SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
WORKOVER UNIT
ADVANCED HYDRAULIC
CEEM as a recognized supplier of oilfield equipment has become a solution provider
to the oil exploration and production sector. CEEM has routinely implemented
improvements to equipment designs and provided operational solutions with
specially designed equipment.
CEEM has participated in the refurbishment and enhancement of equipment owned
by all of the Major HWU suppliers. In doing so it has developed a strong sense of
market requirement and has a wealth of knowledge related to HWU services and
commercial requirements.
CEEM has now assembled a package consisting of all the advancements made to
the hydraulic work-over units as well as bundling of all of the support equipment
that has brought success to many projects.
An Introduction to CEEM’s AHWU
460K AHWU
The CEEM 460K AHWU is designed to be rigged up as a stand-alone unit, and to
be used for the work over of existing wells Offshore and Land based. The rig is
designed to complete all work-over functions completed by a conventional rig with
the additional capability of working with pressure in snubbing and underbalanced
situations.
The CEEM 460K AHWU containerized rig standard package
consists of:
Hydraulic jack
Main work basket
Main control panel
Main winch panel
Tong panel
Counterbalance panel
Basket riser workover (two meter height)
Basket riser drilling (three meter height)
Telescopic derrick
Counterbalance winches (two units typical)
Main winch (15 ton)
Rotary table
Tong delivery
Work window (three meter inside height)
Adjustable work windown plate (within jack frame)
Lower basket
Mid level basket
Work window basket
The CEEM 460K AHWU has the following advantages compared
to a conventional rig:
No drill line required (no slipping or cutting drill).
Function of mast for lifting single joints of pipe and bottom hole assemblies
Individual component weights can be reduced to 8 tons
Low center of gravity.
Unexpected pipe movement maximum 10 feet
Can accommodate any bop stack configuration.
Under-balanced operations and snubbing operations integrated
Small operational footprint
Noise reduced to minimum.
The CEEM 460K AHWU has the following advantages
compared to a conventional HWU:
Simplified rig up
All parts of the rig are compatible as they have been designed to work in a
system
All components are sized to fit in standard shipping containers
All spares and consumables have custom storage to protect the asset until it is
required
15 ton main winch for deploying and recovering bottom hole assemblies
Individual component weights can be reduced to 8 tons
Rig components have been simplified in order to utilize less experienced
personnel
Equipment has been built with common components used in other standard
equipment allowing for purchase from common vendors world wide
Equipment has been built to withstand in field abuse and neglect and require
only the most basic maintenance of lubrication and service
Modular Design
The CEEM 460K AHWU containerized rig achieves its most fundamental profit
enhancement by being modular with all components containers sized.
All components within container dimension
All components can be disassembled to achieve a maximum per piece weight
of 8 tons
All materials have designated storage or shipping frames within the package to
protect them
All components have API lifting eyes for loading, unloading and assembly
Environmental Conditions
The rig is constructed for the following environmental conditions.
Minimum water temperature : N/A
Maximum water temperature : N/A
Ambient extreme maximum : +50º C
Design temperature. min. (class) : -20º C
Atmosphere : Salty & corrosive
Maximum relative humidity : 100%
T
Design Loads
he CEEM 460K AHWU containerized rig is designed to meet expected operational
loads and comply with applicable API guidelines. All steel structures are modeled
and verified by FEA prior to build. After construction materials are proof loaded as
required and NDT is completed
Design Features
All components are able to be shipped inside of shipping containers
Jack
HUSCO valve mounted on milled flat bracket to ensure zero tension on housing
that may cause spool sticking
HUSCO valve piping connected by way of fully machined manifold block to
prevent any tension on HUSCO valve body
Hydraulic piping is 2.5 inch through the tee and then reduces to 2 inch to the
cylinders allowing for maximum flow
CEEM designed swivel flanges on hydraulic piping allowing for zero stress
connection with perfect flange alignment
Valves for two leg four leg selection are full port 2.5 inch flanged connection
