SlideShare une entreprise Scribd logo
1  sur  39
Corporate Presentation
June 2013
CAUTIONARY STATEMENT
Forward Looking Information
This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation
Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to the anticipated production and developments in our operations
in future periods, our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral resources, realization of mineral resource
estimates, costs and timing of development of the projects we currently intend to acquire (the “Projects”), costs and timing of future exploration, results of future exploration and
drilling, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of
directors and committees, and adequacy of financial resources. Wherever possible, words such as ‘‘plans’’, ‘‘expects’’ or ‘‘does not expect’’, ‘‘budget’’, ‘‘scheduled’’, ‘‘estimates’’,
‘‘forecasts’’, ‘‘anticipate’’ or ‘‘does not anticipate’’, ‘‘believe’’, ‘‘intend’’ and similar expressions or statements that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’,
‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, have been used to identify forward-looking information. Statements concerning mineral resource estimates may also be deemed
to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that
express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always,
using words or phrases such as ‘‘expects’’, ‘‘anticipates’’, ‘‘plans’’, ‘‘projects’’, ‘‘estimates’’, ‘‘assumes’’, ‘‘intends’’, ‘‘strategy’’, ‘‘goals’’, ‘‘objectives’’, ‘‘potential’’ or variations
thereof, or stating that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, or the negative of any of these terms and
similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown
risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information. Many of these risks
are listed and described in our final short-form prospectus dated March 19, 2012 (the “Prospectus”), which is available for review on SEDAR at www.sedar.com under our profile.
Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be
other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such information. Forward-looking information involves statements about the future and is inherently uncertain,
and our actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks,
uncertainties and other factors, including, without limitation, those referred to in the Prospectus under the heading ‘‘Risk Factors’’. Our forward-looking information is based on
the beliefs, expectations and opinions of management on the date the statements are made, and we do not assume any obligation to update forward-looking information, whether
as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue
reliance on forward-looking information.
National Instrument 43-101
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”)
“Technical Report and Updated Preliminary Economic Assessment of the Brucejack Project” dated February 20, 2012 “Mineral Resources Update Technical Report” dated April
3, 2012, “Mineral Resources Update Technical Report” dated September 18, 2012 and “Mineral Resources Update Technical Report” dated November 20, 2012. We have filed the
Reports under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of
Mr. Kenneth C. McNaughton, an independent “qualified person” under NI 43-101.
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by
Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do
not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political,
marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves.
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an
inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre
feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred
resource exists, or is economically or legally mineable.
Currency
Unless otherwise indicated, all dollar values herein are in Canadian $.
2
3
 Significant high-grade gold resource:
Valley of the Kings
8.5 M oz gold Indicated (16.1 Mt @ 16.4 g/t gold)
2.9 M oz gold Inferred (5.4 Mt @ 17.0 g/t gold)
 Located in British Columbia, Canada
 Underground feasibility study June 2013
 Commercial production target early 2016
An investment in Gold
Kirkland Lake Mine
(Kirkland Lake)
Kensington Mine
(Coeur)
Casa Berardi
(Aurizon)
El Penon Mine
(Yamana)
Red Lake Mine
(Goldcorp)
Pogo Mine
(Sumitomo)
Valley of the
Kings
F2 Deposit
(Rubicon)
Buritica
(Continental)
Cerro Negro
(Goldcorp)
Eleonore
(Goldcorp)
Cerro Moro
(Yamana)
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
M&I+InferredGoldGrade(g/t)
M&I + Inferred Gold Resources (mm oz)
HIGH-GRADE GOLD WITH SIZE
4November 2012 Valley of the Kings High-Grade Gold Mineral Resource based on a cut-off grade of 5.0 grams of gold-equivalent/tonne.
Data sources: Intierra Ltd., NRH.
Indicated Gold:
8.5 mm oz @ 16.4 g/t Au
Inferred Gold:
2.9 mm oz @ 17.0 g/t Au
5
BRUCEJACK PROJECT LOCATION
220km
Terrace
EXPLORATION AND OWNERSHIP HISTORY
1960-1980
1980-1985
1986-1989
1990
1993
1999-2000
2009
2010
2011-2012
2013
Exploration by
various
companies
West Zone discovery
and definition
by Newhawk
5.3 km
underground
development of
West Zone
West Zone
Feasibility Study
completed
Acquisition by
Silver Standard
Resources Inc.
Exploration resumes.
Discovery of Valley of
the Kings Zone
Acquisition by
Pretivm
Extensive exploration
program, high-grade
resource, exploration road
Mine Development
Certificate issued
Valley of the Kings
underground bulk sample and
feasibility study
6
BRUCEJACK GEOLOGY/DRILLING
7
Meters
500
Valley of the Kings
West Zone
8
MAIN MINERALIZED DOMAINS
West Zone
Underground
Development
Bulk
Sample
N
S
Domain 17 Domain 11
200 m
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained(3)
Gold
(mil oz)
Silver
(mil oz)
Indicated 16.1 16.4 14.2 8.5 7.3
Inferred(2)
5.4 17.0 15.7 2.9 2.7
Valley of the Kings Mineral Resource Estimate
– November 2012(1,4,5)
(Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne)
(1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic
viability. The estimate of Mineral Resources may be materially affected by environmental,
permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news
release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum
(CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines
prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM
Council.
(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in
