SlideShare une entreprise Scribd logo
1  sur  28
NILFISK-ADVANCE
GLOBAL SOURCING UPDATE
A Mid-Size Company Perspective
May 2011
Randy Christoffersen
Vice President of Procurement
Nilfisk-Advance Inc.
1
Nilfisk-Advance, Inc. Confidential
 Company Background
 Global Sourcing Background
 Strategic Approach--Preferred Supplier Report
 Examples of Parts Successfully Sourced in Asia
 Lessons Learned
 Q&A
2
Agenda
Nilfisk-Advance, Inc. Confidential
 Global leader in professional cleaning equipment
 Member of the NKT Group in Denmark
 $1B in annual sales (NKT sales are $3B)
• North American sales are $300M
 50+ sales offices worldwide
 Major manufacturing locations in US, Mexico, Europe &
China
 Headquarters in Copenhagen, Denmark
 U.S. Headquarters in Plymouth, MN
3
Company Background
Nilfisk-Advance, Inc. Confidential
North America Plant Locations
4
Seattle, WA
Plymouth, MN
Springdale, ARPhoenix, AZ
Queretaro, MX
5
Core Businesses
Our businesses are
• Industrial and commercial cleaning equipment
• Professional high-pressure cleaning equipment
• Consumer vacuum and high-pressure cleaning equipment
• Services and accessories
Our customers include
• Manufacturers
• Commercial businesses
• Institutions
• Contract cleaners
• Automotive businesses
• Agricultural businesses
• Building & construction companies
• Service companies
6
Net Sales by Product Category
Vacuum cleaners 25%
Other sales 11%
Floor care machines 39%
High pressure cleaners 18%
After-sales market 7%
Nilfisk-Advance’s New Mission Statement
Nilfisk-Advance’s Mission Statement:
“We enable sustainable cleaning worldwide to improve quality of life”
•We provide superior easy to use,
ergonomic products (for the users)
•We ensure a better and healthier life
when our products are used (cleaner
working- and everyday environment)
•We provide the best
equipment – but we do not
perform the cleaning
•We deliver the most efficient
products for our customers
•We work to avoid unnecessary
depletion of natural resources
(water, chemicals, etc.)
•We work against discrimination,
corruption, etc.
•We are a provider
of equipment to
remove any type
of dust, dirt, litter,
waste, debris, etc.
•We are a global organization
•Our products reach every location
on the globe
•We are agile enough to adjust
to all needs – globally
•We embrace the increasing global
need for cleaning
STRATEGIC DIRECTION
Global Sourcing Progress & Targets
GROUP
TARGET
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
% LCC 2008 % LCC 2009 % LCC 2010 YTD % LCC 2011 FC % LCC 2012 FC % LCC 2013 FC
Total North America Floor Care
Global Sourcing Background
 Nilfisk-Advance has been sourcing in Asia for about
15 years.
 We currently utilize our own purchasing office in China
(DGSO) and a trading company in Taiwan (JCD)
 We opened a plant and sourcing office in Mexico in
2009.
9
Nilfisk-Advance, Inc. Confidential
Locations of DGSO and JCD
10
DGSO
JCD
Nilfisk-Advance, Inc. Confidential
China & Taiwan Sourcing Offices
 DGSO was set up in 2005 Dongguan, China to facilitate communication with
Chinese speaking factories.
 JCD is a trading company established in the mid-1990’s in Taiwan.
 Primary duties of our Asia offices include:
• Identify potential new suppliers
• Obtain quotes
• Negotiate with our guidance
• Execute tooling & F/A orders (including tooling agreements)
• Schedule and track shipments
• Arrange freight consolidation amongst all the factories
• Follow-up on accounting issues
• Work with factories on quality/delivery issues to determine root cause
11
Nilfisk-Advance, Inc. Confidential
 2010 imports from Asia:
• 84 Containers
• $8M in spend
• 50+ active suppliers in 2010
 Organization Structures
 Manager
 Tactical buyers
 Quality rep
 Logistics coordinator
12
Background: Asia
Nilfisk-Advance, Inc. Confidential
Background: Mexico/Queretaro
 We have a full time procurement team on the ground at our largest factory in
Queretaro, Mexico.
 Plant was opened in 2009.
 Staff consists of:
• One manager
• One project manager
• Three direct buyers
• One indirect buyer
• One procurement engineer
 Primary duties include:
