Presented By:
  RAVI KUMAR            http://www.bilzits.com/servicests_en.asp


HCL Technologies Ltd.
2
3
There are better ways …
  wish we didn’t have to
  deal with it.

         http://www.cmsmyth.com/wp-content/uploads/2011/06/rfpgraphic2.png
                                                                             4
What is the purpose and why?




•   Early stage for procurement of services
•   Specification on details of the intended procurement.
•   Competitive - Selection mechanism prior to outsourcing or offshoring
•   Used in re-evaluation as part of strategic sourcing.
             http://ukhypnosis.com/2010/07/10/cbt-with-intolerance-of-uncertainty-and-chronic-worry/   5
Uncertainty & Unknowns
• Quite a challenge at RFP stage…
• They are not all bad; it just means options… more so for agile projects.
• Options need to identified, understood and communicated.




                http://militarytobusiness.blogspot.in/2010/08/dealing-with-uncertainty.html   6
Steps involved



•   Notice of RFP
•   Pre-Proposal Walkthrough
•   Written Clarifications & Questions
•   Response to Written Clarifications & Questions
•   Receipt of Written RFP Deadline
•   RFP Defence
•   RFP Evaluation
•   RFP Selection Announcements, Negotiations etc.
                 http://www.blog-bizedge.biz/2011/03/preproposal-positioning.html   7
Deal With Agile
We will do it collectively…
                                                                                 8
          http://www.webpoppy.net/2011/06/how-to-write-a-website-rfp/
Let’s Self Organize !!!
 ( 5-6 member teams)




                                                   9
  http://en.wikipedia.org/wiki/Self-organization
20 minute time boxes




• Iteration 1 – Walkthrough of RFP questions (15 min + 5 min)
• Iteration 2 – War room
• Iteration 3 – Defense
                                                                                        10
                  http://blog.agilebuddy.com/2009/01/significance-of-time-boxing.html
There is limited time …
• Solution strategy approach and NOT the
                                                  Focus !!!
solution itself.
• Highlighted questions are critical.
• Articulate the following
    • How would you approach estimation and
    release planning.
    • Thoughts on contracting & pricing
    •Testing and product quality (Independent
    Testing Teams vs. Self Contained Testers in
    Dev Teams)
    •Onsite offshore execution ,team loading.
• Pick a moderator to have a handle on things
while the discussion goes on.
                                                              11
???

http://memegenerator.net/instance/10235189         12
Vendor Discretion Advised

  Agile Project AHEAD
• Customer business participation.
• Vendor involvement in the decision making process.
• Offshore teams leveraged for only tasks/activities.

                                                        13
• Estimates & Release Plans.
• Contracting Models.
• Project execution strategy (Onsite/Offshore)




                   http://www.investinganswers.com/personal-finance/smart-consumer/5-money-   14
                   rules-are-just-plain-wrong-2482
Project Chartering
• High level system understanding
• User stories - walkthrough
• Define Acceptance Criteria


                            Story Mapping
• Identify Function Flow
• User stories grouping
• Release Plans




                                                15
Estimates
• Collective planning and estimation
• Story points (Scale 1-10) by functional y grouped teams.
• Effort classification.
                            Release Plans
• Quarterly production releases synchronized with non-agile projects
• Logical grouping based on Functional flow and Criticality.
• Only for 6 months…




                                                                       16
Execution Model
• Onsite heavy in the first few sprints.
• Frequent Onsite off shore team rotation.




                                             17
Contracts & Pricing
• T & M Initially
• Switch to FPP after stability
   • CR based pricing for changing requirements
• Frequent travels factored into pricing.
Name: Ravi Kumar
Email ID:
ravikumar.rk@gmail.com
ravikumar.rk@hcl.com