nature and there has been insufficient exploration to define these Inferred Resources as an
Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in
upgrading them to an Indicated or Measured Mineral Resource category.
(3) Contained metal may differ due to rounding.
(4) The Mineral Resource estimate is defined using 5 m by 5 by 5 m blocks in the well drilled
portion of West Zone (5 m by 10 m drilling or better) and 10 m by 10 m by 10 m blocks in the
remainder of West Zone and in Valley of the Kings.
(5) The gold equivalent value is defined as AuEq=Au + Ag/53
VALLEY OF THE KINGS INDICATED RESOURCE
Northing
(± 25 m)
Ind.Gold*
(Oz.)
6258225 230,900
6258175 484,000
6258125 703,100
6258075 336,600
6258025 1,951,100
6257975 2,365,900
6257925 1,021,000
6257875 513,600
6257825 687,500
6257775 176,400
Total Ounces per 100 m Easting and 50 m Northing strips
Valley of the Kings
Indicated Mineral Resource:
8.5 Moz. Au @ 5.0 g/t AuEq.
(16.1 Mt @ 16.4 g/t Au)
*Nov. 2012 Indicated Mineral Resource;
≥5.0 g/t AuEq.
9
1,092,100 1,776,900 1,467,600 2,185,800 1,391,000 380,100 192,900 Ind. Au* (Oz.)
MINERAL RESOURCE CONTINUITY
10
Total Ounces* per 10 x 100 m N-S corridor – 6257800 N Long SectionLevel (m) Ind. Gold (Oz)*
1540-1570 116,300
1510-1540 499,700
1480-1510 734,800
1450-1480 510,400
1420-1450 365,450
1390-1420 566,700
1360-1390 631,700
1330-1360 364,800
1300-1330 527,400
1270-1300 992,000
1240-1270 998,200
1210-1240 521,950
1180-1210 213,050
1150-1180 246,800
1120-1150 294,600
1090-1120 393,900
1060-1090 317,600
W E
100 m
4,000-6,000
6,000-7,000
7,000-8,000
>10,000
Key (Oz. Au)
3,000-4,000
1,000-3,000
<1,000
8,000-10,000
Total Ounces per level
(Valley of Kings Zone)
*Nov. 2012 Indicated Mineral Resource;
≥5.0 g/t AuEq.
CONTINUITY: HIGH GRADE BLOCKS
11Indicated and Inferred blocks greater than 5 g/t AuEq
Valley of the Kings block model – 426550E section view East (50m wide)
CONTINUITY: HIGH GRADE BLOCKS
12Indicated and Inferred blocks greater than 5 g/t AuEq
Valley of the Kings block model – 426600E section view East (50m wide)
1313
100 m
CONTINUITY: HIGH GRADE BLOCKS
Valley of the Kings block model plan view - 1300m level (50m thick)
14
10,000-TONNE BULK SAMPLE (Q2/Q3)
N S
0.5-5.0 g/t AuEq
5.0-15.0 g/t AuEq
>15.0 g/t AuEq
Key
West Zone
Underground
Development
Valley of the
Kings Bulk
Sample
200 m
546 m
100 m 200 m 300 m
400 m
500 m
Completed 546-meter ramp from the West Zone to Valley of the Kings to extract bulk sample.
BULK SAMPLE: SECTION 426625
15
SN
BULK SAMPLE LOCATION
16
Vertical viewing window ±30 m
1345 m Level
5-10
10-20
20-60
>60
Key (g/t AuEq)
2.5-5
1-2.5
0.3-1
BULK SAMPLE LOCATION
17
5-10
10-20
20-60
>60
Key (g/t AuEq)
2.5-5
1-2.5
0.3-1
1345 m Level
Vertical viewing window ±8.5 m
Polylithic Conglomerate
Fragmental
Volcanic Rocks
Intensely
Silicified
Conglomerate
Hbl-phyric
Latite Flow
Siltstone, litharenite,
pebble conglomerate
BULK SAMPLE LOCATION
18
5-10
10-20
20-60
>60
Key (g/t AuEq)
Only Indicated blocks greater than 5 g/t AuEq shown
1345 m Level
Vertical viewing window ±8.5 m
Polylithic Conglomerate
Fragmental
Volcanic Rocks
Intensely
Silicified
Conglomerate
Hbl-phyric
Latite Flow
Siltstone, litharenite,
pebble conglomerate
BULK SAMPLE PROCESS(1)
19
Typical sample tower flowsheet
Source: Strathcona Mineral Services Limited, Meladine Project
 Process flowsheet summary:
 Crosscut rounds of 100 tonnes transported to
surface
 Crushing to ¾ inch, then to ½ inch
 Run through on-site sample tower
 120 kilograms in 4 samples are sent for testing
 Remainder (99.8 tonnes) shipped for processing
to produce gold
 Representivity testing:
 Representative of drillhole density that informs
the Indicated Mineral Resource
 Representative of average grade of Indicated
Resource and the global resource for Valley of
the Kings
 Representative of style of mineralization for the
rest of Valley of the Kings
(1) Strathcona Mineral Services Ltd is independent QP for Valley of the Kings bulk sample
UNDERGROUND DRILLING
20
SN
Typical Section – Fan Drilling
Detailed underground drilling at <15 meter centers to outline 700,000 ounces of gold.
N
VISIBLE GOLD STRINGERS IN STOCKWORK
21
2222
 Corridors of high-grade visible
gold seams within lower grade
(5g/t to 20g/t) gold quartz
stockwork
 Steeply dipping ore body
 Competent ground conditions
 Stope widths (15m wide X 30m
high) appropriate both for
transverse and longitudinal
layouts
 Cost effective
First 50 meters of Valley of the Kings ramp
Long hole stoping mining method:
MINING METHOD FOR STOCKWORK
PROPOSED MINE DEVELOPMENT
23
Oblique View of Mining Stopes, Valley of the Kings
S
N
100 m
West-Zone
(late mine life)Valley of the Kings
MINE AND MILL SITE LAYOUT
Crushing
Grinding
Gravity Concentrate Circuit
Doré (50%-60% of gold
production)
Flotation Concentrate Circuit
Off-take (40%-50% of
gold production)
Flowsheet Summary:
 Dore bars produced on site,
shipped to gold refinery
 Flotation concentrate (~300
tpd) shipped to Stewart
then sea transport
West Zone
Valley of the Kings
24
BRUCEJACK PROJECT ECONOMICS
25
(1) Source: Technical Report and Updated Preliminary Economic Assessment of
the Brucejack Project, effective date February 20, 2012
(2) Base case metals prices of US$1,100 /oz gold and US$21/oz silver
PEA is based on Mineral Resource estimates for the Valley of the Kings and
West Zone effective November 28, 2011 which are now out-of-date.
February 2012 Preliminary Economic
Assessment Results(1,2) :
Processing rate 1,500 tpd
Mine life 24 years
Total gold production 6.9 million oz
Average annual gold
production (Yrs 1-12)
325,000 ounces
Capex US$436.3 million
Total operating costs C$170.90/t milled
Internal Rate of
Return
29.8%
Net Present Value
(5% discount)
US$2.262 billion
 Processing rate increased
 2,700 tonnes per day
 Mill facilities streamlined
 Flotation concentrate to be sold to
3rd parties rather than refined on
site
 Capex and Opex savings, reduced
project footprint
 Metallurgy continues to be positive
 Feasibility metallurgical studies
confirm gold recoveries 98%, silver
recoveries 92%
Feasibility Study Refinements to PEA:
2013 BRUCEJACK PROJECT PLANS
26
H1 2013
 Completed access ramp to Valley of the Kings
 Underground sampling/drilling Valley of the
Kings
 Commence 10,000-tonne underground bulk
sample from Valley of the Kings
 Feasibility study completed
H2 2013
