WENDIGO
WHERE’D IT GO ?
LOST RIVERS AND URBAN FLOODING:
MEDIA, MYTHS & SMART MITIGATION
Robert Muir, M.A.SC., P.Eng.
Green 13 – January 17, 2018
OUTLINE
•Lost Rivers and Urban Flooding
•Ward 13 and 14 Flood Risks
•Extreme Rainfall Trends – Media
Myths
•Urbanization & Intensification
Stresses
2
WHO AM I ?
•Manager, Stormwater @ City of
Markham
•Previously a Partner at Dillon
Consulting
•Blogger: www.cityfloodmap.com
•Podcast: Open During Construction
•Hobbies: flood mapping, extreme
SEVERE FLOOD EVENTS - TORONTO
MAY 12, 2000
3162
REPORTS
AUGUST 19,
2005
3640
REPORTS
JULY 8, 2013
1934
REPORTS(sample of 4700 total)
4
TORONTO
Valleys &
Flood
Hazards
Overland Flow
beyond the
Valleys
Even More
Overland
Flow
FLOOD LOCATION - VALLEY vs TABLE
LAND
3162
REPORTS
2.0 %
98 %
3640
REPORTS
0.6 %
99 %
1934
REPORTS*
2.8 %
97 %
Flooded Properties within Regulated Valley Area :
5.1 – 7.3 %
(includes River Flood Vulnerable Areas)
Properties in River Flood Vulnerable Areas :
Properties On Table Land (beyond vulnerable
areas) :
MAY 12, 2000
AUGUST 19,
2005 JULY 8, 2013
9
Wards 13
& 14
Regulated
Valley
Features
Overland
Flow Paths
Overland
Flow Spread
(Estimated)
Flood Reports
Ward 13 & 14
(approx.)
Flood Reports
Other Areas
(higher risks)
Wendigo Creek
Spring Creek
• “…the Insurance Bureau of Canada estimates that extreme storms of a
magnitude expected to happen every 40 years are now predicted to
occur every six years.”
• This statement has been:
▫ Refuted by Environment and Climate Change Canada
▫ Advertising Standards Canada has resolved 3 complaint cases resulting in the removal
of this statement from prominent insurer web sites and marketing materials since
2015
Media and marketing myths on extreme weather
Origin (2012; video on next slide)
17
Environment and Climate Change
Canada Refutation of Claim:
18
19
A: “If this is used as the basis for statements
about actual changes in extreme rainfall in
Canada, then I would have concerns.
Alex J. Cannon, Ph.D.
Research Scientist, Climate Data and Analysis
Section, Science and Technology Branch
Environment and Climate Change Canada /
Government of Canada
Q: “Can you comment on one last thing which is
the statement by ICLR/IBC that ECCC data
already shows a 1-standard deviation shift in
extreme weather, with 40 year storms happening
every 6 years, assuming weather follows a
standard normal probability density function?”
Robert J. Muir, M.A.Sc., P.Eng.
Manager, Stormwater
Environmental Services Department
City of Markham
04 January 2018 Exchange with Environment Canada
• Maximum rainfall
intensities decreasing in
certain areas
• Decreasing trends in
Toronto are statistically
significant over 6 to 24
hour rainfall durations
• Same trends in Southern
Ontario … rain stresses not
increasing.
The Data
20
• Toronto Future Climate Drivers Study predicted changes in rainfall extremes
that are contradicted by observed stable values in extreme rainfall
Extreme Rainfall Volumes (mm)
SENES Baseline Predicted Environment Canada Data
2000-2009 2040-2049 1940-1990 1940-2007 1940-2017*
• 100 year Max. Daily 81 204 95.9 94.7 96.8
• 10 year Max. Daily 62 135 68.8 67.6 68.9
• 10 year Max. Hourly 20 39 39.8 38.5 39.5
* Update by City of Markham using ECCC raw data to Sept 15, 2017
Predicted Extremes vs. Observed Trends
21
Rain extremes predicted to ‘go up’ are actually ‘flat’
www.cityfloodmap.com
Less Extreme Rain at Many Ontario Stations
• Stations with
45+ years of
record and
recent data.
• More rain
decreases than
rain increases.
• S. Ont. twice as
