What is PLM?
• PLM systems are designed to manage the full product development cycle of a
product through its entire evolution until that product is obsolete.
• According to Wikipedia, PLM (Product Lifecycle Management) originated at
American Motors Corporation (AMC) as a way to speed up its product
development process and to compete with larger competitors in 1985.
• PLM systems are sometimes misunderstood. Some companies have the opinion
that PLM system is mainly for the Engineering department – this perception is
only partially true. A PLM system is designed to manage the whole product
development process from concept to end of life.
• PLM goes way beyond basic CAD file administration…
What is PLM?
• PLM integrates a multitude of critical cross-functional activities…
• Product Strategy
• Portfolio Management
• Product Management
• Ideation Management
• Requirements Gathering
• Product Design
• Product Engineering
• Product Validation And Compliance
• Product Costing
• Product Quality
• Direct Material Sourcing
• Manufacturing
• After-Market Services
• Product Retirement This picture shows the importance/value these
enterprise applications have during the product
development process
What is PLM?
• Aspects of PLM
• Product Structure And Reuse
• Tightened BOM Creation and Control
• Product Data and Documentation
• Design Reuse
• Program/Project Management
• Centralized Program and Project Management
• Product-Line Control
• Task Delegation with Deliverables
• Collaboration across Business Units
• Engineering Changes
• Stage-Gate Approvals
• Ideas And Requirements
• Quality Tests And Defects
• Issues, root cause and test results
• Product Costs
PLM
iPLM Process – Business Drivers
PLM
Forecast
Accuracy
Time to
Market
Global
Collaboration
Maximize
ROI
Part Re-Use
Product
Quality
Service
What is the iPLM Process?
• iPLM Process
• Process developed by Eccellent Solutions to successfully implement an
“integrated” PLM solution for customers.
Data Load
•CAD
•Supporting
Documents
•Other
Product
Organization
•Context Definition
•Access Controls
•Folder Structure
BOM
•eBOM Import
•Version
•Variations
•Attributes
Change
Management
•Problem Reports
•Change Request
(ECR)
•Change Notification
(ECN)
Other
Processes
•Supplier
Management
•Classification
•mBOM
•Quality
•More…
Project
Management
•Project and
Program definition
•Task Management
and Deliverables
•WBS
Business
Intelligence
•Dashboards
•Reporting
Integration
•ERP
•MES
•CRM
The iPLM Process – where is the data?
Doing iPLM right.
4 Steps to Best-In-Class PLM
1. Organize current Product data in PLM
o Organize Data to match [USE REPLACE COMPANY NAME]’s actual Product Lines
o Change access controls to match Global requirements
2. Implement and Align Business Process in PLM and Production Support Systems
o Change Management
o ECR/ECN
o SKU
o Deviation
o PDP Process
o Automate and Expand the current Product Development Process (PDP)
o Document Control
3. Project Management in PLM
o Project Management is the key to accurately Control, Manage, and Report on Product Development.
o Manage and Control deadlines, assign tasks, and assign deliverables (Eccellent)
o Globally urate and real time product data across groups, teams, locations and vendors
4. Additional PLM Modules according to production priority
o Quality: Add in CAPA, FRACAS etc.
o MPMLink: Manufacturing Process Documentation, BOM Control
o PartsLink: Parts Classification
o Supplier Management: Supplier and Vendor Management
The iPLM Process – who are the stakeholders?
Knights of the PLM table
View and Markup
Drawing from
PLM System
New Sales Order
Created in PLM
iPLM Stakeholders: Sales
Sales Engineer (OEM)
• New Product Design (NPD) Order
Issued by Sales for new orders based on
existing designs found in PLM System.
iPLM
ENGINEERING
CHANGES
• NPD Order initiates
automated workflow process
that begins the Engineering/
Re-Engineering process.
CUSTOMER
DEMANDSSALES
Knights of the PLM table
View and Markup
Drawing from PLM
System
New Product
Request Created
in PLM
iPLM Stakeholders: Marketing
Marketing
• Creates New Product Request (NPR)
created based on customer
requirements or market demands.
• Initiates automated workflow that
begins the product
engineering/re-engineering
process.
iPLMDRAWING
MARKUP
MARKETING
Knights of the PLM table
Project Engineering
System of record for the Project Plan
and the following activities in the PLM System:
• Managing and Assigning Design Tasks and
Deliverables.
• Managing Task Deadlines and Deliverables.
• Working with Project-related Vendors,
• Approving Vendor work,
• Incorporating Vendor contributions into
Production Designs.
iPLM Stakeholders: Engineering
Real-Time
Project
status
updates.
Share
Product Data
to ProjectsChange
Management
iPLMPROJECT
PLAN