HCL Technologies Ltd.
Agile Outsourcing - Dealing with Agile RFPs
No.                                                                   General
   1 Is the supplier ready to implement the Agile project?
     The project is primarily implemented at the location of CUSTOMER at LOCATION. The supplier indicates how this is
   2 realised. Proven experience with this mode of realisation under an Agile routine is of importance.
     The supplier is in a position to independently convert the WHAT (the system must do) into HOW (this must be realised). The supplier
   3 presents his vision on this subject.
     As Agile is going to be worked in teams constituted of people with different (cultural) backgrounds, a comprehensive culture training /
     team building at the start of the project is obvious. What plans does the supplier have for the purpose and what expenditure of time
   4 and cost are involved in this connection?
   5 Please describe how you would respond to a request to set up an Agile Project in partnership
     Advantages of Agile Environment: What does your company see as the main advantage to an Agile development environment? What
   6 are the key disadvantages?
                                                                  Process & Tools
   1 How does the supplier deal with changes in the requirements (content and priority) during the project?

   2   Which Agile routine does the supplier choose for this project? The substantiation of this choice is of particular importance.
   3   In what way can the management and maintenance of the deliverable software be organised?
   4   How does the supplier ensure the guarantee for the maintainability and quality of the deliverable software?
   5   How does the supplier ensure that the preferred suppliers of CUSTOMER can maintain the system?
       Supplier has experience with tooling in an Agile process.
       What tools has the supplier used for the purpose in the earlier projects?
       For each tool, indicate the purpose for which it was employed within the Agile process.
   6
     How do you typically ensure on Agile projects that senior management in your company and the customer company have
   7 appropriate visibility to make decisions and coordinate other activity?
                                                                        Testing
     What vision does the supplier have on tests during an Agile process?
   1 Make a distinction according to system and acceptance tests.
   2 How your organization views testing as part of a scrum team?
     How your organization would develop testing requirements for a sprint. Include test techniques / methods that would be used and how
   3 they would be used?
   4 What testing should be performed as part of a scrum team?
   5 What approach do you take for agile testing?
   6 How do you achieve collaborative working relationships on agile initiatives in order to ensure quality delivery?
     How your organization view testing as part of a independent team and what will be the best strategy to work with
   7 independent testing teams.
                                                             Contracting & Estimation
     Supplier gives a detailed estimate of the time required for the formulation of all product requirements. The substantiation
     of this estimate is of particular importance.
     Assume the following while you think of a solution for this question
     Simple Requirements: 100 >> Medium Requirements: 150 >>Complex Requirements: 100
   1
     Bidders are requested to indicate their own pricing policy (initial and recurring costs) applicable to the products and services called for.
     Specify the prices and rates for the products and services called for. You should be fully prepared here and need to at least include the
   2 deliverable products and services specified by you.
     For each sprint, present a detailed summary of the costs of the proposed team effort during the turnaround time of project estimated
     on the basis of the total list of the product requirements. In addition, the rate employed for each team member of the proposed team
   3 classification must be indicated.
Contracting & Estimation contd…

  What is the contract model that the vendor would like to propose? Fixed Price will be of primary interest for the customer
  but is willing to consider other contractual models as well. Vendor must justify the different contractual models and
4 justify the most appropriate for the project and clearly articulate the risks and downside of Fixed Price model
  Supplier indicates the project organisation roles, rates, quantities, composition, phasing, sprint duration, tooling etc..
  The substantiation of this organisation and estimates are of particular importance.
  How does the supplier guarantee that the cited capacity and knowledge are indeed available in the same and stable (team) composition
  during the entire project? Consider here also the possible visa problem.
5
                                                                     Release
  Supplier indicates in detail which part of the product requirements referred can be realised within 6 months after the start
  of the project implementation. The substantiation of these assessments is of particular importance. The deadline of 6
  months is an arbitrarily chosen reference time. The starting point here is the project organisation as described and the
1 assessment of the product requirements