Hydraulic piping from barrel end of cylinder is routed on backside of post
allowing for maximum work space in window area
Threaded connection on the piping are joined by flanged connection making for
quick repair in the event a threaded connection becomes damaged
Hydraulic cylinders are manufactured with full opening flange on rod end
allowing for rod and piston to be removed through the opening. This allows rod
and piston service with pipe in the hole and no requirement to rig down
Jack is assembled with four posts that form the structure of the jack, cylinders
are not stresses by forces other than the movement of tubulars
Jack cylinders can be removed from jack through the top of the jack frame. This
can be done with pipe in the hole and no requirement to rig down
Jack work window
Jack work window is formed by the main posts of the jack and has line bored
holes at 300mm intervals bored on each post
Jack work window plate can travel the full length of the jack structure allowing
the slips to be positioned at any height
Jack work window through manipulation of slip position can be utilized to create
an effective stroke of 20 feet for the removal / installation of long tool assemblies
Jack work window plate can be positioned near the top of the frame allowing
banding of cable to completed below the slip bowls
Main workbasket
Folding design allows for transport and storage inside a standard shipping
container
Flat finished floor with zero projections above the grating
All floor gratings are hot dipped galvanized
All floor gratings are removable for repair and replacement by threaded fasteners
All main run hydraulic hoses are located within the floor structure and are covered
by stainless steel bulkhead plates complete with stainless steel fasteners
All panels are mounted in the basket by threaded fasteners and are left in
position during normal shipping (folded basket)
Connected to basket riser by way of three inch acme threaded fasteners
Control panels
All panels are constructed of 316 stainless steel
All control levers are profile cut 316 stainless steel
All knobs and dials are machines 316 stainless steel
All fasteners are stainless steel
Control panel lever locks have been designed to operate in both working
positions and neutral position
Control panel lever lock pins are connected to the panel by stainless steel
1000kg test braided line
Control panel lever locks have convenient storage hole adjacent to the lever
assembly they are used with
Derrick
Crown assembly is bolted construction
allowing easy assembly / disassembly for
inspection and service intervals in the field
Crown assembly is mounted on a hinge pin
allowing the crown assembly to tip up so
the derrick can sit on the ground or work
deck directly requiring no special stands
Derrick has rollers built in to the base and
tip so that it can be tailed in/out easily
during rig up/down as well as for rolling in/
out of containers for storage and shipping
Derrick rigs in from the horizontal
requiring a lower sling lift height than the
workbasket for placement
Derrick is pinned in the extended position
by way of spring over hydraulic locks
Cylinders are double rod design with
internal rod pushing a 75mm 4130 pin that
locks the travel of the derrick extension
Exterior rod shows to workers as a visual
indication of lock position, rod flush to outside
of cylinder barrel end lock is engaged, rod
showing lock is in the open position
Counterbalance winch
Winches are mounted over/under allowing
both winch drums to run centerline
and cable is spooled evenly across the
centerline of the drum
Main winch
Winch is strung as two line utilizing die formed cable to reduce overall cable size
Winch block is designed to have 20 percent greater weight than cable on back
side when block at crown to provide no load travel down from crown
Winch block is slim line to allow for minimum distance between counterbalance
winches and provide all three winches with near to center hole operation
Jack plate guide
Jack plate is guided on rails to dampen torque pulsations from rotary table
Guide in drilling riser is full stroke
Guide in work over riser is half stroke
Guide is utilized on derrick deployment
Rotary table hose guide
Rotary supply, return and case drain hoses are protected from snagging during
continuous rotating and jacking operations
Hoses are kept out of the way of workers and do not block entry or exit to the
work floor
Break/make cylinders
Located on bottom side of basket
Left Side / Right side
Used for operating manual tongs in work basket
Hydraulic hose connection
Hydraulic hoses at work basket level are connected with special pipe ends with
integral lifting eye