many significant
decreases.
http://www.cityfloodmap.com/2016/01/climate-change-ontario-short-duration.html
Significant Decr.
Decrease
Increase
Significant Incr.
Source:
Environment Canada Engineering Climate Dataset ftp://ftp.tor.ec.gc.ca/Pub/Engineering_Climate_Dataset/IDF/
Idf_v2-3_2014_12_21_trends.txt in IDF_Additional_Additionnel_v2.30.zip
22
Media “Root Cause” Data Gaps
• Operational issues mis-characterized as a climate change-induced event.
• Reported “unprecedented” conditions contradict past data & reports.
23http://www.cityfloodmap.com/2015/12/stranded-metrolinx-go-train-avoidable.html
July 8, 2013
Stranded GO Train
Toronto’s Don River
May 28, 2013
Greater Flood Weeks Before
Operational Risk Overlooked
Less than
5 Year Flow
=
We’ve seen this before…
24http://www.cityfloodmap.com/2017/05/go-train-flooded-in-1981-too-media.html
=
25
25
SO WHAT IS CAUSING
MORE FLOODING?
•Urbanization and intensification
•Only Milli Vanilli
Blame it on the Rain
26
50 YEARS OF URBANIZATION
27
Urban ‘Pink Splat’… like Cat in the Hat
… don’t think we’ll get
old hydrology back. 28
INTENSIFICATION ON MY
STREET
•45 yrs adding hard surfaces = more
runoff for
the same rain
Example intensification, just the 8 addresses north of me since the late 1970's ... add it 29
WHAT IS INCREASING RIVER
FLOW ?
•University of Guelph research says
urbanization and not changing climate
30
Upper Decile of 𝐑𝐮𝐧𝐨𝐟𝐟 𝐂𝐨𝐞𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐭𝐬
Moira River at Foxboro (02HL001): 1921-30, 1963-72, 2006-15
Don River at Todmorden (02HC024): 1963-72
Don River at Todmorden (02HC024): 2006-15
0.0
0.2
0.4
0.6
0.8
1.0
Mar Apr May Jun Jul Aug Sep Oct Nov
RunoffCoefficient
Month
Rural condition
0.0
0.2
0.4
0.6
0.8
1.0
Early urbanization
0.0
0.2
0.4
0.6
0.8
1.0
Significant urbanization
GREEN
INFRASTRUCTURE•Helps mimic natural hydrologic cycle, reduce
runoff
•2017 WWFMP implementation update, Toronto
Water states implementation issues:
“Design and implementation issues concerning
the installation of green infrastructure in an
urban municipality can impact the construction of
green infrastructure projects.”
32
Completed Project Costs – Typically Very High
33
City / Town LID Type
(Project Name)
Capital +
Soft Cost ($)
Service Area
(ha)
Cost /
Hectare *
Markham Bioswale & Infiltration Trench
(Green Road)
$ 783,602 1.90 $412,422 +
Markham Rain Garden
(Glencrest Park)
$216,000 1.6 ** $135,000
Brampton Bioswale
(County Court SNAP)
$130, 514 0.2 $652,570 +
Whitchurch-
Stouffville
Various Measures
(Coultic Park & CC Parking Lot)
$103,026 0.11 $936,600
Ottawa Bioretention (Sunnyside / Road) $282,887 0.464 $609,670
Ottawa Bioswale (Stewart / Road) $363,452 2.010 $180,821
Ajax Rain Garden (Lake Driveway) $350,000 0.14 $2,500,000
Mississauga Bioswale & Pavers (Elm Drive) $226,000 0.633 $357,030
Mississauga Bioswale (Lakeview) $420,900 1.6 $363,063
Median Unit Cost = $412,000 / ha
* Range similar to TRIECA 2017 examples
** No impervious hectares
reen Infrastructure
Cost for 1050 ha =
$420,000,000
1050 hectares
CONCLUSIONS
• Bad News: Lost Rivers often have concentrated flooding
risks
• Good News: Wards 13 and 14 have relatively low risks
• Bad News: Urbanization & intensification have increased
runoff
• Good News: Rain extremes have not changed
• Green infrastructure would be expensive mitigation and
not cost effective … perhaps consider in only as
isolated amenities where funding is available.
• Residents/businesses can focus on plumbing protection
(Toronto subsidies for backwater valves etc.) for the 35

