ECNG 3015Industrial and Commercial Electrical Systems Lecturer Prof Chandrabhan Sharma # 1 PU System
THE PER UNIT SYSTEM Introduction:The per unit system is fundamental in the analysis of power 	systems  since: 		-	parameters such as voltage and power are 			usually in the kilo or mega range in a power 			system 		-	this is due to the large amount of power 				transmitted 		-	other values such as current and impedance 			are usually represented as a percent or per 			unit 		-	determined by using a base or reference 				value.
The per unit system has several advantages which include: 	1) Calculations are simplified. 	2) Equipment rating. 3) Provides a reference to voltages in the power system. 	4) It is an international standard. Usually base megavolt amperes (MVA) and base voltage in kilovolts are selected to specify the base.
(2) Per Unit Conversion Note: Apu is dimensionless (3) P.U. Impedance
(4) To compare two power systems with different MVAs .
Example: Given a transformer with the following specifications: 100MVA, 66/12 kV, 0.1 p.u. (10%). If the base value chosen is 200, then Note:  Zp.u. for transformer is the same whether referred to primary or secondary side since the it has the same MVA rating on both sides and turns ratio cancels
(5) The p.u. system is used to extract the current that would flow     when a fault occurs.  Consider the system below .
The result is a generator whose voltage is 1p.u. Therefore, .  (6) Convert the p.u. values to the actual values
Fault Calculations 	Why? 		-	fault current magnitude gives the current settings 			for protective relays 		-	provides the required ratings for the C.B. and 				associated equipment Faults can be either: 	a. Symmetrical Fault – 3 faults i.e. n/w still electrically balanced .
b. Unsymmetrical – network not electrically balanced - SLG, DLG, OC 		   – analysis done by symmetrical components The most common fault is the Single Line to Ground Fault (SLG) which occurs over 90% of the time. .  Note: 	If the system is unbalanced, the relationship V = IR does not hold. The operating time of C.B. for clearing a fault is very important in determining fault levels If C.B. operating time  2 cycles after fault initiation then motor contribution to fault currents cannot be ignored. During the first few cycles of a fault, the motors initially act as generators for which the source of excitation is the stored magnetic energy.
In the 1st half cycle of s/c a motor can feed current of magnitudes reaching 10 times the F.L.C. After 5 cycles this current would have decayed to practically ‘0’. Depending on the analysis time frame (re: motors….) 	Xd’’, Xd’ and Xd would be used  .
Circuit Breakers: 	Circuit breakers are needed to: 		-	isolate equipment for maintenance and 		-	interrupt load and fault current .  Transient Impedance Graph
.
Fault Calculations: .  Fault system
Given:  	G1 and G2 = 25 MVA, 0.1pu 	G3 = 20MVA, 0.1pu 	T/F1 and T/F2 = 50 MVA, 10% 	Lines AB, AC, BD, CD = j10Ω and  	Line B’C’ = j0.75Ω Note: 	The impedance between circuit breakers are negligible, 	therefore the rating is the same for all breakers on the 	same bus.
Neglecting resistances provides the worst case value of fault current, which is more desirable for the purpose of rating C.B.  Therefore, using ‘j’ term gives worse case design. Question:  For the system shown above, what is the fault level at D/E? Soln: (1)	Let base value = 100 MVA Then convert all values to a common base p.u. value. Voltage in the ring = 33kV
or
(2)	Using 100 MVA as the base, the 50 MVA transformers must be 	converted to its equivalent value. Therefore, the total impedance of line BC = j0.2 + j 0.52 + j0.2 = j0.92 (3) 	Now the generators must be converted to its equivalent p.u. 	values.
(4)	Now that all equipment and lines are in p.u. on a common 	base, we can draw the equivalent circuit. The neutral of the   	generators is used as the common point for the diagram.
Equivalent circuit
The previous equivalent ckt can be reduced to this ckt
Applying /Y transformation 
This reduces to:
SHORT CIRCUIT CALCULATIONS R.T.F : Equivalent circuit referred to kV1 Solution:
Example Question:  For the system shown above, what is the fault level at A, B, C and D?
Soln: 	Let base value = 100 MVA
 Equivalent circuit becomes:
With the line impedance included (shown in green) the circuit becomes: The short circuit levels would then be: MVAA = 3508;     MVAB = 491;     MVAC = 132.7;     MVAD = 17.4
Limiting S/C levels There are basically two methods  		a.	Sectionalizers 		b.	Reactors a. Sectionalizers N.B.: care must be taken in paralleling cables between buses.
Practical case is where bus interconnect via a cable.  If the existing cable is overloaded then a second cable may be  installed to assist in carrying the load as shown below This will have the effect of increasing the fault level at B.
b. Reactors -	means of increasing the impedance artificially 		by the introduction of reactors Example: Given an old system with switchgear rated at 100 MVA where we need to expand by adding a new feeder and associated switchgear. New rating of added switchgear is 250 MVA. In order to connect both systems, a series reactor of 15 MVA rating is to be introduced. Find the value of the reactance required.
Soln: 	Let base value = 10 MVA 	Reactance of G1 & G2 to new base = 0.24 p.u.
Equivalent circuit
Question: Determine the fault level at the new station busbar (B).  (Ans. 126.9 MVA) Disadvantages of adding reactors: 	-	increased regulation 	-	lowering of power factor 	-	increase in system losses

