SlideShare une entreprise Scribd logo
1  sur  4
RISHIKESH KUMAR YADAVRISHIKESH KUMAR YADAV
Contact: 7898160036, ~ E-Mail: rishiswta@yahoo.in, rituvendra.90@gmail.com
Seeking managerial assignments Project execution , Erection and Alignment of boiler and turbine ,Mechanical
Maintenance / Operations With a reputed organization in thermal power industry.
Professional Précis
 A competent professional with complete over 5 years 8 Months of experience in project execution, erection
and alignment , Boiler,Turbine and its all auxiliaries, and Erection, alignment of static and rotary equipments
chemical , petrochemical , Oil and Gas ( refinery) industries .
 In-depth knowledge of managing maintenance operations for reducing breakdown / downtime & enhancing
operational effectiveness of equipment.
 Comprehensive experience in monitoring projects with respect to cost, resource deployment, time over-runs and
quality compliance to ensure execution of projects within the time & cost parameters.
 Gained hands-on experience at planning & scheduling work for major overhauling of steam turbines & their driven
equipments, boilers and auxiliaries units, turbine and their auxiliary units.
 Mechanical Maintenance of power plant equipments, setting priorities, develop a work schedule, monitor progress
towards goals, making decisions, weighing risk and track activities.
 An effective communicator with strong analytical, problem solving & organizational abilities
Skill Set
Project execution erection and alignment of
exchanger column, vessels and pupmps etc. and
maintenance
(Turbine / and turbine Auxiliaries),
pumps, and heat exchangers etc. Project
execution and Mechanical Maintenance)
Resource Management
Quality Improvement
Project Coordination
Academia
 B.Tech. (Mechanical Engineering) from Institute of Engineering & Technology, Faizabad, Dr. Ram Manohar
Lohia Avadh University, Faizabad, U.P. in 2009. Secured 65% marks.
 12th
from Ram Jatan Inter College, Deoria, U.P. Board in 2005. Secured 62% marks.
 10th
from Nehru Inter College, Kushinagar, U.P. Board in 2001.Secured 56.17%
Employment Scan
WORK EXPERIENCE; 5 years 8 Months of experience in the power sector industries and Refinery .
Current Employer : - LARSEN AND TOUBRO LIMITED (HCP)
Designation :- Senior Engineer
Site :- Reliance Industries Limited Jam Nagar Gujrat.
Work Duration :- Since 2 – Apr -2014 to still now
Work Responsibility :- Project Execution, erection and alignment of all the rotary and static equipment. Like
( compressor and pumps. Blowers, Exchangers etc.)
Contribute to the planning of work programmes to maximise overall efficiency; and to
assist
Other members of the team as required to carry out the planned work programmes.
preparation of Material Requisition, Datasheets, Technical bid evaluation, Vendor Print
review, assistance in commissioning / trouble shooting at site for Rotating equipments like
Compressors, Pumps, Turbine. Etc.
Experience involving execution / monitoring / billing / Quantity Surveying /
Co-ordination with Clients, Consultants, and Contractors in construction work of
large scale EPC projects. End-to-end knowledge on testing and safety standards .
Previous Employer :- LARSEN &TUBRO LIMITED ( THERMAL POWER PLANT CONSTRUCTION
DIVISION)
Designation : - Senior Engineer Project
Site : - Jay Pee Nigrie Super Thermal Power Project, Nigrie Singrauli M.P.
Work Duration : - Since July 2011 to 24 March 2014.
Accountabilities;
 cost reduction Responsible for Project execution, Erection and alignment of steam turbine of 2x660 MW Power
Plant, (Turbine, condenser, and all Auxiliaries of Turbine),all the static and rotatory equipment.
 Planning and implementing about project schedules for improving the overall reliability and safety of plant
Equipment & machinery
 Organizing activities for continual improvement & working towards activities
Highlights:
 Site Regarding HP –IP spigot tightness high face run out of HP rear, convexity on HP turbine rear face resulting
in HIGH coupled run out of HP / IP rotor.
 Deftly handled the process (activities).
 Successfully completed the trial run-up of boiler feed pump.
 Successfully completion of trial running of condensate extraction pump.
 Successfully completed up to the barring gear of Turbine .
 To completed the hydro test & vacuum test of condenser
 Marked significant reduction in H.P front coupled run out is to 0.06mm and result was positive.
Previous Employer
Company Name :- BINA POWER SUPPLY COMPANY LIMITED ( JAY PEE GROUP)
Designation : - Executive engineer ( Project AND Maintenance)
Work duration :- Since July 2009 to June 2011
Accountabilities:
 Responsible for project execution Erection and alignment of 2x 250 mw Power plant, (Turbine, Condenser,
Condensate Extraction Pump, Boiler Feed Pump, Heat Exchangers, Deaerater etc.).
 Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability
and safety of plant equipment & machinery.
 Reviewing history records of key machines for repeated breakdowns to analyze and carrying out necessary
corrective actions using maintenance management services.
 Organizing activities for continual improvement & working towards cost reduction activities
 Maintenance of the facilities mechanical plant and equipment during normal operation as well as planned and
unplanned shutdown periods, using internationally accepted standards and procedures and guidelines.
Beyond Academia
 Functioned as an active team member of the school kabaddi winning team for over 3 years straight.
 Captained the University-Campus Cricket team for over 3 years.
 Active participation as a team member in various games at residential campus during the Annual Sports Meet.
Personal Dossier
Permanent Address : Rishikesh Kumar Yadav S / o Pramhans Yadav,
Village : Badhaya Khurd,
Post office - : Sukrauli Bazaar,
District : Kushinagar-274207 (U.P)
Date of Birth : 20th
April 1985
Languages Known : Hindi, English & Bhojpuri
RISHIKESH KUMAR
YADAV
Resume R