    The supplier needs to work together with other CUSTOMER units that do not work according to Agile.
    How does the supplier plan to deal with the units from the CUSTOMER organisation that do not work according to Agile?
2
    How does the supplier guarantee that he will deliver a working software (zero defect delivery) that is deployed in the acceptance/live
    environment made available by CUSTOMER for the purpose after every sprint?
    How does the supplier envisage to be able to contribute towards as high a delivery reliability as possible?
3
  On-Going Application Support & Maintenance: Describe your methodology for providing on-going application support and maintenance
  services, including the following:
  • Application Updates • User Management • Change Management • Problem management and communication procedures •
  Documentation management• Communication and integration with the customer and its processes
  • Problem diagnosis and root-cause analysis of production defects • Review and approval of problem-fix approach and risks • Design
4 Review, Code Inspection, Testing and other quality assurance processes supporting Application Maintenance



    We have limited time and hence I suggest the following…
    - Think about approach to arrive at solution or strategy and NOT the solution itself.
    - The questions that are in bold are critical; focus discussions to overcome the challenges. Specifically the following must be articulated
            > Approach to estimation and release planning.
            > Contracting & Pricing
            > Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams)
            > Onsite offshore execution model with emphasis on team loading.
    - Pick a moderator to have a handle on things while the discussion goes on.

Contenu connexe

Tendances

An Approach to Active Procurement
An Approach to Active ProcurementAn Approach to Active Procurement
An Approach to Active Procurement
Health Informatics New Zealand
 
Customer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfdCustomer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfd
mogambo
 
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
RIA RUI Society
 
Frank Rood - FICO BV
Frank Rood - FICO BVFrank Rood - FICO BV
Frank Rood - FICO BV
Themadagen
 
Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4
Agile NCR 2013 - Archana Joshi -  maintaining agile equilibrium v4Agile NCR 2013 - Archana Joshi -  maintaining agile equilibrium v4
Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4
AgileNCR2013
 
QM-028-QFD(Quality Function Development)
QM-028-QFD(Quality Function Development)QM-028-QFD(Quality Function Development)
QM-028-QFD(Quality Function Development)
handbook
 
The qfd process sutton f03
The qfd process sutton f03The qfd process sutton f03
The qfd process sutton f03
Surya Ratheesh
 

Tendances (17)

An Approach to Active Procurement
An Approach to Active ProcurementAn Approach to Active Procurement
An Approach to Active Procurement
 
Customer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfdCustomer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfd
 
SIM presentation Oct 9 2012
SIM presentation Oct 9 2012SIM presentation Oct 9 2012
SIM presentation Oct 9 2012
 
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
 
Business Value Articulation In Software Projects
Business Value Articulation In Software ProjectsBusiness Value Articulation In Software Projects
Business Value Articulation In Software Projects
 
Scrum process framework
Scrum process frameworkScrum process framework
Scrum process framework
 
Frank Rood - FICO BV
Frank Rood - FICO BVFrank Rood - FICO BV
Frank Rood - FICO BV
 
Agile in highly regulated environments
Agile in highly regulated environmentsAgile in highly regulated environments
Agile in highly regulated environments
 
Qap White Paper
Qap White PaperQap White Paper
Qap White Paper
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4
Agile NCR 2013 - Archana Joshi -  maintaining agile equilibrium v4Agile NCR 2013 - Archana Joshi -  maintaining agile equilibrium v4
Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4
 
Design drawing review bijoy
Design drawing review   bijoyDesign drawing review   bijoy
Design drawing review bijoy
 
Associate Level Business Analyst Program Lectures
Associate Level Business Analyst Program LecturesAssociate Level Business Analyst Program Lectures
Associate Level Business Analyst Program Lectures
 
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
 
IT NPI Process
IT NPI ProcessIT NPI Process
IT NPI Process
 
QM-028-QFD(Quality Function Development)
QM-028-QFD(Quality Function Development)QM-028-QFD(Quality Function Development)
QM-028-QFD(Quality Function Development)
 
The qfd process sutton f03
The qfd process sutton f03The qfd process sutton f03
The qfd process sutton f03
 

