HYDROLOGYHYDROLOGY
METHODSMETHODS
FLOW DETERMINATION METHODS
• United States Geological Survey (USGS)
Regression Equations
• Local Gauge Data
• High Water/Bankfull Marks
• Rational Method (for Small watersheds)
• Other Methods -Corps of Engineers -HEC
-Natural Resources Conservation
Service -WinTR-55 & WinTR-20
-Federal Highway Administration,
AASHTO, State methods, etc.
FLOW DETERMINATION
• Compare a Couple Methods
• Consider Weather Variations and Period
of Record
•What About Changes in the Watershed?
• Don’t Forget About
•Bulking
•Sediment
•Debris
Guatemala
Australia
Gauging Data Method
Flow in your ungaged watershed (Qu)
is determined from the following equation:
Qu = Qg (Au/Ag)*
Where Qg= Known discharge from the
gauged watershed.
Au= Drainage Area of your
ungauged watershed.
Ag= Known Drainage Area of the
gauging station watershed.
Qu= Peak discharge from your
ungauged watershed
*= an exponent, depending on recurrence interval
and region, usually ranging from 0.60 to 0.90.
Manning EquationManning Equation
V = (1/n) (R2/3
)(S 1/2
)
Where
V = Average flow velocity (m/s)
n = manning roughness coefficient
S = Channel Slope (meter/meter)
R = Hydraulic Radius (meters) = A/P
A = Channel cross-sectional area, m2
P = Wetted Perimeter (meters)
For English Units
V = (1.49/n) (R2/3
)(S 1/2
)
Формула Меннінга
(в метричних одиницях)
V =
1
n
(R
2/3
)(S
1/2
)
де V = середня швидкість течії
метри/секунду)
n = коефіцієнт шорсткості русла
(звичайно 0.04 - 0.07 для природніх
усел);
див. табл. в посібнику, значення "n")
S = ухил русла (метрів/ метрів)
R = гідравлічний радіус (метрів) = A/P
A та P є:
A = площа поперечного розрізу русла
Рівень повної
води
Фактор шорсткості
русла
Поперечний розріз
русла А
Течія
Схема для визначення гідравлічних параметрів русла методом Менінга
Периметр заболоченої
ділянки
Макс ширина
Макс.глибина
(рівень води)
Ухил
Середня
глибина=
Площа
------------ши
рина русла Гідравл радіус (R) =
Площа (A)
------------------------------
Периметр заболоченої ділянки (P)
Rational Method
(Developed to estimate flows for
small watersheds (200-300 Acres)).
Q= C x i x A
Where:
Q = Quantity of Flow (Runoff), in Cubic Feet per Second (cfs).
C = Runoff Coefficient.
i = Average Rainfall Intensity for selected frequency and
duration equal to the Time of Concentration, in inches/hour.
A = Area of the watershed, in Acres.
В метричних одинцях формула
виглядає так:
Q= C x i x A
362
де Течія визначається в куб.метрах
на секунду; Площа – в гектарах;
Інтенсивність дощу – в мм/год.
In Metric Units, the equation is:
Q= C x i x A
362
Where Flow is in cubic meters per
second; Area is in Hectares; and
Rainfall Intensity is in mm/hr.
Source-Mike Furniss
Example
Rational Method
Drainage AreaDrainage Area
DeterminationDetermination
DRAINAGE AREA DETERMINATION EXERCISE
3. lvrmch5 ukraine hydrology and drainage area
3. lvrmch5 ukraine hydrology and drainage area
3. lvrmch5 ukraine hydrology and drainage area

Contenu connexe

En vedette

The drainage basin as a system lesson 2
The drainage basin as a system   lesson 2The drainage basin as a system   lesson 2
The drainage basin as a system lesson 2
Ms Geoflake
 
Drainage basin hydrological cycle smy
Drainage basin hydrological cycle smyDrainage basin hydrological cycle smy
Drainage basin hydrological cycle smy
tonybattista
 
Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)
lesliehome
 
The drainage basin
The drainage basinThe drainage basin
The drainage basin
tonybattista
 
Drainage system
Drainage systemDrainage system
Drainage system
Nikhil Jp
 

En vedette (17)

Drainage Basins VLE
Drainage Basins VLEDrainage Basins VLE
Drainage Basins VLE
 
The drainage basin as a system lesson 2
The drainage basin as a system   lesson 2The drainage basin as a system   lesson 2
The drainage basin as a system lesson 2
 
Pop River Basin
Pop River BasinPop River Basin
Pop River Basin
 
Drainage basin hydrological cycle smy
Drainage basin hydrological cycle smyDrainage basin hydrological cycle smy
Drainage basin hydrological cycle smy
 