Contenu connexe

Tendances

Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnentsRIZWAN KHAN
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Rig types and components
Rig types and componentsRig types and components
Rig types and componentsMarwan Elaraby
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdfTinaMarey
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.womgroup
 
Well control
Well controlWell control
Well controlSaba Saif
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls externalBladimir R
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling amrhaggag
 

Tendances (20)

Well Control
Well ControlWell Control
Well Control
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Wen_Design.ppt
Wen_Design.pptWen_Design.ppt
Wen_Design.ppt
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
Drilling equipment
Drilling equipmentDrilling equipment
Drilling equipment
 
02 wireline
02 wireline02 wireline
02 wireline
 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
 
Tubing string
Tubing stringTubing string
Tubing string
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Packer milling
Packer millingPacker milling
Packer milling
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
 
Well control
Well controlWell control
Well control
 
Day 6 BHA.pptx
Day 6 BHA.pptxDay 6 BHA.pptx
Day 6 BHA.pptx
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 

En vedette

Design of hydraulic circuits
Design of hydraulic circuitsDesign of hydraulic circuits
Design of hydraulic circuitsHardik Siddhpura
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Paranthaman Exporters
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007yudi05
 
How China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentHow China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentReza Mostafavi Tabatabaei
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over SolutionReza Mostafavi Tabatabaei
 
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015Reza Mostafavi Tabatabaei
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 

En vedette (9)

Design of hydraulic circuits
Design of hydraulic circuitsDesign of hydraulic circuits
Design of hydraulic circuits
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
 
How China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentHow China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas Equipment
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
 
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
Industrial hydraulics
Industrial hydraulicsIndustrial hydraulics
Industrial hydraulics
 

Similaire à CEEM Advanced Hydraulic Workover Unit

PacificValvesWedgeplugBrochureCV-408
PacificValvesWedgeplugBrochureCV-408PacificValvesWedgeplugBrochureCV-408
PacificValvesWedgeplugBrochureCV-408Dino Pedicelli
 
Elevator ( lifting & positioning device )
Elevator ( lifting & positioning device )Elevator ( lifting & positioning device )
Elevator ( lifting & positioning device )VM Sethi
 
Report steffones
Report steffonesReport steffones
Report steffonesSteffones K
 
GWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International
 
BOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITBOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITB. Budi Wicaksono
 
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM Group
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM GroupWell Testing Surface safety Valve (SSV), Well Test Valves - WOM Group
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM Groupwomgroup
 
Well Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield MachineWell Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield Machinewomgroup
 
Well Testing Choke Manifolds, Well Test Equipment - WOM Group
Well Testing Choke Manifolds, Well Test Equipment - WOM GroupWell Testing Choke Manifolds, Well Test Equipment - WOM Group
Well Testing Choke Manifolds, Well Test Equipment - WOM Groupwomgroup
 
Well testing choke manifolds
Well testing choke manifoldsWell testing choke manifolds
Well testing choke manifoldswomgroup
 
Well Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield MachineWell Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield Machinewomgroup
 
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Group
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM GroupWell Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Group
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Groupwomgroup
 
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdf
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdfULMA Construction - Self-climbing Formwork Systems Catalogue X.pdf
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdfCarlos Ontaneda
 
HÜDIG presentation about Irrigation systems.pptx
HÜDIG presentation about Irrigation systems.pptxHÜDIG presentation about Irrigation systems.pptx
HÜDIG presentation about Irrigation systems.pptxssuserdb53bf
 
Transitioin_Sleeve 2014E
Transitioin_Sleeve 2014ETransitioin_Sleeve 2014E
Transitioin_Sleeve 2014ETony Hasselman
 
Design and fabrication of portable hydraulic power press
Design and fabrication of portable hydraulic power pressDesign and fabrication of portable hydraulic power press
Design and fabrication of portable hydraulic power pressecwayerode
 

Similaire à CEEM Advanced Hydraulic Workover Unit (20)

