The Two End Points in a Project
Inspiration
Operation
A miracle occurs
Module 1 - Introduction 3
INTRODUCTION/ FUNDAMENTALS
What is a Project?
A project is a temporary endeavor undertaken to create a unique
product or service
- A Guide to the Project Management Body of Knowledge
(PMBOK™), Project Management Institute, 2003
• One time (non-routine)
• Limited funds/time (May be single phase or multiple phases)
• Specific resources utilized (may involve several specialism)
• Performed by people - Single or multi-person & multi location
team(s)
• Planned, controlled (planning, monitoring and controlling is
required)
• Specific Deliverables (specific objectives are to be met or a
specified product is to be created)
Module 1 - Introduction 4
INTRODUCTION/ FUNDAMENTALS
Characteristics of projects
(From Bob Hughes and Cotterell) – addl points from exam point of view
• Non-routine tasks are involved
• Planning is required
• Specific objectives are to be met or a specific product is to be created
• The project has a predetermined time span
• Work is carried out for someone other than yourself
• Work involves several specialisms
• People are formed into a temporary work group to carry out the task
• Work is carried out in several phases
• The resources that are available for use on the project are constrained
• The project is large or complex
What is Management
• Planning – deciding what is to be done
• Organizing – making arrangements
• Staffing – selecting right people for the job etc.
• Directing - giving instructions
• Monitoring – checking on progress
• Controlling – taking action to remedy hold-ups
• Innovating – coming up with new solutions
• Representing – liaising with clients, users, developers,
suppliers and other stakeholders.
Module 1 – Introduction
Bob Hughes, MikeCotterell and Rajib Mall
5
The Management Spectrum
Effective project management focuses on four P’s (in the order):
The People: Stakeholders, the team leaders, and the software team
• Deals with the cultivation of motivated, highly skilled people and teams
• Includes recruiting, selection, performance management, training,
compensation, career development, organization and work design, and team
culture development
The Problem/ Product: before a project can be planned
• Its objectives and scope should be established;
• Alternative solutions should be considered; and
• Technical and management constraints should be identified.
The process: a software process provides the framework from which a
comprehensive plan for software development can be established.
The project: Planning and controlling a software project is done for one
primary reason…it is the only known way to manage complexity
Module 1 - Introduction 6
Q7503 Principles of Project
Management, Fall 2002
7
Project Management Skills
• Leadership
• Communications
• Problem Solving
• Negotiating
• Influencing the Organization
• Mentoring
• Process and technical expertise
8
Software Project Management
Management
Project
Management
Software
Project
Management
9
INTRODUCTION/ FUNDAMENTALS
Software Project Management
• Software project management is aimed to ensure that the
software is delivered on time, within budget and schedule
constraints, and satisfies the requirements of the client
• Management of software projects is different from other types
of management because:
– Software is not tangible
– Software processes are relatively new and still “under trial”
– Larger software projects are usually “one-off” projects
– Computer technology evolves very rapidly
10
INTRODUCTION/ FUNDAMENTALS
Software Projects versus other types of Projects
• Invisibility – With physical artifacts, measuring progress is easy
as it can be seen/ felt. However with Software, progress is not
immediately visible.
• Complexity – Software products are, generally, more complex
than other engineering artifact of same value.
• Flexibility - It is easier to change/ modify software systems to
meet changing organizational/ product requirement as
compared to other engineering artifacts; it may not be possible
to modify a physical artifact at all.
11
Project Phases
• All projects are divided into phases
• All phases together are known as the
Project Life Cycle