ENGINEERING
Knights of the PLM table
iPLM Stakeholders: Engineering
Manage
Assigned
Project Tasks
Create and
modify CAD
Objects and Parts
iPLM
The Product/Design Engineer
• Begins the design process.
• Receives assigned tasks from the Project
Plan and Receives Change Activities and
Notices in PLM
• Begins work on CAD Models and
Component Building
• Updates project tasks daily
• Completes the project tasks in PLM System.
CAD
ENGINEERING
Knights of the PLM table
iPLM Stakeholders: Engineering
Project and
Program Status
Dashboard
Project Planning
using Project Link
Manage Multiple
Projects and
Programs
Program Manager
• Production Oversight
• Oversee multiple projects within one or
many Project Lines.
• Manages Projects as well as Programs
within PLM System.
iPLM
ENGINEERING
Knights of the PLM table
iPLM Stakeholders: Manufacturing
Manufacturing Engineer
• Manufacturing process Mgt
• Fixture designs and process documentation
MANAGE MFG
PROCESS
MANAGEMENT
OPTIONAL ‘MPMLINK’
MODULE FOR MFG PROCESS
AND CONFIGURATION
iPLM
MFG
PROCESS,
MBOM
MANUFACTURING
Knights of the PLM table
iPLM Stakeholders: Manufacturing
Manufacturing (Shop Floor)
• Shop Floor searches, finds, and opens
Latest Release drawings in PLM System.
WINDACCESS UTILITY
PROVIDES SIMPLE
SEARCH CAPABILITIES
WINDACCESS UTILITY
PROVIDES SIMPLE
SEARCH CAPABILITIES
iPLM
MFG
PROCESS,
MBOM
MANUFACTURING
Knights of the PLM table
iPLM Stakeholders: Purchasing
Purchasing/Procurement
• Manages Third party suppliers,
Manufacturers, and Vendor engagements
• Manages critical supplier contact
information, documentation, component
information, pricing, inventory, etc.
OPTIONAL
‘SUMA’ MODULE
FOR SCM
MANAGE COST AND
PRICING FOR
VENDOR SELECTED
PARTS
iPLM
SUPPLIERS,
PRODUCT
COSTS
PURCHASING
Knights of the PLM table
iPLM Stakeholders: Quality
QUALITY
MODULES
Quality Engineer Role
• Failure Reporting, Analysis, and
Corrective Action (FRACAS) in PLM System.
• Capture and Resolve Non-Conformances
• Manage Customer complaints in Customer
Experience Management Module.
• Performs Corrective and Preventive Actions (CAPA)
in PLM System.
iPLM QUALITY
CONTROL
ACTIONS
QUALITY
Knights of the PLM table
iPLM Stakeholders: Executive Team
REPORTING
DASHBOARDS
REALTIME
UPDATES
BASED ON LIVE
DATA
FINANCE
Total Costs by Program
Transaction Costs over Time
iPLM
Executive Team
• End-To-End Product Development and
Production Management,
• Business Intelligence and System Performance Insight.
• Reporting and dashboard development
• Real-Time business analysis and production evaluation.
Knights of the PLM table
iPLM – Reporting and Dashboards
• Once the information is stored and managed within the PLM system,
it is imperative to be able to provide meaningful reports and dynamic
dashboards from which we can use and manage the product
development process.
• We have developed an integrated solution called MIDAS (Meaningful,
Intelligence, Dashboard Application System) from which we can
create all types of dynamic reporting capabilities.
iPLM – Reporting and Dashboards
iPLM Process – Managed Services
• Eccellent Solutions has built the iPLM Process into their Managed Services
Remote PLM Solutions.
• This unique approach help mitigate a lot of the upfront costs and risks
associated to log-term implementation projects.
• This approach also helps control overall project costs and allows for an
‘Agile Project Management’ approach to the total PLM implementation and
ongoing management.
• Our Managed Services includes our proprietary proactive
monitoring system which keeps your PLM environment running smoothly.
• Annual Contracts paid monthly (Think Operational Expense as opposed to
Capital Expense)
• What is ?
• “Priority Monitoring and Classification System”
• Intelligent ‘Proactive’ monitoring allows us to address potential
problems before they become ‘issues’
• Comprehensive and complete system performance management.
• Monitoring your whole environment 24x7x365
• Server
• Network
• Windchill Application
iPLM Process – Managed Services
• Four Levels of PLM Managed Support (Onsite or Hosted)
WINDCHILL SUPPORT LEVELS
Tier 1 Tier 2 Tier 3* Tier 4*±
Proactive
Maintenance &
Monitoring
System
Administration &
Help Desk
Administration &
Consulting
Consulting and
Business
Intelligence
* Includes the iPLM Process
± Includes MIDAS Reporting
iPLM Process – Managed Services
• Expert Administrators and Consultants assigned to
your company.
• Dedicated Account Manager for first line of contact.
• "Operational Expense" as opposed to "Capital
Expense".
• Deploy new technologies?
• Derive more benefit from your PLM.
• Service level agreement (SLA) guarantee.
Questions?
We assume the risk, you maintain control
Call Us: (856) 219-3860
Contact Us: sales@eccellent.com
Visit Us: www.eccellent.com