Contenu connexe

Tendances

Generalised circuit constants
Generalised circuit constantsGeneralised circuit constants
Generalised circuit constantsKaustubh Nande
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsHimmelstern
 
Transformer protection from inrush currents: Discrimination of internal fault...
Transformer protection from inrush currents: Discrimination of internal fault...Transformer protection from inrush currents: Discrimination of internal fault...
Transformer protection from inrush currents: Discrimination of internal fault...Shilpa Shukla
 
Inductance of transmission line
Inductance of transmission lineInductance of transmission line
Inductance of transmission linevishalgohel12195
 
Harmonics In Transformer pdf
Harmonics In Transformer  pdfHarmonics In Transformer  pdf
Harmonics In Transformer pdfnavreet singh
 
Per unit calculation
Per unit calculationPer unit calculation
Per unit calculationobaidurbd
 
Chapter 2 transmission line parameters
Chapter 2  transmission line parametersChapter 2  transmission line parameters
Chapter 2 transmission line parametersfiraoltemesgen1
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...IJERD Editor
 
Symmetrical Fault Analysis
Symmetrical Fault AnalysisSymmetrical Fault Analysis
Symmetrical Fault AnalysisSANTOSH GADEKAR
 
Harmonic presentation 11 6-2018
Harmonic presentation 11 6-2018Harmonic presentation 11 6-2018
Harmonic presentation 11 6-2018WN4UUY
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdfNerupaSharma
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical componentsSirat Mahmood
 
FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongArmstrong Okai Ababio
 
Capacitance on transmission line
Capacitance on transmission lineCapacitance on transmission line
Capacitance on transmission linevishalgohel12195
 

Tendances (20)

Lecture 02.pptx
Lecture 02.pptxLecture 02.pptx
Lecture 02.pptx
 
Generalised circuit constants
Generalised circuit constantsGeneralised circuit constants
Generalised circuit constants
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway Systems
 
Sepic converter
Sepic  converterSepic  converter
Sepic converter
 
Transformer protection from inrush currents: Discrimination of internal fault...
Transformer protection from inrush currents: Discrimination of internal fault...Transformer protection from inrush currents: Discrimination of internal fault...
Transformer protection from inrush currents: Discrimination of internal fault...
 
Inductance of transmission line
Inductance of transmission lineInductance of transmission line
Inductance of transmission line
 
Harmonics In Transformer pdf
Harmonics In Transformer  pdfHarmonics In Transformer  pdf
Harmonics In Transformer pdf
 
Unit4questions
Unit4questionsUnit4questions
Unit4questions
 
Per unit calculation
Per unit calculationPer unit calculation
Per unit calculation
 
Chapter 2 transmission line parameters
Chapter 2  transmission line parametersChapter 2  transmission line parameters
Chapter 2 transmission line parameters
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...
 