Contenu connexe

Tendances (19)

gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
JANARDAN
JANARDANJANARDAN
JANARDAN
 
nazeemres
nazeemresnazeemres
nazeemres
 
ResumE-Rakesh Kumar Singh
ResumE-Rakesh Kumar SinghResumE-Rakesh Kumar Singh
ResumE-Rakesh Kumar Singh
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
Resume
ResumeResume
Resume
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
surya's resume
surya's resumesurya's resume
surya's resume
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
 
Amit resume
Amit resumeAmit resume
Amit resume
 
Satyajit Mishra (1) (1) (1)
Satyajit Mishra (1) (1) (1)Satyajit Mishra (1) (1) (1)
Satyajit Mishra (1) (1) (1)
 
Magdy Hussine CV
Magdy Hussine CVMagdy Hussine CV
Magdy Hussine CV
 

En vedette (6)

LEGENDA PIETREI SACRA_LIMBA ENGLEZA
LEGENDA PIETREI SACRA_LIMBA ENGLEZALEGENDA PIETREI SACRA_LIMBA ENGLEZA
LEGENDA PIETREI SACRA_LIMBA ENGLEZA
 
U J G
U J GU J G
U J G
 
LEGENDA STEAGULUI CU CAP DE LUP_LIMBA ROMANA
LEGENDA STEAGULUI CU CAP DE LUP_LIMBA ROMANALEGENDA STEAGULUI CU CAP DE LUP_LIMBA ROMANA
LEGENDA STEAGULUI CU CAP DE LUP_LIMBA ROMANA
 
Certificate_1
Certificate_1Certificate_1
Certificate_1
 
LEGENDA PIETREI SACRE_LIMB FRANCEZA
LEGENDA PIETREI SACRE_LIMB FRANCEZALEGENDA PIETREI SACRE_LIMB FRANCEZA
LEGENDA PIETREI SACRE_LIMB FRANCEZA
 
LEGENDA PIETREI SACRE_LIMBA ROMANA
LEGENDA PIETREI SACRE_LIMBA ROMANALEGENDA PIETREI SACRE_LIMBA ROMANA
LEGENDA PIETREI SACRE_LIMBA ROMANA
 

Similaire à Resume R (20)

CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
chayana
chayanachayana
chayana
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 
Resume
ResumeResume
Resume
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Resume 15 hvac
Resume 15 hvacResume 15 hvac
Resume 15 hvac
 
aravind ..
aravind ..aravind ..
aravind ..
 
Nitesh Hinduja CV
Nitesh Hinduja CVNitesh Hinduja CV
Nitesh Hinduja CV
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Pankaj_Prajapati
Pankaj_PrajapatiPankaj_Prajapati
Pankaj_Prajapati
 