• Each phase is marked by completion of
Deliverables
• Identify the primary software project phases
Q7503 Principles of Project
Management, Fall 2002
12
Seven Core Project Phases
Q7503 Principles of Project
Management, Fall 2002
13
Project Phases A.K.A.
14
Interactions / Stakeholders
• As a PM, who do you interact with?
– Internal to Project team – team members
– External to project team but within the
same organization - Project sponsor,
Executives, Functional managers
– External to both the project team and the
organization – Customers, Contractors
Purpose of Project Management
• Ensure meeting the project objectives
within the allocated schedule & budget
– Communication
– Meetings
– Reviews
– Authorization
– Record Keeping
– Monitoring (testing)
– Interface Control
• Not for assigning blame (usually)
Module 1 - Introduction 16
Project Life Cycle
5%
20% 60%
15%
Concept Planning Execution/Control Closing
Percentages and graph refer to the amount of effort (people)
In IT projects = 90-95% of cost!
Definition | Analysis |Design|Build|Test|Accept| Implement| Operation
INTRODUCTION/ FUNDAMENTALS
Initiation
or
Module 1 - Introduction 17
•Initiation – on the first stage, the necessity, feasibility, scope, time, budget
and critical success factors of the project are defined along with the approach
and methods to be used to deliver the required products and results.
•Planning – this stage includes a detailed identification of all the project
elements and matters including project team, specified allocation of project
resources and timeline, assignments of project tasks, evaluation of risks,
definition of criteria for quality and successful completion of each deliverable,
etc.
•Execution – this is the working phase where the project plan is
implemented through practical actions that lead to successful project
accomplishment. It is necessary to control performance and quality of all the
required activities to know if they match the project’s requirements.
•Closure – this stage identifies the project completion including testing,
evaluation and formal acceptance of the final product by the customer,
learning obtained from project experience, disposing resources, etc.
Project Life Cycle
Q7503 Principles of Project
Management, Fall 2002
18
Lifecycle Relationships
Q7503 Principles of Project
Management, Fall 2002
19
Project vs. Program Management
• What’s a ‘program’?
• Mostly differences of scale
• Often a number of related projects
• Longer than projects
• Definitions vary
• Ex: Program Manager for MS Word
Module 1 - Introduction 20
INTRODUCTION/ FUNDAMENTALS
The Triple Constraint of Projects
• On Time, Budget, Quality = Required Scope
Time
Cost Quality
•Integration
•Trade – Off’s
Q7503 Principles of Project
Management, Fall 2002
21
Trade-off Triangle
• Know which of these are fixed & variable
for every project
Problems with Software Projects
Manager’s Point of View:
• Poor estimates and plans
• Lack of quality standards and measures
• Lack of guidance about making organizational decisions
• Lack of techniques to make progress visible
• Poor role definition – who does what?
• Incorrect success criteria
Members’ Point of View:
• Inadequate specification of work
• Management ignorance of IT
• Lack of knowledge of application area
• Lack of standards Contd/-
Module 1 - Introduction 22
Problems with Software Projects
• Lack of standards
• Lack of up-to-date documentation
• Preceding activities not completed on time – including late delivery of
equipment
• Lack of communication between users and technicians
• Lack of communication leading to duplication of work
• Lack of commitment – especially when a project is tied to one person who
then moves
• Narrow scope of technical expertise
• Changing statutory requirements
• Changing software environment
• Deadline pressure
• Lack of quality control
• Remote management
• Lack of training
Module 1 - Introduction 23
INTRODUCTION/ FUNDAMENTALS
Assignment 1
Q1. What do you understand by Need identification, Vision
and Scope for a product? Search on internet to find sample
vision and scope document, copy the headings in your
notebook and be prepared to present in the class –Group
Activity – one per group.
Q2. What is the Vision Statement of ABES EC? What is the