Contenu connexe

Tendances

RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
Rail~Volution
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
Rail~Volution
 
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
glennmcgillivray
 
Short Version of Wet Area Mapping CANNOR
Short Version of Wet Area Mapping CANNORShort Version of Wet Area Mapping CANNOR
Short Version of Wet Area Mapping CANNOR
Gustavo Moran
 
Lecture4(hydro)
Lecture4(hydro)Lecture4(hydro)
Lecture4(hydro)
mltan4
 
Asfpm 2009 Presentation S Mishra Final
Asfpm 2009 Presentation S Mishra FinalAsfpm 2009 Presentation S Mishra Final
Asfpm 2009 Presentation S Mishra Final
sumishra
 

Tendances (20)

Mosbahi et al, 2016
Mosbahi et  al, 2016Mosbahi et  al, 2016
Mosbahi et al, 2016
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
 
Capstone wix
Capstone wixCapstone wix
Capstone wix
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
 
Runoff computation by infiltration indices
Runoff computation by infiltration indicesRunoff computation by infiltration indices
Runoff computation by infiltration indices
 
LANDSLIDE SUSCEPTIBILITY MAPPING OF THE AITOLOAKARNANIA AND EVRYTANIA REGIONA...
LANDSLIDE SUSCEPTIBILITY MAPPING OF THE AITOLOAKARNANIA AND EVRYTANIA REGIONA...LANDSLIDE SUSCEPTIBILITY MAPPING OF THE AITOLOAKARNANIA AND EVRYTANIA REGIONA...
LANDSLIDE SUSCEPTIBILITY MAPPING OF THE AITOLOAKARNANIA AND EVRYTANIA REGIONA...
 
4 runoff and floods
4 runoff and floods4 runoff and floods
4 runoff and floods
 
INFILTRATION PPT
INFILTRATION PPTINFILTRATION PPT
INFILTRATION PPT
 
Interception and Depression Storage
Interception and Depression StorageInterception and Depression Storage
Interception and Depression Storage
 
Infiltration equations and index
Infiltration equations and indexInfiltration equations and index
Infiltration equations and index
 
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
ICLR Friday Forum: More flood than meets the eye (Dec 7, 2018)
 
Short Version of Wet Area Mapping CANNOR
Short Version of Wet Area Mapping CANNORShort Version of Wet Area Mapping CANNOR
Short Version of Wet Area Mapping CANNOR
 
Hampton-Rds-MATS-Poster-2
Hampton-Rds-MATS-Poster-2Hampton-Rds-MATS-Poster-2
Hampton-Rds-MATS-Poster-2
 
Phosphorus stratification and edge of-field phosphorus losses
Phosphorus stratification and edge of-field phosphorus lossesPhosphorus stratification and edge of-field phosphorus losses
Phosphorus stratification and edge of-field phosphorus losses
 
Lecture4(hydro)
Lecture4(hydro)Lecture4(hydro)
Lecture4(hydro)
 
Runoff final
Runoff finalRunoff final
Runoff final
 
Characterizing Change in Baseflow Interactions with Urbanization Through Even...
Characterizing Change in Baseflow Interactions with Urbanization Through Even...Characterizing Change in Baseflow Interactions with Urbanization Through Even...
Characterizing Change in Baseflow Interactions with Urbanization Through Even...
 