Symmetrical Fault Analysis
Symmetrical Fault AnalysisSymmetrical Fault Analysis
Symmetrical Fault Analysis
 
chapter 3 part 1.ppt
chapter 3 part 1.pptchapter 3 part 1.ppt
chapter 3 part 1.ppt
 
Harmonic presentation 11 6-2018
Harmonic presentation 11 6-2018Harmonic presentation 11 6-2018
Harmonic presentation 11 6-2018
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdf
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical components
 
FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation Armstrong
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
Capacitance on transmission line
Capacitance on transmission lineCapacitance on transmission line
Capacitance on transmission line
 

En vedette

Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!PRABHAHARAN429
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysiskirkusawi
 
Fault Calculations
Fault CalculationsFault Calculations
Fault Calculationsmichaeljmack
 
Unit 1, Power system Analysis
Unit 1, Power system AnalysisUnit 1, Power system Analysis
Unit 1, Power system AnalysisAbha Tripathi
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysisHari Kumar
 
ECNH 3015 Examples of PU system
ECNH 3015  Examples of PU systemECNH 3015  Examples of PU system
ECNH 3015 Examples of PU systemChandrabhan Sharma
 
ECNG 6509 Switchgear Technology
ECNG 6509    Switchgear TechnologyECNG 6509    Switchgear Technology
ECNG 6509 Switchgear TechnologyChandrabhan Sharma
 
105996292 electrical-control-automation-studio
105996292 electrical-control-automation-studio105996292 electrical-control-automation-studio
105996292 electrical-control-automation-studioTùng Nguyễn
 
Power system-analysis-presntation
Power system-analysis-presntationPower system-analysis-presntation
Power system-analysis-presntationoviiiiiiiiiiii
 

En vedette (20)

Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
 
ECNG 3015 chapter 1 - Basics
ECNG 3015  chapter 1 - BasicsECNG 3015  chapter 1 - Basics
ECNG 3015 chapter 1 - Basics
 
Fault Calculations
Fault CalculationsFault Calculations
Fault Calculations
 
Unit 1, Power system Analysis
Unit 1, Power system AnalysisUnit 1, Power system Analysis
Unit 1, Power system Analysis
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysis
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Splice
SpliceSplice
Splice
 
ECNH 3015 Examples of PU system
ECNH 3015  Examples of PU systemECNH 3015  Examples of PU system
ECNH 3015 Examples of PU system
 
ECNG 6509 Switchgear Technology
ECNG 6509    Switchgear TechnologyECNG 6509    Switchgear Technology
ECNG 6509 Switchgear Technology
 
105996292 electrical-control-automation-studio
105996292 electrical-control-automation-studio105996292 electrical-control-automation-studio
105996292 electrical-control-automation-studio
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
Lecture 13
Lecture 13Lecture 13
Lecture 13
 
Lecture 5
Lecture 5Lecture 5
Lecture 5
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
Power system-analysis-presntation
Power system-analysis-presntationPower system-analysis-presntation
Power system-analysis-presntation
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 

Similaire à ECNG 3015 - PU system and 3Phase Fault calculation

Power-System-Slide-1.pptx
Power-System-Slide-1.pptxPower-System-Slide-1.pptx
Power-System-Slide-1.pptxssuser99d6551
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointslmnsvn
 
per_unit_system.pptx
per_unit_system.pptxper_unit_system.pptx
per_unit_system.pptxPaylamKanal
 
Design and Development of Power Electronic Controller for Grid-connected PV A...
Design and Development of Power Electronic Controller for Grid-connected PV A...Design and Development of Power Electronic Controller for Grid-connected PV A...
Design and Development of Power Electronic Controller for Grid-connected PV A...IJAPEJOURNAL
 
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC Converters
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC ConvertersModeling and Analysis of Transformerless High Gain Buck-boost DC-DC Converters
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC ConvertersIAES-IJPEDS
 
1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdf1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdfLiewChiaPing
 
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...IJMTST Journal
 
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...Alexander Decker
 
Assignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemAssignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemVara Prasad
 
Assignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemAssignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemVara Prasad
 
EE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_QuestionsEE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_QuestionsSanthosh Kumar
 

Similaire à ECNG 3015 - PU system and 3Phase Fault calculation (20)

Power-System-Slide-1.pptx
Power-System-Slide-1.pptxPower-System-Slide-1.pptx
Power-System-Slide-1.pptx
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection point
 
per_unit_system.pptx
per_unit_system.pptxper_unit_system.pptx
per_unit_system.pptx
 
Design and Development of Power Electronic Controller for Grid-connected PV A...
Design and Development of Power Electronic Controller for Grid-connected PV A...Design and Development of Power Electronic Controller for Grid-connected PV A...
Design and Development of Power Electronic Controller for Grid-connected PV A...
 