difference between Vision Statement and Quality Policy of
an Organization? – Individual work.
Module 1 - Introduction 24
Vision Statement
• A vision statement is sometimes called a
picture of your company in the future but
it’s so much more than that. Your vision
statement is your inspiration, the framework
for all your strategic planning.
• A vision statement may apply to an entire
company or to a single division of that
company. Whether for all or part of an
organization, the vision statement answers
the question, “Where do we want to go?”
Module 1 - Introduction 25
Vision Statement
General Motors – Vision Statement
"GM’s vision is to be the world leader in
transportation products and related services.
We will earn our customers’ enthusiasm
through continuous improvement driven by the
integrity, teamwork, and innovation
of GM people."
Module 1 - Introduction 26
Scope Definition
• A scope statement is one of the most critical
pieces of a project, and writing one can be a
difficult task for a project manager – no
matter what type of project management
methodology is being used. But, an
effectively written scope statement can help
the rest of the project flow along with
minimal problems.
Module 1 - Introduction 27
Scope Definition
The firsts step on writing a scope statement is filling in the
project name, project charter, and a listing of the
project owner, sponsors, and stakeholders.
Next, A project justification will need to be identified, as
well as project requirements, milestones, and
deliverables. (In scope Items)
Any non-goals - items that fall outside of the scope of the
project - need to be identified here.
And finally, cost estimates need to be provided within the
scope statement.
Note - This can be a cumbersome task, but it is a necessary one. As
the project progresses, everyone involved knows where they can
look should a question arise.
Module 1 - Introduction 28
Questions?
Module 1 - Introduction 29
Extra Slides
Module 1 - Introduction 30
31
Four Project Dimensions
• People
• Process
• Product
• Technology
Q7503 Principles of Project
Management, Fall 2002
Q7503 Principles of Project
Management, Fall 2002
32
People-Related Mistakes Part 1
• Undermined motivation
• Weak personnel
– Weak vs. Junior
• Uncontrolled problem employees
• Heroics
• Adding people to a late project
Q7503 Principles of Project
Management, Fall 2002
33
People-Related Mistakes Part 2
• Noisy, crowded offices
• Customer-Developer friction
• Unrealistic expectations
• Politics over substance
• Wishful thinking
Q7503 Principles of Project
Management, Fall 2002
34
People-Related Mistakes Part 3
• Lack of effective project sponsorship
• Lack of stakeholder buy-in
• Lack of user input
Q7503 Principles of Project
Management, Fall 2002
35
Process-Related Mistakes Part 1
• Optimistic schedules
• Insufficient risk management
• Contractor failure
• Insufficient planning
• Abandonment of plan under pressure
Q7503 Principles of Project
Management, Fall 2002
36
Process-Related Mistakes Part 2
• Wasted time during fuzzy front end
• Shortchanged upstream activities
• Inadequate design
• Shortchanged quality assurance
Q7503 Principles of Project Management, Fall 2002 37
Process-Related Mistakes Part 3
• Insufficient management controls
• Frequent convergence
• Omitting necessary tasks from estimates
• Planning to catch-up later
• Code-like-hell programming
Q7503 Principles of Project
Management, Fall 2002
38
Product-Related Mistakes
• Requirements gold-plating
– Gilding the lily
• Feature creep
• Developer gold-plating
– Beware the pet project
• Push-me, pull-me negotiation
• Research-oriented development
Q7503 Principles of Project
Management, Fall 2002
39
Technology-Related Mistakes
• Silver-bullet syndrome
• Overestimated savings from new tools and
methods
– Fad warning
• Switching tools in mid-project
• Lack of automated source-code control
Module 1 - Introduction 40
INTRODUCTION/ FUNDAMENTALS
The Value of Project Management
• Allows for excellent organization and tracking
• Better control and use of resources
• Reduces complexity of inter-related tasks
• Allows measurement of outcome versus plans
• Early identification of problems and quick correction