Catalogue n° HD-E-00
Catalogue n° HD-E-00Catalogue n° HD-E-00
Catalogue n° HD-E-00
 
PacificValvesWedgeplugBrochureCV-408
PacificValvesWedgeplugBrochureCV-408PacificValvesWedgeplugBrochureCV-408
PacificValvesWedgeplugBrochureCV-408
 
Trulift presentation
Trulift presentationTrulift presentation
Trulift presentation
 
Elevator ( lifting & positioning device )
Elevator ( lifting & positioning device )Elevator ( lifting & positioning device )
Elevator ( lifting & positioning device )
 
Report steffones
Report steffonesReport steffones
Report steffones
 
GWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal Valves
 
BOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITBOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNIT
 
Cezary Mroz Presentation
Cezary Mroz PresentationCezary Mroz Presentation
Cezary Mroz Presentation
 
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM Group
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM GroupWell Testing Surface safety Valve (SSV), Well Test Valves - WOM Group
Well Testing Surface safety Valve (SSV), Well Test Valves - WOM Group
 
Well Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield MachineWell Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield Machine
 
Well Testing Choke Manifolds, Well Test Equipment - WOM Group
Well Testing Choke Manifolds, Well Test Equipment - WOM GroupWell Testing Choke Manifolds, Well Test Equipment - WOM Group
Well Testing Choke Manifolds, Well Test Equipment - WOM Group
 
Well testing choke manifolds
Well testing choke manifoldsWell testing choke manifolds
Well testing choke manifolds
 
Well Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield MachineWell Testing Choke Manifolds - Worldwide Oilfield Machine
Well Testing Choke Manifolds - Worldwide Oilfield Machine
 
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Group
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM GroupWell Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Group
Well Testing Flowheads, Well Testing Flowhead Manufacturers - WOM Group
 
Butterflytraining
ButterflytrainingButterflytraining
Butterflytraining
 
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdf
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdfULMA Construction - Self-climbing Formwork Systems Catalogue X.pdf
ULMA Construction - Self-climbing Formwork Systems Catalogue X.pdf
 
Ram Pump Brochure - Latham International
Ram Pump Brochure - Latham InternationalRam Pump Brochure - Latham International
Ram Pump Brochure - Latham International
 
HÜDIG presentation about Irrigation systems.pptx
HÜDIG presentation about Irrigation systems.pptxHÜDIG presentation about Irrigation systems.pptx
HÜDIG presentation about Irrigation systems.pptx
 
Transitioin_Sleeve 2014E
Transitioin_Sleeve 2014ETransitioin_Sleeve 2014E
Transitioin_Sleeve 2014E
 
Design and fabrication of portable hydraulic power press
Design and fabrication of portable hydraulic power pressDesign and fabrication of portable hydraulic power press
Design and fabrication of portable hydraulic power press
 

Dernier

call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...Delhi Call girls
 
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)Delhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)Delhi Call girls
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)Delhi Call girls
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)Delhi Call girls
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceDelhi Call girls
 
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607dollysharma2066
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)Delhi Call girls
 
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 5, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)Delhi Call girls
 
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncr
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi NcrCall Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncr
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncrnoida100girls
 
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...Delhi Call girls
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceDelhi Call girls
 
Dubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnm
Dubai Call Girls Centerfold O525547819 Call Girls Dubai CfnmDubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnm
Dubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnmkojalkojal131
 
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort ServiceDelhi Call girls
 

Dernier (20)

call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
 
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 15 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 53 (Gurgaon)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 54 (Gurgaon)
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 61 (Gurgaon)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 66 (Gurgaon)
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
 
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Dwarka Delhi | +91-8377087607
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 56 (Gurgaon)
 
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 5, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 5, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 68 (Gurgaon)
 
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncr
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi NcrCall Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncr
Call Girls In Vasant Kunj ☎✔ 9871031762 ☎✔ Russion Escorts Service In Delhi Ncr
 
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
call girls in Indirapuram (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service...
 
