1. Page 1 of 1
Rajendra Prajapat
Work Summary:
Skills:
Experience Summary:
Key Expertise:
Diploma Mechanical with 3.4 years of experience in piping design engineering, experience in
equipment & pipinglayouts,piperouting, isometric drawings, section drawing, 3D modeling, Bill
of material, pipe size & ASME code & standards.
Currently working as Engineer in Larsen & Toubro Technology Services, Process Engineering
Dept. (Mechanical Engineer), Vadodara from Aug 2011 to till date.
Overall 3.4 years of experience in Piping Design in EPCM projects of oil & gas and Chemical
plants, food.
Worked extensively in creating 3D Models using different software tools.
Prepared piping & equipment layout, isometric, GA drawing, BOQ, section drawings.
Adapt to challenging conditions with quick learning attitude.
Exceptional leadership skills,Motivational,problemsolvingand decision makingcapabilities,
coupled with excellent communication and interpersonal skills.
Currently working for Stepan, US for greenfield project.
Prepared 3d model for various discipline like piping, equipment, plumbing, HVAC,
firefighting.
Extensive working experience in tools like AutoCAD & AutoCAD plant 3D,auto cad MEP,
Inventor.
Preparation of Piping BOQ.
Generation of Piping Isometrics and Piping layouts and Sectional Views from 3D model.
Good written and oral communication skills
Co-ordination with Client, Vendors and Contractors
Domain Mechanical Engineer
Tools
Auto Cad MEP
Auto Cad Plant 3D
Auto Cad
Autodesk Inventor
Auto plant Bentley
CEASER (Basic)
Sp 3d (modeling)
2. Page 2 of 2
Rajendra Prajapat
Project Details:
Project 1:-
Project 2:
Project Name Mondelez (DDC)
Duration 5 Months
Team Size 5 people
Description Greenfield project for MONDELEZ international , Aravalli
Role &
Contribution
Role: Piping & Layouting Design Engineer
Responsibilities:
Preparation of conceptual equipment layouts.
Pipe lineroutingas per P&IDs in auto plant3D.
Prepared 3d model for piping& process equipment.
Pipe sizing& prepared UFD for utility system.
Preparation of PipingBOQ.
Generation of Pipinglayouts and Sectional Views from 3D model.
Pipe span calculationsand selection of supports
Pipe load calculation.
Co-ordination internally (with Electrical,HVAC & Phe, firefighting,lighting)
and with clientfor clash free 3D modeling.
Prepared GA drawing for piping.
Project Name PepsiCo south GF
Duration 4 months
Team Size 7 people
Description Auto cad MEP Modeling for Piping, Equipment, PHE, Firefighting.
Role &
Contribution
Role : Piping Design Engineer
Responsibilities:
Pipe lineroutingas per P&IDs in MEP.
3D Modelingof plantEquipment on AutoCAD.
3D Modelingof PHE (public health engg.) on AutoCAD MEP.
3D Modelingof firefightingon AutoCAD MEP.
Co-ordination with other disciplinefor clash free3D modeling.
Clash check & clash resolution for all discipline.
Extraction of Pipinglayouts and Sectional Views from 3D model.
Review of 3D Model in Navisworks.
Tools AutoCAD & Auto cad MEP
3. Page 3 of 3
Rajendra Prajapat
Checking of vendor drawings and approvingthe same.
On Site co-ordination duringthe execution phase.
Prepared equipment layoutas per process requirement.
Extraction of Isometric drawings from 3D model
Tools AutoCAD & AutoCAD plant 3d.
Project 3:
Project Name Continental tire India limited
Duration 7 Months
Team Size 9 people
Description 3d modeling in Mep & piping layout
Role&
Contribution
Role: Piping Design Engineer
Responsibilities:
Preparation of conceptual equipment layouts.
3D Modeling of equipment, piping, ducting, structure & cable tray.
Generation of Piping layouts and Sectional Views from 3D model
Extraction of Isometric drawings from 3D model
Checking of civil drawings with reference to equipment layouts
Preparation of General Arrangement Drawing with sections
Preparation of Piping BOQ
On Site co-ordination duringthe execution phase.
