Prioritization 301
   Advanced Roadmapping Class


         Bruce McCarthy
   Chief Product Person, Reqqs
         bruce@reqqs.com
          www.reqqs.com
           @d8a_driven
Why roadmaps matter
R
“Did [Previous PM] send you his
 spreadsheet of [5 trillion un-
 prioritized] feature requests?”
          - VP Product Management
“We need this to close
[big deal] this quarter!”
             - Key Sales Person
“37% of our Support calls are about
 [oldest, hairiest part of the code].
           Can’t we fix it?”
                   - Support Manager
“[Shiny tech thing] will make
[your top priority] much easier!”
                       - Tech Lead
“[Previously irrelevant competitor]
just shipped [shiny feature]. How are
     we going to leapfrog them?”
                        - VP Marketing
“We gotta drop everything and work
  on [meaningless buzzword]. It’s
         gonna be huge!”
                         - VP Sales
“If you don’t support [obscure
platform] I can’t buy your stuff.”
               - Key Customer CTO
“Why would anybody schedule [easy
feature] before [hard feature]? Who
  approved that [expletive] idea?”
                               - CEO
“What’s your business case for [CEO’s
  pet project]? When do we make
              money?”
                               - CFO
“You can’t add work without
subtracting something? What, is your
         whole team lazy?”
                               - CEO
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Roadmap Process
1.   Set Goals
2.   Collect Ideas Today’s
3.   Set Priorities focus
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Prioritization
Prioritization
Important
 Basis of your roadmap

 Can determine success

 Inspires confidence

 Grooms your backlog

 Key PM skill
Prioritization
Important                Hard
 Basis of your roadmap    Big backlogs

 Can determine success    Competing goals

 Inspires confidence       Multiple stakeholders

 Grooms your backlog      Vocal customers

 Key PM skill             Dependencies

                          Risks
Methods I Don’t
 Recommend
Methods I Don’t
 Recommend
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?


Customer   How to stop growing
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?


Customer   How to stop growing


Analyst    How to miss the market window
Math makes (almost)
 everything better
Value / Effort = Priority
High




Value




  Low

         High            Low
                Effort
High




Value




  Low

         High            Low
                Effort
Value / Effort = Priority


     Value = Expected
  Contribution to Defined
           Goals
Typical Goals
Typical Goals
Grow the user base
Typical Goals
Grow the user base
Increase customer satisfaction
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Transformation (revenue in future years)
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Transformation (revenue in future years)
Generate buzz
Value / Effort = Priority
Value / Effort = Priority



   Value = V1+V2+V3...
Value / Effort = Priority
Value / Effort = Priority


 (V1+V2+V3) / (E1+E2) x
      Certainty = P
Contribution
Contribution
Exact numbers
Contribution
Exact numbers
Contribution
Exact numbers

1-10
Contribution
Exact numbers

1-10

1-100
Contribution
Exact numbers

1-10

1-100

Fibonacci
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars

0,1,2
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars

0,1,2
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
(V1+V2)/E = Raw


Feature   V1   V2   E   Raw       C    Score


  A       1    1    2    1       75%   0.75


  B       1    0    2   0.5      90%   0.45


  C       2    -1   1    1       40%    0.4
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
(V1+V2)/E x C = Score


Feature   V1   V2   E    Raw     C    Score


  A       1    1    2      1    75%   0.75


  B       1    0    2    0.5    90%    0.45


  C       2    -1   1      1    40%    0.4
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
Are We There Yet?
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities    w/o this, you
4.   Get Buy-in          are f***ed
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Shuttle Diplomacy

 “I’ve got a draft set of
priorities. Would you help
       me refine it?”
Collaboration

“I’ll present our priorities
to the executive team on
           Friday”
Feature   V1   V2   E   Raw    C    Score



         1    1    2    1    75%   0.75



  ?       1    0    2   0.5   90%   0.45



         2    -1   1    1    40%    0.4
Use Tools
(Don’t let them use you.)
Discussion
For Slides & Excel
     Template

         Bruce McCarthy
   Chief Product Person, Reqqs
         bruce@reqqs.com
    www.reqqs.com/resources
           @d8a_driven

Contenu connexe

Tendances

Tendances (20)