Contenu connexe

Tendances

Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentation
Plural Technolog
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
ulfkoester
 
Change Management Options
Change Management Options Change Management Options
Change Management Options
Aras
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140
kailashgavare
 
Requirements Management with HP ALM
Requirements Management with HP ALMRequirements Management with HP ALM
Requirements Management with HP ALM
pd7.group
 

Tendances (20)

Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentation
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
 
Lect3 ch15-unit2
Lect3 ch15-unit2Lect3 ch15-unit2
Lect3 ch15-unit2
 
I
II
I
 
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesigning with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation Approach
 
Change Management Options
Change Management Options Change Management Options
Change Management Options
 
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
 
DreamApps
DreamAppsDreamApps
DreamApps
 
New Engineering Client for Agile PLM
New Engineering Client for Agile PLMNew Engineering Client for Agile PLM
New Engineering Client for Agile PLM
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140
 
Using Agile In A Quality Driven Environment
Using Agile In A Quality Driven EnvironmentUsing Agile In A Quality Driven Environment
Using Agile In A Quality Driven Environment
 
Software Processes
Software Processes Software Processes
Software Processes
 
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
 
Agile Method - Lec 1-2-3
Agile Method - Lec 1-2-3Agile Method - Lec 1-2-3
Agile Method - Lec 1-2-3
 
ARAS - change management
ARAS - change managementARAS - change management
ARAS - change management
 
Plm & windchill
Plm & windchillPlm & windchill
Plm & windchill
 
Requirements Management with HP ALM
Requirements Management with HP ALMRequirements Management with HP ALM
Requirements Management with HP ALM
 
Chapter 2 software process models
Chapter 2   software process modelsChapter 2   software process models
Chapter 2 software process models
 

Similaire à The Road to PLM

Top10_PLM_applications
Top10_PLM_applicationsTop10_PLM_applications
Top10_PLM_applications
Liz York
 
6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf
RatheshPriyanK1
 
Plm fundas part 2
Plm fundas part 2Plm fundas part 2
Plm fundas part 2
Anand Joshi
 

Similaire à The Road to PLM (20)

The benefits of ALM and PLM Integration
The benefits of ALM and PLM IntegrationThe benefits of ALM and PLM Integration
The benefits of ALM and PLM Integration
 
What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...
 