• Identify potential new suppliers
• Obtain quotes & negotiate pricing
• Execute tooling & F/A orders (including tooling agreements)
• Pay suppliers
• Work with factories on quality/delivery issues to determine root cause
• Lead major supplier performance resolution
13
Nilfisk-Advance, Inc. Confidential
14
Preferred Supplier Strategic Overview
• General Information
Spend/Part Count Data
‘Stoplight’ Category
Growth Indicator
Comments about Factory/Capabilities
# of Visits
We use a R/Y/G approach to manage our sourcing process:
Successful Supplier Examples Suppliers - China
• Power Cords and Cord Sets
• Certifications for all agencies we’ve needed (UL, CSA, TUV, etc.)
• Draws their own wire, extrudes jacket, twists wire, assembles,
molds plugs, etc.
15
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - China
• Steel fabricator (punching/stamping/bending/welding/polishing/etc.)
• 1 Robotic Welder
• Small capacity injection mold machines
• Good quality systems
16
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - China
• Machined parts with tight tolerances
• ISO 9001:2008 Certified
17
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - China
• Aluminum & Magnesium Die Castings and Machining
• ISO 9001, TS 16949 Certified
• Yellow because of decline in process control in 2010
18
Squeegee Frames
Polisher Frames
Brush Decks
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - China
• Injection Molding, assemblies, and loose tolerance
machining/stampings
• Parent company also makes terminal blocks, fuse blocks, and
circuit breakers.
• Yellow because of lack of investment in recent years
19
Dust Skirt for OBS
Brush Skirt Housing
Gimbal
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Permanent Mold Aluminum and Machining
• ISO 9002, QS 9000, TS16949 Certifications
• World class supplier
20
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Wire Harnesses, wire assemblies, and printed circuit boards
• ISO 9002, QS 9000, TS16949 Certifications
• Strongest in harnesses
21
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Gear Manufacturing from raw steel to finished product
• ISO 14001, TS16949, QS 9000. Certifications
22
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Molded rubber parts bonded to steel (small)
• ISO 9001-2000 and TS 16949:2002
23
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Push-pull and static cable assemblies
• ISO 9001-2000, ISO 14001 Certifications
24
Nilfisk-Advance, Inc. Confidential
Successful Supplier Examples Suppliers - Taiwan
• Ductile and grey iron castings and processing
• ISO 9001-2000, ISO 14001 Certifications
25
Nilfisk-Advance, Inc. Confidential
Lessons Learned--Overall
 Many commodity categories can be sourced successfully in Asia and Mexico.
 Categorizing suppliers facilitates success.
 Be cautious about suppliers “over-promising.”
 Due diligence processes (such as supplier assessment) need to be the same
worldwide.
 Recognize you will have longer lead times and larger pipelines.
 This can be mitigated with warehousing in some situations.
 Expect occasional air freight will be required.
 Keep quote packages to a few parts if possible.
 Focus on higher volume parts with high labor content.
 Clear technical specifications are a must.
 Low cost tooling is a critical advantage in Asia.
 New products can be developed globally, but timeframes may be extended.
26
Nilfisk-Advance, Inc. Confidential
Lessons Learned—Organization & Structure
 “Feet on the ground” in the region is absolutely critical.
 You cannot manage day-to-day details with Asia suppliers from the U.S.
 Language barriers with smaller suppliers can be significant.
 Central (dedicated) U.S. project management is highly recommended.
 Identify and prioritize projects.
 Track progress regularly and relentlessly.
 Involving other key functions in the process can facilitate faster progress.
 Quality
 Engineering
 Operations Leadership
 Regular visits by U. S. project managers and leadership to key suppliers are
important.
27
Nilfisk-Advance, Inc. Confidential
Q&A
28
Nilfisk-Advance, Inc. Confidential