Resume R

  • 1. RISHIKESH KUMAR YADAVRISHIKESH KUMAR YADAV Contact: 7898160036, ~ E-Mail: rishiswta@yahoo.in, rituvendra.90@gmail.com Seeking managerial assignments Project execution , Erection and Alignment of boiler and turbine ,Mechanical Maintenance / Operations With a reputed organization in thermal power industry. Professional Précis  A competent professional with complete over 5 years 8 Months of experience in project execution, erection and alignment , Boiler,Turbine and its all auxiliaries, and Erection, alignment of static and rotary equipments chemical , petrochemical , Oil and Gas ( refinery) industries .  In-depth knowledge of managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment.  Comprehensive experience in monitoring projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure execution of projects within the time & cost parameters.  Gained hands-on experience at planning & scheduling work for major overhauling of steam turbines & their driven equipments, boilers and auxiliaries units, turbine and their auxiliary units.  Mechanical Maintenance of power plant equipments, setting priorities, develop a work schedule, monitor progress towards goals, making decisions, weighing risk and track activities.  An effective communicator with strong analytical, problem solving & organizational abilities Skill Set Project execution erection and alignment of exchanger column, vessels and pupmps etc. and maintenance (Turbine / and turbine Auxiliaries), pumps, and heat exchangers etc. Project execution and Mechanical Maintenance) Resource Management Quality Improvement Project Coordination Academia  B.Tech. (Mechanical Engineering) from Institute of Engineering & Technology, Faizabad, Dr. Ram Manohar Lohia Avadh University, Faizabad, U.P. in 2009. Secured 65% marks.  12th from Ram Jatan Inter College, Deoria, U.P. Board in 2005. Secured 62% marks.  10th from Nehru Inter College, Kushinagar, U.P. Board in 2001.Secured 56.17% Employment Scan WORK EXPERIENCE; 5 years 8 Months of experience in the power sector industries and Refinery . Current Employer : - LARSEN AND TOUBRO LIMITED (HCP) Designation :- Senior Engineer Site :- Reliance Industries Limited Jam Nagar Gujrat.
  • 2. Work Duration :- Since 2 – Apr -2014 to still now Work Responsibility :- Project Execution, erection and alignment of all the rotary and static equipment. Like ( compressor and pumps. Blowers, Exchangers etc.) Contribute to the planning of work programmes to maximise overall efficiency; and to assist Other members of the team as required to carry out the planned work programmes. preparation of Material Requisition, Datasheets, Technical bid evaluation, Vendor Print review, assistance in commissioning / trouble shooting at site for Rotating equipments like Compressors, Pumps, Turbine. Etc. Experience involving execution / monitoring / billing / Quantity Surveying / Co-ordination with Clients, Consultants, and Contractors in construction work of large scale EPC projects. End-to-end knowledge on testing and safety standards . Previous Employer :- LARSEN &TUBRO LIMITED ( THERMAL POWER PLANT CONSTRUCTION DIVISION) Designation : - Senior Engineer Project Site : - Jay Pee Nigrie Super Thermal Power Project, Nigrie Singrauli M.P. Work Duration : - Since July 2011 to 24 March 2014. Accountabilities;  cost reduction Responsible for Project execution, Erection and alignment of steam turbine of 2x660 MW Power Plant, (Turbine, condenser, and all Auxiliaries of Turbine),all the static and rotatory equipment.  Planning and implementing about project schedules for improving the overall reliability and safety of plant Equipment & machinery  Organizing activities for continual improvement & working towards activities Highlights:  Site Regarding HP –IP spigot tightness high face run out of HP rear, convexity on HP turbine rear face resulting in HIGH coupled run out of HP / IP rotor.  Deftly handled the process (activities).  Successfully completed the trial run-up of boiler feed pump.  Successfully completion of trial running of condensate extraction pump.  Successfully completed up to the barring gear of Turbine .  To completed the hydro test & vacuum test of condenser  Marked significant reduction in H.P front coupled run out is to 0.06mm and result was positive. Previous Employer Company Name :- BINA POWER SUPPLY COMPANY LIMITED ( JAY PEE GROUP) Designation : - Executive engineer ( Project AND Maintenance) Work duration :- Since July 2009 to June 2011
  • 3. Accountabilities:  Responsible for project execution Erection and alignment of 2x 250 mw Power plant, (Turbine, Condenser, Condensate Extraction Pump, Boiler Feed Pump, Heat Exchangers, Deaerater etc.).  Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipment & machinery.  Reviewing history records of key machines for repeated breakdowns to analyze and carrying out necessary corrective actions using maintenance management services.  Organizing activities for continual improvement & working towards cost reduction activities  Maintenance of the facilities mechanical plant and equipment during normal operation as well as planned and unplanned shutdown periods, using internationally accepted standards and procedures and guidelines. Beyond Academia  Functioned as an active team member of the school kabaddi winning team for over 3 years straight.  Captained the University-Campus Cricket team for over 3 years.  Active participation as a team member in various games at residential campus during the Annual Sports Meet. Personal Dossier Permanent Address : Rishikesh Kumar Yadav S / o Pramhans Yadav, Village : Badhaya Khurd, Post office - : Sukrauli Bazaar, District : Kushinagar-274207 (U.P) Date of Birth : 20th April 1985 Languages Known : Hindi, English & Bhojpuri RISHIKESH KUMAR YADAV