Presentation Structure
1. Port Orientation
2. Status Quo – Port Characteristics
3. The Need for Capacity Expansion
4. Options Considered & Approved Scheme
5. CTCT Expansion – Construction Aspects
Cape Town
• FIGURE II
Main breakwater
V&A Waterfront
Duncan
Dock
Ben
Schoem
an
Dock
C
ontainerTerm
inal
Cape Town Container Terminal
Orientation
Cape Town Container Terminal
Orientation
2. Status Quo – Port Characteristics
Cape Town Container Terminal
• Infrastructure Characteristics
• Basin at depth -14m CD Port
• Quay length: 1372m (5 berths at various depths)
• Type of quay construction: Block Wall
• Original design vessel: 2500 TEU vessel, Draft = 11.7m, length = 270m, beam = 31.8m
• Terminal Characteristics
• Straddle carrier operation
• Stack area:
• concrete paving with approx. 11,000 ground slots (function of stack height),
• reefer points of 1,600
• Ship to Shore Cranes:
• Number = 6 and relatively old
• Constraint = reach, height, lifting capacity, availability of spares & end of economic
lifespan
• Yard equipment
• Straddle Carriers & Haulers/Trailers
• Above average age
• Limited stack height
Cape Town Container Terminal
Existing Characteristics
G.P.
Reefer
MT
Cape Town Container Terminal
Existing Layout
3. The Need for Capacity Expansion
Cape Town Container Terminal
TEUThrough-Put(‘000)
CTCT TEU Forecast
-
250
500
750
1,000
1,250
1,500
1,750
2,000
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
CTCT (Historical)
Capacity
Projected Demand 8%
Projected Demand 10%
Cape Town Container Terminal
The Need for Expansion
4. Options Considered & Approved Scheme
Cape Town Container Terminal
Fundamental capacity constraints:
• Stack area – insufficient stacking space
• STS Cranes – needs replacement
• Yard equipment – cannot cope with current & projected volumes
Cape Town Container Terminal
Expansion Options Considered
Options for capacity growth:
A. Reclamation option within port (Quay
501/502)
B. Stack capacity in Port Industrial Park
Site
C. Reclamation option within port (Duncan
Dock)
D. Seaward reclamation
• 300m seaward reclamation for additional stacks
• STS crane replacement (6 off)
• Yard equipment replacement (straddle carriers
+ haulers/trailers)
• Reshuffling of stacks & increase in reefer points
Extensive delays in completing EIA and
obtaining successful RoD. Needed to
expedite an alternate solution in order to
bring additional capacity on line to suit
immediate demand.
Cape Town Container Terminal
Preferred Option: Reclamation
Reconfiguration
Basin Deepening
Container Handling Equipment
Quay Refurbishment
Cape Town Container Terminal
Alternative Option: Reconfiguration
• CTCT development structured in 3 phase approach
• Phase 1 & 2 capex approved (R4.2b)
• Phase 3 future concept
Cape Town Container Terminal
Approved Expansion Scheme
• Berth Capacity
• Quay refurbishment (deck on piles)
• Increase berth depths to 15.5m below Chart Datum
• Design vessel: TEU = 6000, LOA =350m, Beam = 45m, Draft = 14.0m
• STS Crane Capacity
• Replace existing cranes (6) with Super Post Panamax size
• Increase cranes (+2) to match increased stack capacity
• Yard Equipment Capacity
• Convert from Straddles to RTGs
• To allow future capacity increases to match berths
• Stack Capacity
• Demolition of non-essential infrastructure
• Increase stacking foot print with more dense stacking
• Efficiency Improvements
• Truck Staging Area
• PIP Site Bridge
• Comms & Instrumentation (including Gate Automation & CCTV)
• Standardisation of Operational System (NAVIS)
• Entrance / exit modifications
Cape Town Container Terminal
Approved Expansion Scheme
Cape Town Container Terminal
Quay Refurbishment & Berth Deepening
Cape Town Container Terminal
Reconfiguration
6. CTCT Expansion – Construction Aspects
Cape Town Container Terminal
Cape Town Container Terminal
Construction
Quay Refurbishment &
Berth Deepening
• Deepen basin (-15.5m CD)
• Dredging 1.23 million m3 of
sand, clay & rock
• New front crane rail
beam on piles
• Suspended reinforced
concrete deck
Cape Town Container Terminal
Quay Refurbishment & Berth Deepening
Trailing Suction Hopper
Dredger (Gefion R) dredging
in Ben Schoeman Basin
Disposal of dredged material
at approved offshore
disposal site
Cape Town Container Terminal
Soft Dredging
Drilling & blasting of rock
Cape Town Container Terminal
Pre-treatment of Rock
Lifting of split hopper bargeArrival of dredging spread
on combi vessel -
comprising backhoe dredger
& 2 split hopper barges
Cape Town Container Terminal
Rock & Hard Dredging
Backhoe commences
dredging
Installing
backhoe spud
legs
Cape Town Container Terminal
Rock & Hard Dredging
Dredged rock in barge
awaiting disposal
Dredging of rock
Cape Town Container Terminal
Rock & Hard Dredging
Completed pile casingWelding of steel pile casings
Cape Town Container Terminal
Quay Refurbishment: Piling
Pitching of pile casing into
piling frame / access platform
Lifting of steel pile casing
Cape Town Container Terminal
Quay Refurbishment: Piling
Pitched pile and application
of vibrating piling hammer
Cape Town Container Terminal
Quay Refurbishment: Piling
Drilling of rock socket using wirth
drill rig & placing of drill string
Cape Town Container Terminal
Quay Refurbishment: Piling
Fabricating of reinforcing cage and placement
Cape Town Container Terminal
Quay Refurbishment: Piling
Tremie
concreting of
socket
Placing of temporary
bracing, precast concrete
pile collars and air lifting to
clear drilled socket
Cape Town Container Terminal
Quay Refurbishment: Piling
Culemborg batching plant
and precast yard
Cape Town Container Terminal
Quay Refurbishment: Precasting
Precasting of
transverse beams
Preparation work on
quayside rebates
Cape Town Container Terminal
Quay Refurbishment: Precasting
Placing of precast units
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Basic Stabilisation
Cape Town Container Terminal
Quay Refurbishment: Quay Furniture
Area 370, 380
and 390 not
included in
scope
Stack area – Sectional completions
Cape Town Container Terminal
Reconfiguration: Rubber Tyred Gantries
Cape Town Container Terminal
Reconfiguration: Non-Stack Areas
Cape Town Container Terminal
Reconfiguration: Non-Stack Areas
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
Current Status of Construction
Aerial Photos by Aerial Perspective: www.aerialphoto.co.za
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
THANK YOU!