Interdisciplinary co-ordination for clash check.
Checking and approve the contractor & vendor drawings.
Tools AutoCAD Plant 3D ,AutoCAD mep & AutoCAD
Project 4:
Project Name Bhilai steel plant
Duration 1 Months
Team Size 4 people
Description Prepared drawings from raster image.
Role&
Contribution
Role: team member
Responsibilities:
Prepared drawings fromraster image .
Tools AutoCAD
Project 5:
4. Page 4 of 4
Rajendra Prajapat
Project Name
ADDAR
CUSTOMBER NAME: Addar Speciality Chemical
Production Plant, Jubail, Saudi Arabia.
Duration 8 Months
Team Size 9 people
Description 3d modeling & layout detailing.
Role&
Contribution
Role: Piping design Engineer
Responsibilities:
Preparation of plot plan layout,tank farmequipment layouts.
Preparation of 3D Modeling of Equipment, Structure, pipingwith
reference to equipment layouts,GA drawings and civil drawings.
Regular co-ordination with Clientand Other Disciplinesfor deliverables
and inputs requirement etc.,
Regular co-ordination with project manager & mechanical coordinator for
the project requirements.
Tools AutoCAD & Autocad plant3d
Project 6:
Project Name Nerolac Paints Limited , Hosur,Tamil Nadu
Duration 5 Months
Team Size 5 people
Description 3d modeling & layout detailing.
Role&
Contribution
Role: Trainee
Responsibilities:
Preparation of conceptual equipment layout
Pipe rack routingwith sections and pipingloads
Modeling of Equipment’s, piping,supports and equipment, GA drawings
and civil drawings.
Generation of Pipinglayouts and Sectional Views from 3D model
Preparation of Typical pipingdrawings
Generation of Isometric drawings from 3D model
Preparation of PipingBOQ
Tools AutoCAD & Autocad plant 3d
Project 7:
Project Name
Stepan FFl-2 Moerdijk Alkoxylation Project Netherland
CUSTOMBER NAME: Stepan
Duration 6 Months
Team Size 6 people
5. Page 5 of 5
Rajendra Prajapat
Description Piping & equipment layout detailing.
Role&
Contribution
Role: Trainee
Responsibilities:
Modeling of Equipments, piping,supports and equipment, GA drawings
and civil drawings.
Generation of Pipinglayouts and Sectional Views from 3D model
Preparation of Typical pipingdrawings
Generation of Isometric drawings from 3D model
Preparation of PipingBOQ
Tools AutoCAD & Autocad plant 3d
Project 8:
Project Name
Stepan FFl-3 GULF COAST GREENFIELD
ALKOXYLATION PROJECT GEISMER, LOUISIANA
Duration 2 Months
Team
Size
6
people,onging
Description Piping & equipment layout detailing.
Role&
Contribution
Role: piping lead engineer
Responsibilities:
Prepared piping material specification in Autocad plant3d.(Admin work).
Prepared piping& equipment 3d model in Autocad plant3d.
Pipe rack design & rack load calculation.
Tools AutoCAD & Autocad plant 3d
Project 9:
Project Name Chevron EGTL
Duration 2 Months
Team Size 8 people
Description Isometric & P&id
Role&
Contribution
Role: team member
Responsibilities:
Generation of Isometric drawings form 2d layoutdrawings in Auto cad.
Preparation of Piping P&id in Auto cad.
6. Page 6 of 6
Rajendra Prajapat
Educational Qualification & Certifications:
Personal information:
Tools AutoCAD
B.E A.M.I.E (The Institution of Engineers, India)-Pursuing
Diploma
Mechanical EngineeringCompleted in 2011 from Govt. R.C. khetan Polytechnic college
Jaipur (RAJ).
E-mail Rajendra.prajapat4@gmail.com
Languages known English,Hindi
Passport no. Z2952888
Mob. no. +91-9722706025,8758592523