Top10_PLM_applications
Top10_PLM_applicationsTop10_PLM_applications
Top10_PLM_applications
 
EAC Hunter Fan Presentation
EAC Hunter Fan PresentationEAC Hunter Fan Presentation
EAC Hunter Fan Presentation
 
Hunter Fan + EAC Presentation
Hunter Fan + EAC PresentationHunter Fan + EAC Presentation
Hunter Fan + EAC Presentation
 
What Is PLM and Why Is It Important
What Is PLM and Why Is It ImportantWhat Is PLM and Why Is It Important
What Is PLM and Why Is It Important
 
6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf
 
Abhi bhalla a 02
Abhi bhalla a 02Abhi bhalla a 02
Abhi bhalla a 02
 
Do-It-Yourself ENOVIA PLM MIgration
Do-It-Yourself ENOVIA PLM MIgrationDo-It-Yourself ENOVIA PLM MIgration
Do-It-Yourself ENOVIA PLM MIgration
 
Product Data Management
Product Data ManagementProduct Data Management
Product Data Management
 
What is BPM?
What is BPM?What is BPM?
What is BPM?
 
what-is-bpm-1234452005226143-34862409.ppt
what-is-bpm-1234452005226143-34862409.pptwhat-is-bpm-1234452005226143-34862409.ppt
what-is-bpm-1234452005226143-34862409.ppt
 
Plm fundas part 2
Plm fundas part 2Plm fundas part 2
Plm fundas part 2
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
 
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleDiscovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
 
SCM Migration Webinar - English
SCM Migration Webinar - EnglishSCM Migration Webinar - English
SCM Migration Webinar - English
 
Soft engg introduction and process models
Soft engg introduction and process modelsSoft engg introduction and process models
Soft engg introduction and process models
 
Session2
Session2Session2
Session2
 
SDLC
SDLCSDLC
SDLC
 
ARC's Dick Slansky's PLM with Shop Floor Operations Presentation at ARC's 200...
ARC's Dick Slansky's PLM with Shop Floor Operations Presentation at ARC's 200...ARC's Dick Slansky's PLM with Shop Floor Operations Presentation at ARC's 200...
ARC's Dick Slansky's PLM with Shop Floor Operations Presentation at ARC's 200...
 

Dernier

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Dernier (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