Contenu connexe

Tendances

General Knowledge of Maritime Logistics
General Knowledge of Maritime LogisticsGeneral Knowledge of Maritime Logistics
General Knowledge of Maritime LogisticsYoussef Serroukh
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTgangadhar7907
 
TRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENTTRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENTAshish Hande
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project reportshehri_cbe
 
Port and Terminal Operations Management PPT
Port and Terminal Operations Management PPTPort and Terminal Operations Management PPT
Port and Terminal Operations Management PPTzelalemdagne3
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong ihab tarek
 
Port evolution in Africa
Port evolution in AfricaPort evolution in Africa
Port evolution in AfricaTristan Wiggill
 
Port Chapter two and three.pptx
Port Chapter two and three.pptxPort Chapter two and three.pptx
Port Chapter two and three.pptxzelalemdagne3
 
Container Strategy, benchmarking and viability Ngqura Container Terminal
Container Strategy, benchmarking and viability  Ngqura Container TerminalContainer Strategy, benchmarking and viability  Ngqura Container Terminal
Container Strategy, benchmarking and viability Ngqura Container TerminalTransnet Port Terminals
 
Value Added Service In The Port Environment 2005
Value Added Service In The Port Environment 2005Value Added Service In The Port Environment 2005
Value Added Service In The Port Environment 2005RichardSzuflak
 
Port tariff and overview of Malaysia west port's tariff
Port tariff and overview of Malaysia west port's tariffPort tariff and overview of Malaysia west port's tariff
Port tariff and overview of Malaysia west port's tariffFaeizah ZOot
 
A Brief presentation on Containerisation
A Brief presentation on ContainerisationA Brief presentation on Containerisation
A Brief presentation on Containerisationsubhash_ae
 
Port management and operations
Port management and operations Port management and operations
Port management and operations Maheshkumar Chande
 

Tendances (20)

General Knowledge of Maritime Logistics
General Knowledge of Maritime LogisticsGeneral Knowledge of Maritime Logistics
General Knowledge of Maritime Logistics
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
D & f m sea transport
D & f m  sea transportD & f m  sea transport
D & f m sea transport
 
TRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENTTRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENT
 
Rail freight transport
Rail freight transportRail freight transport
Rail freight transport
 
Shipping
ShippingShipping
Shipping
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
 
