SlideShare une entreprise Scribd logo
1  sur  4
PROFESSIONAL RESUME
Name: RANJITHKUMAR KUMARAN
Current Position: Project Manager
Date of Birth: 31-05-1969
Nationality: Indian
Qualifications: B.Tech. Mechanical Engineering
MBA (Operations Management)
Contact Details chichinran@gmail.com, rankuchin@gmail.com
Mob: +91 8129689315 +91 8089840659
C-Madonna Castle, 45-Rose Garden, Canal Cross Road,
Perumanur P.O, Thevara, Kochi-682015, Kerala.
CAREER OBJECTIVES
Sr. Mechanical Engineer for execution and pre-commissioning activities of Piping, Equipment
and Structural works of Oil & Gas and Petrochemical projects. Responsibilities include:
Execution, quality, project engineering, preparation of scope of work for tender, bid
evaluation, project risk assessmentwork pack preparation, health and safety initiatives;
implementing innovative solutions to practical problems; motivating and development of
personnel.
CAREER SUMMARY
Mechanical Engineer with more than 23years of work experience in the field of project
management, pre-commissioning, preparing detailed drawings, work packs, scheduling,
monitoring, expediting, project controlling & co-ordination.
Having sound technical and administrative background, involved in the execution of various
mechanical construction and maintenance project in Oil & gas and Petrochemical industries.
Familiar with various international codes and standards for different systems in the field of
Mechanical Engineering, especially pertaining to piping, tanks and welding such as ASME,
API, ASTM, BS and IS Codes. Have experience in material take off, preparation of bill of
quantities, planning, and project control including inspection and commissioning activities.
SOFTWARE EXPOSURE
• MS Word,
• Excel,
• Power Point,
• Auto cad,
• Piping Design & Drafting Course from Tech path Institute, Kochi
• PDMS from ASTS institute Kochi
Page 1 of 4
PROFESSIONAL RESUME
From Jun 2015 P G C Pvt. LTD. Koch
Project Manager
Responsibilities:
Medium sized construction contracting company executing Civil, Structural, Mechanical and
Piping works.
Project Manager for the Civil and structural works of offsite and unit pipe rack for refinery
expansion project. Coordinating with contractors and client for the timely completion of the
project, responsible for the day to day affairs of the site, safety aspects, labour deployment,
billing etc.
Mar 2014 –Feb 2015 M/s Ras Gas Qatar
Sr. Construction Engineer
Sr. Construction Engineer in Operations Project Department of Ras gas LNG plant.
Responsible for the execution of projects in brown field including the shut down activities.
Execution of preparatory works for shut down projects include review of documents such as
method statements, JSA, schedules etc ,monitoring and reviewing the procurement and
fabrication of shut down projects, reviewing the constructability study and site surveys for it,
executing the projects during shutdown period and following-up the post shut down activities
and site clearance.
Mar2013- Dec 2013 M/s JP-SUDAPET Khartoum, Sudan
Construction Manager
Responsibilities
Worked as PMC Construction Manager for the FPF expansion and new FSF constructions at
Baleela, Block six of Sudan Oil field .Responsibilities include the management of construction
activities of flow lines of light crude, heavy crude, water injection, gas injection and gas lift.; high
pressure compressor installation for gas injection, installation of heater treater unit etc.
Nov 2012 - Jan 2013 M/s Nama Mott Mac Abudhabi
Senior Project Engineer
Responsibilities:
Worked for Nama Mott as Senior Project Engineer for the updation and as-built drawings of
Piping manifolds of GASCO Abudhabi at Maqta and Habshan areas.
Sept.2011-Aug2012 M/s CINDA ENGG.AND CONSTRUCTIONS Ltd Kochi
Senior Project Engineer
Responsibilities:
CINDA is Taiwan based multinational engineering and construction firm in Oil and Gas and
petrochemical plants Worked as Sr. Engineer responsible for the Equipment erection, pre-
commissioning and piping works of Petronet LNG terminal at Kochi. Responsibilities include the
erection of equipments, both static and rotary and their alignments and commissioning
assistance; executed piping works and the commissioning activities of the Nitrogen plant. Also
