SlideShare une entreprise Scribd logo
1  sur  37
Télécharger pour lire hors ligne
Biomass Gasification Technology
for producing Electricity, Thermal energy and SynGas

Universal gasifier
Company: Artim d.o.o., razvoj in projektiranje
Biomass heating, power generation, ORC waste heat, waste management

-10 years experience – Renewable energy: Biomass heating – 50 kW – 10 MW
- 2010 – 2013: new technologies – partner company GB Conculting, Volter
- Biomass heat and power: 30 kWel – 3 Mwel
Micro cogeneration CHP, Universal gasifier, Down draft gasifier, Thermal and CHP plants

- ORC – waste heat to power – 20-60 kW, 60-110 kW

(80 - 116 °C) – low temperature technology - ORC (GreenMachine)

- “Waste management” – tires, waste plastic and used oil
to fuel
- Waste plastic
- Used tires
- Used oil
CHP – heat and power from biomass
Wood biomass and agriculture biomass
CHP – heat and power from biomass
With Universal Gasifier
Technology includs:
- Preparation of biomass (drying + grinding to size <2mm)
- Biomass gasification – “Universal gasifier”
- Dry Syngas cleaning – only on solid particles, no tar technology,
no water consumption
- CHP unit – internal combustion engine and electric generator with
power electronics
- Process Control and remote monitoring
CHP – heat and power from biomass
Machine assembly
Biomass drying
Flash dryer or
rotary dryer

Biomass grinding
to <2-3 mm
Hammer mill

Gasification and
cleaning of Syngas
Universal gasifier
“Gasifired Vergassen
GB 3G Series”

CHP unit
Container unit or
unit for machine room
Biomass preparation – one step drying and
grinding – better energy efficiency
Biomass preparation – same machine as for pellet
factory
Biomass preparation –
one step drying and grinding –
better energy efficiency,
small space footprint
CHP – heat and power from biomass –
Biomass pre-preparation for hammer mill
Large size of biomass should be grinded to wood chips size,
to enter hammer mill
6-12 mm and moisture 45% max. - for flash dryer
> 15 mm and moisture >50% - for rotary dryer
CHP – heat and power from biomass –
Universal gasifier, CE certified
UG type gasifier can work with different kind of biomass - grinded to size
less than 2 mm and with water content of max. 12%.
Gasification works in "Entrained flow principle". Gasification process of
biomass particles is very quick (0,5 - 4 sec.) - because of biomass size and
temperature inside gasifier - 1200 - 1400°C.
Produced syngas has only traces of tar, carbon conversion is very high.
Characteristics of Universal gasifier :
• biomass flexibility
• biomass fuel size, is to be limited to <2-3 mm, water content max. 12%
• dry Syngas cleaning only, no tar cleaning
• different kind of biomass: wood, soya husk, sunflower husk, straw, ...
• very small footprint of gasifier
• typical payback is within 48 - 72 months
• low maintenance, no operative risk, easy to operate
• modular assembly
• high carbon conversion: > 98 %
• operation range from 40% - 100 % nominal power output
Entarined flow gasification
35 years old technology of coal gasification
CHP – heat and power from biomass –
Power plant shematic
1 MW power plant –
example
CHP – heat and power from biomass
1 MW power plant with biomass storage - top view
CHP – heat and power from biomass – container CHP unit –
140 – 180 kWe
CHP – heat and power from biomass – container CHP - 500 kWel
CHP – heat and power from biomass –700 kWel
Engine, generator, heat exchanger - for instalation in engine room
CHP – heat and power from biomass – Guascor CHP
Engine room
CHP – heat and power from biomass
Heat and power:
- “Green electricity” – feed in tariffs - different from country to
country
- Heat power - 90 °C / 70 °C
- Electricity – own consumption + feeding the greed
- Heat – for drying, heating, …
CHP – heat and power from biomass
Standard power units – basic parameters:
• electric power, thermal power
• wood biomass consumption
• service and maintainance cost (approximate – dependent on location of installation
and power CHP units)

• approximate electricity consumption for biomass preparation
• guaranteed working hours: 7500 hour / year (under defined conditions and
biomass quality)
Biomass CHP 140 kWel / 220 kWthermal
Gasifier UG 300, TEDOM 140 kW
Biomass use and energy production 140 kWelectric / 220 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 1050 MWh (-105 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost - work + material :
• Electricity for biomass preparation:

950 tons
945 MWh
1650 MWh
30.000 - 50.000 EUR
84.000 kWh
Biomass CHP 250 kWel / 370 kWthermal
Gasifier UG 400, Guascor 250 kW
Biomass use and energy production 250 kW electric / 370 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 1875 MWh (-187 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost - work + material:
• Electricity for biomass preparation:

1650 tons
1688 MWh
2775 MWh
50.000 - 75.000 EUR
150.000 kWh
Biomass CHP 330 kWel / 500 kWthermal
Gasifier UG 400, Guascor 330 kW
Biomass use and energy production 330 kW electric / 500 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 2475 MWh (-248 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost – work + material:
• Electricity for biomass preparation:

2180 tons
2227 MWh
3750 MWh
65.000 - 85.000 EUR
200.000 kWh
Biomass CHP 500 kWel / 750 kWthermal
Gasifier UG 600, Guascor 500 kW
Biomass use and energy production 500 kW electric / 750 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 3750 MWh (-375 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost – work + material:
• Electricity for biomass preparation:

3350 tons
3375 MWh
5625 MWh
80.000 - 110.000 EUR
300.000 kWh
Biomass CHP 700 kWel / 1050 kWthermal
Gasifier UG 600, Guascor 700 kW
Biomass use and energy production 700 kW electric / 1050 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 5250 MWh (-525 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost – work + material:
• Electricity for biomass preparation:

4850 tons
4725 MWh
7875 MWh
120.000 - 150.000 EUR
420.000 kWh
Biomass CHP 1000 kWel / 1500 kWthermal
Gasifier UG 700, Guascor 2 x 500 kW
Biomass use and energy production 1000 kW electric / 1500 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 7500 MWh (-750 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost – work + material:
• Electricity for biomass preparation:

6700 tons
6750 MWh
10.500 MWh
170.000 - 210.000 EUR
600.000 kWh
Biomass CHP 1400 kWel / 2150 kWthermal
Gasifier UG 800, Guascor 2 x 700 kW
Biomass use and energy production 1400 kW electric / 2150 kW thermal , operation of plant: 7500 hours / year

• Wood biomass consumption – 12% water content:
• Electricity produced : 10.500 MWh (-1050 MWh – self consumption CHP)=
• Thermal produced :
• Maintenance and service cost – work + material:
• Electricity for biomass preparation:

9600 tons
9450 MWh
16.100 MWh
220.000 - 270.000 EUR
840.000 kWh
Other technologies from
Company Artim d.o.o.
and partners
Volter - container CHP – 28 kWel or 40 kWel
Volter - container CHP – 28 kWel or 40 kWel

5 CHP plants in Finland,
3 plants - in construction in GB

www.volter.si
Low temperature catalytic
depolymerization

www.biomasa-elektrika.si
Low temperature depolymerization
Waste plastic, used oil or used tires
Process 1 : used tires
Process 2 : waste plastic, used oil
Low temperature depolymerization
The products are:
Poly-fuel® - „green“ synthetic (fuel) oil
Poly-carbon® - soot (carbon)
Poly-gas® - synthetic gas
- Environmentally friendly, dealing with the comprehensive issue of waste disposal
- Energetically independent, using the input material for its own operation, while at the
same time it is possible to generate electric power and heat (CHP) or use of polyfuel in
place of heating oil
ORC Green machine ElectraTherm
Low temperature waste heat to electric power

In Czech republic more than
15 instalations on Biogas
power plants.
Photo: 650 kW waste heat
 42 kW electric power
www.biomasa-elektrika.si
Further informations:
Artim d.o.o.
Radoslav Irgl
Virmaše 210
4220 Škofja Loka, Slovenia
GSM : +386(0) 40 471 173 , +386(0) 51 233 453
Email : rado.irgl@artim.si, info@artim.si,
www.artim.si , www.biomasa-elektrika.si

Contenu connexe

Tendances

Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power PlantsDaniel Campos
 
Biomass Gasifier
Biomass GasifierBiomass Gasifier
Biomass GasifierVivek Faldu
 
Valmet gasification - Frank Ligthart
Valmet gasification - Frank LigthartValmet gasification - Frank Ligthart
Valmet gasification - Frank LigthartEBAconference
 
Biomass to energy & its future
Biomass to energy & its futureBiomass to energy & its future
Biomass to energy & its futureMasheer Inc.
 