Contenu connexe

Tendances

Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...
Preparing  for growt: How Odfjell Drilling is benefiting from running IFS App...Preparing  for growt: How Odfjell Drilling is benefiting from running IFS App...
Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...IFS
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson
 
quality - security - environment project
quality - security - environment projectquality - security - environment project
quality - security - environment projectIsraa Hussein
 
Tools and techniques
Tools and techniquesTools and techniques
Tools and techniquesnithyanithi26
 
Quality Manufacturing Solutions
Quality Manufacturing SolutionsQuality Manufacturing Solutions
Quality Manufacturing SolutionsNeville Mare
 
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room SpecialistTectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room SpecialistManoj M
 
Endries Brochure
Endries BrochureEndries Brochure
Endries BrochureByron Olson
 
ISO 9001 Quality Management System Standard
ISO 9001 Quality Management System StandardISO 9001 Quality Management System Standard
ISO 9001 Quality Management System StandardISO Consulting Services
 
Turnxon Company Presentation
Turnxon Company Presentation Turnxon Company Presentation
Turnxon Company Presentation Sofia Chan
 

Tendances (20)

Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...
Preparing  for growt: How Odfjell Drilling is benefiting from running IFS App...Preparing  for growt: How Odfjell Drilling is benefiting from running IFS App...
Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...
 
Angstrom overview September
Angstrom overview SeptemberAngstrom overview September
Angstrom overview September
 
QUALITY TEAM 1 - 2015
QUALITY TEAM 1 - 2015QUALITY TEAM 1 - 2015
QUALITY TEAM 1 - 2015
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIM
 
Ontario PIastics, Inc. Info
Ontario PIastics, Inc. InfoOntario PIastics, Inc. Info
Ontario PIastics, Inc. Info
 
Iso new
Iso newIso new
Iso new
 
TPM
TPMTPM
TPM
 
quality - security - environment project
quality - security - environment projectquality - security - environment project
quality - security - environment project
 
Chico CV-2
Chico CV-2Chico CV-2
Chico CV-2
 
Iso 9000 overview
Iso 9000 overviewIso 9000 overview
Iso 9000 overview
 
Tools and techniques
Tools and techniquesTools and techniques
Tools and techniques
 
Quality Manufacturing Solutions
Quality Manufacturing SolutionsQuality Manufacturing Solutions
Quality Manufacturing Solutions
 
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room SpecialistTectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
 
Building a Lean Business System
Building a Lean Business SystemBuilding a Lean Business System
Building a Lean Business System
 
Endries Brochure
Endries BrochureEndries Brochure
Endries Brochure
 
PERSONAL INFORMATION1
PERSONAL INFORMATION1PERSONAL INFORMATION1
PERSONAL INFORMATION1
 
ISPO Code in light of ISO9001:2015
ISPO Code in light of ISO9001:2015ISPO Code in light of ISO9001:2015
ISPO Code in light of ISO9001:2015
 
ISO 9001 Quality Management System Standard
ISO 9001 Quality Management System StandardISO 9001 Quality Management System Standard
ISO 9001 Quality Management System Standard
 
Turnxon Company Presentation
Turnxon Company Presentation Turnxon Company Presentation
Turnxon Company Presentation
 
Cool Point Group Profile
Cool Point Group ProfileCool Point Group Profile
Cool Point Group Profile
 

Similaire à Asia Sourcing Update for ISM - FINAL 5-11

Naffco supply chain managment
Naffco supply chain managmentNaffco supply chain managment
Naffco supply chain managmentBhushan M Soni
 
Case Study - Desalination Unit Project
Case Study - Desalination Unit ProjectCase Study - Desalination Unit Project
Case Study - Desalination Unit ProjectJohn William
 
IPS Company Profile - General
IPS Company Profile - GeneralIPS Company Profile - General
IPS Company Profile - GeneralAzadeh sohrabi
 
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering) Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering) PatrickvanRensburg
 
Quality Management
Quality ManagementQuality Management
Quality ManagementAsim Qureshi
 
Yeahui electronic limited company profile
Yeahui electronic limited company profileYeahui electronic limited company profile
Yeahui electronic limited company profileGraceLiu120
 
Linkeight Ltd - Introduction
Linkeight Ltd - IntroductionLinkeight Ltd - Introduction
Linkeight Ltd - IntroductionJeremy Robbie
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingJohn William
 