Agile205: Intro to Agile Product Management
Agile205: Intro to Agile Product ManagementAgile205: Intro to Agile Product Management
Agile205: Intro to Agile Product Management
 
Strategic Role - Product Management
Strategic Role - Product ManagementStrategic Role - Product Management
Strategic Role - Product Management
 
Product Roadmap
Product RoadmapProduct Roadmap
Product Roadmap
 
Product Discovery At Google
Product Discovery At GoogleProduct Discovery At Google
Product Discovery At Google
 
Product management foundations
Product management foundationsProduct management foundations
Product management foundations
 
Product Roadmapping 101: Where Do I Start?
Product Roadmapping 101: Where Do I Start?Product Roadmapping 101: Where Do I Start?
Product Roadmapping 101: Where Do I Start?
 
WTF is a Product Roadmap?
WTF is a Product Roadmap?WTF is a Product Roadmap?
WTF is a Product Roadmap?
 
Product Roadmaps - Tips on how to create and manage roadmaps
Product Roadmaps - Tips on how to create and manage roadmapsProduct Roadmaps - Tips on how to create and manage roadmaps
Product Roadmaps - Tips on how to create and manage roadmaps
 
Product Roadmap
Product RoadmapProduct Roadmap
Product Roadmap
 
What is Product Management ?
What is Product Management ?What is Product Management ?
What is Product Management ?
 
Agile Product Manager/Product Owner Dilemma (PMEC)
Agile Product Manager/Product Owner Dilemma (PMEC)Agile Product Manager/Product Owner Dilemma (PMEC)
Agile Product Manager/Product Owner Dilemma (PMEC)
 
Product Manager 101: What Does A Product Manager Actually Do?
Product Manager 101: What Does A Product Manager Actually Do?Product Manager 101: What Does A Product Manager Actually Do?
Product Manager 101: What Does A Product Manager Actually Do?
 
What Is Product Management?
What Is Product Management?What Is Product Management?
What Is Product Management?
 
Product roadmap-guide-by-product plan
Product roadmap-guide-by-product planProduct roadmap-guide-by-product plan
Product roadmap-guide-by-product plan
 
The Startup Owner's Manual - Founder's Workbook
The Startup Owner's Manual - Founder's WorkbookThe Startup Owner's Manual - Founder's Workbook
The Startup Owner's Manual - Founder's Workbook
 
Product roadmap 101
Product roadmap 101Product roadmap 101
Product roadmap 101
 
Innovation Games™
Innovation Games™Innovation Games™
Innovation Games™
 
Fundamentals of Agile Product Management
Fundamentals of Agile Product ManagementFundamentals of Agile Product Management
Fundamentals of Agile Product Management
 
New Product Development Process
New Product Development ProcessNew Product Development Process
New Product Development Process
 
Lean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 ProductsLean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 Products
 

En vedette

Brugnoli System Ux
Brugnoli System UxBrugnoli System Ux
Brugnoli System Ux
frog
 

En vedette (8)

Moscow method
Moscow methodMoscow method
Moscow method
 
Product Management Metrics | Saeed Khan | ProductTank Toronto
Product Management Metrics | Saeed Khan | ProductTank Toronto Product Management Metrics | Saeed Khan | ProductTank Toronto
Product Management Metrics | Saeed Khan | ProductTank Toronto
 
Brugnoli System Ux
Brugnoli System UxBrugnoli System Ux
Brugnoli System Ux
 
Prioritization Techniques for Agile Teams
Prioritization Techniques for Agile TeamsPrioritization Techniques for Agile Teams
Prioritization Techniques for Agile Teams
 
Product Management by Numbers: Using Metrics To Optimize Your Product by Dan ...
Product Management by Numbers: Using Metrics To Optimize Your Product by Dan ...Product Management by Numbers: Using Metrics To Optimize Your Product by Dan ...
Product Management by Numbers: Using Metrics To Optimize Your Product by Dan ...
 