ASME OLD GUARD PRESENTATION CONTEST
ASME OLD GUARD PRESENTATION CONTESTASME OLD GUARD PRESENTATION CONTEST
ASME OLD GUARD PRESENTATION CONTESTSaad Javed
 
Process for biomass conversion
Process for biomass conversion Process for biomass conversion
Process for biomass conversion Shadan Rasheed
 
Overview biomass ash in gasification system
Overview biomass ash in gasification systemOverview biomass ash in gasification system
Overview biomass ash in gasification systemcakbentra
 
Gasification and Gasifiers
Gasification and GasifiersGasification and Gasifiers
Gasification and GasifiersAditya Bose
 
Eai presentation green power conference hyderabad jan 2010
Eai presentation   green power conference hyderabad jan 2010Eai presentation   green power conference hyderabad jan 2010
Eai presentation green power conference hyderabad jan 2010Renganathan M G
 
Biomass energy and biouels
Biomass energy and biouelsBiomass energy and biouels
Biomass energy and biouelsAshish Bandewar
 
Combined draftgasifier
Combined draftgasifierCombined draftgasifier
Combined draftgasifierBhaskar Social
 

Tendances (19)

Briquetting 1
Briquetting 1Briquetting 1
Briquetting 1
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Biomass Gasifier
Biomass GasifierBiomass Gasifier
Biomass Gasifier
 
Bio-gasifier Coupled Engine
Bio-gasifier Coupled EngineBio-gasifier Coupled Engine
Bio-gasifier Coupled Engine
 
Valmet gasification - Frank Ligthart
Valmet gasification - Frank LigthartValmet gasification - Frank Ligthart
Valmet gasification - Frank Ligthart
 
Combustion of solid biofuel
Combustion of solid biofuelCombustion of solid biofuel
Combustion of solid biofuel
 
Biomass energy
Biomass energyBiomass energy
Biomass energy
 
Biomass to energy & its future
Biomass to energy & its futureBiomass to energy & its future
Biomass to energy & its future
 
ASME OLD GUARD PRESENTATION CONTEST
ASME OLD GUARD PRESENTATION CONTESTASME OLD GUARD PRESENTATION CONTEST
ASME OLD GUARD PRESENTATION CONTEST
 
Process for biomass conversion
Process for biomass conversion Process for biomass conversion
Process for biomass conversion
 
Biomass Gasification
Biomass GasificationBiomass Gasification
Biomass Gasification
 
Overview biomass ash in gasification system
Overview biomass ash in gasification systemOverview biomass ash in gasification system
Overview biomass ash in gasification system
 
Biomass
BiomassBiomass
Biomass
 
Gasification and Gasifiers
Gasification and GasifiersGasification and Gasifiers
Gasification and Gasifiers
 
Biomass energy
Biomass energyBiomass energy
Biomass energy
 
Eai presentation green power conference hyderabad jan 2010
Eai presentation   green power conference hyderabad jan 2010Eai presentation   green power conference hyderabad jan 2010
Eai presentation green power conference hyderabad jan 2010
 
Biomass energy and biouels
Biomass energy and biouelsBiomass energy and biouels
Biomass energy and biouels
 
Biomass conversion technologies
Biomass conversion technologiesBiomass conversion technologies
Biomass conversion technologies
 
Combined draftgasifier
Combined draftgasifierCombined draftgasifier
Combined draftgasifier
 

Similaire à Biomass heat and power - gasification CHP with universal biomass gasifier

Business Forum Energy Efficiency in Moldova
Business Forum Energy Efficiency in MoldovaBusiness Forum Energy Efficiency in Moldova
Business Forum Energy Efficiency in Moldovaabozhkovbalkanikaenergy
 
RaCBio concept and how can it work
RaCBio concept and how can it workRaCBio concept and how can it work
RaCBio concept and how can it workHorst Unterlechner
 
Solar Process Heat - Markus Gründler
Solar Process Heat - Markus GründlerSolar Process Heat - Markus Gründler
Solar Process Heat - Markus GründlerSardegna Ricerche
 
Marc van wonterghem | E-Rational - value for heat
Marc van wonterghem  | E-Rational - value for heatMarc van wonterghem  | E-Rational - value for heat
Marc van wonterghem | E-Rational - value for heatGreenbridge nv
 
Biomass heat and power eco village-en
Biomass heat and power eco village-enBiomass heat and power eco village-en
Biomass heat and power eco village-enRado Irgl
 