Asfpm 2009 Presentation S Mishra Final
Asfpm 2009 Presentation S Mishra FinalAsfpm 2009 Presentation S Mishra Final
Asfpm 2009 Presentation S Mishra Final
 
URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014
 

Similaire à Lost Rivers & Urban Flooding, Media, Myths & Smart Mitigation - Toronto Wards 13 / 14 - Presentation to Green 13

Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
Robert Muir
 
Cities and Climate Change - Cities and climate change adaptation
Cities and Climate Change - Cities and climate change adaptationCities and Climate Change - Cities and climate change adaptation
Cities and Climate Change - Cities and climate change adaptation
ipcc-media
 
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
glennmcgillivray
 
Renewing Our Vision - Trends analysis
Renewing Our Vision - Trends analysis Renewing Our Vision - Trends analysis
Renewing Our Vision - Trends analysis
CHCRPA
 
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
glennmcgillivray
 

Similaire à Lost Rivers & Urban Flooding, Media, Myths & Smart Mitigation - Toronto Wards 13 / 14 - Presentation to Green 13 (20)

Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
 
Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
Urbanization and Baseflow Impacts - Evidence-based Water Budget Management an...
 
Flood plains to floor drains design standard adaptation for urban flood risk ...
Flood plains to floor drains design standard adaptation for urban flood risk ...Flood plains to floor drains design standard adaptation for urban flood risk ...
Flood plains to floor drains design standard adaptation for urban flood risk ...
 
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Senior Capstone Design Final presentation
Senior Capstone Design Final presentationSenior Capstone Design Final presentation
Senior Capstone Design Final presentation
 
Cities and Climate Change - Cities and climate change adaptation
Cities and Climate Change - Cities and climate change adaptationCities and Climate Change - Cities and climate change adaptation
Cities and Climate Change - Cities and climate change adaptation
 
Historical Analysis of Agroenvironmental Conditions
Historical Analysis of Agroenvironmental ConditionsHistorical Analysis of Agroenvironmental Conditions
Historical Analysis of Agroenvironmental Conditions
 
Historical Analysis of Agroenvironmental Conditions
Historical Analysis of Agroenvironmental ConditionsHistorical Analysis of Agroenvironmental Conditions
Historical Analysis of Agroenvironmental Conditions
 
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
ICLR Friday Forum: Flood Mitigation Planning in BC's Lower Mainland (April 20...
 
IDF Trend Analysis, Future Climate Projections & System Design for Extreme We...
IDF Trend Analysis, Future Climate Projections & System Design for Extreme We...IDF Trend Analysis, Future Climate Projections & System Design for Extreme We...
IDF Trend Analysis, Future Climate Projections & System Design for Extreme We...
 
Cwc june2014
Cwc june2014Cwc june2014
Cwc june2014
 
Renewing Our Vision - Trends analysis
Renewing Our Vision - Trends analysis Renewing Our Vision - Trends analysis
Renewing Our Vision - Trends analysis
 
Brantwaterpresentation 121002114120-phpapp02
Brantwaterpresentation 121002114120-phpapp02Brantwaterpresentation 121002114120-phpapp02
Brantwaterpresentation 121002114120-phpapp02
 
The Future of Water in New York
The Future of Water in New YorkThe Future of Water in New York
The Future of Water in New York
 
Tangible Approaches to Quantify Climate Change - APWA Conference
Tangible Approaches to Quantify Climate Change - APWA Conference Tangible Approaches to Quantify Climate Change - APWA Conference
Tangible Approaches to Quantify Climate Change - APWA Conference
 
Infrastructure Resiliency and Adaptation for Climate Change and Today’s Extremes
Infrastructure Resiliency and Adaptation for Climate Change and Today’s ExtremesInfrastructure Resiliency and Adaptation for Climate Change and Today’s Extremes
Infrastructure Resiliency and Adaptation for Climate Change and Today’s Extremes
 
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
ICLR Friday Forum; TRCA flood risk assessment (January 25, 2019)
 
IRJET- Impact of Urbanization on Environment
IRJET-  	  Impact of Urbanization on EnvironmentIRJET-  	  Impact of Urbanization on Environment
IRJET- Impact of Urbanization on Environment
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 

Plus de Robert Muir

An Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey InfrastructureAn Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey Infrastructure
Robert Muir
 
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
Robert Muir
 
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Robert Muir
 
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Robert Muir
 

Plus de Robert Muir (20)

City of Markham IDF & Design Hyetograph Review
City of Markham IDF & Design Hyetograph Review City of Markham IDF & Design Hyetograph Review
City of Markham IDF & Design Hyetograph Review
 
Cost Effectiveness of LID Implementation
Cost Effectiveness of LID ImplementationCost Effectiveness of LID Implementation
Cost Effectiveness of LID Implementation
 
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
 
National Research Council - Guidelines on Undertaking a Comprehensive Analysi...
National Research Council - Guidelines on Undertaking a Comprehensive Analysi...National Research Council - Guidelines on Undertaking a Comprehensive Analysi...
National Research Council - Guidelines on Undertaking a Comprehensive Analysi...
 