Building a Company-Wide Growth Culture: SaaStr Annual 2016
Building a Company-Wide Growth Culture: SaaStr Annual 2016Building a Company-Wide Growth Culture: SaaStr Annual 2016
Building a Company-Wide Growth Culture: SaaStr Annual 2016
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 
25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know
 

Similaire à Prioritization 301 - Advanced Roadmapping Class, Bruce McCarthy

Webinar agile-spring-maximum-roi
Webinar agile-spring-maximum-roiWebinar agile-spring-maximum-roi
Webinar agile-spring-maximum-roi
Cygnet Infotech
 
Agile for Startups
Agile for StartupsAgile for Startups
Agile for Startups
Jim Murphy
 

Similaire à Prioritization 301 - Advanced Roadmapping Class, Bruce McCarthy (20)

Agile Marketing Approach PowerPoint Presentation Slides
Agile Marketing Approach PowerPoint Presentation SlidesAgile Marketing Approach PowerPoint Presentation Slides
Agile Marketing Approach PowerPoint Presentation Slides
 
Scrum Market Management PowerPoint Presentation Slides
Scrum Market Management PowerPoint Presentation SlidesScrum Market Management PowerPoint Presentation Slides
Scrum Market Management PowerPoint Presentation Slides
 
Marketing Scrum PowerPoint Presentation Slides
Marketing Scrum PowerPoint Presentation SlidesMarketing Scrum PowerPoint Presentation Slides
Marketing Scrum PowerPoint Presentation Slides
 
Board Deck Templates for Startups
Board Deck Templates for StartupsBoard Deck Templates for Startups
Board Deck Templates for Startups
 
Saying No with Confidence - The Customer Centric Way by TIER Mobility VP of P...
Saying No with Confidence - The Customer Centric Way by TIER Mobility VP of P...Saying No with Confidence - The Customer Centric Way by TIER Mobility VP of P...
Saying No with Confidence - The Customer Centric Way by TIER Mobility VP of P...
 
Scrum Methodology For Marketing PowerPoint Presentation Slides
Scrum Methodology For Marketing PowerPoint Presentation SlidesScrum Methodology For Marketing PowerPoint Presentation Slides
Scrum Methodology For Marketing PowerPoint Presentation Slides
 
O365 Practical Adoption Strategies - HDI Regina Chapter
O365 Practical Adoption Strategies - HDI Regina ChapterO365 Practical Adoption Strategies - HDI Regina Chapter
O365 Practical Adoption Strategies - HDI Regina Chapter
 
Webinar agile-spring-maximum-roi
Webinar agile-spring-maximum-roiWebinar agile-spring-maximum-roi
Webinar agile-spring-maximum-roi
 
Build Innovation into Your Admin Routine
Build Innovation into Your Admin RoutineBuild Innovation into Your Admin Routine
Build Innovation into Your Admin Routine
 
Learn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLearn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream management
 
Get Your Product to Market with Less: Paradigms for Innovation
Get Your Product to Market with Less: Paradigms for InnovationGet Your Product to Market with Less: Paradigms for Innovation
Get Your Product to Market with Less: Paradigms for Innovation
 
Scrum Marketing Methodology PowerPoint Presentation Slides
Scrum Marketing Methodology PowerPoint Presentation SlidesScrum Marketing Methodology PowerPoint Presentation Slides
Scrum Marketing Methodology PowerPoint Presentation Slides
 
Agile for Startups
Agile for StartupsAgile for Startups
Agile for Startups
 
Jan de Vries - How to convince your boss that it is DevOps that he wants
Jan de Vries - How to convince your boss that it is DevOps that he wantsJan de Vries - How to convince your boss that it is DevOps that he wants
Jan de Vries - How to convince your boss that it is DevOps that he wants
 
How to Rock Your Next Presentation and Demo
How to Rock Your Next Presentation and Demo How to Rock Your Next Presentation and Demo
How to Rock Your Next Presentation and Demo
 
Data Solutions for Products by Leadspace Director of Analytics
Data Solutions for Products by Leadspace Director of AnalyticsData Solutions for Products by Leadspace Director of Analytics
Data Solutions for Products by Leadspace Director of Analytics
 
Dev ops
Dev opsDev ops
Dev ops
 
Mike long-portfolio-presentation
Mike long-portfolio-presentationMike long-portfolio-presentation
Mike long-portfolio-presentation
 
Mike long-portfolio-presentation
Mike long-portfolio-presentationMike long-portfolio-presentation
Mike long-portfolio-presentation
 
Portfolio Presentation
Portfolio PresentationPortfolio Presentation
Portfolio Presentation
 