Port and Terminal Operations Management PPT
Port and Terminal Operations Management PPTPort and Terminal Operations Management PPT
Port and Terminal Operations Management PPT
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong
 
Port evolution in Africa
Port evolution in AfricaPort evolution in Africa
Port evolution in Africa
 
Port Chapter two and three.pptx
Port Chapter two and three.pptxPort Chapter two and three.pptx
Port Chapter two and three.pptx
 
Container Strategy, benchmarking and viability Ngqura Container Terminal
Container Strategy, benchmarking and viability  Ngqura Container TerminalContainer Strategy, benchmarking and viability  Ngqura Container Terminal
Container Strategy, benchmarking and viability Ngqura Container Terminal
 
Value Added Service In The Port Environment 2005
Value Added Service In The Port Environment 2005Value Added Service In The Port Environment 2005
Value Added Service In The Port Environment 2005
 
Ports in india and its facilities
Ports in india and its facilitiesPorts in india and its facilities
Ports in india and its facilities
 
Future Watch: Smart Ports
Future Watch: Smart PortsFuture Watch: Smart Ports
Future Watch: Smart Ports
 
Port tariff and overview of Malaysia west port's tariff
Port tariff and overview of Malaysia west port's tariffPort tariff and overview of Malaysia west port's tariff
Port tariff and overview of Malaysia west port's tariff
 
Port of Dubai
Port of DubaiPort of Dubai
Port of Dubai
 
Port tariff
Port tariffPort tariff
Port tariff
 
A Brief presentation on Containerisation
A Brief presentation on ContainerisationA Brief presentation on Containerisation
A Brief presentation on Containerisation
 
Port management and operations
Port management and operations Port management and operations
Port management and operations
 

En vedette

Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionMilton Chamber of Commerce
 
Central City Development Strategy 2008
Central City Development Strategy 2008Central City Development Strategy 2008
Central City Development Strategy 2008Mike Perk
 
Hydroponics for agriculture
Hydroponics for agricultureHydroponics for agriculture
Hydroponics for agricultureHaris Setiawan
 

En vedette (6)

Bulelwa
BulelwaBulelwa
Bulelwa
 
Creative Cape Town Programme
Creative Cape Town ProgrammeCreative Cape Town Programme
Creative Cape Town Programme
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
2010 Regional CAPE Merit List By Subject
2010 Regional CAPE Merit List By Subject2010 Regional CAPE Merit List By Subject
2010 Regional CAPE Merit List By Subject
 
Central City Development Strategy 2008
Central City Development Strategy 2008Central City Development Strategy 2008
Central City Development Strategy 2008
 
Hydroponics for agriculture
Hydroponics for agricultureHydroponics for agriculture
Hydroponics for agriculture
 

Similaire à Expansion Of The Cape Town Container Terminal

Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Case Study Brighton Pier 2012
Case Study   Brighton Pier 2012Case Study   Brighton Pier 2012
Case Study Brighton Pier 2012gavinrixon
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1patrickhudd
 
Brownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentBrownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentIES / IAQM
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Updatekingstonyc
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientationkarnold3
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) iSolomon Okoro
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdfRaviNobleseas
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14Kristipoom R-khubut
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit Juan Carlos Bonapace
 

Similaire à Expansion Of The Cape Town Container Terminal (20)

2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Case Study Brighton Pier 2012
Case Study   Brighton Pier 2012Case Study   Brighton Pier 2012
Case Study Brighton Pier 2012
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Body corctd
Body corctdBody corctd
Body corctd
 
Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
Linkedin
LinkedinLinkedin
Linkedin
 
Brownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentBrownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards development
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Update
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientation
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) i
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit
 

Plus de Railways and Harbours

Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Railways and Harbours
 
Enhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailEnhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailRailways and Harbours
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2Railways and Harbours
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2Railways and Harbours
 
Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Railways and Harbours
 
Expansion amidst a financial economic downturn
Expansion amidst a financial economic downturnExpansion amidst a financial economic downturn
Expansion amidst a financial economic downturnRailways and Harbours
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaRailways and Harbours
 
Role Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRole Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRailways and Harbours
 
Hub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionHub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionRailways and Harbours
 
How to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsHow to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsRailways and Harbours
 
Human Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportHuman Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportRailways and Harbours
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Railways and Harbours
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsRailways and Harbours
 
Sensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsSensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsRailways and Harbours
 
Piracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaPiracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaRailways and Harbours
 
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Railways and Harbours
 
New Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetNew Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetRailways and Harbours
 

Plus de Railways and Harbours (20)

Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4
 
Transnet Supplier Development Plan
Transnet Supplier Development PlanTransnet Supplier Development Plan
Transnet Supplier Development Plan
 
Enhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailEnhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through Rail
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2
 
Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...
 