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
 
An Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey InfrastructureAn Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey Infrastructure
 
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
 
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
Ontario Society of Professional Engineers OSPE Green Infrastructure Roundtabl...
 
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
 
Thinking Fast and Slow in the ROW, Mission Possible Strategies to Make Room f...
Thinking Fast and Slow in the ROW, Mission Possible Strategies to Make Room f...Thinking Fast and Slow in the ROW, Mission Possible Strategies to Make Room f...
Thinking Fast and Slow in the ROW, Mission Possible Strategies to Make Room f...
 
Storm Warts, The Floods Awaken, A New Hope for Cost-Effective Investment in F...
Storm Warts, The Floods Awaken, A New Hope for Cost-Effective Investment in F...Storm Warts, The Floods Awaken, A New Hope for Cost-Effective Investment in F...
Storm Warts, The Floods Awaken, A New Hope for Cost-Effective Investment in F...
 
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
 
Climate Change & Urban Development Have Impacted Streamflows in Southern Ontario
Climate Change & Urban Development Have Impacted Streamflows in Southern OntarioClimate Change & Urban Development Have Impacted Streamflows in Southern Ontario
Climate Change & Urban Development Have Impacted Streamflows in Southern Ontario
 
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
 
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
 
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
 
Addressing Climate Change through Engineering Practice
Addressing Climate Change through Engineering PracticeAddressing Climate Change through Engineering Practice
Addressing Climate Change through Engineering Practice
 
Robert Muir Green Infrastructure for Climate Adaptation NRC Workshop on Urban...
Robert Muir Green Infrastructure for Climate Adaptation NRC Workshop on Urban...Robert Muir Green Infrastructure for Climate Adaptation NRC Workshop on Urban...
Robert Muir Green Infrastructure for Climate Adaptation NRC Workshop on Urban...
 
Robert Muir Extreme Rainfall Trends - NRC Workshop on urban rural storm flood...
Robert Muir Extreme Rainfall Trends - NRC Workshop on urban rural storm flood...Robert Muir Extreme Rainfall Trends - NRC Workshop on urban rural storm flood...
Robert Muir Extreme Rainfall Trends - NRC Workshop on urban rural storm flood...
 

Dernier

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Dernier (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Lost Rivers & Urban Flooding, Media, Myths & Smart Mitigation - Toronto Wards 13 / 14 - Presentation to Green 13