Page 2 of 4
PROFESSIONAL RESUME
involved in the installation and pre-commissioning activities of Air heater unit, BOG
Compressor, Gas Turbine generators etc
Sept. 10-July2011 M/s Aker Solutions Mumbai
Senior Engineer
Responsibilities:
Aker is a multinational consultancy firm in the area of Oil & Gas and Petrochemical industries.
Aker was the PMC for the construction of CMS, PTFE and D-PTFE plats at GFL Ltd. Gujarat
Worked as Sr. Engineer for execution and pre-commissioning of Piping/Equipments works of
CMS and D-PTFE plants at Gujarat Flourochemicals Ltd.at Dahej, Gujarat; Also worked as
Senior engineer at Akzo Noble site at Bangalore for the execution and pre-commissioning
activities of their new paint manufacturing plant.
Jan 09- Dec 2009 M/S Toyo Engineering India Ltd
Senior Engineer Piping
Responsibilities:
Toyo is a multinational consultancy firm in the area of Oil & Gas and Petrochemical industries.
Toyo was the P M C for the Up gradation of IOCL Refinery at Baroda.
Responsibilities:
Coordination of Execution of the piping works for the Heater units of Delayed Cocker Unit.
Coordinating with contractors and client for the timely completion of the project, conducting
meetings, monitoring the progress, Inspection of Fit-ups, Hydro Tests, Checking confirmation to
P&ID, isometrics, and general project specifications, Performing review and constructability of
proposed piping site modifications etc.
P G C Pvt. LTD.
Jan.2008-Jan.2009 BPCL- Kochi Refinery, Kochi
Project Manager
Responsibilities:
Medium sized construction contracting company executing Civil, Structural, Mechanical and
Piping works.
Project Manager for the Civil, structural and electrical works at CDU/VDU plant revamp project.
Coordinating with contractors and client for the timely completion of the project, responsible for
the day to day affairs of the site, safety aspects, labour deployment, billing etc.
Sept 2003- Dec 2007 Rai University, Kochi Campus
Assistant Professor
Responsibilities:
Asst. Professor in School of Engineering of the university’s Kochi Campus. Worked as the head of
Mechanical Engineering department and Examination Superintendent.
Page 3 of 4
PROFESSIONAL RESUME
Sept.1999-June 2003 M/s KOCHUMON & Associates
Sr. Project Engineer
Responsibilities:
Sr.Project Engineer responsible for the fabrication and erection of piping and structural works,
with a subcontractor of BHEL at NTPC Simhadri Project at Visakhapatnam and at Vizag Steels.
Sept.1997-June 1999 M/S Toyo Engineering Corporation
Area Coordinator Piping
Responsibilities:
Area Coordinator Piping: MRPL Refinery Mangalore. (Sept.1997-June 1999)
TOYO was the PMC for the construction of MRPL Phase I and II Execution and pre-
commissioning of the offsite piping works and Tie-in joints between Phase I and Phase II of
Mangalore Refinery and Petrochemicals Ltd. Coordinating with contractors and client,
Preparation of detailed drawing , conducting meetings ,monitoring and reporting progress on
daily basis etc.
Feb.1997-Aug1997 M/s PRAXAIR INDIA PVT. LTD
Piping Engineer
Responsibilities:
Coordination of executing the piping works for the fabrication and erection of 2500 TPD Oxygen
plant at Jindal Vijayanagar Steel Plants. Coordinating with contractors and client, Preparation of
detailed drawing, inspection of fit-ups, welding etc.
Oct.1995-Dec.1996 M/s L & T LTD
Piping Engineer
Responsibilities:
The execution of Fabrication and erection of Air Separation Unit at Reliance site under Hitachi
Japan as Consultants. Worked as Inspection engineer for the Fabrication of Offshore platform for
ENRON Oil and Gas India Ltd. Inspection and coordination of NDTs, viz. Radiography, Dye
penetrant Test, Magnetic particle Test, Ultrasonic Test etc. Also for the Naphtha Cracker plant at
Reliance site as Inspection Engineer to complete the final NDTs to make the system ready for
Commissioning.
June1991-Jan.95 M/S PLUSTECH ENGG.PVT. LTD
Site Engineer
Responsibilities:
Worked as Site engineer for the Fabrication and erection of piping and structural works of
petrochemical plants of Reliance Industries at Hazira and other locations.
PERSONNEL DETAILS
Marital Status : Married
Languages : English, Hindi, Malayalam, Tamil
Passport Details: J 5241889
Date of Expiry: 23/05/2021
Page 4 of 4