Expansion amidst a financial economic downturn
Expansion amidst a financial economic downturnExpansion amidst a financial economic downturn
Expansion amidst a financial economic downturn
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South Africa
 
Role Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRole Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa Waters
 
Hub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionHub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean Region
 
How to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsHow to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and ports
 
Human Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportHuman Resources Development In Shipping And Transport
Human Resources Development In Shipping And Transport
 
Namport Walvis Bay Port Development
Namport Walvis Bay Port DevelopmentNamport Walvis Bay Port Development
Namport Walvis Bay Port Development
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African ports
 
Sensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsSensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & Ports
 
Piracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaPiracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africa
 
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
 
New Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetNew Simulation Systems installed by Transnet
New Simulation Systems installed by Transnet
 
N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)
 

Dernier

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxOs Hillman
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledCaitlinCummins3
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIIRODORI inc.
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteriamilos639
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxSaksham Gupta
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsAlejandro Cremades
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performanceirhcs
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)Norah Medlin
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfmstarkes24
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learninggauravwankar27
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfprchbhandari
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Associationseri bangash
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsRajesh Gupta
 
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.docGuide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.docssuserf63bd7
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettJacobBadgett
 
Expert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning AdvisorsExpert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning Advisorscardinalpointwealth11
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfomnme1
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrenttoniquemcintosh1
 

Dernier (20)

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdf
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.docGuide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
Expert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning AdvisorsExpert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning Advisors
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 