The Road to PLM

  • 2. What is PLM? • PLM systems are designed to manage the full product development cycle of a product through its entire evolution until that product is obsolete. • According to Wikipedia, PLM (Product Lifecycle Management) originated at American Motors Corporation (AMC) as a way to speed up its product development process and to compete with larger competitors in 1985. • PLM systems are sometimes misunderstood. Some companies have the opinion that PLM system is mainly for the Engineering department – this perception is only partially true. A PLM system is designed to manage the whole product development process from concept to end of life. • PLM goes way beyond basic CAD file administration…
  • 3. What is PLM? • PLM integrates a multitude of critical cross-functional activities… • Product Strategy • Portfolio Management • Product Management • Ideation Management • Requirements Gathering • Product Design • Product Engineering • Product Validation And Compliance • Product Costing • Product Quality • Direct Material Sourcing • Manufacturing • After-Market Services • Product Retirement This picture shows the importance/value these enterprise applications have during the product development process
  • 4. What is PLM? • Aspects of PLM • Product Structure And Reuse • Tightened BOM Creation and Control • Product Data and Documentation • Design Reuse • Program/Project Management • Centralized Program and Project Management • Product-Line Control • Task Delegation with Deliverables • Collaboration across Business Units • Engineering Changes • Stage-Gate Approvals • Ideas And Requirements • Quality Tests And Defects • Issues, root cause and test results • Product Costs PLM
  • 5. iPLM Process – Business Drivers PLM Forecast Accuracy Time to Market Global Collaboration Maximize ROI Part Re-Use Product Quality Service
  • 6. What is the iPLM Process? • iPLM Process • Process developed by Eccellent Solutions to successfully implement an “integrated” PLM solution for customers. Data Load •CAD •Supporting Documents •Other Product Organization •Context Definition •Access Controls •Folder Structure BOM •eBOM Import •Version •Variations •Attributes Change Management •Problem Reports •Change Request (ECR) •Change Notification (ECN) Other Processes •Supplier Management •Classification •mBOM •Quality •More… Project Management •Project and Program definition •Task Management and Deliverables •WBS Business Intelligence •Dashboards •Reporting Integration •ERP •MES •CRM
  • 7. The iPLM Process – where is the data?
  • 8. Doing iPLM right. 4 Steps to Best-In-Class PLM 1. Organize current Product data in PLM o Organize Data to match [USE REPLACE COMPANY NAME]’s actual Product Lines o Change access controls to match Global requirements 2. Implement and Align Business Process in PLM and Production Support Systems o Change Management o ECR/ECN o SKU o Deviation o PDP Process o Automate and Expand the current Product Development Process (PDP) o Document Control 3. Project Management in PLM o Project Management is the key to accurately Control, Manage, and Report on Product Development. o Manage and Control deadlines, assign tasks, and assign deliverables (Eccellent) o Globally urate and real time product data across groups, teams, locations and vendors 4. Additional PLM Modules according to production priority o Quality: Add in CAPA, FRACAS etc. o MPMLink: Manufacturing Process Documentation, BOM Control o PartsLink: Parts Classification o Supplier Management: Supplier and Vendor Management
  • 9. The iPLM Process – who are the stakeholders? Knights of the PLM table
  • 10. View and Markup Drawing from PLM System New Sales Order Created in PLM iPLM Stakeholders: Sales Sales Engineer (OEM) • New Product Design (NPD) Order Issued by Sales for new orders based on existing designs found in PLM System. iPLM ENGINEERING CHANGES • NPD Order initiates automated workflow process that begins the Engineering/ Re-Engineering process. CUSTOMER DEMANDSSALES Knights of the PLM table
  • 11. View and Markup Drawing from PLM System New Product Request Created in PLM iPLM Stakeholders: Marketing Marketing • Creates New Product Request (NPR) created based on customer requirements or market demands. • Initiates automated workflow that begins the product engineering/re-engineering process. iPLMDRAWING MARKUP MARKETING Knights of the PLM table
  • 12. Project Engineering System of record for the Project Plan and the following activities in the PLM System: • Managing and Assigning Design Tasks and Deliverables. • Managing Task Deadlines and Deliverables. • Working with Project-related Vendors, • Approving Vendor work, • Incorporating Vendor contributions into Production Designs. iPLM Stakeholders: Engineering Real-Time Project status updates. Share Product Data to ProjectsChange Management iPLMPROJECT PLAN ENGINEERING Knights of the PLM table