Contenu connexe

Tendances

CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep Pandey
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015DEVARAJ B C
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil EngineerMohammad Sarowar
 

Tendances (18)

CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
UpdatedCV_2015
UpdatedCV_2015UpdatedCV_2015
UpdatedCV_2015
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
CV for J. Moloney
CV for J. MoloneyCV for J. Moloney
CV for J. Moloney
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
bs cv latest16.8
bs cv latest16.8bs cv latest16.8
bs cv latest16.8
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Prabhakar_CV
Prabhakar_CVPrabhakar_CV
Prabhakar_CV
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 

En vedette (18)

Jeffrey Selorm Dzata_Mechanical Engineer
Jeffrey Selorm Dzata_Mechanical Engineer Jeffrey Selorm Dzata_Mechanical Engineer
Jeffrey Selorm Dzata_Mechanical Engineer
 
DESIGN ENGINEER
DESIGN ENGINEERDESIGN ENGINEER
DESIGN ENGINEER
 
Diwakar CV
Diwakar CVDiwakar CV
Diwakar CV
 
QC engineer at Suzlon energy ltd.
QC engineer at Suzlon energy ltd.QC engineer at Suzlon energy ltd.
QC engineer at Suzlon energy ltd.
 
SREE Resume new
SREE Resume newSREE Resume new
SREE Resume new
 
Anand_CV
Anand_CVAnand_CV
Anand_CV
 
Rahul Ghosh
Rahul GhoshRahul Ghosh
Rahul Ghosh
 
Mohd Muttalib CV.pdf
Mohd Muttalib CV.pdfMohd Muttalib CV.pdf
Mohd Muttalib CV.pdf
 
Bio_data2
Bio_data2Bio_data2
Bio_data2
 
GIRISH CV
GIRISH CVGIRISH CV
GIRISH CV
 
Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016
 
CV of ABDUL GAFFAR
CV of ABDUL GAFFARCV of ABDUL GAFFAR
CV of ABDUL GAFFAR
 
Presentation of SP Engg Corp Pvt. Ltd. India
Presentation of  SP Engg Corp Pvt. Ltd. IndiaPresentation of  SP Engg Corp Pvt. Ltd. India
Presentation of SP Engg Corp Pvt. Ltd. India
 
Ibrahim dilawer syed cv
Ibrahim dilawer syed  cvIbrahim dilawer syed  cv
Ibrahim dilawer syed cv
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
Farid Ibne Qasam Mulla_Resume
Farid Ibne Qasam Mulla_ResumeFarid Ibne Qasam Mulla_Resume
Farid Ibne Qasam Mulla_Resume
 
Rahul ghosh(1)
Rahul ghosh(1)Rahul ghosh(1)
Rahul ghosh(1)
 
AJAY PAWAR CV
AJAY PAWAR CVAJAY PAWAR CV
AJAY PAWAR CV
 

Similaire à CV latestone

Similaire à CV latestone (20)

Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Curriculam vitae deepak
Curriculam vitae deepakCurriculam vitae deepak
Curriculam vitae deepak
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
CV - B.SRIKANTH
CV - B.SRIKANTH CV - B.SRIKANTH
CV - B.SRIKANTH
 
Cv b.srikanth
Cv   b.srikanth Cv   b.srikanth
Cv b.srikanth
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
Ashok Kumar Das-Biodata
Ashok Kumar Das-BiodataAshok Kumar Das-Biodata
Ashok Kumar Das-Biodata
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
AS_CV
AS_CVAS_CV
AS_CV
 
prashant resume latest
prashant resume latestprashant resume latest
prashant resume latest
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 