En vedette

Delivering Business Value - The Deal Breakers
Delivering Business Value - The Deal BreakersDelivering Business Value - The Deal Breakers
Delivering Business Value - The Deal Breakers
Ravi Kumar
 
DevOps Days 2012 - Going LEAN in IT Services Organization
DevOps Days 2012 -  Going LEAN in IT Services OrganizationDevOps Days 2012 -  Going LEAN in IT Services Organization
DevOps Days 2012 - Going LEAN in IT Services Organization
Ravi Kumar
 
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over ProcessAttaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
Ravi Kumar
 

En vedette (7)

Agile IT Services Manifesto
Agile IT Services ManifestoAgile IT Services Manifesto
Agile IT Services Manifesto
 
Delivering Business Value - The Deal Breakers
Delivering Business Value - The Deal BreakersDelivering Business Value - The Deal Breakers
Delivering Business Value - The Deal Breakers
 
DevOps Days 2012 - Going LEAN in IT Services Organization
DevOps Days 2012 -  Going LEAN in IT Services OrganizationDevOps Days 2012 -  Going LEAN in IT Services Organization
DevOps Days 2012 - Going LEAN in IT Services Organization
 
Embracing Agile for Business Impact: Role of Leadership & Management
Embracing Agile for Business Impact: Role of Leadership & ManagementEmbracing Agile for Business Impact: Role of Leadership & Management
Embracing Agile for Business Impact: Role of Leadership & Management
 
Agile Adoption in IT Services - Evolution over Revolution
Agile Adoption in IT Services - Evolution over RevolutionAgile Adoption in IT Services - Evolution over Revolution
Agile Adoption in IT Services - Evolution over Revolution
 
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
 
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over ProcessAttaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
Attaining Agile Fluency: Coaching Techniques - Focus on Goals Over Process
 

Similaire à Agile india2012 - Dealing with agile RFP

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
Terry Bunio
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
Heidi Owens
 

Similaire à Agile india2012 - Dealing with agile RFP (20)

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Agile concepts
Agile conceptsAgile concepts
Agile concepts
 
Top 10 Agile Metrics
Top 10 Agile MetricsTop 10 Agile Metrics
Top 10 Agile Metrics
 
Nearshore Best Practices Workshop
Nearshore Best Practices WorkshopNearshore Best Practices Workshop
Nearshore Best Practices Workshop
 
BAAgileQA
BAAgileQABAAgileQA
BAAgileQA
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software too
 
Agile projects
Agile projectsAgile projects
Agile projects
 
Asset Finance Agile Projects
Asset Finance Agile ProjectsAsset Finance Agile Projects
Asset Finance Agile Projects
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Software Agility.pptx
Software Agility.pptxSoftware Agility.pptx
Software Agility.pptx
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Top Agile Metrics
Top Agile MetricsTop Agile Metrics
Top Agile Metrics
 
Agile Introduction
Agile IntroductionAgile Introduction
Agile Introduction
 
The Dashlane Agile Journey
The Dashlane Agile JourneyThe Dashlane Agile Journey
The Dashlane Agile Journey
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
 
Scaled agile implementation
Scaled agile implementationScaled agile implementation
Scaled agile implementation
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnzLecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
 
Agile Framework based on PMBOK 6th Edition.pdf
Agile Framework based on PMBOK 6th Edition.pdfAgile Framework based on PMBOK 6th Edition.pdf
Agile Framework based on PMBOK 6th Edition.pdf
 