KES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxKES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxssuser45c724
 
Synergy Global Sourcing_India_Engineering_June2016_youtube
Synergy Global Sourcing_India_Engineering_June2016_youtubeSynergy Global Sourcing_India_Engineering_June2016_youtube
Synergy Global Sourcing_India_Engineering_June2016_youtubeKetan Chandarana
 
Group o packaging brochure 2013
Group o packaging brochure 2013Group o packaging brochure 2013
Group o packaging brochure 2013jurgen29
 
Ultra Enterprises profile
Ultra Enterprises profileUltra Enterprises profile
Ultra Enterprises profileMaxpromotion
 
GainShare Consultants Company Overview - Q1'2015
GainShare Consultants Company Overview - Q1'2015GainShare Consultants Company Overview - Q1'2015
GainShare Consultants Company Overview - Q1'2015John Linebaugh
 
Company presentation-Tec-Shine
Company presentation-Tec-ShineCompany presentation-Tec-Shine
Company presentation-Tec-ShineAlisa Chen
 
National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...Caribbean Development Bank
 
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITYmetalworth
 

Similaire à Asia Sourcing Update for ISM - FINAL 5-11 (20)

Naffco supply chain managment
Naffco supply chain managmentNaffco supply chain managment
Naffco supply chain managment
 
Cfmc info
Cfmc infoCfmc info
Cfmc info
 
Case Study - Desalination Unit Project
Case Study - Desalination Unit ProjectCase Study - Desalination Unit Project
Case Study - Desalination Unit Project
 
IPS Company Profile - General
IPS Company Profile - GeneralIPS Company Profile - General
IPS Company Profile - General
 
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering) Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Yeahui electronic limited company profile
Yeahui electronic limited company profileYeahui electronic limited company profile
Yeahui electronic limited company profile
 
Linkeight Ltd - Introduction
Linkeight Ltd - IntroductionLinkeight Ltd - Introduction
Linkeight Ltd - Introduction
 
Ts industries overview ver 5
Ts industries overview ver 5Ts industries overview ver 5
Ts industries overview ver 5
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
KES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxKES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptx
 
Synergy Global Sourcing_India_Engineering_June2016_youtube
Synergy Global Sourcing_India_Engineering_June2016_youtubeSynergy Global Sourcing_India_Engineering_June2016_youtube
Synergy Global Sourcing_India_Engineering_June2016_youtube
 
Dcp introduction1
Dcp introduction1Dcp introduction1
Dcp introduction1
 
Group o packaging brochure 2013
Group o packaging brochure 2013Group o packaging brochure 2013
Group o packaging brochure 2013
 
Ultra Enterprises profile
Ultra Enterprises profileUltra Enterprises profile
Ultra Enterprises profile
 
GainShare Consultants Company Overview - Q1'2015
GainShare Consultants Company Overview - Q1'2015GainShare Consultants Company Overview - Q1'2015
GainShare Consultants Company Overview - Q1'2015
 
Company presentation-Tec-Shine
Company presentation-Tec-ShineCompany presentation-Tec-Shine
Company presentation-Tec-Shine
 
National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...
 
Automotive Insulations Limited - the digital journey, Paul Walker
Automotive Insulations Limited - the digital journey, Paul WalkerAutomotive Insulations Limited - the digital journey, Paul Walker
Automotive Insulations Limited - the digital journey, Paul Walker
 