  • 13. iPLM Stakeholders: Engineering Manage Assigned Project Tasks Create and modify CAD Objects and Parts iPLM The Product/Design Engineer • Begins the design process. • Receives assigned tasks from the Project Plan and Receives Change Activities and Notices in PLM • Begins work on CAD Models and Component Building • Updates project tasks daily • Completes the project tasks in PLM System. CAD ENGINEERING Knights of the PLM table
  • 14. iPLM Stakeholders: Engineering Project and Program Status Dashboard Project Planning using Project Link Manage Multiple Projects and Programs Program Manager • Production Oversight • Oversee multiple projects within one or many Project Lines. • Manages Projects as well as Programs within PLM System. iPLM ENGINEERING Knights of the PLM table
  • 15. iPLM Stakeholders: Manufacturing Manufacturing Engineer • Manufacturing process Mgt • Fixture designs and process documentation MANAGE MFG PROCESS MANAGEMENT OPTIONAL ‘MPMLINK’ MODULE FOR MFG PROCESS AND CONFIGURATION iPLM MFG PROCESS, MBOM MANUFACTURING Knights of the PLM table
  • 16. iPLM Stakeholders: Manufacturing Manufacturing (Shop Floor) • Shop Floor searches, finds, and opens Latest Release drawings in PLM System. WINDACCESS UTILITY PROVIDES SIMPLE SEARCH CAPABILITIES WINDACCESS UTILITY PROVIDES SIMPLE SEARCH CAPABILITIES iPLM MFG PROCESS, MBOM MANUFACTURING Knights of the PLM table
  • 17. iPLM Stakeholders: Purchasing Purchasing/Procurement • Manages Third party suppliers, Manufacturers, and Vendor engagements • Manages critical supplier contact information, documentation, component information, pricing, inventory, etc. OPTIONAL ‘SUMA’ MODULE FOR SCM MANAGE COST AND PRICING FOR VENDOR SELECTED PARTS iPLM SUPPLIERS, PRODUCT COSTS PURCHASING Knights of the PLM table
  • 18. iPLM Stakeholders: Quality QUALITY MODULES Quality Engineer Role • Failure Reporting, Analysis, and Corrective Action (FRACAS) in PLM System. • Capture and Resolve Non-Conformances • Manage Customer complaints in Customer Experience Management Module. • Performs Corrective and Preventive Actions (CAPA) in PLM System. iPLM QUALITY CONTROL ACTIONS QUALITY Knights of the PLM table
  • 19. iPLM Stakeholders: Executive Team REPORTING DASHBOARDS REALTIME UPDATES BASED ON LIVE DATA FINANCE Total Costs by Program Transaction Costs over Time iPLM Executive Team • End-To-End Product Development and Production Management, • Business Intelligence and System Performance Insight. • Reporting and dashboard development • Real-Time business analysis and production evaluation. Knights of the PLM table
  • 20. iPLM – Reporting and Dashboards • Once the information is stored and managed within the PLM system, it is imperative to be able to provide meaningful reports and dynamic dashboards from which we can use and manage the product development process. • We have developed an integrated solution called MIDAS (Meaningful, Intelligence, Dashboard Application System) from which we can create all types of dynamic reporting capabilities.
  • 21. iPLM – Reporting and Dashboards
  • 22. iPLM Process – Managed Services • Eccellent Solutions has built the iPLM Process into their Managed Services Remote PLM Solutions. • This unique approach help mitigate a lot of the upfront costs and risks associated to log-term implementation projects. • This approach also helps control overall project costs and allows for an ‘Agile Project Management’ approach to the total PLM implementation and ongoing management. • Our Managed Services includes our proprietary proactive monitoring system which keeps your PLM environment running smoothly. • Annual Contracts paid monthly (Think Operational Expense as opposed to Capital Expense)
  • 23. • What is ? • “Priority Monitoring and Classification System” • Intelligent ‘Proactive’ monitoring allows us to address potential problems before they become ‘issues’ • Comprehensive and complete system performance management. • Monitoring your whole environment 24x7x365 • Server • Network • Windchill Application iPLM Process – Managed Services
  • 24. • Four Levels of PLM Managed Support (Onsite or Hosted) WINDCHILL SUPPORT LEVELS Tier 1 Tier 2 Tier 3* Tier 4*± Proactive Maintenance & Monitoring System Administration & Help Desk Administration & Consulting Consulting and Business Intelligence * Includes the iPLM Process ± Includes MIDAS Reporting iPLM Process – Managed Services
  • 25. • Expert Administrators and Consultants assigned to your company. • Dedicated Account Manager for first line of contact. • "Operational Expense" as opposed to "Capital Expense". • Deploy new technologies? • Derive more benefit from your PLM. • Service level agreement (SLA) guarantee. Questions? We assume the risk, you maintain control Call Us: (856) 219-3860 Contact Us: sales@eccellent.com Visit Us: www.eccellent.com