Contenu connexe

Tendances

Software estimation
Software estimationSoftware estimation
Software estimation
Md Shakir
 

Tendances (20)

Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)
 
Software development process models
Software development process modelsSoftware development process models
Software development process models
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Improving software economics
Improving software economicsImproving software economics
Improving software economics
 
Software Project Management: Risk Management
Software Project Management: Risk ManagementSoftware Project Management: Risk Management
Software Project Management: Risk Management
 
Software design
Software designSoftware design
Software design
 
SPM PPT
SPM PPTSPM PPT
SPM PPT
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 
Resource Allocation In Software Project Management
Resource Allocation In Software Project ManagementResource Allocation In Software Project Management
Resource Allocation In Software Project Management
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Software Architecture
Software ArchitectureSoftware Architecture
Software Architecture
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approach
 

Similaire à Introduction to Software Project Management

1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
RAJU852744
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
aulasnilda
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
Durga Prasad Mishra
 

Similaire à Introduction to Software Project Management (20)

Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
1. introduction
1. introduction1. introduction
1. introduction
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
Ch01
Ch01Ch01
Ch01
 
SPM_UNIT-1(1).pptx
SPM_UNIT-1(1).pptxSPM_UNIT-1(1).pptx
SPM_UNIT-1(1).pptx
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
 
1.introduction pm
1.introduction pm1.introduction pm
1.introduction pm
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniques
 
Lect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakesLect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakes
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 

Plus de Reetesh Gupta

Plus de Reetesh Gupta (16)

Algorithm Design and Analysis
Algorithm Design and AnalysisAlgorithm Design and Analysis
Algorithm Design and Analysis
 
Analysis of Algorithms-Heapsort
Analysis of Algorithms-HeapsortAnalysis of Algorithms-Heapsort
Analysis of Algorithms-Heapsort
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow Diagrams
 
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
 
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
 
Unit3 software review control software
Unit3 software review control softwareUnit3 software review control software
Unit3 software review control software
 
Unit2 scheduling wbs_network
Unit2 scheduling wbs_networkUnit2 scheduling wbs_network
Unit2 scheduling wbs_network
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 
Slides15
Slides15Slides15
Slides15
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna 2
Ccna 2Ccna 2
Ccna 2
 
CCNA PPT
CCNA PPTCCNA PPT
CCNA PPT
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Dernier (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Introduction to Software Project Management

