SlideShare une entreprise Scribd logo
1  sur  17
Industrial Training Presentation
(Central Electronics Limited)
Name . Ramakant Tyagi
Roll No. 1219431055
Session . 2012-16
Department of Electronic & Communication Engineering
H.R INSTITUTE OF TECHNOLOGY , GHAZIABAD(U.P)
COMPANY PROFILE
TYPE :PUBLIC SECTOR UNDERTAKING(PSU)
FOUNDED IN : 1974
HEADQAURTERS : NEW DELHI, INDIA
KEY PERSONS : Dr. NALIN SINGHAL
(Chairman & Managing director)
INDUSTRY : ENGINNERING
PRODUCTS: Solar Photovoltaic, Railways Electronic, Ceramics
WEBSITE : www.celindia.co.in
Cel Unit and Location
Central Electronics Limited (CEL) manufacturing
unit is located in Sahibabad, district Ghaziabad in
state of Uttar Pradesh. and has been producing
Solar Photovoltaic, Railways Electronic, Ceramics .
CEL has developed a number of critical
components for strategic applications and is
supplying these items to Defence Industry. CEL is
ISO-9001:2008 & ISO-14001:2004 certifications
company, backed by a strong group of high
dedicated and well qualified R&D team and has a
production plant with an established capacity of
13 MW per year
*
*An axle counter is a device on
a railway that detects the passing
of a train between two points on
a track.
*A counting head (or 'detection
point') is installed at each end
of the section, and as each
train axle passes the counting
head at the start of the section,
a counter increments.
*
*COUNTS AXLES
*COUNTS AXLES IN
AND OUT OF SECTION
*
Transmitter coils
Receiver coils
Base
Clamp
*
*A detection point comprises two independent sensors,
therefore the device can detect the direction and speed
of a train by the order and time in which the sensors
are passed. As the train passes a similar counting head
at the end of the section, the counter decrements. If the
net count is evaluated as zero, the section is presumed
to be clear for a second train.
*Initially axle counters were imported from Germany to
gain experience and to evaluate their suitability for
adoption on Indian Railways.
*Mark-I model was introduced in Indian
Railways after extensive laboratory and
field trials under various conditions. Later
stage based on the field feedback, two
models of axle counters known as single
entry/exit (RDSO Mark-II) axle counter and
Multi entry/exit axle counter were emerged
and after extensive laboratory and field
trials under various conditions, the design
was finalized and commercialized through
private sector as well as public sector
*Based on the feedback from field, a new axle counter has
been developed by RDSO, known as “UNIVERSAL AXLE
COUNTER”. It is universal system up to four entry / exit
points of one section of straight road or Points zone portion
and number of entry/ exit points are easily convertible at site
as per the required application.
*
*
•Earlier Axle counters only monitored
the amplitude of the signal from
detectors.
•Present versions monitor both
amplitude and phase. This gives
additional discrimination between
presence and absence of wheels
*
*IF AXLES IN NOT
EQUAL TO AXLES OUT
THEN SECTION
OCCUPIED
IN = 50 OUT = 0
SECTION IS OCCUPIED
IN = 50 OUT = 50
SECTION IS CLEAR
IN = 50 OUT = 40
*
•Detection of direction of movement is important
and it is done by having two detectors adjacent to
each other.
•Depending on the direction of movement the
sequence of dips of the two detectors changes.
A B
A
B
Dip of A precedes that
of B
A B
A
B
Dip of B precedes that
of A
Time
Signal
*
CARDFILE
Input Card
Logic Card
Output Card
Power supply
*
* An axle counter system can cover a very long section up to
15 Kms.
*It does not get affected either by flooding of track or poor
maintenance of tracks unlike the track circuit, which is
highly susceptible to these conditions.
*Efficiency and safe working of axle counters does not
depend up various track parameters and climate condition
such as length, ballast condition, drainage, stray voltage
and currents, track feed voltage and lead cables, etc. like
track circuits.
*
* Axle counters have been finding more and more uses on
modern safety signaling systems in railways
These are being used presently for the following :-
a) Automatic Signaling systems.
b) Level-crossing warning system using axle counter.
c) Monitoring of berthing tracks in station areas and yards.
d) Intermediate Block Signaling in Double line sections .
Presentation on universal axel counter by cel

Contenu connexe

Tendances

cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)
Coomarasamy Chidambaram
 
Indian railway signal engg. vol iv
Indian railway signal engg. vol ivIndian railway signal engg. vol iv
Indian railway signal engg. vol iv
Bhanu Teja
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
Lokesh Gogia
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
Rom!el Rajbansh
 

Tendances (20)

Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
 
Signaling in railways
Signaling in railways Signaling in railways
Signaling in railways
 
cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
Distribution of power supply in indian railway
Distribution of power supply in indian railwayDistribution of power supply in indian railway
Distribution of power supply in indian railway
 