Plus de ProductCamp Boston

Plus de ProductCamp Boston (20)

175 Product Manager as a Leader
175 Product Manager as a Leader175 Product Manager as a Leader
175 Product Manager as a Leader
 
B2B Buyers don't Trust what we say about our products
B2B Buyers don't Trust what we say about our productsB2B Buyers don't Trust what we say about our products
B2B Buyers don't Trust what we say about our products
 
Building a Weatherproof Framework - How to Survive the Product Launch Storm i...
Building a Weatherproof Framework - How to Survive the Product Launch Storm i...Building a Weatherproof Framework - How to Survive the Product Launch Storm i...
Building a Weatherproof Framework - How to Survive the Product Launch Storm i...
 
Getting your Product Noticed
Getting your Product NoticedGetting your Product Noticed
Getting your Product Noticed
 
A lifecycle for microservices
A lifecycle for microservicesA lifecycle for microservices
A lifecycle for microservices
 
178 - Design Discovery Workshops
178  - Design Discovery Workshops178  - Design Discovery Workshops
178 - Design Discovery Workshops
 
113 -Product Marketing and the Collaboration with Product Management - sessio...
113 -Product Marketing and the Collaboration with Product Management - sessio...113 -Product Marketing and the Collaboration with Product Management - sessio...
113 -Product Marketing and the Collaboration with Product Management - sessio...
 
108 - 3 Trends Impacting Messaging and Content
108 - 3 Trends Impacting Messaging and Content108 - 3 Trends Impacting Messaging and Content
108 - 3 Trends Impacting Messaging and Content
 
Why do product managers need to be more vulnerable
Why do product managers need to be more vulnerable Why do product managers need to be more vulnerable
Why do product managers need to be more vulnerable
 
172 - How Not to Kill each other
172 - How Not to Kill each other172 - How Not to Kill each other
172 - How Not to Kill each other
 
Connecting Product Decisions to Revenue
Connecting Product Decisions to RevenueConnecting Product Decisions to Revenue
Connecting Product Decisions to Revenue
 
107 - It's not easy starting new: career transitioning to product, starting ...
107 - It's not easy starting new: career transitioning to product,  starting ...107 - It's not easy starting new: career transitioning to product,  starting ...
107 - It's not easy starting new: career transitioning to product, starting ...
 
How can ANYONE do UX Research?
How can ANYONE do UX Research?How can ANYONE do UX Research?
How can ANYONE do UX Research?
 
181 - What Skills Do I Need To Really Succeed As A PM
181 - What Skills Do I Need To Really Succeed As A PM181 - What Skills Do I Need To Really Succeed As A PM
181 - What Skills Do I Need To Really Succeed As A PM
 
177 - Team-Based Innovation
177 - Team-Based Innovation177 - Team-Based Innovation
177 - Team-Based Innovation
 
163 - Customer Centric Product Management - How To Be Awesome
163 - Customer Centric Product Management - How To Be Awesome163 - Customer Centric Product Management - How To Be Awesome
163 - Customer Centric Product Management - How To Be Awesome
 
159 - Strategic UX Research
159 - Strategic UX Research159 - Strategic UX Research
159 - Strategic UX Research
 
158 - Product Management for Enterprise-Grade platforms
158 - Product Management for Enterprise-Grade platforms 158 - Product Management for Enterprise-Grade platforms
158 - Product Management for Enterprise-Grade platforms
 
153- Experience Maps: Essential Tool in Product Innovation Strategies
153- Experience Maps: Essential Tool in Product Innovation Strategies153- Experience Maps: Essential Tool in Product Innovation Strategies
153- Experience Maps: Essential Tool in Product Innovation Strategies
 
152 - Confident Communication
152 - Confident Communication 152 - Confident Communication
152 - Confident Communication
 

Dernier

!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Dernier (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 