 Complete bulk sample report
 Process bulk sample
 File Environmental Assessment Certificate
Application
 Resource update
 Valley of the Kings drilling
BRUCEJACK PHOTOS
27
Recently-completed bridge Husky 8
Sample Tower assembly May 2013
COMMUNITY ENGAGEMENT
28
 Pretivm’s management team has been
cooperatively engaging with First Nations
and local community leaders in the
Stewart, BC region for over 10 years
 We work to ensure that our
communication about the progress of the
Brucejack Project is open and continuous
 Commercial relationships with local First
Nations developed during the exploration
phase at Brucejack have been mutually
successful
 We will continue to extend both
commercial contract and employment
opportunities to locals whenever possible
Stewart warehouse constructed by development
corporation of Skii km Lax Ha First Nation
BRUCEJACK PERMITTING
29
1986
1989
1993
1998
1999
2006
2011-2012
2013
2014
2015
2016
Reclamation
Permit
Mine Development
Certificate issued
April 15, 1993
Project Assessment
Certificate
Permitted for
exploration and
exploration road
Project Assessment
Certificate allowed to
expire
Approval in principle
for development of a
mine at West Zone
Reclamation
Completion
Project Description
under review for
underground mine at
Brucejack’s Valley of
the Kings
 Brucejack Lake is not fish habitat
 Waste rock from 1980’s/1990’s
underground development was deposited
in Brucejack Lake as part of 1999
reclamation
 More than 50% of tailings (targeting 60%) to
be used for paste backfill and deposited
underground, with remainder of tailings to
be deposited in bottom 30 meters of
Brucejack Lake
Anticipate
Environmental
Assessment Certificate
Construction,
commissioning
Commercial
production target
PRETIVM MANAGEMENT
30
Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc.
President & Chief Executive Officer,
Director
Peter de Visser, CA
Chief Financial Officer
Joseph Ovsenek, B.A. Sc., P.Eng., LLB
Vice President & Chief Development Officer,
Director
Ken McNaughton, M.A. Sc., P.Eng.
Vice President & Chief Exploration Officer
Ian I Chang, M.A. Sc., P.Eng.
Vice President, Project Development
Michelle Romero, B.A., M.L.S.
Director, Corporate Relations
Kevin Torpy, B.Sc.
Director, Mine Engineering
Warwick Board, Ph.D., P.Geo.
Chief Geologist
Max Holtby, B.Sc., P. Geo.
Director, Permitting
Andrew Saltis, I.Eng.
Site Project Manager, Mine Manager
SHAREHOLDING & ANALYST COVERAGE
31
Institutions,
53%
Retail, 23%
Management,
5%
Silver
Standard,
19%
Capital Structure(1)
Public Float 83.3
Silver Standard Shares 19.0
Total Issued & Outstanding Shares 102.3
Incentive Options 8.5
Total Fully Diluted Shares 110.8
Market Capitalization C$706 million
Working Capital (at March 31, 2013) C$22.5 million
Share Offering gross proceeds (at
April 26, 2013) (3)
C$40 million
(1) As of June 5, 2013; ownership calculated on an undiluted basis.
(2) As of June 5, 2013. Source: IPREO, SEDI
(3) See new release dated April 26, 2013
(shares in millions)
Top Shareholders(2)
(shares in millions)
Silver Standard Resources 18.986
Royce & Associates 10.689
Passport Capital 5.927
Liberty Metals & Mining 5.780
Robert Quartermain 2.853
TD Asset Management 2.153
Sun Valley Gold LLC 2.018
Sprott Asset Management 1.686
Connor Clark & Lunn 1.590
Carmignac Gestion 1.562
Analyst Coverage
BMO John Hayes
CIBC Jeff Killeen
Citibank Alex Hacking
Cormark Securities Richard Gray
Cowen Securities Adam Graf
Global Hunter Securities Jeff Wright
GMP Securities George Albino
RBC Dan Rollins
Salman Partners Ash Guglani
Scotiabank Ovais Habib
Very Independent Research John Tumazos
HIGH-GRADE GOLD PRODUCTION
32
MeadowBank
(Agnico Eagle)
Laronde
(Agnico Eagle)
Hycroft (Allied Nevada)
Kemess (Aurico)
Casa Berardi Mine
(Aurizon Mines)
Ruby Hill (Barrick)
Round Mountain
(Barrick/Kinross)
Turqouise Ridge
(Barrick/Newmont)
Red Lake
(Goldcorp)
Musselwhite
(Goldcorp)
Marigold Mine
(GoldCorp/Barrick)
Fort Knox (Kinross)
Kirkland Lake
(Kirkland Lake Gold)
Mesquite (NewGold)
Carlin (Newmont)
Canadian Malartic
(Osisko) Valley of the Kings
(Pretium)
Detour Lake Mine
(Detour Gold)
0
100
200
300
400
500
600
700
0 2 4 6 8 10 12 14 16 18
AnnualGoldProduction(Koz/year)
Grade (g/t)
Average gold production vs. grade for various North American
producing mines with >2Moz Au
Data sources: Companies, NRH.
Production target:
400k-500k oz/year
@ 14g/t -15g/t head grade
CONTACT
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE
Pretium Resources Inc.
570 Granville St.
Suite 1600
Vancouver, BC
Canada V6C 3P1
COMMON SHARES
TSX/NYSE:PVG
Issued: 102 million
Fully diluted: 110.8 million
52-week hi/low: $16.37/$5.53
Market cap: $889 million
(at June 5 2013)
Advancing a major high-grade gold resource in Canada
APPENDIX: BRUCEJACK COMPARATIVE GEOCHRONOLOGY
34
APPENDIX: GEOLOGICAL EVOLUTION
35
~192-188 Ma
Active island arc
Porphyry-related hydrothermal system
Initial mineralization
Telescoping porphyry
Syn-deposition volcanic pile deformation
Main mineralization continuum
Magmatic
Brine
Vapour
~196-192 Ma
Heated
Seawater
Ocean
Mineralizing
fluids
Volcano-sedimentary
sub-basin
APPENDIX: GEOLOGICAL EVOLUTION
36
Cretaceous deformation at ~110 Ma
Uplift and erosion
Valley of the Kings
Waning of porphyry system
Arc-related deformation
Mafic dyke intrusion
West Zone
SN
~184 Ma
APPENDIX: BRUCEJACK AREA GEOLOGY
37
>0.3 g/t gold
500mExisting 5km underground workings
1980-1994 – Newhawk
908 DDH/120,000m
2009-2010 – Silver Standard
110 DDH/50,946m
2011-2012 – Pretivm
426 DDH/155,144m
West Zone
Valley of the Kings Zone
North – South
Valley of the Kings Zone
Valley of the Kings Zone
500m
West Zone
West Zone
(Teuton)
0.65 g/t Au
0 - 1047 m
(Seabridge)
APPENDIX: VALLEY OF THE KINGS GOLD GRADE
38
Valley of the Kings – Indicated Resource grade consistency
Resource Estimate
(Snowden)
Cumulative Drilling
(m)
Indicated Gold Resource
Ounces (mil)
Indicated Gold
Grade (g/t)
April 2012 59,100 4.9 17.3
September 2012 114,949 5.1 16.2
November 2012 174,182 8.5 16.4
Valley of the Kings – Drilling results and gold grade
Year
Hole number by
series
Over 1
kilogram
per tonne
100 - 1,000
g/t
15 – 100
g/t
5 – 15
g/t Annual total
2009 1 - 37 2 3 31 107 143
2010 38 - 110 6 14 52 129 201
2011 111 - 288 21 59 137 304 521
2012 289 - 585 49 151 285 491 976
2009-2012 Total: 78 227 505 1,031 1,841
APPENDIX: BRUCEJACK GEOLOGY CROSS SECTION
39