  • 1. WENDIGO WHERE’D IT GO ? LOST RIVERS AND URBAN FLOODING: MEDIA, MYTHS & SMART MITIGATION Robert Muir, M.A.SC., P.Eng. Green 13 – January 17, 2018
  • 2. OUTLINE •Lost Rivers and Urban Flooding •Ward 13 and 14 Flood Risks •Extreme Rainfall Trends – Media Myths •Urbanization & Intensification Stresses 2
  • 3. WHO AM I ? •Manager, Stormwater @ City of Markham •Previously a Partner at Dillon Consulting •Blogger: www.cityfloodmap.com •Podcast: Open During Construction •Hobbies: flood mapping, extreme
  • 4. SEVERE FLOOD EVENTS - TORONTO MAY 12, 2000 3162 REPORTS AUGUST 19, 2005 3640 REPORTS JULY 8, 2013 1934 REPORTS(sample of 4700 total) 4
  • 9. FLOOD LOCATION - VALLEY vs TABLE LAND 3162 REPORTS 2.0 % 98 % 3640 REPORTS 0.6 % 99 % 1934 REPORTS* 2.8 % 97 % Flooded Properties within Regulated Valley Area : 5.1 – 7.3 % (includes River Flood Vulnerable Areas) Properties in River Flood Vulnerable Areas : Properties On Table Land (beyond vulnerable areas) : MAY 12, 2000 AUGUST 19, 2005 JULY 8, 2013 9
  • 14. Flood Reports Ward 13 & 14 (approx.)
  • 17. • “…the Insurance Bureau of Canada estimates that extreme storms of a magnitude expected to happen every 40 years are now predicted to occur every six years.” • This statement has been: ▫ Refuted by Environment and Climate Change Canada ▫ Advertising Standards Canada has resolved 3 complaint cases resulting in the removal of this statement from prominent insurer web sites and marketing materials since 2015 Media and marketing myths on extreme weather Origin (2012; video on next slide) 17
  • 18. Environment and Climate Change Canada Refutation of Claim: 18
  • 19. 19 A: “If this is used as the basis for statements about actual changes in extreme rainfall in Canada, then I would have concerns. Alex J. Cannon, Ph.D. Research Scientist, Climate Data and Analysis Section, Science and Technology Branch Environment and Climate Change Canada / Government of Canada Q: “Can you comment on one last thing which is the statement by ICLR/IBC that ECCC data already shows a 1-standard deviation shift in extreme weather, with 40 year storms happening every 6 years, assuming weather follows a standard normal probability density function?” Robert J. Muir, M.A.Sc., P.Eng. Manager, Stormwater Environmental Services Department City of Markham 04 January 2018 Exchange with Environment Canada
  • 20. • Maximum rainfall intensities decreasing in certain areas • Decreasing trends in Toronto are statistically significant over 6 to 24 hour rainfall durations • Same trends in Southern Ontario … rain stresses not increasing. The Data 20
  • 21. • Toronto Future Climate Drivers Study predicted changes in rainfall extremes that are contradicted by observed stable values in extreme rainfall Extreme Rainfall Volumes (mm) SENES Baseline Predicted Environment Canada Data 2000-2009 2040-2049 1940-1990 1940-2007 1940-2017* • 100 year Max. Daily 81 204 95.9 94.7 96.8 • 10 year Max. Daily 62 135 68.8 67.6 68.9 • 10 year Max. Hourly 20 39 39.8 38.5 39.5 * Update by City of Markham using ECCC raw data to Sept 15, 2017 Predicted Extremes vs. Observed Trends 21 Rain extremes predicted to ‘go up’ are actually ‘flat’
  • 22. www.cityfloodmap.com Less Extreme Rain at Many Ontario Stations • Stations with 45+ years of record and recent data. • More rain decreases than rain increases. • S. Ont. twice as many significant decreases. http://www.cityfloodmap.com/2016/01/climate-change-ontario-short-duration.html Significant Decr. Decrease Increase Significant Incr. Source: Environment Canada Engineering Climate Dataset ftp://ftp.tor.ec.gc.ca/Pub/Engineering_Climate_Dataset/IDF/ Idf_v2-3_2014_12_21_trends.txt in IDF_Additional_Additionnel_v2.30.zip 22
  • 23. Media “Root Cause” Data Gaps • Operational issues mis-characterized as a climate change-induced event. • Reported “unprecedented” conditions contradict past data & reports. 23http://www.cityfloodmap.com/2015/12/stranded-metrolinx-go-train-avoidable.html July 8, 2013 Stranded GO Train Toronto’s Don River May 28, 2013 Greater Flood Weeks Before Operational Risk Overlooked Less than 5 Year Flow =
  • 24. We’ve seen this before… 24http://www.cityfloodmap.com/2017/05/go-train-flooded-in-1981-too-media.html =
  • 25. 25 25
