SlideShare une entreprise Scribd logo
1  sur  33
A
Presentation on
from 31-5-2016 to 25-7-2016
SUBMITTED TO: SUBMITTED BY :
Mr. Prateek Agarwal PURSHOTTAM SUMAN
(Asst. professor of electrical- UID: K11238
-engg. ) Electrical Engineering
CONTANTS
• RAILWAY INTRODUCTION
• RAILWAY PLATFORM LIGHT SYSTEM
 LIGHT SENSOR
 TRAIN SCHEDULER SENSOR
• ELECTRICAL LOCOMOTIVE
 HISTORY
 OVERVIEW
 ELECRICAL SUPPLY
 PARTS OF ELECTRIC LOCOMOTIVE
• RAILWAY INTRODUCTION
• Jurisdiction Government of India
• Industry Rail transport
• Founded 16 April 1857 (1857-04-16)
• Headquarters Rail Bhavan, NewDelhi,India
• Area served India
• Key people Suresh prabhu (Ministry of Railways)
• Products Rail transport, Cargotransport, Services, more...
• Revenue 1634.5 billion
Net income 157.8 billion
• Owner(s) Republic of India (100%)
• Employees 1.307 million
• Divisions 17 Railway Zones
• Website www.Indianrailways.gov.in
Conti…
• Railway were first introduced in India in the year 16 April 1853
from Mumbai to thane.
• IR holds over 2,39,281 freight wagons, 62,924 passenger
coaches and 9,013 locomotive (43 steam, 5,345 diesel and
4,568electric locomotive).
• 12,617 passenger and 7421 freight trains daily runs.
• As of 31 march 2013, 20,884 km (31.9;) of the total 65436km
route length was electrified.
• All Electrified sections IR use 25,000 volt AC traction through
overhead catenary delivery.
CAUTION DURING TRAINING
• Obtain permission before operating any high voltage
equipment.
• Maintain an unobstructed access to all electrical panels.
• Wiring or other electrical modifications must be referred to
the Electronics Shop or the Building Coordinator.Avoid
using extension cords whenever possible. If you must use
one, obtain a heavy- duty one that is electrically grounded,
with its own fuse, and install it safely. Extension cords
should not go under doors, across aisles, be hung from the
ceiling, or plugged into other extension cords.
• Always wear globs and shoe .
RAILWAY PLATFORM LIGHT SYSTEM
 Required large amount of power .
 7-8 kw per day
 for saving power at the station sensor technique are
used.
 After it we required only around 4kw power only.
…
Two types of
sensor are
used—
Light
sensor
Train
scheduler
sensor
• Work on sun light
Day time light intensity high so all station lights is off.
Evening to night light intensity is low so all lights is on.
Light sensor
Train scheduler sensor
• Set at starting of platforms.
• Both sensors are connected to the two
contractor boxes contractor c1 and c2.
• Two sensor uses
Conti…
• 30% light is on When train
is not present on the platform.
• Remaining 70% of light part
is also on when train entered
to the platform train sensor is
worked.
• The train gone again 70% part of
light is off.
…
• platform power is used for
tube light, fans and stalls etc.
• Automatically worked device.
• signaling system also
connected.
• Installing cost :- 40,000-
50,000rs per platform.
ELECTRIC LOCOMOTIVE
• Locomotives in India consist of electric and diesel
locomotives. Locomotives are also
called locos or engines.
• An electric locomotive is a locomotive powered by
electricity from overhead lines, an on-board energy
storage device such as a chemical battery or fuel cell.
• Electricity is used to eliminate smoke and take
advantage of the high efficiency of electric motors.
OVERVIEW OF ELECTRIC LOCOMOTIVE
• Now a days all locos are running
through Electricity with the help of
OHE line.
• Pantograph is used to connect the
loco with OHE line.
• Loco contains 2 Bogies, each Bogie