  • 2. The Two End Points in a Project Inspiration Operation A miracle occurs
  • 3. Module 1 - Introduction 3 INTRODUCTION/ FUNDAMENTALS What is a Project? A project is a temporary endeavor undertaken to create a unique product or service - A Guide to the Project Management Body of Knowledge (PMBOK™), Project Management Institute, 2003 • One time (non-routine) • Limited funds/time (May be single phase or multiple phases) • Specific resources utilized (may involve several specialism) • Performed by people - Single or multi-person & multi location team(s) • Planned, controlled (planning, monitoring and controlling is required) • Specific Deliverables (specific objectives are to be met or a specified product is to be created)
  • 4. Module 1 - Introduction 4 INTRODUCTION/ FUNDAMENTALS Characteristics of projects (From Bob Hughes and Cotterell) – addl points from exam point of view • Non-routine tasks are involved • Planning is required • Specific objectives are to be met or a specific product is to be created • The project has a predetermined time span • Work is carried out for someone other than yourself • Work involves several specialisms • People are formed into a temporary work group to carry out the task • Work is carried out in several phases • The resources that are available for use on the project are constrained • The project is large or complex
  • 5. What is Management • Planning – deciding what is to be done • Organizing – making arrangements • Staffing – selecting right people for the job etc. • Directing - giving instructions • Monitoring – checking on progress • Controlling – taking action to remedy hold-ups • Innovating – coming up with new solutions • Representing – liaising with clients, users, developers, suppliers and other stakeholders. Module 1 – Introduction Bob Hughes, MikeCotterell and Rajib Mall 5
  • 6. The Management Spectrum Effective project management focuses on four P’s (in the order): The People: Stakeholders, the team leaders, and the software team • Deals with the cultivation of motivated, highly skilled people and teams • Includes recruiting, selection, performance management, training, compensation, career development, organization and work design, and team culture development The Problem/ Product: before a project can be planned • Its objectives and scope should be established; • Alternative solutions should be considered; and • Technical and management constraints should be identified. The process: a software process provides the framework from which a comprehensive plan for software development can be established. The project: Planning and controlling a software project is done for one primary reason…it is the only known way to manage complexity Module 1 - Introduction 6
  • 7. Q7503 Principles of Project Management, Fall 2002 7 Project Management Skills • Leadership • Communications • Problem Solving • Negotiating • Influencing the Organization • Mentoring • Process and technical expertise
  • 9. 9 INTRODUCTION/ FUNDAMENTALS Software Project Management • Software project management is aimed to ensure that the software is delivered on time, within budget and schedule constraints, and satisfies the requirements of the client • Management of software projects is different from other types of management because: – Software is not tangible – Software processes are relatively new and still “under trial” – Larger software projects are usually “one-off” projects – Computer technology evolves very rapidly
  • 10. 10 INTRODUCTION/ FUNDAMENTALS Software Projects versus other types of Projects • Invisibility – With physical artifacts, measuring progress is easy as it can be seen/ felt. However with Software, progress is not immediately visible. • Complexity – Software products are, generally, more complex than other engineering artifact of same value. • Flexibility - It is easier to change/ modify software systems to meet changing organizational/ product requirement as compared to other engineering artifacts; it may not be possible to modify a physical artifact at all.
  • 11. 11 Project Phases • All projects are divided into phases • All phases together are known as the Project Life Cycle • Each phase is marked by completion of Deliverables • Identify the primary software project phases
  • 12. Q7503 Principles of Project Management, Fall 2002 12 Seven Core Project Phases
  • 13. Q7503 Principles of Project Management, Fall 2002 13 Project Phases A.K.A.
  • 14. 14 Interactions / Stakeholders • As a PM, who do you interact with? – Internal to Project team – team members – External to project team but within the same organization - Project sponsor, Executives, Functional managers – External to both the project team and the organization – Customers, Contractors
  • 15. Purpose of Project Management • Ensure meeting the project objectives within the allocated schedule & budget – Communication – Meetings – Reviews – Authorization – Record Keeping – Monitoring (testing) – Interface Control • Not for assigning blame (usually)
  • 16. Module 1 - Introduction 16 Project Life Cycle 5% 20% 60% 15% Concept Planning Execution/Control Closing Percentages and graph refer to the amount of effort (people) In IT projects = 90-95% of cost! Definition | Analysis |Design|Build|Test|Accept| Implement| Operation INTRODUCTION/ FUNDAMENTALS Initiation or
  • 17. Module 1 - Introduction 17 •Initiation – on the first stage, the necessity, feasibility, scope, time, budget and critical success factors of the project are defined along with the approach and methods to be used to deliver the required products and results. •Planning – this stage includes a detailed identification of all the project elements and matters including project team, specified allocation of project resources and timeline, assignments of project tasks, evaluation of risks, definition of criteria for quality and successful completion of each deliverable, etc. •Execution – this is the working phase where the project plan is implemented through practical actions that lead to successful project accomplishment. It is necessary to control performance and quality of all the required activities to know if they match the project’s requirements. •Closure – this stage identifies the project completion including testing, evaluation and formal acceptance of the final product by the customer, learning obtained from project experience, disposing resources, etc. Project Life Cycle