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
 

Agile india2012 - Dealing with agile RFP

  • 1. Presented By: RAVI KUMAR http://www.bilzits.com/servicests_en.asp HCL Technologies Ltd.
  • 2. 2
  • 3. 3
  • 4. There are better ways … wish we didn’t have to deal with it. http://www.cmsmyth.com/wp-content/uploads/2011/06/rfpgraphic2.png 4
  • 5. What is the purpose and why? • Early stage for procurement of services • Specification on details of the intended procurement. • Competitive - Selection mechanism prior to outsourcing or offshoring • Used in re-evaluation as part of strategic sourcing. http://ukhypnosis.com/2010/07/10/cbt-with-intolerance-of-uncertainty-and-chronic-worry/ 5
  • 6. Uncertainty & Unknowns • Quite a challenge at RFP stage… • They are not all bad; it just means options… more so for agile projects. • Options need to identified, understood and communicated. http://militarytobusiness.blogspot.in/2010/08/dealing-with-uncertainty.html 6
  • 7. Steps involved • Notice of RFP • Pre-Proposal Walkthrough • Written Clarifications & Questions • Response to Written Clarifications & Questions • Receipt of Written RFP Deadline • RFP Defence • RFP Evaluation • RFP Selection Announcements, Negotiations etc. http://www.blog-bizedge.biz/2011/03/preproposal-positioning.html 7
  • 8. Deal With Agile We will do it collectively… 8 http://www.webpoppy.net/2011/06/how-to-write-a-website-rfp/
  • 9. Let’s Self Organize !!! ( 5-6 member teams) 9 http://en.wikipedia.org/wiki/Self-organization
  • 10. 20 minute time boxes • Iteration 1 – Walkthrough of RFP questions (15 min + 5 min) • Iteration 2 – War room • Iteration 3 – Defense 10 http://blog.agilebuddy.com/2009/01/significance-of-time-boxing.html
  • 11. There is limited time … • Solution strategy approach and NOT the Focus !!! solution itself. • Highlighted questions are critical. • Articulate the following • How would you approach estimation and release planning. • Thoughts on contracting & pricing •Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams) •Onsite offshore execution ,team loading. • Pick a moderator to have a handle on things while the discussion goes on. 11
  • 13. Vendor Discretion Advised Agile Project AHEAD • Customer business participation. • Vendor involvement in the decision making process. • Offshore teams leveraged for only tasks/activities. 13
  • 14. • Estimates & Release Plans. • Contracting Models. • Project execution strategy (Onsite/Offshore) http://www.investinganswers.com/personal-finance/smart-consumer/5-money- 14 rules-are-just-plain-wrong-2482
  • 15. Project Chartering • High level system understanding • User stories - walkthrough • Define Acceptance Criteria Story Mapping • Identify Function Flow • User stories grouping • Release Plans 15
  • 16. Estimates • Collective planning and estimation • Story points (Scale 1-10) by functional y grouped teams. • Effort classification. Release Plans • Quarterly production releases synchronized with non-agile projects • Logical grouping based on Functional flow and Criticality. • Only for 6 months… 16
  • 17. Execution Model • Onsite heavy in the first few sprints. • Frequent Onsite off shore team rotation. 17
  • 18. Contracts & Pricing • T & M Initially • Switch to FPP after stability • CR based pricing for changing requirements • Frequent travels factored into pricing.
  • 19. Name: Ravi Kumar Email ID: ravikumar.rk@gmail.com ravikumar.rk@hcl.com HCL Technologies Ltd.
  • 20. Agile Outsourcing - Dealing with Agile RFPs No. General 1 Is the supplier ready to implement the Agile project? The project is primarily implemented at the location of CUSTOMER at LOCATION. The supplier indicates how this is 2 realised. Proven experience with this mode of realisation under an Agile routine is of importance. The supplier is in a position to independently convert the WHAT (the system must do) into HOW (this must be realised). The supplier 3 presents his vision on this subject. As Agile is going to be worked in teams constituted of people with different (cultural) backgrounds, a comprehensive culture training / team building at the start of the project is obvious. What plans does the supplier have for the purpose and what expenditure of time 4 and cost are involved in this connection? 5 Please describe how you would respond to a request to set up an Agile Project in partnership Advantages of Agile Environment: What does your company see as the main advantage to an Agile development environment? What 6 are the key disadvantages? Process & Tools 1 How does the supplier deal with changes in the requirements (content and priority) during the project? 2 Which Agile routine does the supplier choose for this project? The substantiation of this choice is of particular importance. 3 In what way can the management and maintenance of the deliverable software be organised? 4 How does the supplier ensure the guarantee for the maintainability and quality of the deliverable software? 