Indian railway signal engg. vol iv
Indian railway signal engg. vol ivIndian railway signal engg. vol iv
Indian railway signal engg. vol iv
 
India modern rail service for public
India modern rail service for publicIndia modern rail service for public
India modern rail service for public
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
 
Vocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication SystemVocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication System
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Intelligent train engine ppt
Intelligent train engine pptIntelligent train engine ppt
Intelligent train engine ppt
 
ADVANCED TRAVELLER INFORMATION SYSTEM
ADVANCED TRAVELLER INFORMATION SYSTEMADVANCED TRAVELLER INFORMATION SYSTEM
ADVANCED TRAVELLER INFORMATION SYSTEM
 
Railway signal
Railway signalRailway signal
Railway signal
 
Railway training ppt
Railway training pptRailway training ppt
Railway training ppt
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian Railways
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 

En vedette

En vedette (11)

Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counter
 
GGTronics ssdac
GGTronics ssdacGGTronics ssdac
GGTronics ssdac
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)
 
AUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITSAUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITS
 
Signalling Maintanance
Signalling MaintananceSignalling Maintanance
Signalling Maintanance
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering system
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilities
 
Digital frequency meter
Digital frequency meterDigital frequency meter
Digital frequency meter
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
 
Types of time base generators
Types of time base generatorsTypes of time base generators
Types of time base generators
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 

Similaire à Presentation on universal axel counter by cel

PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.
SURJEET PANDEY
 
FINAL REPORT_B.tech
FINAL REPORT_B.techFINAL REPORT_B.tech
FINAL REPORT_B.tech
afzal usmani
 

Similaire à Presentation on universal axel counter by cel (20)

IRJET- Solar Powered Transmission Line Inspection Robot
IRJET- Solar Powered Transmission Line Inspection RobotIRJET- Solar Powered Transmission Line Inspection Robot
IRJET- Solar Powered Transmission Line Inspection Robot
 
IRJET- Design Analysis of Land Surveying Robot using Arduino UNO
IRJET- Design Analysis of Land Surveying Robot using Arduino UNOIRJET- Design Analysis of Land Surveying Robot using Arduino UNO
IRJET- Design Analysis of Land Surveying Robot using Arduino UNO
 
IRJET - Designing of Railway Signalling, Interlocking System and Control...
 IRJET -  	  Designing of Railway Signalling, Interlocking System and Control... IRJET -  	  Designing of Railway Signalling, Interlocking System and Control...
IRJET - Designing of Railway Signalling, Interlocking System and Control...
 
presentation
presentationpresentation
presentation
 
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLESOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
 
PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.
 
AUTOMATIC ACCELERATION CONTROL IN TRAFFIC SIGNAL/SCHOOL ZONE
AUTOMATIC ACCELERATION CONTROL IN TRAFFIC SIGNAL/SCHOOL ZONEAUTOMATIC ACCELERATION CONTROL IN TRAFFIC SIGNAL/SCHOOL ZONE
AUTOMATIC ACCELERATION CONTROL IN TRAFFIC SIGNAL/SCHOOL ZONE
 
FINAL REPORT_B.tech
FINAL REPORT_B.techFINAL REPORT_B.tech
FINAL REPORT_B.tech
 
A Low Cost Yet Super efficient Means to Prevent Overloading as Well as Accide...
A Low Cost Yet Super efficient Means to Prevent Overloading as Well as Accide...A Low Cost Yet Super efficient Means to Prevent Overloading as Well as Accide...
A Low Cost Yet Super efficient Means to Prevent Overloading as Well as Accide...
 
automatic toll collection.pptx
automatic toll collection.pptxautomatic toll collection.pptx
automatic toll collection.pptx
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
IRJET- Review on Performance of OTA Structure
IRJET- Review on Performance of OTA StructureIRJET- Review on Performance of OTA Structure
IRJET- Review on Performance of OTA Structure
 
Kamlesh meena tarinig ppt instrumentation limited
Kamlesh meena tarinig ppt instrumentation limitedKamlesh meena tarinig ppt instrumentation limited
Kamlesh meena tarinig ppt instrumentation limited
 
IJSRED-V2I2P31
IJSRED-V2I2P31IJSRED-V2I2P31
IJSRED-V2I2P31
 
IRJET - Driverless Metro Train to Shuttle between Two Stations
IRJET -  	  Driverless Metro Train to Shuttle between Two StationsIRJET -  	  Driverless Metro Train to Shuttle between Two Stations
IRJET - Driverless Metro Train to Shuttle between Two Stations
 
Automation of Railway Gate and Road traffic using Internet of Things (IoT)
Automation of Railway Gate and Road traffic using Internet of Things (IoT)Automation of Railway Gate and Road traffic using Internet of Things (IoT)
Automation of Railway Gate and Road traffic using Internet of Things (IoT)
 
Substation journal
Substation  journalSubstation  journal
Substation journal
 
Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)
 
Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...
 