CV latestone

  • 1. PROFESSIONAL RESUME Name: RANJITHKUMAR KUMARAN Current Position: Project Manager Date of Birth: 31-05-1969 Nationality: Indian Qualifications: B.Tech. Mechanical Engineering MBA (Operations Management) Contact Details chichinran@gmail.com, rankuchin@gmail.com Mob: +91 8129689315 +91 8089840659 C-Madonna Castle, 45-Rose Garden, Canal Cross Road, Perumanur P.O, Thevara, Kochi-682015, Kerala. CAREER OBJECTIVES Sr. Mechanical Engineer for execution and pre-commissioning activities of Piping, Equipment and Structural works of Oil & Gas and Petrochemical projects. Responsibilities include: Execution, quality, project engineering, preparation of scope of work for tender, bid evaluation, project risk assessmentwork pack preparation, health and safety initiatives; implementing innovative solutions to practical problems; motivating and development of personnel. CAREER SUMMARY Mechanical Engineer with more than 23years of work experience in the field of project management, pre-commissioning, preparing detailed drawings, work packs, scheduling, monitoring, expediting, project controlling & co-ordination. Having sound technical and administrative background, involved in the execution of various mechanical construction and maintenance project in Oil & gas and Petrochemical industries. Familiar with various international codes and standards for different systems in the field of Mechanical Engineering, especially pertaining to piping, tanks and welding such as ASME, API, ASTM, BS and IS Codes. Have experience in material take off, preparation of bill of quantities, planning, and project control including inspection and commissioning activities. SOFTWARE EXPOSURE • MS Word, • Excel, • Power Point, • Auto cad, • Piping Design & Drafting Course from Tech path Institute, Kochi • PDMS from ASTS institute Kochi Page 1 of 4
  • 2. PROFESSIONAL RESUME From Jun 2015 P G C Pvt. LTD. Koch Project Manager Responsibilities: Medium sized construction contracting company executing Civil, Structural, Mechanical and Piping works. Project Manager for the Civil and structural works of offsite and unit pipe rack for refinery expansion project. Coordinating with contractors and client for the timely completion of the project, responsible for the day to day affairs of the site, safety aspects, labour deployment, billing etc. Mar 2014 –Feb 2015 M/s Ras Gas Qatar Sr. Construction Engineer Sr. Construction Engineer in Operations Project Department of Ras gas LNG plant. Responsible for the execution of projects in brown field including the shut down activities. Execution of preparatory works for shut down projects include review of documents such as method statements, JSA, schedules etc ,monitoring and reviewing the procurement and fabrication of shut down projects, reviewing the constructability study and site surveys for it, executing the projects during shutdown period and following-up the post shut down activities and site clearance. Mar2013- Dec 2013 M/s JP-SUDAPET Khartoum, Sudan Construction Manager Responsibilities Worked as PMC Construction Manager for the FPF expansion and new FSF constructions at Baleela, Block six of Sudan Oil field .Responsibilities include the management of construction activities of flow lines of light crude, heavy crude, water injection, gas injection and gas lift.; high pressure compressor installation for gas injection, installation of heater treater unit etc. Nov 2012 - Jan 2013 M/s Nama Mott Mac Abudhabi Senior Project Engineer Responsibilities: Worked for Nama Mott as Senior Project Engineer for the updation and as-built drawings of Piping manifolds of GASCO Abudhabi at Maqta and Habshan areas. Sept.2011-Aug2012 M/s CINDA ENGG.AND CONSTRUCTIONS Ltd Kochi Senior Project Engineer Responsibilities: CINDA is Taiwan based multinational engineering and construction firm in Oil and Gas and petrochemical plants Worked as Sr. Engineer responsible for the Equipment erection, pre- commissioning and piping works of Petronet LNG terminal at Kochi. Responsibilities include the erection of equipments, both static and rotary and their alignments and commissioning assistance; executed piping works and the commissioning activities of the Nitrogen plant. Also Page 2 of 4