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Pari Chowk Escorts, Noida >༒8448380779 Escort Service
 
Dubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnm
Dubai Call Girls Centerfold O525547819 Call Girls Dubai CfnmDubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnm
Dubai Call Girls Centerfold O525547819 Call Girls Dubai Cfnm
 
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Surajpur Greater Noida >༒8448380779 Escort Service
 

CEEM Advanced Hydraulic Workover Unit

  • 2. CEEM as a recognized supplier of oilfield equipment has become a solution provider to the oil exploration and production sector. CEEM has routinely implemented improvements to equipment designs and provided operational solutions with specially designed equipment. CEEM has participated in the refurbishment and enhancement of equipment owned by all of the Major HWU suppliers. In doing so it has developed a strong sense of market requirement and has a wealth of knowledge related to HWU services and commercial requirements. CEEM has now assembled a package consisting of all the advancements made to the hydraulic work-over units as well as bundling of all of the support equipment that has brought success to many projects. An Introduction to CEEM’s AHWU
  • 3. 460K AHWU The CEEM 460K AHWU is designed to be rigged up as a stand-alone unit, and to be used for the work over of existing wells Offshore and Land based. The rig is designed to complete all work-over functions completed by a conventional rig with the additional capability of working with pressure in snubbing and underbalanced situations. The CEEM 460K AHWU containerized rig standard package consists of: Hydraulic jack Main work basket Main control panel Main winch panel Tong panel Counterbalance panel Basket riser workover (two meter height) Basket riser drilling (three meter height) Telescopic derrick Counterbalance winches (two units typical) Main winch (15 ton) Rotary table Tong delivery Work window (three meter inside height) Adjustable work windown plate (within jack frame) Lower basket Mid level basket Work window basket
  • 4. The CEEM 460K AHWU has the following advantages compared to a conventional rig: No drill line required (no slipping or cutting drill). Function of mast for lifting single joints of pipe and bottom hole assemblies Individual component weights can be reduced to 8 tons Low center of gravity. Unexpected pipe movement maximum 10 feet Can accommodate any bop stack configuration. Under-balanced operations and snubbing operations integrated Small operational footprint Noise reduced to minimum. The CEEM 460K AHWU has the following advantages compared to a conventional HWU: Simplified rig up All parts of the rig are compatible as they have been designed to work in a system All components are sized to fit in standard shipping containers All spares and consumables have custom storage to protect the asset until it is required 15 ton main winch for deploying and recovering bottom hole assemblies Individual component weights can be reduced to 8 tons Rig components have been simplified in order to utilize less experienced personnel Equipment has been built with common components used in other standard equipment allowing for purchase from common vendors world wide Equipment has been built to withstand in field abuse and neglect and require only the most basic maintenance of lubrication and service
  • 5. Modular Design The CEEM 460K AHWU containerized rig achieves its most fundamental profit enhancement by being modular with all components containers sized. All components within container dimension All components can be disassembled to achieve a maximum per piece weight of 8 tons All materials have designated storage or shipping frames within the package to protect them All components have API lifting eyes for loading, unloading and assembly Environmental Conditions The rig is constructed for the following environmental conditions. Minimum water temperature : N/A Maximum water temperature : N/A Ambient extreme maximum : +50º C Design temperature. min. (class) : -20º C Atmosphere : Salty & corrosive Maximum relative humidity : 100% T Design Loads he CEEM 460K AHWU containerized rig is designed to meet expected operational loads and comply with applicable API guidelines. All steel structures are modeled and verified by FEA prior to build. After construction materials are proof loaded as required and NDT is completed Design Features All components are able to be shipped inside of shipping containers Jack HUSCO valve mounted on milled flat bracket to ensure zero tension on housing that may cause spool sticking HUSCO valve piping connected by way of fully machined manifold block to prevent any tension on HUSCO valve body Hydraulic piping is 2.5 inch through the tee and then reduces to 2 inch to the cylinders allowing for maximum flow CEEM designed swivel flanges on hydraulic piping allowing for zero stress connection with perfect flange alignment Valves for two leg four leg selection are full port 2.5 inch flanged connection Hydraulic piping from barrel end of cylinder is routed on backside of post allowing for maximum work space in window area Threaded connection on the piping are joined by flanged connection making for quick repair in the event a threaded connection becomes damaged Hydraulic cylinders are manufactured with full opening flange on rod end allowing for rod and piston to be removed through the opening. This allows rod and piston service with pipe in the hole and no requirement to rig down