Contenu connexe

Tendances

Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
PretiumR
 
Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014
PretiumR
 
Solaris Resources September 2020 Corporate Presentation
Solaris Resources   September 2020 Corporate PresentationSolaris Resources   September 2020 Corporate Presentation
Solaris Resources September 2020 Corporate Presentation
JacquelineWagenaar1
 
Blackwater pea slides v final
Blackwater pea slides   v finalBlackwater pea slides   v final
Blackwater pea slides v final
newgold2011
 

Tendances (15)

Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016
 
Solaris Resources - March 2022
Solaris Resources - March 2022Solaris Resources - March 2022
Solaris Resources - March 2022
 
Solaris Resources - August 2021
Solaris Resources - August 2021Solaris Resources - August 2021
Solaris Resources - August 2021
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
 
Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014
 
Solaris Resources September 2020 Corporate Presentation
Solaris Resources   September 2020 Corporate PresentationSolaris Resources   September 2020 Corporate Presentation
Solaris Resources September 2020 Corporate Presentation
 
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
 
Ssr mining corp. pres. 081717
Ssr mining corp. pres.   081717Ssr mining corp. pres.   081717
Ssr mining corp. pres. 081717
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Blackwater pea slides v final
Blackwater pea slides   v finalBlackwater pea slides   v final
Blackwater pea slides v final
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 