consist of 6 wheels. So totally loco
consists of 12 wheels.
• Pantograph draws 25 KV of
electricity from OHE line, which is
very high AC voltage.
14
Pantograph
Transformer oil testing
• oil, a type of insulating and cooling oil used
in transformers and other electrical equipment,
needs to be tested periodically to ensure that it is
still fit for purpose. This is because it tends to
deteriorate over time.
• To assess the insulating property of dielectric
transformer oil, a sample of the transformer oil is
taken and its breakdown voltage is measured.
The lower the resulting breakdown voltage, the
poorer the quality of the transformer oil.
images
Electricity Supply
OHE
PANTOGRAPH
ROOF-BAR
DJ
QLM
MAIN TRANSFORMER (TFWR)
GR
TFP
OHE
(Over Head equipment)
• A system of conductors / equipments carrying
traction power from traction sub station to
electric locomotive.
PANTOGRAPH
Pantograph is used to connect the loco with OHE line.
• Its use for taking 25 kv AC supply from the OHE.
• Two panto connected on roof.
• Operating Pressure- 6.5-8.0 kg/cm2
• min. Raising Pressure- 4.5 kg/cm2.
• lowering pressure- 3.5 kg/cm2.
• Raising, lowering time- 6-10sec, < 10 sec.
• min. voltage- 85V.
ROOF-BAR
•
1 Main circuit breaker
2 Transducers
3 Pantograph
4 Resistor harmonic filter
5 Surge arrestor
6 Roof line
DJ
(High Voltage Circuit Breaker)
• Use for close and open of connection b/w
OHE and main Transformer.
• C.B operate to pneumatic pressure.
• Remotely control by switch which place in
cabin.
• operate also when relay open.
• Two types of DJ
 Air Circuit Breaker
 Vacuum Circuit Breaker
QLM
(Over Current Protection Relay)
• Its main transformer over current relay.
• Place in relay board Cab no. 2.
• Connected b/w DJ and main Transformer.
• When current is more then 300Amp then
relay energies and DJ will be open.
GR
(Graduator)
• work as a regulator.
• Tap changer.
• The output voltage of a transformer varies
according to the turns ratio of the primary and
the secondary windings of the transformer. It
can appreciated that at any point of the primary
or the secondary winding the voltage is
different from any other point on the same
winding because these points are at different
ratios with respect to the other winding.
…
• Broadly tap-changers can be divided into two
categories-namely off-load and on-load.
• Off-load tap-changers cannot be operated while
current is flowing in the circuit. Off-load tap-
changers are used mainly for non-critical
applications where a momentary interruption in
the current can be tolerated. Hence, such tap-
changers have no use in traction duty.
• In traction only on-load tap-changers (OLTC) are
used. They are capable of changing the taps
rapidly without interrupting the flow of current.
TFP
• Its primary winding of main transformer.
• TFP has 288 turns.
• TFP-1,2 are secondary winding of main
transformer.
• TFP-1,2 give supply traction motor by traction
power circuit.
Electric-locomotive
Parts Of Electric Locomotive
• Transformer
• Asynchronous Motor
• Axle Brush
• Battery
• Bucholz Relay
• Camshaft
• Cannon Box
• Chopper Control
28
…
• Circuit Breaker
• Contactor
• Converter
• Cooling Fans
• Creep Control
• DC Link
• Dynamic Braking
• Grid
…
• Ground Relay
• GTO Thyristor
• IGBT
• Inverter
• Jerk Limit
• Line Breaker
• Master Controller
• Motor Blowers
…
• Notching Relay
• No-Volt Relay
• Overload Relay
• Pantograph
• Rectifier
• Relay
• Resistance Control
• SEPEX
…
• Shoegear
• Synchronous Motor
• Tap Changer
• Thyristor
• Transformer
• Transistor
• Wheel Spin
• Wheel Spin Relay (WSR)
.
.