Rock quality determination, rock structure rating
Rock quality determination, rock structure ratingRock quality determination, rock structure rating
Rock quality determination, rock structure rating
 
9. lvrm ch 13 14 ukraine- erosion control-eb
9. lvrm ch 13 14 ukraine- erosion control-eb9. lvrm ch 13 14 ukraine- erosion control-eb
9. lvrm ch 13 14 ukraine- erosion control-eb
 
Drainage basins
Drainage basinsDrainage basins
Drainage basins
 
Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)
 
The drainage basin
The drainage basinThe drainage basin
The drainage basin
 
Rain gauge
Rain gauge   Rain gauge
Rain gauge
 
Precipitation and rain gauges
Precipitation and rain gaugesPrecipitation and rain gauges
Precipitation and rain gauges
 
Rainfall measurement methods
Rainfall measurement methodsRainfall measurement methods
Rainfall measurement methods
 
PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System) PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System)
 
Rain guage
Rain guageRain guage
Rain guage
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Drainage system
Drainage systemDrainage system
Drainage system
 
drainage class 9
drainage class 9drainage class 9
drainage class 9
 

Plus de Radmila Ustych

Pristaia english new скорочена регіональний симпозіум
Pristaia english new скорочена регіональний симпозіумPristaia english new скорочена регіональний симпозіум
Pristaia english new скорочена регіональний симпозіум
Radmila Ustych
 

Plus de Radmila Ustych (20)

12. environmental issues, impacts, mitigations
12. environmental issues,  impacts, mitigations12. environmental issues,  impacts, mitigations
12. environmental issues, impacts, mitigations
 
11. environmentally sensitive maintenance and road closure small
11. environmentally sensitive maintenance and road closure small11. environmentally sensitive maintenance and road closure small
11. environmentally sensitive maintenance and road closure small
 
10. lvrm ch12 ukraine materials
10. lvrm ch12 ukraine materials 10. lvrm ch12 ukraine materials
10. lvrm ch12 ukraine materials
 
8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 min8. lvrm ch11 ukraine slope stabilization 60 min
8. lvrm ch11 ukraine slope stabilization 60 min
 
7. lvrm ch7 ukraine surf subdrainage-1 hr-
7. lvrm ch7 ukraine surf subdrainage-1 hr-7. lvrm ch7 ukraine surf subdrainage-1 hr-
7. lvrm ch7 ukraine surf subdrainage-1 hr-
 
2. lvrm ch2 ukraine enviro analysis
2. lvrm ch2  ukraine enviro analysis2. lvrm ch2  ukraine enviro analysis
2. lvrm ch2 ukraine enviro analysis
 
1c. location, design, specs, and costs of roads
1c. location, design, specs, and costs of roads1c. location, design, specs, and costs of roads
1c. location, design, specs, and costs of roads
 
1. lvrbm pss intro ukraine, 60+min short us
1. lvrbm pss intro ukraine, 60+min short us1. lvrbm pss intro ukraine, 60+min short us
1. lvrbm pss intro ukraine, 60+min short us
 
Styranivski лісові дороги освіта ua
Styranivski лісові дороги освіта uaStyranivski лісові дороги освіта ua
Styranivski лісові дороги освіта ua
 
Derbal hydrofor ua
Derbal hydrofor uaDerbal hydrofor ua
Derbal hydrofor ua
 
презентация беларусь Ukr
презентация беларусь Ukrпрезентация беларусь Ukr
презентация беларусь Ukr
 
презентация беларусь Eng
презентация беларусь Engпрезентация беларусь Eng
презентация беларусь Eng
 
лісові дороги освіта Eng
лісові дороги освіта Engлісові дороги освіта Eng
лісові дороги освіта Eng
 
коржов львів 31.08.2015
коржов львів 31.08.2015коржов львів 31.08.2015
коржов львів 31.08.2015
 
Pristaia укр скорочена регіональний симпозіум
Pristaia укр скорочена  регіональний симпозіумPristaia укр скорочена  регіональний симпозіум
Pristaia укр скорочена регіональний симпозіум
 
Pristaia english new скорочена регіональний симпозіум
Pristaia english new скорочена регіональний симпозіумPristaia english new скорочена регіональний симпозіум
Pristaia english new скорочена регіональний симпозіум
 
Presentation roads connectivity_august_2015_prots
Presentation roads connectivity_august_2015_protsPresentation roads connectivity_august_2015_prots
Presentation roads connectivity_august_2015_prots
 
Styranivski лісові дороги освіта en
Styranivski  лісові дороги освіта enStyranivski  лісові дороги освіта en
Styranivski лісові дороги освіта en
 