  • 26. SO WHAT IS CAUSING MORE FLOODING? •Urbanization and intensification •Only Milli Vanilli Blame it on the Rain 26
  • 27. 50 YEARS OF URBANIZATION 27
  • 28. Urban ‘Pink Splat’… like Cat in the Hat … don’t think we’ll get old hydrology back. 28
  • 29. INTENSIFICATION ON MY STREET •45 yrs adding hard surfaces = more runoff for the same rain Example intensification, just the 8 addresses north of me since the late 1970's ... add it 29
  • 30. WHAT IS INCREASING RIVER FLOW ? •University of Guelph research says urbanization and not changing climate 30
  • 31. Upper Decile of 𝐑𝐮𝐧𝐨𝐟𝐟 𝐂𝐨𝐞𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐭𝐬 Moira River at Foxboro (02HL001): 1921-30, 1963-72, 2006-15 Don River at Todmorden (02HC024): 1963-72 Don River at Todmorden (02HC024): 2006-15 0.0 0.2 0.4 0.6 0.8 1.0 Mar Apr May Jun Jul Aug Sep Oct Nov RunoffCoefficient Month Rural condition 0.0 0.2 0.4 0.6 0.8 1.0 Early urbanization 0.0 0.2 0.4 0.6 0.8 1.0 Significant urbanization
  • 32. GREEN INFRASTRUCTURE•Helps mimic natural hydrologic cycle, reduce runoff •2017 WWFMP implementation update, Toronto Water states implementation issues: “Design and implementation issues concerning the installation of green infrastructure in an urban municipality can impact the construction of green infrastructure projects.” 32
  • 33. Completed Project Costs – Typically Very High 33 City / Town LID Type (Project Name) Capital + Soft Cost ($) Service Area (ha) Cost / Hectare * Markham Bioswale & Infiltration Trench (Green Road) $ 783,602 1.90 $412,422 + Markham Rain Garden (Glencrest Park) $216,000 1.6 ** $135,000 Brampton Bioswale (County Court SNAP) $130, 514 0.2 $652,570 + Whitchurch- Stouffville Various Measures (Coultic Park & CC Parking Lot) $103,026 0.11 $936,600 Ottawa Bioretention (Sunnyside / Road) $282,887 0.464 $609,670 Ottawa Bioswale (Stewart / Road) $363,452 2.010 $180,821 Ajax Rain Garden (Lake Driveway) $350,000 0.14 $2,500,000 Mississauga Bioswale & Pavers (Elm Drive) $226,000 0.633 $357,030 Mississauga Bioswale (Lakeview) $420,900 1.6 $363,063 Median Unit Cost = $412,000 / ha * Range similar to TRIECA 2017 examples ** No impervious hectares
  • 34. reen Infrastructure Cost for 1050 ha = $420,000,000 1050 hectares
  • 35. CONCLUSIONS • Bad News: Lost Rivers often have concentrated flooding risks • Good News: Wards 13 and 14 have relatively low risks • Bad News: Urbanization & intensification have increased runoff • Good News: Rain extremes have not changed • Green infrastructure would be expensive mitigation and not cost effective … perhaps consider in only as isolated amenities where funding is available. • Residents/businesses can focus on plumbing protection (Toronto subsidies for backwater valves etc.) for the 35

Notes de l'éditeur

  1. There is a safety factor and decreases in some regions in Canada. In southern Ontario the trends are similar to Toronto – decreases in Kingston, Ottawa, St Thomas London and Windsor. This table shows Ontario long term station trends, collecting data for over 45 years – green means annual maximum rain event volumes are down – red mean up. There are slightly more downward than upward trends. Southern Ontario has twice as many statistically significant decreasing trends as increasing ones.
  2. We spend a lot of time responding to media data gaps. Sensational events are mischaracterized in the media like the 2013 GO Train flood – it was called an unprecedented flood event but it was more accurately an operational decision because the flood risk is known in that area. It was less than a 5 year design flow, a larger flood happened 6 weeks before, but still some government reports and agencies mischaracterize the severity of the event and the cause.
  3. Even governments may mischaracterize root cause – although the Richmond Hill GO Train line was flood prone since it began in the late 1970’s, flooding has been used to call for green house gas emissions control
  4. So this pink urban splat .. looks like Cat in the Hat. And I don’t think we’ll get old hydrology back. Given known design limitations and hydrology stresses
  5. Markham Green Road excludes plantings Markham Glencrest Park cost -141 + 75 soft cost estimated Brampton excludes in house design cost