Power system calculations
Power system calculationsPower system calculations
Power system calculations
 
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC Converters
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC ConvertersModeling and Analysis of Transformerless High Gain Buck-boost DC-DC Converters
Modeling and Analysis of Transformerless High Gain Buck-boost DC-DC Converters
 
1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdf1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdf
 
Ki3418621868
Ki3418621868Ki3418621868
Ki3418621868
 
I41045662
I41045662I41045662
I41045662
 
[IJET-V2I3P17] Authors: R.C.Rohini, G.Srividhya
[IJET-V2I3P17] Authors: R.C.Rohini, G.Srividhya[IJET-V2I3P17] Authors: R.C.Rohini, G.Srividhya
[IJET-V2I3P17] Authors: R.C.Rohini, G.Srividhya
 
C04721623
C04721623C04721623
C04721623
 
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...
Analysis of 7-Level Cascaded & MLDCLI with Sinusoidal PWM & Modified Referenc...
 
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...
Matlab simulink based-analysis of photovoltaic array fed multilevel boost con...
 
AHK SMPS P4 TR Final
AHK SMPS P4 TR FinalAHK SMPS P4 TR Final
AHK SMPS P4 TR Final
 
Thyristor switched capacitor
Thyristor switched capacitorThyristor switched capacitor
Thyristor switched capacitor
 
Assignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemAssignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power system
 
Assignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power systemAssignment 1 170901 interconnected power system
Assignment 1 170901 interconnected power system
 
EE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_QuestionsEE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_Questions
 
Gran importancia
Gran importanciaGran importancia
Gran importancia
 

Plus de Chandrabhan Sharma (16)

ECNG 3015 chapter 6 - switchgear technology
ECNG 3015  chapter 6 - switchgear technologyECNG 3015  chapter 6 - switchgear technology
ECNG 3015 chapter 6 - switchgear technology
 
Ices chapter 8 - illumination engineering
Ices   chapter 8 - illumination engineeringIces   chapter 8 - illumination engineering
Ices chapter 8 - illumination engineering
 
ECNG 3015 chapter 2 - pu system
ECNG 3015  chapter 2 - pu systemECNG 3015  chapter 2 - pu system
ECNG 3015 chapter 2 - pu system
 
ECNG 6509 Transformer Technology
ECNG 6509  Transformer TechnologyECNG 6509  Transformer Technology
ECNG 6509 Transformer Technology
 
ECNG 3013 E
ECNG 3013 EECNG 3013 E
ECNG 3013 E
 
ECNG 3013 D
ECNG 3013 DECNG 3013 D
ECNG 3013 D
 
ECNG 3013 C
ECNG 3013 CECNG 3013 C
ECNG 3013 C
 
ECNG 3013 B
ECNG 3013 BECNG 3013 B
ECNG 3013 B
 
ECNG 3013 A
ECNG 3013 AECNG 3013 A
ECNG 3013 A
 
ECNG 3015- System Earthing
ECNG 3015- System EarthingECNG 3015- System Earthing
ECNG 3015- System Earthing
 
ECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent Protection
 
ECNG 3015 Power System Protection
ECNG 3015    Power System ProtectionECNG 3015    Power System Protection
ECNG 3015 Power System Protection
 
ECNG 6503 #4
ECNG 6503 #4ECNG 6503 #4
ECNG 6503 #4
 
ECNG 6503 # 3
ECNG 6503 # 3ECNG 6503 # 3
ECNG 6503 # 3
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
ECNG 6503 #1
ECNG 6503 #1 ECNG 6503 #1
ECNG 6503 #1
 

Dernier

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 

Dernier (20)