  • 18. Q7503 Principles of Project Management, Fall 2002 18 Lifecycle Relationships
  • 19. Q7503 Principles of Project Management, Fall 2002 19 Project vs. Program Management • What’s a ‘program’? • Mostly differences of scale • Often a number of related projects • Longer than projects • Definitions vary • Ex: Program Manager for MS Word
  • 20. Module 1 - Introduction 20 INTRODUCTION/ FUNDAMENTALS The Triple Constraint of Projects • On Time, Budget, Quality = Required Scope Time Cost Quality •Integration •Trade – Off’s
  • 21. Q7503 Principles of Project Management, Fall 2002 21 Trade-off Triangle • Know which of these are fixed & variable for every project
  • 22. Problems with Software Projects Manager’s Point of View: • Poor estimates and plans • Lack of quality standards and measures • Lack of guidance about making organizational decisions • Lack of techniques to make progress visible • Poor role definition – who does what? • Incorrect success criteria Members’ Point of View: • Inadequate specification of work • Management ignorance of IT • Lack of knowledge of application area • Lack of standards Contd/- Module 1 - Introduction 22
  • 23. Problems with Software Projects • Lack of standards • Lack of up-to-date documentation • Preceding activities not completed on time – including late delivery of equipment • Lack of communication between users and technicians • Lack of communication leading to duplication of work • Lack of commitment – especially when a project is tied to one person who then moves • Narrow scope of technical expertise • Changing statutory requirements • Changing software environment • Deadline pressure • Lack of quality control • Remote management • Lack of training Module 1 - Introduction 23
  • 24. INTRODUCTION/ FUNDAMENTALS Assignment 1 Q1. What do you understand by Need identification, Vision and Scope for a product? Search on internet to find sample vision and scope document, copy the headings in your notebook and be prepared to present in the class –Group Activity – one per group. Q2. What is the Vision Statement of ABES EC? What is the difference between Vision Statement and Quality Policy of an Organization? – Individual work. Module 1 - Introduction 24
  • 25. Vision Statement • A vision statement is sometimes called a picture of your company in the future but it’s so much more than that. Your vision statement is your inspiration, the framework for all your strategic planning. • A vision statement may apply to an entire company or to a single division of that company. Whether for all or part of an organization, the vision statement answers the question, “Where do we want to go?” Module 1 - Introduction 25
  • 26. Vision Statement General Motors – Vision Statement "GM’s vision is to be the world leader in transportation products and related services. We will earn our customers’ enthusiasm through continuous improvement driven by the integrity, teamwork, and innovation of GM people." Module 1 - Introduction 26
  • 27. Scope Definition • A scope statement is one of the most critical pieces of a project, and writing one can be a difficult task for a project manager – no matter what type of project management methodology is being used. But, an effectively written scope statement can help the rest of the project flow along with minimal problems. Module 1 - Introduction 27
  • 28. Scope Definition The firsts step on writing a scope statement is filling in the project name, project charter, and a listing of the project owner, sponsors, and stakeholders. Next, A project justification will need to be identified, as well as project requirements, milestones, and deliverables. (In scope Items) Any non-goals - items that fall outside of the scope of the project - need to be identified here. And finally, cost estimates need to be provided within the scope statement. Note - This can be a cumbersome task, but it is a necessary one. As the project progresses, everyone involved knows where they can look should a question arise. Module 1 - Introduction 28
  • 29. Questions? Module 1 - Introduction 29
  • 30. Extra Slides Module 1 - Introduction 30
  • 31. 31 Four Project Dimensions • People • Process • Product • Technology Q7503 Principles of Project Management, Fall 2002
  • 32. Q7503 Principles of Project Management, Fall 2002 32 People-Related Mistakes Part 1 • Undermined motivation • Weak personnel – Weak vs. Junior • Uncontrolled problem employees • Heroics • Adding people to a late project
  • 33. Q7503 Principles of Project Management, Fall 2002 33 People-Related Mistakes Part 2 • Noisy, crowded offices • Customer-Developer friction • Unrealistic expectations • Politics over substance • Wishful thinking
  • 34. Q7503 Principles of Project Management, Fall 2002 34 People-Related Mistakes Part 3 • Lack of effective project sponsorship • Lack of stakeholder buy-in • Lack of user input
  • 35. Q7503 Principles of Project Management, Fall 2002 35 Process-Related Mistakes Part 1 • Optimistic schedules • Insufficient risk management • Contractor failure • Insufficient planning • Abandonment of plan under pressure
  • 36. Q7503 Principles of Project Management, Fall 2002 36 Process-Related Mistakes Part 2 • Wasted time during fuzzy front end • Shortchanged upstream activities • Inadequate design • Shortchanged quality assurance
  • 37. Q7503 Principles of Project Management, Fall 2002 37 Process-Related Mistakes Part 3 • Insufficient management controls • Frequent convergence • Omitting necessary tasks from estimates • Planning to catch-up later • Code-like-hell programming
  • 38. Q7503 Principles of Project Management, Fall 2002 38 Product-Related Mistakes • Requirements gold-plating – Gilding the lily • Feature creep • Developer gold-plating – Beware the pet project • Push-me, pull-me negotiation • Research-oriented development
  • 39. Q7503 Principles of Project Management, Fall 2002 39 Technology-Related Mistakes • Silver-bullet syndrome • Overestimated savings from new tools and methods – Fad warning • Switching tools in mid-project • Lack of automated source-code control
  • 40. Module 1 - Introduction 40 INTRODUCTION/ FUNDAMENTALS The Value of Project Management • Allows for excellent organization and tracking • Better control and use of resources • Reduces complexity of inter-related tasks • Allows measurement of outcome versus plans • Early identification of problems and quick correction