Contenu connexe

Tendances

Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTNikunj Parashar
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive pptSubhash kumar
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial TrainingLokesh Parihar
 
Overhead Electrification
Overhead Electrification Overhead Electrification
Overhead Electrification Suresh Sunny
 
Railway Industrial Training Report
Railway Industrial Training ReportRailway Industrial Training Report
Railway Industrial Training ReportLokesh Parihar
 
Pantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction ControlPantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction ControlKelvin Lam
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankitAnkit Verma
 
NWR summer training ppt
NWR summer training pptNWR summer training ppt
NWR summer training pptKaushu Deshwal
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMSaikumarDendi
 
Pantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactorPantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactorvishalgohel12195
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial TrainingLokesh Parihar
 

Tendances (20)

Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 
Overhead Electrification
Overhead Electrification Overhead Electrification
Overhead Electrification
 
Railway Industrial Training Report
Railway Industrial Training ReportRailway Industrial Training Report
Railway Industrial Training Report
 
electric traction
electric tractionelectric traction
electric traction
 
Pantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction ControlPantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction Control
 
Train lighting
Train lightingTrain lighting
Train lighting
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
Eletric traction
Eletric tractionEletric traction
Eletric traction
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankit
 
NWR summer training ppt
NWR summer training pptNWR summer training ppt
NWR summer training ppt
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
Pantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactorPantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactor
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
 
Electrical traction
Electrical traction Electrical traction
Electrical traction
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 

En vedette

Pantograph Failure & Analysis
Pantograph Failure & AnalysisPantograph Failure & Analysis
Pantograph Failure & AnalysisKelvin Lam
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimeKelvin Lam
 
Magnetic components used in train pantograph to reduce arcing
Magnetic components used in train pantograph to reduce arcingMagnetic components used in train pantograph to reduce arcing
Magnetic components used in train pantograph to reduce arcingSaurabh Mishra
 
CHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINCHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINAditya Shiva Appalla
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil LtdaSistema FIEB
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed trainmechanical Singh
 
Electric Traction
Electric Traction Electric Traction
Electric Traction ZunAib Ali
 

En vedette (9)

Pantograph Failure & Analysis
Pantograph Failure & AnalysisPantograph Failure & Analysis
Pantograph Failure & Analysis
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing Regime
 
Magnetic components used in train pantograph to reduce arcing
Magnetic components used in train pantograph to reduce arcingMagnetic components used in train pantograph to reduce arcing
Magnetic components used in train pantograph to reduce arcing
 
CHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINCHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAIN
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
 
Traction motor
Traction motorTraction motor
Traction motor
 
Bullet train
Bullet trainBullet train
Bullet train
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
Electric Traction
Electric Traction Electric Traction
Electric Traction
 

Similaire à Railway ppt

Delhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxDelhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxMAYANKSHARMA852342
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawalDhiraj Mahajan
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentationAnuragKumar528
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.pptssuserf805c8
 
north-western railway ,ajmer rajasthan.pptx
north-western railway ,ajmer rajasthan.pptxnorth-western railway ,ajmer rajasthan.pptx
north-western railway ,ajmer rajasthan.pptxManish Gangwal
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptDrAyyarKandasamy
 
Industrial Training PPT-Divyansh Khelani.pptx
Industrial Training PPT-Divyansh Khelani.pptxIndustrial Training PPT-Divyansh Khelani.pptx
Industrial Training PPT-Divyansh Khelani.pptxDivyanshKhelani1
 
Supply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptSupply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptDrAyyarKandasamy
 

Similaire à Railway ppt (20)

Delhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxDelhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptx
 
Railway training
Railway trainingRailway training
Railway training
 
Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
Metro train
Metro trainMetro train
Metro train
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentation
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.ppt
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
north-western railway ,ajmer rajasthan.pptx
north-western railway ,ajmer rajasthan.pptxnorth-western railway ,ajmer rajasthan.pptx
north-western railway ,ajmer rajasthan.pptx
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Bharat singh 1
Bharat singh 1Bharat singh 1
Bharat singh 1
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Industrial Training PPT-Divyansh Khelani.pptx
Industrial Training PPT-Divyansh Khelani.pptxIndustrial Training PPT-Divyansh Khelani.pptx
Industrial Training PPT-Divyansh Khelani.pptx
 