Prioritization 301 - Advanced Roadmapping Class, Bruce McCarthy

Notes de l'éditeur

  1. I’m Bruce McCarthy, CPP of Reqqs - the smart roadmap tool for product people. I’ve been in product management for 16 years at companies like iMarket (bought by Dun & Bradstreet) and ATG (bought by Oracle). My day job currently is VP of Product at NetProspex in Waltham. \n\nI’m here to talk about how to do prioritization in an objective and collaborative way so that you can get the buy-in you need to put together a roadmap that will stick. This is the advanced class because you guys are well beyond the basics of H-M-L.\n\nI developed this methodology over time in various jobs. I’ve seen it work over and over again where gut instinct or endless meetings fail. In talking with other product people, I’ve found the good ones usually develop something similar. I’ve really just tried to standardize it and genericize it a bit so everyone can benefit.\n
  2. In today’s agile world, do roadmaps still matter? Aren’t we allowed to change direction after each sprint? Actually, I think roadmaps are needed even more in an agile world. Yes, you can correct course after each sprint, but you should be correcting course toward something - toward a vision of where you want your product or your company to be in a year or 2 or 3. You need to stake out that vision and then you need to work out what you think is the best path to get there. That’s your roadmap.\n
  3. Your roadmap is also a shield against the constant onslaught of potentially diverting requests from all quarters.\n
  4. \n
  5. \n
  6. \n
  7. \n
  8. \n
  9. \n
  10. \n
  11. \n
  12. \n
  13. This is my favorite - actually heard - CEO quote.\n
  14. Your roadmap isn’t much of a shield unless you have buy-in from your stakeholders on it. Before you can get that, though, you need priorities. To set priorities you need ideas, and you need goals to test those ideas against. I want to talk about priorities first because your roadmap is really a reflection - a timeline view - of your priorities.\n
  15. Your roadmap isn’t much of a shield unless you have buy-in from your stakeholders on it. Before you can get that, though, you need priorities. To set priorities you need ideas, and you need goals to test those ideas against. I want to talk about priorities first because your roadmap is really a reflection - a timeline view - of your priorities.\n
  16. \n
  17. \n
  18. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  19. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  20. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  21. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  22. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  23. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  24. The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  25. There is a better way.\n
  26. A simple equation. It’s really the familiar ROI calculation. Effort is the investment you make to generate value in return. The items in your backlog that have the highest ROI are the ones you should do first, right?\n
  27. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  28. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  29. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  30. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  31. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  32. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  33. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  34. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  35. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  36. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  37. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  38. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  39. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  40. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  41. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  42. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  43. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  44. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  45. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  46. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  47. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  48. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  49. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  50. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  51. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  52. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  53. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  54. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  55. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  56. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  57. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  58. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  59. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  60. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  61. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  62. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  63. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  64. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  65. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  66. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  67. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  68. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  69. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  70. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  71. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  72. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  73. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  74. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  75. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  76. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  77. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  78. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  79. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  80. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  81. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  82. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  83. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  84. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  85. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  86. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  87. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  88. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  89. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  90. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  91. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  92. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  93. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  94. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  95. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  96. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  97. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  98. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  99. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  100. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  101. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  102. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  103. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  104. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  105. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  106. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  107. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  108. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  109. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  110. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  111. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  112. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  113. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  114. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  115. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  116. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  117. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  118. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  119. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  120. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  121. Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  122. \n
  123. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  124. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  125. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  126. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  127. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  128. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  129. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  130. Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  131. \n
  132. \n
  133. \n
  134. \n
  135. \n
  136. \n
  137. \n
  138. \n
  139. \n
  140. \n
  141. Removing the QA step to ship early means negative numbers for quality (V2)\n
  142. Removing the QA step to ship early means negative numbers for quality (V2)\n
  143. Removing the QA step to ship early means negative numbers for quality (V2)\n
  144. Removing the QA step to ship early means negative numbers for quality (V2)\n
  145. No. Maybe halfway.\n
  146. \n
  147. \n
  148. \n
  149. Henry Kissinger was Nixon’s Secretary of State and famously settled things down in the Middle East after the 1967 war using shuttle diplomacy.\n
  150. \n
  151. \n
  152. \n
  153. A long-time PM of a company I had just joined saw the way this methodology drove consensus among his executive team as “magical.”\n
  154. A PM I met recently told me he had a friend who developed a spreadsheet like this but could not get buy-in on it. Turns out he made two critical mistakes. First, he had about 20 different goals he scored everything against and so couldn’t get anyone to review it with him. Second, he insisted the team adopt the spreadsheet’s recommendations exactly without further discussion.\n
  155. \n
  156. \n