Biomass-heat-and-power-Eco-Village-Ptuj-EN
Biomass-heat-and-power-Eco-Village-Ptuj-ENBiomass-heat-and-power-Eco-Village-Ptuj-EN
Biomass-heat-and-power-Eco-Village-Ptuj-ENRado Irgl
 
090816 Presentation Gasifier
090816 Presentation Gasifier090816 Presentation Gasifier
090816 Presentation GasifierJanogb
 
Biomass Gasification Overview - Ilkka Hannula
Biomass Gasification Overview - Ilkka HannulaBiomass Gasification Overview - Ilkka Hannula
Biomass Gasification Overview - Ilkka HannulaEBAconference
 
Orebro: energy standards and efficiency in energy
Orebro: energy standards and efficiency in energyOrebro: energy standards and efficiency in energy
Orebro: energy standards and efficiency in energyBjörn Sundin
 
Biorefinery in Eastern Slovakia
Biorefinery in Eastern SlovakiaBiorefinery in Eastern Slovakia
Biorefinery in Eastern Slovakiaindustrialbiotech
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Farming Futures
 
RECENT Biogas Presentation
RECENT Biogas PresentationRECENT Biogas Presentation
RECENT Biogas PresentationRecent EU
 
ORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generationORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generationRado Irgl
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsFortum Heat Lietuva
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Sindhu Maiyya
 
BFB-Power-Plants-Waste-to-energy-Enered-3.pdf
BFB-Power-Plants-Waste-to-energy-Enered-3.pdfBFB-Power-Plants-Waste-to-energy-Enered-3.pdf
BFB-Power-Plants-Waste-to-energy-Enered-3.pdfRado Irgl
 

Similaire à Biomass heat and power - gasification CHP with universal biomass gasifier (20)

Business Forum Energy Efficiency in Moldova
Business Forum Energy Efficiency in MoldovaBusiness Forum Energy Efficiency in Moldova
Business Forum Energy Efficiency in Moldova
 
RaCBio concept and how can it work
RaCBio concept and how can it workRaCBio concept and how can it work
RaCBio concept and how can it work
 
Solar Process Heat - Markus Gründler
Solar Process Heat - Markus GründlerSolar Process Heat - Markus Gründler
Solar Process Heat - Markus Gründler
 
Marc van wonterghem | E-Rational - value for heat
Marc van wonterghem  | E-Rational - value for heatMarc van wonterghem  | E-Rational - value for heat
Marc van wonterghem | E-Rational - value for heat
 
Biomass heat and power eco village-en
Biomass heat and power eco village-enBiomass heat and power eco village-en
Biomass heat and power eco village-en
 
Biomass-heat-and-power-Eco-Village-Ptuj-EN
Biomass-heat-and-power-Eco-Village-Ptuj-ENBiomass-heat-and-power-Eco-Village-Ptuj-EN
Biomass-heat-and-power-Eco-Village-Ptuj-EN
 
090816 Presentation Gasifier
090816 Presentation Gasifier090816 Presentation Gasifier
090816 Presentation Gasifier
 
Water/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING BWater/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING B
 
Biomass Gasification Overview - Ilkka Hannula
Biomass Gasification Overview - Ilkka HannulaBiomass Gasification Overview - Ilkka Hannula
Biomass Gasification Overview - Ilkka Hannula
 
Orebro: energy standards and efficiency in energy
Orebro: energy standards and efficiency in energyOrebro: energy standards and efficiency in energy
Orebro: energy standards and efficiency in energy
 
Cultiveco_Greenhouse
Cultiveco_GreenhouseCultiveco_Greenhouse
Cultiveco_Greenhouse
 
Biorefinery in Eastern Slovakia
Biorefinery in Eastern SlovakiaBiorefinery in Eastern Slovakia
Biorefinery in Eastern Slovakia
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
 
Thisted Municipality
Thisted MunicipalityThisted Municipality
Thisted Municipality
 
RECENT Biogas Presentation
RECENT Biogas PresentationRECENT Biogas Presentation
RECENT Biogas Presentation
 
ORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generationORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generation
 
One-day workshop on Industrial Heating
One-day workshop on Industrial HeatingOne-day workshop on Industrial Heating
One-day workshop on Industrial Heating
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - Baltics
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle
 
BFB-Power-Plants-Waste-to-energy-Enered-3.pdf
BFB-Power-Plants-Waste-to-energy-Enered-3.pdfBFB-Power-Plants-Waste-to-energy-Enered-3.pdf
BFB-Power-Plants-Waste-to-energy-Enered-3.pdf
 

