------------------------------------------------------------------------------------  In case of fire 10 seconds on 05 seconds off, 3 times  In case of 20 seconds on, Heavy chlorine leak 10 seconds off, 5 times.  All clear signal Continuous siren for 3 min, only once. ---------------------------------------------------------------------------------
  • 39. Thank you Let us develop a positive safety culture involving all our employees & associates