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY
1.MRL INTRODUCTION - INDUSTRIAL SUPPLIES & MRO CAPABILITY
 

Asia Sourcing Update for ISM - FINAL 5-11

  • 1. NILFISK-ADVANCE GLOBAL SOURCING UPDATE A Mid-Size Company Perspective May 2011 Randy Christoffersen Vice President of Procurement Nilfisk-Advance Inc. 1 Nilfisk-Advance, Inc. Confidential
  • 2.  Company Background  Global Sourcing Background  Strategic Approach--Preferred Supplier Report  Examples of Parts Successfully Sourced in Asia  Lessons Learned  Q&A 2 Agenda Nilfisk-Advance, Inc. Confidential
  • 3.  Global leader in professional cleaning equipment  Member of the NKT Group in Denmark  $1B in annual sales (NKT sales are $3B) • North American sales are $300M  50+ sales offices worldwide  Major manufacturing locations in US, Mexico, Europe & China  Headquarters in Copenhagen, Denmark  U.S. Headquarters in Plymouth, MN 3 Company Background Nilfisk-Advance, Inc. Confidential
  • 4. North America Plant Locations 4 Seattle, WA Plymouth, MN Springdale, ARPhoenix, AZ Queretaro, MX
  • 5. 5 Core Businesses Our businesses are • Industrial and commercial cleaning equipment • Professional high-pressure cleaning equipment • Consumer vacuum and high-pressure cleaning equipment • Services and accessories Our customers include • Manufacturers • Commercial businesses • Institutions • Contract cleaners • Automotive businesses • Agricultural businesses • Building & construction companies • Service companies
  • 6. 6 Net Sales by Product Category Vacuum cleaners 25% Other sales 11% Floor care machines 39% High pressure cleaners 18% After-sales market 7%
  • 7. Nilfisk-Advance’s New Mission Statement Nilfisk-Advance’s Mission Statement: “We enable sustainable cleaning worldwide to improve quality of life” •We provide superior easy to use, ergonomic products (for the users) •We ensure a better and healthier life when our products are used (cleaner working- and everyday environment) •We provide the best equipment – but we do not perform the cleaning •We deliver the most efficient products for our customers •We work to avoid unnecessary depletion of natural resources (water, chemicals, etc.) •We work against discrimination, corruption, etc. •We are a provider of equipment to remove any type of dust, dirt, litter, waste, debris, etc. •We are a global organization •Our products reach every location on the globe •We are agile enough to adjust to all needs – globally •We embrace the increasing global need for cleaning STRATEGIC DIRECTION
  • 8. Global Sourcing Progress & Targets GROUP TARGET 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% % LCC 2008 % LCC 2009 % LCC 2010 YTD % LCC 2011 FC % LCC 2012 FC % LCC 2013 FC Total North America Floor Care
  • 9. Global Sourcing Background  Nilfisk-Advance has been sourcing in Asia for about 15 years.  We currently utilize our own purchasing office in China (DGSO) and a trading company in Taiwan (JCD)  We opened a plant and sourcing office in Mexico in 2009. 9 Nilfisk-Advance, Inc. Confidential
  • 10. Locations of DGSO and JCD 10 DGSO JCD Nilfisk-Advance, Inc. Confidential
  • 11. China & Taiwan Sourcing Offices  DGSO was set up in 2005 Dongguan, China to facilitate communication with Chinese speaking factories.  JCD is a trading company established in the mid-1990’s in Taiwan.  Primary duties of our Asia offices include: • Identify potential new suppliers • Obtain quotes • Negotiate with our guidance • Execute tooling & F/A orders (including tooling agreements) • Schedule and track shipments • Arrange freight consolidation amongst all the factories • Follow-up on accounting issues • Work with factories on quality/delivery issues to determine root cause 11 Nilfisk-Advance, Inc. Confidential
  • 12.  2010 imports from Asia: • 84 Containers • $8M in spend • 50+ active suppliers in 2010  Organization Structures  Manager  Tactical buyers  Quality rep  Logistics coordinator 12 Background: Asia Nilfisk-Advance, Inc. Confidential
  • 13. Background: Mexico/Queretaro  We have a full time procurement team on the ground at our largest factory in Queretaro, Mexico.  Plant was opened in 2009.  Staff consists of: • One manager • One project manager • Three direct buyers • One indirect buyer • One procurement engineer  Primary duties include: • Identify potential new suppliers • Obtain quotes & negotiate pricing • Execute tooling & F/A orders (including tooling agreements) • Pay suppliers • Work with factories on quality/delivery issues to determine root cause • Lead major supplier performance resolution 13 Nilfisk-Advance, Inc. Confidential