Plus de Rado Irgl

Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter PtujSoproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter PtujRado Irgl
 
Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal power
Small Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal powerSmall Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal power
Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal powerRado Irgl
 
Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter Rado Irgl
 
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...Rado Irgl
 
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...Rado Irgl
 
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWthBiomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWthRado Irgl
 

Plus de Rado Irgl (6)

Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter PtujSoproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter Ptuj
 
Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal power
Small Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal powerSmall Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal power
Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal power
 
Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter
 
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
 
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
 
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWthBiomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
 

Dernier

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 

Dernier (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

Biomass heat and power - gasification CHP with universal biomass gasifier

  • 1. Biomass Gasification Technology for producing Electricity, Thermal energy and SynGas Universal gasifier
  • 2. Company: Artim d.o.o., razvoj in projektiranje Biomass heating, power generation, ORC waste heat, waste management -10 years experience – Renewable energy: Biomass heating – 50 kW – 10 MW - 2010 – 2013: new technologies – partner company GB Conculting, Volter - Biomass heat and power: 30 kWel – 3 Mwel Micro cogeneration CHP, Universal gasifier, Down draft gasifier, Thermal and CHP plants - ORC – waste heat to power – 20-60 kW, 60-110 kW (80 - 116 °C) – low temperature technology - ORC (GreenMachine) - “Waste management” – tires, waste plastic and used oil to fuel - Waste plastic - Used tires - Used oil
  • 3. CHP – heat and power from biomass Wood biomass and agriculture biomass
  • 4. CHP – heat and power from biomass With Universal Gasifier Technology includs: - Preparation of biomass (drying + grinding to size <2mm) - Biomass gasification – “Universal gasifier” - Dry Syngas cleaning – only on solid particles, no tar technology, no water consumption - CHP unit – internal combustion engine and electric generator with power electronics - Process Control and remote monitoring
  • 5. CHP – heat and power from biomass Machine assembly Biomass drying Flash dryer or rotary dryer Biomass grinding to <2-3 mm Hammer mill Gasification and cleaning of Syngas Universal gasifier “Gasifired Vergassen GB 3G Series” CHP unit Container unit or unit for machine room
  • 6. Biomass preparation – one step drying and grinding – better energy efficiency
  • 7. Biomass preparation – same machine as for pellet factory
  • 8. Biomass preparation – one step drying and grinding – better energy efficiency, small space footprint
  • 9. CHP – heat and power from biomass – Biomass pre-preparation for hammer mill Large size of biomass should be grinded to wood chips size, to enter hammer mill 6-12 mm and moisture 45% max. - for flash dryer > 15 mm and moisture >50% - for rotary dryer
  • 10. CHP – heat and power from biomass – Universal gasifier, CE certified UG type gasifier can work with different kind of biomass - grinded to size less than 2 mm and with water content of max. 12%. Gasification works in "Entrained flow principle". Gasification process of biomass particles is very quick (0,5 - 4 sec.) - because of biomass size and temperature inside gasifier - 1200 - 1400°C. Produced syngas has only traces of tar, carbon conversion is very high. Characteristics of Universal gasifier : • biomass flexibility • biomass fuel size, is to be limited to <2-3 mm, water content max. 12% • dry Syngas cleaning only, no tar cleaning • different kind of biomass: wood, soya husk, sunflower husk, straw, ... • very small footprint of gasifier • typical payback is within 48 - 72 months • low maintenance, no operative risk, easy to operate • modular assembly • high carbon conversion: > 98 % • operation range from 40% - 100 % nominal power output
  • 11. Entarined flow gasification 35 years old technology of coal gasification
  • 12. CHP – heat and power from biomass – Power plant shematic
  • 13. 1 MW power plant – example
  • 14. CHP – heat and power from biomass 1 MW power plant with biomass storage - top view
  • 15. CHP – heat and power from biomass – container CHP unit – 140 – 180 kWe