Supply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptSupply systems for Electric Traction.ppt
Supply systems for Electric Traction.ppt
 

Dernier

Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 

Dernier (20)

Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 

Railway ppt

  • 1. A Presentation on from 31-5-2016 to 25-7-2016 SUBMITTED TO: SUBMITTED BY : Mr. Prateek Agarwal PURSHOTTAM SUMAN (Asst. professor of electrical- UID: K11238 -engg. ) Electrical Engineering
  • 2. CONTANTS • RAILWAY INTRODUCTION • RAILWAY PLATFORM LIGHT SYSTEM  LIGHT SENSOR  TRAIN SCHEDULER SENSOR • ELECTRICAL LOCOMOTIVE  HISTORY  OVERVIEW  ELECRICAL SUPPLY  PARTS OF ELECTRIC LOCOMOTIVE
  • 3. • RAILWAY INTRODUCTION • Jurisdiction Government of India • Industry Rail transport • Founded 16 April 1857 (1857-04-16) • Headquarters Rail Bhavan, NewDelhi,India • Area served India • Key people Suresh prabhu (Ministry of Railways) • Products Rail transport, Cargotransport, Services, more... • Revenue 1634.5 billion Net income 157.8 billion • Owner(s) Republic of India (100%) • Employees 1.307 million • Divisions 17 Railway Zones • Website www.Indianrailways.gov.in
  • 4. Conti… • Railway were first introduced in India in the year 16 April 1853 from Mumbai to thane. • IR holds over 2,39,281 freight wagons, 62,924 passenger coaches and 9,013 locomotive (43 steam, 5,345 diesel and 4,568electric locomotive). • 12,617 passenger and 7421 freight trains daily runs. • As of 31 march 2013, 20,884 km (31.9;) of the total 65436km route length was electrified. • All Electrified sections IR use 25,000 volt AC traction through overhead catenary delivery.
  • 5. CAUTION DURING TRAINING • Obtain permission before operating any high voltage equipment. • Maintain an unobstructed access to all electrical panels. • Wiring or other electrical modifications must be referred to the Electronics Shop or the Building Coordinator.Avoid using extension cords whenever possible. If you must use one, obtain a heavy- duty one that is electrically grounded, with its own fuse, and install it safely. Extension cords should not go under doors, across aisles, be hung from the ceiling, or plugged into other extension cords. • Always wear globs and shoe .
  • 6.
  • 7. RAILWAY PLATFORM LIGHT SYSTEM  Required large amount of power .  7-8 kw per day  for saving power at the station sensor technique are used.  After it we required only around 4kw power only.
  • 8. … Two types of sensor are used— Light sensor Train scheduler sensor
  • 9. • Work on sun light Day time light intensity high so all station lights is off. Evening to night light intensity is low so all lights is on. Light sensor
  • 10. Train scheduler sensor • Set at starting of platforms. • Both sensors are connected to the two contractor boxes contractor c1 and c2. • Two sensor uses
  • 11. Conti… • 30% light is on When train is not present on the platform. • Remaining 70% of light part is also on when train entered to the platform train sensor is worked. • The train gone again 70% part of light is off.
  • 12. … • platform power is used for tube light, fans and stalls etc. • Automatically worked device. • signaling system also connected. • Installing cost :- 40,000- 50,000rs per platform.
  • 13. ELECTRIC LOCOMOTIVE • Locomotives in India consist of electric and diesel locomotives. Locomotives are also called locos or engines. • An electric locomotive is a locomotive powered by electricity from overhead lines, an on-board energy storage device such as a chemical battery or fuel cell. • Electricity is used to eliminate smoke and take advantage of the high efficiency of electric motors.