  • 14. 14 Preferred Supplier Strategic Overview • General Information Spend/Part Count Data ‘Stoplight’ Category Growth Indicator Comments about Factory/Capabilities # of Visits We use a R/Y/G approach to manage our sourcing process:
  • 15. Successful Supplier Examples Suppliers - China • Power Cords and Cord Sets • Certifications for all agencies we’ve needed (UL, CSA, TUV, etc.) • Draws their own wire, extrudes jacket, twists wire, assembles, molds plugs, etc. 15 Nilfisk-Advance, Inc. Confidential
  • 16. Successful Supplier Examples Suppliers - China • Steel fabricator (punching/stamping/bending/welding/polishing/etc.) • 1 Robotic Welder • Small capacity injection mold machines • Good quality systems 16 Nilfisk-Advance, Inc. Confidential
  • 17. Successful Supplier Examples Suppliers - China • Machined parts with tight tolerances • ISO 9001:2008 Certified 17 Nilfisk-Advance, Inc. Confidential
  • 18. Successful Supplier Examples Suppliers - China • Aluminum & Magnesium Die Castings and Machining • ISO 9001, TS 16949 Certified • Yellow because of decline in process control in 2010 18 Squeegee Frames Polisher Frames Brush Decks Nilfisk-Advance, Inc. Confidential
  • 19. Successful Supplier Examples Suppliers - China • Injection Molding, assemblies, and loose tolerance machining/stampings • Parent company also makes terminal blocks, fuse blocks, and circuit breakers. • Yellow because of lack of investment in recent years 19 Dust Skirt for OBS Brush Skirt Housing Gimbal Nilfisk-Advance, Inc. Confidential
  • 20. Successful Supplier Examples Suppliers - Taiwan • Permanent Mold Aluminum and Machining • ISO 9002, QS 9000, TS16949 Certifications • World class supplier 20 Nilfisk-Advance, Inc. Confidential
  • 21. Successful Supplier Examples Suppliers - Taiwan • Wire Harnesses, wire assemblies, and printed circuit boards • ISO 9002, QS 9000, TS16949 Certifications • Strongest in harnesses 21 Nilfisk-Advance, Inc. Confidential
  • 22. Successful Supplier Examples Suppliers - Taiwan • Gear Manufacturing from raw steel to finished product • ISO 14001, TS16949, QS 9000. Certifications 22 Nilfisk-Advance, Inc. Confidential
  • 23. Successful Supplier Examples Suppliers - Taiwan • Molded rubber parts bonded to steel (small) • ISO 9001-2000 and TS 16949:2002 23 Nilfisk-Advance, Inc. Confidential
  • 24. Successful Supplier Examples Suppliers - Taiwan • Push-pull and static cable assemblies • ISO 9001-2000, ISO 14001 Certifications 24 Nilfisk-Advance, Inc. Confidential
  • 25. Successful Supplier Examples Suppliers - Taiwan • Ductile and grey iron castings and processing • ISO 9001-2000, ISO 14001 Certifications 25 Nilfisk-Advance, Inc. Confidential
  • 26. Lessons Learned--Overall  Many commodity categories can be sourced successfully in Asia and Mexico.  Categorizing suppliers facilitates success.  Be cautious about suppliers “over-promising.”  Due diligence processes (such as supplier assessment) need to be the same worldwide.  Recognize you will have longer lead times and larger pipelines.  This can be mitigated with warehousing in some situations.  Expect occasional air freight will be required.  Keep quote packages to a few parts if possible.  Focus on higher volume parts with high labor content.  Clear technical specifications are a must.  Low cost tooling is a critical advantage in Asia.  New products can be developed globally, but timeframes may be extended. 26 Nilfisk-Advance, Inc. Confidential
  • 27. Lessons Learned—Organization & Structure  “Feet on the ground” in the region is absolutely critical.  You cannot manage day-to-day details with Asia suppliers from the U.S.  Language barriers with smaller suppliers can be significant.  Central (dedicated) U.S. project management is highly recommended.  Identify and prioritize projects.  Track progress regularly and relentlessly.  Involving other key functions in the process can facilitate faster progress.  Quality  Engineering  Operations Leadership  Regular visits by U. S. project managers and leadership to key suppliers are important. 27 Nilfisk-Advance, Inc. Confidential

Notes de l'éditeur

  1. 2
  2. 3
  3. 5