  • 16. CHP – heat and power from biomass – container CHP - 500 kWel
  • 17. CHP – heat and power from biomass –700 kWel Engine, generator, heat exchanger - for instalation in engine room
  • 18. CHP – heat and power from biomass – Guascor CHP Engine room
  • 19. CHP – heat and power from biomass Heat and power: - “Green electricity” – feed in tariffs - different from country to country - Heat power - 90 °C / 70 °C - Electricity – own consumption + feeding the greed - Heat – for drying, heating, …
  • 20. CHP – heat and power from biomass Standard power units – basic parameters: • electric power, thermal power • wood biomass consumption • service and maintainance cost (approximate – dependent on location of installation and power CHP units) • approximate electricity consumption for biomass preparation • guaranteed working hours: 7500 hour / year (under defined conditions and biomass quality)
  • 21. Biomass CHP 140 kWel / 220 kWthermal Gasifier UG 300, TEDOM 140 kW Biomass use and energy production 140 kWelectric / 220 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 1050 MWh (-105 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost - work + material : • Electricity for biomass preparation: 950 tons 945 MWh 1650 MWh 30.000 - 50.000 EUR 84.000 kWh
  • 22. Biomass CHP 250 kWel / 370 kWthermal Gasifier UG 400, Guascor 250 kW Biomass use and energy production 250 kW electric / 370 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 1875 MWh (-187 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost - work + material: • Electricity for biomass preparation: 1650 tons 1688 MWh 2775 MWh 50.000 - 75.000 EUR 150.000 kWh
  • 23. Biomass CHP 330 kWel / 500 kWthermal Gasifier UG 400, Guascor 330 kW Biomass use and energy production 330 kW electric / 500 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 2475 MWh (-248 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost – work + material: • Electricity for biomass preparation: 2180 tons 2227 MWh 3750 MWh 65.000 - 85.000 EUR 200.000 kWh
  • 24. Biomass CHP 500 kWel / 750 kWthermal Gasifier UG 600, Guascor 500 kW Biomass use and energy production 500 kW electric / 750 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 3750 MWh (-375 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost – work + material: • Electricity for biomass preparation: 3350 tons 3375 MWh 5625 MWh 80.000 - 110.000 EUR 300.000 kWh
  • 25. Biomass CHP 700 kWel / 1050 kWthermal Gasifier UG 600, Guascor 700 kW Biomass use and energy production 700 kW electric / 1050 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 5250 MWh (-525 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost – work + material: • Electricity for biomass preparation: 4850 tons 4725 MWh 7875 MWh 120.000 - 150.000 EUR 420.000 kWh
  • 26. Biomass CHP 1000 kWel / 1500 kWthermal Gasifier UG 700, Guascor 2 x 500 kW Biomass use and energy production 1000 kW electric / 1500 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 7500 MWh (-750 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost – work + material: • Electricity for biomass preparation: 6700 tons 6750 MWh 10.500 MWh 170.000 - 210.000 EUR 600.000 kWh
  • 27. Biomass CHP 1400 kWel / 2150 kWthermal Gasifier UG 800, Guascor 2 x 700 kW Biomass use and energy production 1400 kW electric / 2150 kW thermal , operation of plant: 7500 hours / year • Wood biomass consumption – 12% water content: • Electricity produced : 10.500 MWh (-1050 MWh – self consumption CHP)= • Thermal produced : • Maintenance and service cost – work + material: • Electricity for biomass preparation: 9600 tons 9450 MWh 16.100 MWh 220.000 - 270.000 EUR 840.000 kWh
  • 28. Other technologies from Company Artim d.o.o. and partners
  • 29. Volter - container CHP – 28 kWel or 40 kWel
  • 30. Volter - container CHP – 28 kWel or 40 kWel 5 CHP plants in Finland, 3 plants - in construction in GB www.volter.si
  • 32. Low temperature depolymerization Waste plastic, used oil or used tires Process 1 : used tires Process 2 : waste plastic, used oil
  • 33. Low temperature depolymerization The products are: Poly-fuel® - „green“ synthetic (fuel) oil Poly-carbon® - soot (carbon) Poly-gas® - synthetic gas - Environmentally friendly, dealing with the comprehensive issue of waste disposal - Energetically independent, using the input material for its own operation, while at the same time it is possible to generate electric power and heat (CHP) or use of polyfuel in place of heating oil
  • 34. ORC Green machine ElectraTherm Low temperature waste heat to electric power In Czech republic more than 15 instalations on Biogas power plants. Photo: 650 kW waste heat  42 kW electric power
  • 35.
  • 37. Further informations: Artim d.o.o. Radoslav Irgl Virmaše 210 4220 Škofja Loka, Slovenia GSM : +386(0) 40 471 173 , +386(0) 51 233 453 Email : rado.irgl@artim.si, info@artim.si, www.artim.si , www.biomasa-elektrika.si