Montenegro presentation
Montenegro presentationMontenegro presentation
Montenegro presentation
 
Macedonia presentation
Macedonia presentationMacedonia presentation
Macedonia presentation
 

3. lvrmch5 ukraine hydrology and drainage area

  • 2.
  • 3.
  • 4.
  • 5.
  • 6. FLOW DETERMINATION METHODS • United States Geological Survey (USGS) Regression Equations • Local Gauge Data • High Water/Bankfull Marks • Rational Method (for Small watersheds) • Other Methods -Corps of Engineers -HEC -Natural Resources Conservation Service -WinTR-55 & WinTR-20 -Federal Highway Administration, AASHTO, State methods, etc.
  • 7. FLOW DETERMINATION • Compare a Couple Methods • Consider Weather Variations and Period of Record •What About Changes in the Watershed? • Don’t Forget About •Bulking •Sediment •Debris
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 16. Gauging Data Method Flow in your ungaged watershed (Qu) is determined from the following equation: Qu = Qg (Au/Ag)* Where Qg= Known discharge from the gauged watershed. Au= Drainage Area of your ungauged watershed. Ag= Known Drainage Area of the gauging station watershed. Qu= Peak discharge from your ungauged watershed *= an exponent, depending on recurrence interval and region, usually ranging from 0.60 to 0.90.
  • 17. Manning EquationManning Equation V = (1/n) (R2/3 )(S 1/2 ) Where V = Average flow velocity (m/s) n = manning roughness coefficient S = Channel Slope (meter/meter) R = Hydraulic Radius (meters) = A/P A = Channel cross-sectional area, m2 P = Wetted Perimeter (meters) For English Units V = (1.49/n) (R2/3 )(S 1/2 )
  • 18. Формула Меннінга (в метричних одиницях) V = 1 n (R 2/3 )(S 1/2 ) де V = середня швидкість течії метри/секунду) n = коефіцієнт шорсткості русла (звичайно 0.04 - 0.07 для природніх усел); див. табл. в посібнику, значення "n") S = ухил русла (метрів/ метрів) R = гідравлічний радіус (метрів) = A/P A та P є: A = площа поперечного розрізу русла
  • 19.
  • 20. Рівень повної води Фактор шорсткості русла Поперечний розріз русла А Течія Схема для визначення гідравлічних параметрів русла методом Менінга Периметр заболоченої ділянки Макс ширина Макс.глибина (рівень води) Ухил Середня глибина= Площа ------------ши рина русла Гідравл радіус (R) = Площа (A) ------------------------------ Периметр заболоченої ділянки (P)
  • 21. Rational Method (Developed to estimate flows for small watersheds (200-300 Acres)). Q= C x i x A Where: Q = Quantity of Flow (Runoff), in Cubic Feet per Second (cfs). C = Runoff Coefficient. i = Average Rainfall Intensity for selected frequency and duration equal to the Time of Concentration, in inches/hour. A = Area of the watershed, in Acres.
  • 22. В метричних одинцях формула виглядає так: Q= C x i x A 362 де Течія визначається в куб.метрах на секунду; Площа – в гектарах; Інтенсивність дощу – в мм/год.
  • 23. In Metric Units, the equation is: Q= C x i x A 362 Where Flow is in cubic meters per second; Area is in Hectares; and Rainfall Intensity is in mm/hr.
  • 25.
  • 26.
  • 27.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 36.
  • 37.
  • 38.
  • 39.

Notes de l'éditeur

  1. Hemos visto como delineamos areas de proteccion para tomas superficiales, veamos ahora como delineamos areas de proteccion para pozos.
  2. Primero vamos a ubicar en nuestro mapa el punto que marca la toma de agua para consumo humano. Todo el terreno aguas arriba de este punto y que contribuye agua al mismo, es nuestra cuenca.
  3. Luego trazamos una linea a lo largo de de la superficie del terreno que sea directamente perpendicular a todas las curvas de nivel o cotas del mapa topografico y que busque unir los puntos mas altos o cerros de alrededor.
  4. Continuamos trazando.
  5. Y finalmente llega a nuestro rio y de ahi a la toma. De no existir mapas topograficos del area, los limites de la cuenca se pueden determinar o estimar en el campo mediante la observacion al recorrer la cuenca. Sin embargo esta tarea puede resultar complicada y se presta para que se obvien detalles importantes.
  6. Y finalmente aqui necesitamos unir las dos lineas en la parte superior de la figura. Ya hemos delineado nuestra area geografica o cuenca que contribuye agua a nuestra toma.