  • 3. PROFESSIONAL RESUME involved in the installation and pre-commissioning activities of Air heater unit, BOG Compressor, Gas Turbine generators etc Sept. 10-July2011 M/s Aker Solutions Mumbai Senior Engineer Responsibilities: Aker is a multinational consultancy firm in the area of Oil & Gas and Petrochemical industries. Aker was the PMC for the construction of CMS, PTFE and D-PTFE plats at GFL Ltd. Gujarat Worked as Sr. Engineer for execution and pre-commissioning of Piping/Equipments works of CMS and D-PTFE plants at Gujarat Flourochemicals Ltd.at Dahej, Gujarat; Also worked as Senior engineer at Akzo Noble site at Bangalore for the execution and pre-commissioning activities of their new paint manufacturing plant. Jan 09- Dec 2009 M/S Toyo Engineering India Ltd Senior Engineer Piping Responsibilities: Toyo is a multinational consultancy firm in the area of Oil & Gas and Petrochemical industries. Toyo was the P M C for the Up gradation of IOCL Refinery at Baroda. Responsibilities: Coordination of Execution of the piping works for the Heater units of Delayed Cocker Unit. Coordinating with contractors and client for the timely completion of the project, conducting meetings, monitoring the progress, Inspection of Fit-ups, Hydro Tests, Checking confirmation to P&ID, isometrics, and general project specifications, Performing review and constructability of proposed piping site modifications etc. P G C Pvt. LTD. Jan.2008-Jan.2009 BPCL- Kochi Refinery, Kochi Project Manager Responsibilities: Medium sized construction contracting company executing Civil, Structural, Mechanical and Piping works. Project Manager for the Civil, structural and electrical works at CDU/VDU plant revamp project. Coordinating with contractors and client for the timely completion of the project, responsible for the day to day affairs of the site, safety aspects, labour deployment, billing etc. Sept 2003- Dec 2007 Rai University, Kochi Campus Assistant Professor Responsibilities: Asst. Professor in School of Engineering of the university’s Kochi Campus. Worked as the head of Mechanical Engineering department and Examination Superintendent. Page 3 of 4
  • 4. PROFESSIONAL RESUME Sept.1999-June 2003 M/s KOCHUMON & Associates Sr. Project Engineer Responsibilities: Sr.Project Engineer responsible for the fabrication and erection of piping and structural works, with a subcontractor of BHEL at NTPC Simhadri Project at Visakhapatnam and at Vizag Steels. Sept.1997-June 1999 M/S Toyo Engineering Corporation Area Coordinator Piping Responsibilities: Area Coordinator Piping: MRPL Refinery Mangalore. (Sept.1997-June 1999) TOYO was the PMC for the construction of MRPL Phase I and II Execution and pre- commissioning of the offsite piping works and Tie-in joints between Phase I and Phase II of Mangalore Refinery and Petrochemicals Ltd. Coordinating with contractors and client, Preparation of detailed drawing , conducting meetings ,monitoring and reporting progress on daily basis etc. Feb.1997-Aug1997 M/s PRAXAIR INDIA PVT. LTD Piping Engineer Responsibilities: Coordination of executing the piping works for the fabrication and erection of 2500 TPD Oxygen plant at Jindal Vijayanagar Steel Plants. Coordinating with contractors and client, Preparation of detailed drawing, inspection of fit-ups, welding etc. Oct.1995-Dec.1996 M/s L & T LTD Piping Engineer Responsibilities: The execution of Fabrication and erection of Air Separation Unit at Reliance site under Hitachi Japan as Consultants. Worked as Inspection engineer for the Fabrication of Offshore platform for ENRON Oil and Gas India Ltd. Inspection and coordination of NDTs, viz. Radiography, Dye penetrant Test, Magnetic particle Test, Ultrasonic Test etc. Also for the Naphtha Cracker plant at Reliance site as Inspection Engineer to complete the final NDTs to make the system ready for Commissioning. June1991-Jan.95 M/S PLUSTECH ENGG.PVT. LTD Site Engineer Responsibilities: Worked as Site engineer for the Fabrication and erection of piping and structural works of petrochemical plants of Reliance Industries at Hazira and other locations. PERSONNEL DETAILS Marital Status : Married Languages : English, Hindi, Malayalam, Tamil Passport Details: J 5241889 Date of Expiry: 23/05/2021 Page 4 of 4