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 

ECNG 3015 - PU system and 3Phase Fault calculation

  • 1. ECNG 3015Industrial and Commercial Electrical Systems Lecturer Prof Chandrabhan Sharma # 1 PU System
  • 2. THE PER UNIT SYSTEM Introduction:The per unit system is fundamental in the analysis of power systems since: - parameters such as voltage and power are usually in the kilo or mega range in a power system - this is due to the large amount of power transmitted - other values such as current and impedance are usually represented as a percent or per unit - determined by using a base or reference value.
  • 3. The per unit system has several advantages which include: 1) Calculations are simplified. 2) Equipment rating. 3) Provides a reference to voltages in the power system. 4) It is an international standard. Usually base megavolt amperes (MVA) and base voltage in kilovolts are selected to specify the base.
  • 4. (2) Per Unit Conversion Note: Apu is dimensionless (3) P.U. Impedance
  • 5. (4) To compare two power systems with different MVAs .
  • 6. Example: Given a transformer with the following specifications: 100MVA, 66/12 kV, 0.1 p.u. (10%). If the base value chosen is 200, then Note: Zp.u. for transformer is the same whether referred to primary or secondary side since the it has the same MVA rating on both sides and turns ratio cancels
  • 7. (5) The p.u. system is used to extract the current that would flow when a fault occurs. Consider the system below .
  • 8. The result is a generator whose voltage is 1p.u. Therefore, . (6) Convert the p.u. values to the actual values
  • 9. Fault Calculations Why? - fault current magnitude gives the current settings for protective relays - provides the required ratings for the C.B. and associated equipment Faults can be either: a. Symmetrical Fault – 3 faults i.e. n/w still electrically balanced .
  • 10. b. Unsymmetrical – network not electrically balanced - SLG, DLG, OC – analysis done by symmetrical components The most common fault is the Single Line to Ground Fault (SLG) which occurs over 90% of the time. . Note: If the system is unbalanced, the relationship V = IR does not hold. The operating time of C.B. for clearing a fault is very important in determining fault levels If C.B. operating time  2 cycles after fault initiation then motor contribution to fault currents cannot be ignored. During the first few cycles of a fault, the motors initially act as generators for which the source of excitation is the stored magnetic energy.
  • 11. In the 1st half cycle of s/c a motor can feed current of magnitudes reaching 10 times the F.L.C. After 5 cycles this current would have decayed to practically ‘0’. Depending on the analysis time frame (re: motors….) Xd’’, Xd’ and Xd would be used .
  • 12. Circuit Breakers: Circuit breakers are needed to: - isolate equipment for maintenance and - interrupt load and fault current . Transient Impedance Graph
  • 13. .
  • 14. Fault Calculations: . Fault system
  • 15. Given: G1 and G2 = 25 MVA, 0.1pu G3 = 20MVA, 0.1pu T/F1 and T/F2 = 50 MVA, 10% Lines AB, AC, BD, CD = j10Ω and Line B’C’ = j0.75Ω Note: The impedance between circuit breakers are negligible, therefore the rating is the same for all breakers on the same bus.
  • 16. Neglecting resistances provides the worst case value of fault current, which is more desirable for the purpose of rating C.B. Therefore, using ‘j’ term gives worse case design. Question: For the system shown above, what is the fault level at D/E? Soln: (1) Let base value = 100 MVA Then convert all values to a common base p.u. value. Voltage in the ring = 33kV
  • 17. or
  • 18. (2) Using 100 MVA as the base, the 50 MVA transformers must be converted to its equivalent value. Therefore, the total impedance of line BC = j0.2 + j 0.52 + j0.2 = j0.92 (3) Now the generators must be converted to its equivalent p.u. values.
  • 19. (4) Now that all equipment and lines are in p.u. on a common base, we can draw the equivalent circuit. The neutral of the generators is used as the common point for the diagram.
  • 21. The previous equivalent ckt can be reduced to this ckt
  • 24.
  • 25.
  • 26. SHORT CIRCUIT CALCULATIONS R.T.F : Equivalent circuit referred to kV1 Solution:
  • 27.
  • 28. Example Question: For the system shown above, what is the fault level at A, B, C and D?
  • 29. Soln: Let base value = 100 MVA
  • 31.
  • 32. With the line impedance included (shown in green) the circuit becomes: The short circuit levels would then be: MVAA = 3508; MVAB = 491; MVAC = 132.7; MVAD = 17.4
  • 33. Limiting S/C levels There are basically two methods a. Sectionalizers b. Reactors a. Sectionalizers N.B.: care must be taken in paralleling cables between buses.
  • 34. Practical case is where bus interconnect via a cable. If the existing cable is overloaded then a second cable may be installed to assist in carrying the load as shown below This will have the effect of increasing the fault level at B.
  • 35. b. Reactors - means of increasing the impedance artificially by the introduction of reactors Example: Given an old system with switchgear rated at 100 MVA where we need to expand by adding a new feeder and associated switchgear. New rating of added switchgear is 250 MVA. In order to connect both systems, a series reactor of 15 MVA rating is to be introduced. Find the value of the reactance required.
  • 36. Soln: Let base value = 10 MVA Reactance of G1 & G2 to new base = 0.24 p.u.
  • 38.
  • 39. Question: Determine the fault level at the new station busbar (B). (Ans. 126.9 MVA) Disadvantages of adding reactors: - increased regulation - lowering of power factor - increase in system losses