  • 6. Jack is assembled with four posts that form the structure of the jack, cylinders are not stresses by forces other than the movement of tubulars Jack cylinders can be removed from jack through the top of the jack frame. This can be done with pipe in the hole and no requirement to rig down Jack work window Jack work window is formed by the main posts of the jack and has line bored holes at 300mm intervals bored on each post Jack work window plate can travel the full length of the jack structure allowing the slips to be positioned at any height Jack work window through manipulation of slip position can be utilized to create an effective stroke of 20 feet for the removal / installation of long tool assemblies Jack work window plate can be positioned near the top of the frame allowing banding of cable to completed below the slip bowls Main workbasket Folding design allows for transport and storage inside a standard shipping container Flat finished floor with zero projections above the grating All floor gratings are hot dipped galvanized All floor gratings are removable for repair and replacement by threaded fasteners All main run hydraulic hoses are located within the floor structure and are covered by stainless steel bulkhead plates complete with stainless steel fasteners All panels are mounted in the basket by threaded fasteners and are left in position during normal shipping (folded basket) Connected to basket riser by way of three inch acme threaded fasteners Control panels All panels are constructed of 316 stainless steel All control levers are profile cut 316 stainless steel All knobs and dials are machines 316 stainless steel All fasteners are stainless steel Control panel lever locks have been designed to operate in both working positions and neutral position Control panel lever lock pins are connected to the panel by stainless steel 1000kg test braided line Control panel lever locks have convenient storage hole adjacent to the lever assembly they are used with
  • 7. Derrick Crown assembly is bolted construction allowing easy assembly / disassembly for inspection and service intervals in the field Crown assembly is mounted on a hinge pin allowing the crown assembly to tip up so the derrick can sit on the ground or work deck directly requiring no special stands Derrick has rollers built in to the base and tip so that it can be tailed in/out easily during rig up/down as well as for rolling in/ out of containers for storage and shipping Derrick rigs in from the horizontal requiring a lower sling lift height than the workbasket for placement Derrick is pinned in the extended position by way of spring over hydraulic locks Cylinders are double rod design with internal rod pushing a 75mm 4130 pin that locks the travel of the derrick extension Exterior rod shows to workers as a visual indication of lock position, rod flush to outside of cylinder barrel end lock is engaged, rod showing lock is in the open position Counterbalance winch Winches are mounted over/under allowing both winch drums to run centerline and cable is spooled evenly across the centerline of the drum Main winch Winch is strung as two line utilizing die formed cable to reduce overall cable size Winch block is designed to have 20 percent greater weight than cable on back side when block at crown to provide no load travel down from crown Winch block is slim line to allow for minimum distance between counterbalance winches and provide all three winches with near to center hole operation Jack plate guide Jack plate is guided on rails to dampen torque pulsations from rotary table Guide in drilling riser is full stroke Guide in work over riser is half stroke Guide is utilized on derrick deployment Rotary table hose guide Rotary supply, return and case drain hoses are protected from snagging during continuous rotating and jacking operations Hoses are kept out of the way of workers and do not block entry or exit to the work floor Break/make cylinders Located on bottom side of basket Left Side / Right side Used for operating manual tongs in work basket Hydraulic hose connection Hydraulic hoses at work basket level are connected with special pipe ends with integral lifting eye