Similaire à June 6, Corporate Presentation

Corporate presentation october 2013
Corporate presentation october 2013Corporate presentation october 2013
Corporate presentation october 2013
PretiumR
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
PretiumR
 
Solaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate PresentationSolaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate Presentation
JacquelineWagenaar1
 

Similaire à June 6, Corporate Presentation (20)

Corporate presentation october 2013
Corporate presentation october 2013Corporate presentation october 2013
Corporate presentation october 2013
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 
Solaris Resources - September 2022
Solaris Resources - September 2022Solaris Resources - September 2022
Solaris Resources - September 2022
 
Solaris Resources - June 2022-Public-2.pdf
Solaris Resources - June 2022-Public-2.pdfSolaris Resources - June 2022-Public-2.pdf
Solaris Resources - June 2022-Public-2.pdf
 
Solaris Resources - August 2022
Solaris Resources - August 2022Solaris Resources - August 2022
Solaris Resources - August 2022
 
Solaris Resources - July 2022-2
Solaris Resources - July 2022-2Solaris Resources - July 2022-2
Solaris Resources - July 2022-2
 
Solaris Resources - April 2022-MRE-3-Public.pdf
Solaris Resources - April 2022-MRE-3-Public.pdfSolaris Resources - April 2022-MRE-3-Public.pdf
Solaris Resources - April 2022-MRE-3-Public.pdf
 
Solaris Resources - May 2022.pdf
Solaris Resources - May 2022.pdfSolaris Resources - May 2022.pdf
Solaris Resources - May 2022.pdf
 
Solaris Resources - September 2021
Solaris Resources - September 2021Solaris Resources - September 2021
Solaris Resources - September 2021
 
TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018
 
Solaris Resources - October 2021
Solaris Resources - October 2021Solaris Resources - October 2021
Solaris Resources - October 2021
 
Scotiabank Latin American Mining Conference
Scotiabank Latin American Mining ConferenceScotiabank Latin American Mining Conference
Scotiabank Latin American Mining Conference
 
Solaris Resources - January 2022
Solaris Resources -  January 2022Solaris Resources -  January 2022
Solaris Resources - January 2022
 
Solaris Resources - February 2022
Solaris Resources - February 2022Solaris Resources - February 2022
Solaris Resources - February 2022
 
Solaris Resources - December 2021
Solaris Resources - December 2021Solaris Resources - December 2021
Solaris Resources - December 2021
 
Solaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate PresentationSolaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate Presentation
 
TNR Gold Shotgun Gold Presentation December 2018
TNR Gold Shotgun Gold Presentation December 2018TNR Gold Shotgun Gold Presentation December 2018
TNR Gold Shotgun Gold Presentation December 2018
 
Solaris Resources - May 2021
Solaris Resources - May 2021Solaris Resources - May 2021
Solaris Resources - May 2021
 
Solaris Resources - November 2021
Solaris Resources  - November 2021Solaris Resources  - November 2021
Solaris Resources - November 2021
 
Solaris Resources - Nov 2021
Solaris Resources - Nov 2021Solaris Resources - Nov 2021
Solaris Resources - Nov 2021
 

Plus de PretiumR

Plus de PretiumR (20)

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference Call
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 final
 

Dernier

VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
dharasingh5698
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
Probe Gold
 

Dernier (20)

VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
 

June 6, Corporate Presentation

  • 2. CAUTIONARY STATEMENT Forward Looking Information This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to the anticipated production and developments in our operations in future periods, our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral resources, realization of mineral resource estimates, costs and timing of development of the projects we currently intend to acquire (the “Projects”), costs and timing of future exploration, results of future exploration and drilling, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees, and adequacy of financial resources. Wherever possible, words such as ‘‘plans’’, ‘‘expects’’ or ‘‘does not expect’’, ‘‘budget’’, ‘‘scheduled’’, ‘‘estimates’’, ‘‘forecasts’’, ‘‘anticipate’’ or ‘‘does not anticipate’’, ‘‘believe’’, ‘‘intend’’ and similar expressions or statements that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, have been used to identify forward-looking information. Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as ‘‘expects’’, ‘‘anticipates’’, ‘‘plans’’, ‘‘projects’’, ‘‘estimates’’, ‘‘assumes’’, ‘‘intends’’, ‘‘strategy’’, ‘‘goals’’, ‘‘objectives’’, ‘‘potential’’ or variations thereof, or stating that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information. Many of these risks are listed and described in our final short-form prospectus dated March 19, 2012 (the “Prospectus”), which is available for review on SEDAR at www.sedar.com under our profile. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Forward-looking information involves statements about the future and is inherently uncertain, and our actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Prospectus under the heading ‘‘Risk Factors’’. Our forward-looking information is based on the beliefs, expectations and opinions of management on the date the statements are made, and we do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Technical Report and Updated Preliminary Economic Assessment of the Brucejack Project” dated February 20, 2012 “Mineral Resources Update Technical Report” dated April 3, 2012, “Mineral Resources Update Technical Report” dated September 18, 2012 and “Mineral Resources Update Technical Report” dated November 20, 2012. We have filed the Reports under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $. 2
  • 3. 3  Significant high-grade gold resource: Valley of the Kings 8.5 M oz gold Indicated (16.1 Mt @ 16.4 g/t gold) 2.9 M oz gold Inferred (5.4 Mt @ 17.0 g/t gold)  Located in British Columbia, Canada  Underground feasibility study June 2013  Commercial production target early 2016 An investment in Gold
  • 4. Kirkland Lake Mine (Kirkland Lake) Kensington Mine (Coeur) Casa Berardi (Aurizon) El Penon Mine (Yamana) Red Lake Mine (Goldcorp) Pogo Mine (Sumitomo) Valley of the Kings F2 Deposit (Rubicon) Buritica (Continental) Cerro Negro (Goldcorp) Eleonore (Goldcorp) Cerro Moro (Yamana) 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 M&I+InferredGoldGrade(g/t) M&I + Inferred Gold Resources (mm oz) HIGH-GRADE GOLD WITH SIZE 4November 2012 Valley of the Kings High-Grade Gold Mineral Resource based on a cut-off grade of 5.0 grams of gold-equivalent/tonne. Data sources: Intierra Ltd., NRH. Indicated Gold: 8.5 mm oz @ 16.4 g/t Au Inferred Gold: 2.9 mm oz @ 17.0 g/t Au
  • 6. EXPLORATION AND OWNERSHIP HISTORY 1960-1980 1980-1985 1986-1989 1990 1993 1999-2000 2009 2010 2011-2012 2013 Exploration by various companies West Zone discovery and definition by Newhawk 5.3 km underground development of West Zone West Zone Feasibility Study completed Acquisition by Silver Standard Resources Inc. Exploration resumes. Discovery of Valley of the Kings Zone Acquisition by Pretivm Extensive exploration program, high-grade resource, exploration road Mine Development Certificate issued Valley of the Kings underground bulk sample and feasibility study 6
  • 8. 8 MAIN MINERALIZED DOMAINS West Zone Underground Development Bulk Sample N S Domain 17 Domain 11 200 m Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained(3) Gold (mil oz) Silver (mil oz) Indicated 16.1 16.4 14.2 8.5 7.3 Inferred(2) 5.4 17.0 15.7 2.9 2.7 Valley of the Kings Mineral Resource Estimate – November 2012(1,4,5) (Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne) (1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council. (2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category. (3) Contained metal may differ due to rounding. (4) The Mineral Resource estimate is defined using 5 m by 5 by 5 m blocks in the well drilled portion of West Zone (5 m by 10 m drilling or better) and 10 m by 10 m by 10 m blocks in the remainder of West Zone and in Valley of the Kings. (5) The gold equivalent value is defined as AuEq=Au + Ag/53
  • 9. VALLEY OF THE KINGS INDICATED RESOURCE Northing (± 25 m) Ind.Gold* (Oz.) 6258225 230,900 6258175 484,000 6258125 703,100 6258075 336,600 6258025 1,951,100 6257975 2,365,900 6257925 1,021,000 6257875 513,600 6257825 687,500 6257775 176,400 Total Ounces per 100 m Easting and 50 m Northing strips Valley of the Kings Indicated Mineral Resource: 8.5 Moz. Au @ 5.0 g/t AuEq. (16.1 Mt @ 16.4 g/t Au) *Nov. 2012 Indicated Mineral Resource; ≥5.0 g/t AuEq. 9 1,092,100 1,776,900 1,467,600 2,185,800 1,391,000 380,100 192,900 Ind. Au* (Oz.)