Plus de Bharat Sanchar Nigam Limited (7)

Project 2015
Project 2015Project 2015
Project 2015
 
Presentation on solar cell by cel
Presentation on solar cell by celPresentation on solar cell by cel
Presentation on solar cell by cel
 
Traning report _central_electronic_limited_ (1)
Traning report _central_electronic_limited_ (1)Traning report _central_electronic_limited_ (1)
Traning report _central_electronic_limited_ (1)
 
Fibre optic communication vs satellite communication (1)
Fibre optic communication vs satellite communication (1)Fibre optic communication vs satellite communication (1)
Fibre optic communication vs satellite communication (1)
 
Broadband technology
Broadband technologyBroadband technology
Broadband technology
 
Ramakant tyagi presentation on ip addressing
Ramakant tyagi presentation on ip addressingRamakant tyagi presentation on ip addressing
Ramakant tyagi presentation on ip addressing
 
Lan & vlan
Lan & vlanLan & vlan
Lan & vlan
 

Dernier

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Presentation on universal axel counter by cel

  • 1. Industrial Training Presentation (Central Electronics Limited) Name . Ramakant Tyagi Roll No. 1219431055 Session . 2012-16 Department of Electronic & Communication Engineering H.R INSTITUTE OF TECHNOLOGY , GHAZIABAD(U.P)
  • 2. COMPANY PROFILE TYPE :PUBLIC SECTOR UNDERTAKING(PSU) FOUNDED IN : 1974 HEADQAURTERS : NEW DELHI, INDIA KEY PERSONS : Dr. NALIN SINGHAL (Chairman & Managing director) INDUSTRY : ENGINNERING PRODUCTS: Solar Photovoltaic, Railways Electronic, Ceramics WEBSITE : www.celindia.co.in
  • 3. Cel Unit and Location Central Electronics Limited (CEL) manufacturing unit is located in Sahibabad, district Ghaziabad in state of Uttar Pradesh. and has been producing Solar Photovoltaic, Railways Electronic, Ceramics . CEL has developed a number of critical components for strategic applications and is supplying these items to Defence Industry. CEL is ISO-9001:2008 & ISO-14001:2004 certifications company, backed by a strong group of high dedicated and well qualified R&D team and has a production plant with an established capacity of 13 MW per year
  • 4. * *An axle counter is a device on a railway that detects the passing of a train between two points on a track. *A counting head (or 'detection point') is installed at each end of the section, and as each train axle passes the counting head at the start of the section, a counter increments.
  • 5. * *COUNTS AXLES *COUNTS AXLES IN AND OUT OF SECTION
  • 7. * *A detection point comprises two independent sensors, therefore the device can detect the direction and speed of a train by the order and time in which the sensors are passed. As the train passes a similar counting head at the end of the section, the counter decrements. If the net count is evaluated as zero, the section is presumed to be clear for a second train. *Initially axle counters were imported from Germany to gain experience and to evaluate their suitability for adoption on Indian Railways.
  • 8. *Mark-I model was introduced in Indian Railways after extensive laboratory and field trials under various conditions. Later stage based on the field feedback, two models of axle counters known as single entry/exit (RDSO Mark-II) axle counter and Multi entry/exit axle counter were emerged and after extensive laboratory and field trials under various conditions, the design was finalized and commercialized through private sector as well as public sector
  • 9. *Based on the feedback from field, a new axle counter has been developed by RDSO, known as “UNIVERSAL AXLE COUNTER”. It is universal system up to four entry / exit points of one section of straight road or Points zone portion and number of entry/ exit points are easily convertible at site as per the required application.
  • 10. *
  • 11. * •Earlier Axle counters only monitored the amplitude of the signal from detectors. •Present versions monitor both amplitude and phase. This gives additional discrimination between presence and absence of wheels
  • 12. * *IF AXLES IN NOT EQUAL TO AXLES OUT THEN SECTION OCCUPIED IN = 50 OUT = 0 SECTION IS OCCUPIED IN = 50 OUT = 50 SECTION IS CLEAR IN = 50 OUT = 40
  • 13. * •Detection of direction of movement is important and it is done by having two detectors adjacent to each other. •Depending on the direction of movement the sequence of dips of the two detectors changes. A B A B Dip of A precedes that of B A B A B Dip of B precedes that of A Time Signal
  • 15. * * An axle counter system can cover a very long section up to 15 Kms. *It does not get affected either by flooding of track or poor maintenance of tracks unlike the track circuit, which is highly susceptible to these conditions. *Efficiency and safe working of axle counters does not depend up various track parameters and climate condition such as length, ballast condition, drainage, stray voltage and currents, track feed voltage and lead cables, etc. like track circuits.
  • 16. * * Axle counters have been finding more and more uses on modern safety signaling systems in railways These are being used presently for the following :- a) Automatic Signaling systems. b) Level-crossing warning system using axle counter. c) Monitoring of berthing tracks in station areas and yards. d) Intermediate Block Signaling in Double line sections .