5 How does the supplier ensure that the preferred suppliers of CUSTOMER can maintain the system? Supplier has experience with tooling in an Agile process. What tools has the supplier used for the purpose in the earlier projects? For each tool, indicate the purpose for which it was employed within the Agile process. 6 How do you typically ensure on Agile projects that senior management in your company and the customer company have 7 appropriate visibility to make decisions and coordinate other activity? Testing What vision does the supplier have on tests during an Agile process? 1 Make a distinction according to system and acceptance tests. 2 How your organization views testing as part of a scrum team? How your organization would develop testing requirements for a sprint. Include test techniques / methods that would be used and how 3 they would be used? 4 What testing should be performed as part of a scrum team? 5 What approach do you take for agile testing? 6 How do you achieve collaborative working relationships on agile initiatives in order to ensure quality delivery? How your organization view testing as part of a independent team and what will be the best strategy to work with 7 independent testing teams. Contracting & Estimation Supplier gives a detailed estimate of the time required for the formulation of all product requirements. The substantiation of this estimate is of particular importance. Assume the following while you think of a solution for this question Simple Requirements: 100 >> Medium Requirements: 150 >>Complex Requirements: 100 1 Bidders are requested to indicate their own pricing policy (initial and recurring costs) applicable to the products and services called for. Specify the prices and rates for the products and services called for. You should be fully prepared here and need to at least include the 2 deliverable products and services specified by you. For each sprint, present a detailed summary of the costs of the proposed team effort during the turnaround time of project estimated on the basis of the total list of the product requirements. In addition, the rate employed for each team member of the proposed team 3 classification must be indicated.
  • 21. Contracting & Estimation contd… What is the contract model that the vendor would like to propose? Fixed Price will be of primary interest for the customer but is willing to consider other contractual models as well. Vendor must justify the different contractual models and 4 justify the most appropriate for the project and clearly articulate the risks and downside of Fixed Price model Supplier indicates the project organisation roles, rates, quantities, composition, phasing, sprint duration, tooling etc.. The substantiation of this organisation and estimates are of particular importance. How does the supplier guarantee that the cited capacity and knowledge are indeed available in the same and stable (team) composition during the entire project? Consider here also the possible visa problem. 5 Release Supplier indicates in detail which part of the product requirements referred can be realised within 6 months after the start of the project implementation. The substantiation of these assessments is of particular importance. The deadline of 6 months is an arbitrarily chosen reference time. The starting point here is the project organisation as described and the 1 assessment of the product requirements The supplier needs to work together with other CUSTOMER units that do not work according to Agile. How does the supplier plan to deal with the units from the CUSTOMER organisation that do not work according to Agile? 2 How does the supplier guarantee that he will deliver a working software (zero defect delivery) that is deployed in the acceptance/live environment made available by CUSTOMER for the purpose after every sprint? How does the supplier envisage to be able to contribute towards as high a delivery reliability as possible? 3 On-Going Application Support & Maintenance: Describe your methodology for providing on-going application support and maintenance services, including the following: • Application Updates • User Management • Change Management • Problem management and communication procedures • Documentation management• Communication and integration with the customer and its processes • Problem diagnosis and root-cause analysis of production defects • Review and approval of problem-fix approach and risks • Design 4 Review, Code Inspection, Testing and other quality assurance processes supporting Application Maintenance We have limited time and hence I suggest the following… - Think about approach to arrive at solution or strategy and NOT the solution itself. - The questions that are in bold are critical; focus discussions to overcome the challenges. Specifically the following must be articulated > Approach to estimation and release planning. > Contracting & Pricing > Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams) > Onsite offshore execution model with emphasis on team loading. - Pick a moderator to have a handle on things while the discussion goes on.