  • 10. MINERAL RESOURCE CONTINUITY 10 Total Ounces* per 10 x 100 m N-S corridor – 6257800 N Long SectionLevel (m) Ind. Gold (Oz)* 1540-1570 116,300 1510-1540 499,700 1480-1510 734,800 1450-1480 510,400 1420-1450 365,450 1390-1420 566,700 1360-1390 631,700 1330-1360 364,800 1300-1330 527,400 1270-1300 992,000 1240-1270 998,200 1210-1240 521,950 1180-1210 213,050 1150-1180 246,800 1120-1150 294,600 1090-1120 393,900 1060-1090 317,600 W E 100 m 4,000-6,000 6,000-7,000 7,000-8,000 >10,000 Key (Oz. Au) 3,000-4,000 1,000-3,000 <1,000 8,000-10,000 Total Ounces per level (Valley of Kings Zone) *Nov. 2012 Indicated Mineral Resource; ≥5.0 g/t AuEq.
  • 11. CONTINUITY: HIGH GRADE BLOCKS 11Indicated and Inferred blocks greater than 5 g/t AuEq Valley of the Kings block model – 426550E section view East (50m wide)
  • 12. CONTINUITY: HIGH GRADE BLOCKS 12Indicated and Inferred blocks greater than 5 g/t AuEq Valley of the Kings block model – 426600E section view East (50m wide)
  • 13. 1313 100 m CONTINUITY: HIGH GRADE BLOCKS Valley of the Kings block model plan view - 1300m level (50m thick)
  • 14. 14 10,000-TONNE BULK SAMPLE (Q2/Q3) N S 0.5-5.0 g/t AuEq 5.0-15.0 g/t AuEq >15.0 g/t AuEq Key West Zone Underground Development Valley of the Kings Bulk Sample 200 m 546 m 100 m 200 m 300 m 400 m 500 m Completed 546-meter ramp from the West Zone to Valley of the Kings to extract bulk sample.
  • 15. BULK SAMPLE: SECTION 426625 15 SN
  • 16. BULK SAMPLE LOCATION 16 Vertical viewing window ±30 m 1345 m Level 5-10 10-20 20-60 >60 Key (g/t AuEq) 2.5-5 1-2.5 0.3-1
  • 17. BULK SAMPLE LOCATION 17 5-10 10-20 20-60 >60 Key (g/t AuEq) 2.5-5 1-2.5 0.3-1 1345 m Level Vertical viewing window ±8.5 m Polylithic Conglomerate Fragmental Volcanic Rocks Intensely Silicified Conglomerate Hbl-phyric Latite Flow Siltstone, litharenite, pebble conglomerate
  • 18. BULK SAMPLE LOCATION 18 5-10 10-20 20-60 >60 Key (g/t AuEq) Only Indicated blocks greater than 5 g/t AuEq shown 1345 m Level Vertical viewing window ±8.5 m Polylithic Conglomerate Fragmental Volcanic Rocks Intensely Silicified Conglomerate Hbl-phyric Latite Flow Siltstone, litharenite, pebble conglomerate
  • 19. BULK SAMPLE PROCESS(1) 19 Typical sample tower flowsheet Source: Strathcona Mineral Services Limited, Meladine Project  Process flowsheet summary:  Crosscut rounds of 100 tonnes transported to surface  Crushing to ¾ inch, then to ½ inch  Run through on-site sample tower  120 kilograms in 4 samples are sent for testing  Remainder (99.8 tonnes) shipped for processing to produce gold  Representivity testing:  Representative of drillhole density that informs the Indicated Mineral Resource  Representative of average grade of Indicated Resource and the global resource for Valley of the Kings  Representative of style of mineralization for the rest of Valley of the Kings (1) Strathcona Mineral Services Ltd is independent QP for Valley of the Kings bulk sample
  • 20. UNDERGROUND DRILLING 20 SN Typical Section – Fan Drilling Detailed underground drilling at <15 meter centers to outline 700,000 ounces of gold. N
  • 21. VISIBLE GOLD STRINGERS IN STOCKWORK 21
  • 22. 2222  Corridors of high-grade visible gold seams within lower grade (5g/t to 20g/t) gold quartz stockwork  Steeply dipping ore body  Competent ground conditions  Stope widths (15m wide X 30m high) appropriate both for transverse and longitudinal layouts  Cost effective First 50 meters of Valley of the Kings ramp Long hole stoping mining method: MINING METHOD FOR STOCKWORK
  • 23. PROPOSED MINE DEVELOPMENT 23 Oblique View of Mining Stopes, Valley of the Kings S N 100 m West-Zone (late mine life)Valley of the Kings
  • 24. MINE AND MILL SITE LAYOUT Crushing Grinding Gravity Concentrate Circuit Doré (50%-60% of gold production) Flotation Concentrate Circuit Off-take (40%-50% of gold production) Flowsheet Summary:  Dore bars produced on site, shipped to gold refinery  Flotation concentrate (~300 tpd) shipped to Stewart then sea transport West Zone Valley of the Kings 24
  • 25. BRUCEJACK PROJECT ECONOMICS 25 (1) Source: Technical Report and Updated Preliminary Economic Assessment of the Brucejack Project, effective date February 20, 2012 (2) Base case metals prices of US$1,100 /oz gold and US$21/oz silver PEA is based on Mineral Resource estimates for the Valley of the Kings and West Zone effective November 28, 2011 which are now out-of-date. February 2012 Preliminary Economic Assessment Results(1,2) : Processing rate 1,500 tpd Mine life 24 years Total gold production 6.9 million oz Average annual gold production (Yrs 1-12) 325,000 ounces Capex US$436.3 million Total operating costs C$170.90/t milled Internal Rate of Return 29.8% Net Present Value (5% discount) US$2.262 billion  Processing rate increased  2,700 tonnes per day  Mill facilities streamlined  Flotation concentrate to be sold to 3rd parties rather than refined on site  Capex and Opex savings, reduced project footprint  Metallurgy continues to be positive  Feasibility metallurgical studies confirm gold recoveries 98%, silver recoveries 92% Feasibility Study Refinements to PEA:
  • 26. 2013 BRUCEJACK PROJECT PLANS 26 H1 2013  Completed access ramp to Valley of the Kings  Underground sampling/drilling Valley of the Kings  Commence 10,000-tonne underground bulk sample from Valley of the Kings  Feasibility study completed H2 2013  Complete bulk sample report  Process bulk sample  File Environmental Assessment Certificate Application  Resource update  Valley of the Kings drilling
  • 27. BRUCEJACK PHOTOS 27 Recently-completed bridge Husky 8 Sample Tower assembly May 2013
  • 28. COMMUNITY ENGAGEMENT 28  Pretivm’s management team has been cooperatively engaging with First Nations and local community leaders in the Stewart, BC region for over 10 years  We work to ensure that our communication about the progress of the Brucejack Project is open and continuous  Commercial relationships with local First Nations developed during the exploration phase at Brucejack have been mutually successful  We will continue to extend both commercial contract and employment opportunities to locals whenever possible Stewart warehouse constructed by development corporation of Skii km Lax Ha First Nation