Notes de l'éditeur

  1. managing all stakeholder Expectations is challenging – conflict
  2. This is the first introduction to how we approach the management of projects. This is from the PMBOK: Every project can be divided into 4 major phases: Concept where we document the original idea and get funding for the next phase. Planning where we detail the plan and get approval for the remainder. Execution (we do the work)/Control(we make sure everything follows the plan, react to problems, report progress) Closing where we document what went right and wrong, and close up. Note the line graph (and percentages) of effort expended. This is exactly the shape of the cost flow in an IT project, where 85-95% of the costs are people costs.
  3. Classical definition of success is on time, budget, and does what the client expected it to do. However, must add to this: A happy team. The key stakeholder is your (the students’) team. Project management is rules, structure, discipline. May turn people off. Do not over do it. Similarly, be careful about over managing the contractor (part of your team). They must make their profit. A happy client. The client must be involved in the process (the team can’t just disappear and turn up six months later with the completed project). That is why we have phases, which provide milestones, intermediate deliverables, progress reports, reviews, etc. that the client must be involved in. Your upper level management (ULM) must also be happy: they also must be involved in the process. At your (PM) level, you will be communicating mostly with the client PM level of management. However, your ULM will be communicating with the client’s ULM, and you do not wish hassles coming down the hierarchy. (Case of the client complaining to his ULM, who goes to your ULM, who does not know about the project.)
  4. Peopleware issues 10-to-1 difference in Dev productivity Teams 3 or 5 to 1 diff Process Dev basics, risk mgmt, QA, lifecycle planning, customer orientation Product Most tangible dimension Technology
  5. Motivation: studies show has largest impact Don’t undermine Morale 2nd greatest influence on productivity Junior != bad Uncontrolled: most common developer complain about their managers Heroics. Company hostage. “Can-do”, “how high” attitudes Brooks, reading assignment
  6. 60%of developers feel unsatisfactory environment: need quite and privacy MS offices Friction: classic differing viewpoints Results in ‘poor communication’ Passive-aggressive Realistic Expectations: 1 of top 5 reasons for success of in-house projects Perception woe Politics Managing-up Wishful Cognitive dissonance Closing your eyes and hoping McConnell: maybe causes the most problems in software development
  7. Sponsor: a must, no power All players must buy-in User input: Survey: number 1 reason for success W/O input: guessing
  8. Similar to wishful thinking Puts unnecessary pressure Risk Mgmt: Risks will manage you Contractor: late, poor quality, or fails to meet specifications Requires lots of management Insufficient planning: “if you don’t care where you’re going, any plan will do” Abandonment Out the window Fall into code-and-fix mode
  9. fuzzy: before sign-off Upstream: Lack of analysis and design 10 to 100 times more costly 5 hrs vs. 50 Design: Seen schedules w/o it at all QA: Seems easy to compress 1 day QA == 3 to 10 later
  10. Management controls Need to be able to track We’ll cover lots of these PMI Convergence Waste of time Missing tasks Often 20-30% of a schedule Catch-up later How many times have you seen a project catch-up? Only by all-nighters Like hell “Entrepreneurial” approach See catch-up later
  11. Gold Gilding the lily Performance is required more often than need be Feature creep 25% average change in req. Dev. Gold Nifty new technology Pet project Push-me Slip schedule + add features Research vs. Development
  12. who’s heard of ‘silver bullet’ (not the beer) SCM Jones: 10% month, I see more