Expansion Of The Cape Town Container Terminal

  • 1. Railways and Harbours Conference March 2009 Expansion of the Cape Town Container Terminal
  • 2. EXPANSION OF THE CAPE TOWNEXPANSION OF THE CAPE TOWN CONTAINER TERMINALCONTAINER TERMINAL Presentation Structure 1. Port Orientation 2. Status Quo – Port Characteristics 3. The Need for Capacity Expansion 4. Options Considered & Approved Scheme 5. CTCT Expansion – Construction Aspects
  • 4. • FIGURE II Main breakwater V&A Waterfront Duncan Dock Ben Schoem an Dock C ontainerTerm inal Cape Town Container Terminal Orientation
  • 5. Cape Town Container Terminal Orientation
  • 6. 2. Status Quo – Port Characteristics Cape Town Container Terminal
  • 7. • Infrastructure Characteristics • Basin at depth -14m CD Port • Quay length: 1372m (5 berths at various depths) • Type of quay construction: Block Wall • Original design vessel: 2500 TEU vessel, Draft = 11.7m, length = 270m, beam = 31.8m • Terminal Characteristics • Straddle carrier operation • Stack area: • concrete paving with approx. 11,000 ground slots (function of stack height), • reefer points of 1,600 • Ship to Shore Cranes: • Number = 6 and relatively old • Constraint = reach, height, lifting capacity, availability of spares & end of economic lifespan • Yard equipment • Straddle Carriers & Haulers/Trailers • Above average age • Limited stack height Cape Town Container Terminal Existing Characteristics
  • 8. G.P. Reefer MT Cape Town Container Terminal Existing Layout
  • 9. 3. The Need for Capacity Expansion Cape Town Container Terminal
  • 10. TEUThrough-Put(‘000) CTCT TEU Forecast - 250 500 750 1,000 1,250 1,500 1,750 2,000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 CTCT (Historical) Capacity Projected Demand 8% Projected Demand 10% Cape Town Container Terminal The Need for Expansion
  • 11. 4. Options Considered & Approved Scheme Cape Town Container Terminal
  • 12. Fundamental capacity constraints: • Stack area – insufficient stacking space • STS Cranes – needs replacement • Yard equipment – cannot cope with current & projected volumes Cape Town Container Terminal Expansion Options Considered Options for capacity growth: A. Reclamation option within port (Quay 501/502) B. Stack capacity in Port Industrial Park Site C. Reclamation option within port (Duncan Dock) D. Seaward reclamation
  • 13. • 300m seaward reclamation for additional stacks • STS crane replacement (6 off) • Yard equipment replacement (straddle carriers + haulers/trailers) • Reshuffling of stacks & increase in reefer points Extensive delays in completing EIA and obtaining successful RoD. Needed to expedite an alternate solution in order to bring additional capacity on line to suit immediate demand. Cape Town Container Terminal Preferred Option: Reclamation
  • 14. Reconfiguration Basin Deepening Container Handling Equipment Quay Refurbishment Cape Town Container Terminal Alternative Option: Reconfiguration
  • 15. • CTCT development structured in 3 phase approach • Phase 1 & 2 capex approved (R4.2b) • Phase 3 future concept Cape Town Container Terminal Approved Expansion Scheme
  • 16. • Berth Capacity • Quay refurbishment (deck on piles) • Increase berth depths to 15.5m below Chart Datum • Design vessel: TEU = 6000, LOA =350m, Beam = 45m, Draft = 14.0m • STS Crane Capacity • Replace existing cranes (6) with Super Post Panamax size • Increase cranes (+2) to match increased stack capacity • Yard Equipment Capacity • Convert from Straddles to RTGs • To allow future capacity increases to match berths • Stack Capacity • Demolition of non-essential infrastructure • Increase stacking foot print with more dense stacking • Efficiency Improvements • Truck Staging Area • PIP Site Bridge • Comms & Instrumentation (including Gate Automation & CCTV) • Standardisation of Operational System (NAVIS) • Entrance / exit modifications Cape Town Container Terminal Approved Expansion Scheme
  • 17. Cape Town Container Terminal Quay Refurbishment & Berth Deepening
  • 18. Cape Town Container Terminal Reconfiguration
  • 19. 6. CTCT Expansion – Construction Aspects Cape Town Container Terminal
  • 20. Cape Town Container Terminal Construction
  • 21. Quay Refurbishment & Berth Deepening • Deepen basin (-15.5m CD) • Dredging 1.23 million m3 of sand, clay & rock • New front crane rail beam on piles • Suspended reinforced concrete deck Cape Town Container Terminal Quay Refurbishment & Berth Deepening
  • 22. Trailing Suction Hopper Dredger (Gefion R) dredging in Ben Schoeman Basin Disposal of dredged material at approved offshore disposal site Cape Town Container Terminal Soft Dredging
  • 23. Drilling & blasting of rock Cape Town Container Terminal Pre-treatment of Rock
  • 24. Lifting of split hopper bargeArrival of dredging spread on combi vessel - comprising backhoe dredger & 2 split hopper barges Cape Town Container Terminal Rock & Hard Dredging
  • 25. Backhoe commences dredging Installing backhoe spud legs Cape Town Container Terminal Rock & Hard Dredging
  • 26. Dredged rock in barge awaiting disposal Dredging of rock Cape Town Container Terminal Rock & Hard Dredging
  • 27. Completed pile casingWelding of steel pile casings Cape Town Container Terminal Quay Refurbishment: Piling
  • 28. Pitching of pile casing into piling frame / access platform Lifting of steel pile casing Cape Town Container Terminal Quay Refurbishment: Piling
  • 29. Pitched pile and application of vibrating piling hammer Cape Town Container Terminal Quay Refurbishment: Piling
  • 30. Drilling of rock socket using wirth drill rig & placing of drill string Cape Town Container Terminal Quay Refurbishment: Piling
  • 31. Fabricating of reinforcing cage and placement Cape Town Container Terminal Quay Refurbishment: Piling
  • 32. Tremie concreting of socket Placing of temporary bracing, precast concrete pile collars and air lifting to clear drilled socket Cape Town Container Terminal Quay Refurbishment: Piling
  • 33. Culemborg batching plant and precast yard Cape Town Container Terminal Quay Refurbishment: Precasting
  • 34. Precasting of transverse beams Preparation work on quayside rebates Cape Town Container Terminal Quay Refurbishment: Precasting
  • 35. Placing of precast units Cape Town Container Terminal Quay Refurbishment: Precasting
  • 36. Cape Town Container Terminal Quay Refurbishment: Precasting
  • 37. Cape Town Container Terminal Quay Refurbishment: Precasting
  • 38. Cape Town Container Terminal Quay Refurbishment: Basic Stabilisation
  • 39. Cape Town Container Terminal Quay Refurbishment: Quay Furniture
  • 40. Area 370, 380 and 390 not included in scope Stack area – Sectional completions
  • 41. Cape Town Container Terminal Reconfiguration: Rubber Tyred Gantries
  • 42. Cape Town Container Terminal Reconfiguration: Non-Stack Areas
  • 43. Cape Town Container Terminal Reconfiguration: Non-Stack Areas
  • 44. Cape Town Container Terminal Current Status of Construction
  • 45. Cape Town Container Terminal Current Status of Construction
  • 46. Cape Town Container Terminal Current Status of Construction
  • 47. Aerial Photos by Aerial Perspective: www.aerialphoto.co.za Cape Town Container Terminal Current Status of Construction