  • 29. BRUCEJACK PERMITTING 29 1986 1989 1993 1998 1999 2006 2011-2012 2013 2014 2015 2016 Reclamation Permit Mine Development Certificate issued April 15, 1993 Project Assessment Certificate Permitted for exploration and exploration road Project Assessment Certificate allowed to expire Approval in principle for development of a mine at West Zone Reclamation Completion Project Description under review for underground mine at Brucejack’s Valley of the Kings  Brucejack Lake is not fish habitat  Waste rock from 1980’s/1990’s underground development was deposited in Brucejack Lake as part of 1999 reclamation  More than 50% of tailings (targeting 60%) to be used for paste backfill and deposited underground, with remainder of tailings to be deposited in bottom 30 meters of Brucejack Lake Anticipate Environmental Assessment Certificate Construction, commissioning Commercial production target
  • 30. PRETIVM MANAGEMENT 30 Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc. President & Chief Executive Officer, Director Peter de Visser, CA Chief Financial Officer Joseph Ovsenek, B.A. Sc., P.Eng., LLB Vice President & Chief Development Officer, Director Ken McNaughton, M.A. Sc., P.Eng. Vice President & Chief Exploration Officer Ian I Chang, M.A. Sc., P.Eng. Vice President, Project Development Michelle Romero, B.A., M.L.S. Director, Corporate Relations Kevin Torpy, B.Sc. Director, Mine Engineering Warwick Board, Ph.D., P.Geo. Chief Geologist Max Holtby, B.Sc., P. Geo. Director, Permitting Andrew Saltis, I.Eng. Site Project Manager, Mine Manager
  • 31. SHAREHOLDING & ANALYST COVERAGE 31 Institutions, 53% Retail, 23% Management, 5% Silver Standard, 19% Capital Structure(1) Public Float 83.3 Silver Standard Shares 19.0 Total Issued & Outstanding Shares 102.3 Incentive Options 8.5 Total Fully Diluted Shares 110.8 Market Capitalization C$706 million Working Capital (at March 31, 2013) C$22.5 million Share Offering gross proceeds (at April 26, 2013) (3) C$40 million (1) As of June 5, 2013; ownership calculated on an undiluted basis. (2) As of June 5, 2013. Source: IPREO, SEDI (3) See new release dated April 26, 2013 (shares in millions) Top Shareholders(2) (shares in millions) Silver Standard Resources 18.986 Royce & Associates 10.689 Passport Capital 5.927 Liberty Metals & Mining 5.780 Robert Quartermain 2.853 TD Asset Management 2.153 Sun Valley Gold LLC 2.018 Sprott Asset Management 1.686 Connor Clark & Lunn 1.590 Carmignac Gestion 1.562 Analyst Coverage BMO John Hayes CIBC Jeff Killeen Citibank Alex Hacking Cormark Securities Richard Gray Cowen Securities Adam Graf Global Hunter Securities Jeff Wright GMP Securities George Albino RBC Dan Rollins Salman Partners Ash Guglani Scotiabank Ovais Habib Very Independent Research John Tumazos
  • 32. HIGH-GRADE GOLD PRODUCTION 32 MeadowBank (Agnico Eagle) Laronde (Agnico Eagle) Hycroft (Allied Nevada) Kemess (Aurico) Casa Berardi Mine (Aurizon Mines) Ruby Hill (Barrick) Round Mountain (Barrick/Kinross) Turqouise Ridge (Barrick/Newmont) Red Lake (Goldcorp) Musselwhite (Goldcorp) Marigold Mine (GoldCorp/Barrick) Fort Knox (Kinross) Kirkland Lake (Kirkland Lake Gold) Mesquite (NewGold) Carlin (Newmont) Canadian Malartic (Osisko) Valley of the Kings (Pretium) Detour Lake Mine (Detour Gold) 0 100 200 300 400 500 600 700 0 2 4 6 8 10 12 14 16 18 AnnualGoldProduction(Koz/year) Grade (g/t) Average gold production vs. grade for various North American producing mines with >2Moz Au Data sources: Companies, NRH. Production target: 400k-500k oz/year @ 14g/t -15g/t head grade
  • 33. CONTACT Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES TSX/NYSE:PVG Issued: 102 million Fully diluted: 110.8 million 52-week hi/low: $16.37/$5.53 Market cap: $889 million (at June 5 2013) Advancing a major high-grade gold resource in Canada
  • 35. APPENDIX: GEOLOGICAL EVOLUTION 35 ~192-188 Ma Active island arc Porphyry-related hydrothermal system Initial mineralization Telescoping porphyry Syn-deposition volcanic pile deformation Main mineralization continuum Magmatic Brine Vapour ~196-192 Ma Heated Seawater Ocean Mineralizing fluids Volcano-sedimentary sub-basin
  • 36. APPENDIX: GEOLOGICAL EVOLUTION 36 Cretaceous deformation at ~110 Ma Uplift and erosion Valley of the Kings Waning of porphyry system Arc-related deformation Mafic dyke intrusion West Zone SN ~184 Ma
  • 37. APPENDIX: BRUCEJACK AREA GEOLOGY 37 >0.3 g/t gold 500mExisting 5km underground workings 1980-1994 – Newhawk 908 DDH/120,000m 2009-2010 – Silver Standard 110 DDH/50,946m 2011-2012 – Pretivm 426 DDH/155,144m West Zone Valley of the Kings Zone North – South Valley of the Kings Zone Valley of the Kings Zone 500m West Zone West Zone (Teuton) 0.65 g/t Au 0 - 1047 m (Seabridge)
  • 38. APPENDIX: VALLEY OF THE KINGS GOLD GRADE 38 Valley of the Kings – Indicated Resource grade consistency Resource Estimate (Snowden) Cumulative Drilling (m) Indicated Gold Resource Ounces (mil) Indicated Gold Grade (g/t) April 2012 59,100 4.9 17.3 September 2012 114,949 5.1 16.2 November 2012 174,182 8.5 16.4 Valley of the Kings – Drilling results and gold grade Year Hole number by series Over 1 kilogram per tonne 100 - 1,000 g/t 15 – 100 g/t 5 – 15 g/t Annual total 2009 1 - 37 2 3 31 107 143 2010 38 - 110 6 14 52 129 201 2011 111 - 288 21 59 137 304 521 2012 289 - 585 49 151 285 491 976 2009-2012 Total: 78 227 505 1,031 1,841
  • 39. APPENDIX: BRUCEJACK GEOLOGY CROSS SECTION 39