  • 14. OVERVIEW OF ELECTRIC LOCOMOTIVE • Now a days all locos are running through Electricity with the help of OHE line. • Pantograph is used to connect the loco with OHE line. • Loco contains 2 Bogies, each Bogie consist of 6 wheels. So totally loco consists of 12 wheels. • Pantograph draws 25 KV of electricity from OHE line, which is very high AC voltage. 14 Pantograph
  • 15.
  • 16. Transformer oil testing • oil, a type of insulating and cooling oil used in transformers and other electrical equipment, needs to be tested periodically to ensure that it is still fit for purpose. This is because it tends to deteriorate over time. • To assess the insulating property of dielectric transformer oil, a sample of the transformer oil is taken and its breakdown voltage is measured. The lower the resulting breakdown voltage, the poorer the quality of the transformer oil.
  • 19. OHE (Over Head equipment) • A system of conductors / equipments carrying traction power from traction sub station to electric locomotive.
  • 20. PANTOGRAPH Pantograph is used to connect the loco with OHE line. • Its use for taking 25 kv AC supply from the OHE. • Two panto connected on roof. • Operating Pressure- 6.5-8.0 kg/cm2 • min. Raising Pressure- 4.5 kg/cm2. • lowering pressure- 3.5 kg/cm2. • Raising, lowering time- 6-10sec, < 10 sec. • min. voltage- 85V.
  • 21. ROOF-BAR • 1 Main circuit breaker 2 Transducers 3 Pantograph 4 Resistor harmonic filter 5 Surge arrestor 6 Roof line
  • 22. DJ (High Voltage Circuit Breaker) • Use for close and open of connection b/w OHE and main Transformer. • C.B operate to pneumatic pressure. • Remotely control by switch which place in cabin. • operate also when relay open. • Two types of DJ  Air Circuit Breaker  Vacuum Circuit Breaker
  • 23. QLM (Over Current Protection Relay) • Its main transformer over current relay. • Place in relay board Cab no. 2. • Connected b/w DJ and main Transformer. • When current is more then 300Amp then relay energies and DJ will be open.
  • 24. GR (Graduator) • work as a regulator. • Tap changer. • The output voltage of a transformer varies according to the turns ratio of the primary and the secondary windings of the transformer. It can appreciated that at any point of the primary or the secondary winding the voltage is different from any other point on the same winding because these points are at different ratios with respect to the other winding.
  • 25. … • Broadly tap-changers can be divided into two categories-namely off-load and on-load. • Off-load tap-changers cannot be operated while current is flowing in the circuit. Off-load tap- changers are used mainly for non-critical applications where a momentary interruption in the current can be tolerated. Hence, such tap- changers have no use in traction duty. • In traction only on-load tap-changers (OLTC) are used. They are capable of changing the taps rapidly without interrupting the flow of current.
  • 26. TFP • Its primary winding of main transformer. • TFP has 288 turns. • TFP-1,2 are secondary winding of main transformer. • TFP-1,2 give supply traction motor by traction power circuit.
  • 28. Parts Of Electric Locomotive • Transformer • Asynchronous Motor • Axle Brush • Battery • Bucholz Relay • Camshaft • Cannon Box • Chopper Control 28
  • 29. … • Circuit Breaker • Contactor • Converter • Cooling Fans • Creep Control • DC Link • Dynamic Braking • Grid
  • 30. … • Ground Relay • GTO Thyristor • IGBT • Inverter • Jerk Limit • Line Breaker • Master Controller • Motor Blowers
  • 31. … • Notching Relay • No-Volt Relay • Overload Relay • Pantograph • Rectifier • Relay • Resistance Control • SEPEX
  • 32. … • Shoegear • Synchronous Motor • Tap Changer • Thyristor • Transformer • Transistor • Wheel Spin • Wheel Spin Relay (WSR)
  • 33. . .