1. Roger Berryment
24 Meadow Pathway Drive
Fletcher, NC 28732
603-767-5759
Experience:
30 years’ experience in heavy industrial multi trade construction projects in the
Pulp and Paper, Energy, Bio-Pharmaceutical, Hydro Electric, and Manufacturing
industries. Primary responsibilities include the development of project estimates,
award negotiations, pre-construction planning, constructability reviews, project
scheduling, procurement of materials, equipment and sub-contracts, generation
and maintenance of project budgets, client interface and contract management.
Projects types include Plan and Spec., Design Build and Conceptual projects
ranging in value from $200,000 to $10,000,000.
Attributes:
Conceptual, Plan and Spec. and Design Build estimating,
material and equipment take off, sub-contract solicitations,
and constructability review.
Primavera Scheduling Software schedule development
Budget and Cost Report generation and maintenance.
Multi Craft knowledge in Civil , Structural, Mechanical
Equipment and Piping Installations, Controls and Electrical
Integration, and Heavy Rigging.
Project Credentials:
2011-Present Construction Engineer
Engineered Construction Services, Inc. Raymond, Me
Responsible for procurement, scheduling and supervision and Management of all
on site activities for Sub-Contractors and site crews for multi craft heavy
industrial projects ranging from $200,000 to $4,500,000 in value. Projects
completed in the past four years have been a design build Biomass facility,
HRSG Gas Burner Conversion on two 2MM BTU Steam Boilers and an HVAC
project at the Portsmouth Naval Shipyard that included 14,000 LF of High
Pressure Steam Piping, Compressed Air, 15# Steam Piping. Installation of 3
274,000 CFM Air Rotation units, Trane Air Handlers and Ductwork ranging
from 60” down to 8” as well as 4 Air Cooled Condensers, office space and
mechanical equipment support and Building Management Controls integration.
2. 2009-2011 Project Manager
Keystone Construction & Maintenance Services, Inc. Rowley, MA
Responsible for reviewing, estimating and development of multi craft projects
from $200,000 to $10,000,000 in value, start up, turnover and maintenance of
projects as well as the procurement of materials and sub-contractors and
oversight throughout the entire project.
2000-2008 Construction Engineer
Abington Group Portsmouth, NH
Responsible for procurement, scheduling, crew supervision, field estimating and
cost engineering for various projects in the pulp and paper, power and
manufacturing facilities throughout New England.
1999-2000 Project Manager
Bio kinetics Philadelphia, PA
Cost Control and scheduling for biopharmaceutical capital projects ranging in
value from $5,000,000 to $60,000,000 million in North Carolina and Stamford
Connecticut.
1988-1999 Construction Engineer
Abington Group Portsmouth, NH
Responsible for procurement, scheduling, crew supervision, field estimating and
cost engineering for various projects in the pulp and paper, power and
manufacturing facilities throughout New England.
Project Experience:
2000-2001 PNSY Cogeneration Project, PNSY Kittery Maine- Project Engineer
for the Installation of a 5.2 MW Solar Turbine, HRSG Boilers, Support
structures, foundations selective demolition and installation of all
supporting mechanical and piping systems (5MM). Responsible for all
layout, scheduling, procurement of all materials, subcontracts and
equipment. Additional responsible included crew productivity oversight,
cost control and analysis as well as CPM scheduling and updates
2002 PSNY Mechanical Utilities Project, PSNY Kittery, Maine- Project
Engineer for the Installation of over 15,000 LF 12” through 2” CS steam,
Condensate, Water and Air piping as well as site excavation,
foundations, pre-cast structures and site development (4MM). Primary
responsibilities were procurement, subcontract supervision, site
management as well as const controls and scheduling.
2002-2004 UCONN Power Plant Project, Storres, CT- Lead Construction
Engineer for the Installation of (3) 5.2 MW Solar Turbine, (3) HRSG
3. Boilers, (3) Cooling Towers, (3) Steam Absorption Chillers, installation
of all supporting mechanical and piping systems, (10MM). Responsible
for all layout, scheduling, procurement of all material, subcontracts and
equipment, site coordination. Additional responsibility for productivity,
cost controls and analysis as well as CPM scheduling and updates.
2006-2007 Trigen Power SDA Installation, Syracuse, NY- Lead Construction
Engineer for the Installation of an SDA Flue Gas Scrubber Unit including
Vessel installation, rigging, and welding of ducting as well as various
mechanical and piping support systems (6MM). Responsible for all layout,
scheduling, procurement of all materials, subcontracts and equipment. Also
responsible for productivity, cost controls and analysis as well as CPM
scheduling and updates.
2006-2008 Amherst College Co Gen, Amherst, MA- Lead Construction Engineer for
the Installation of a 3.2 MW Solar Turbine, HRSG Boiler, Feedwater and
Condensate recovery system and a 500 kw Steam Turbine. Responsible for
all layout, scheduling, procurement of all material, subcontracts and
equipment. Also responsible for productivity, cost controls and analysis as
well as CPM scheduling and updates.
2009-2011 P&G Gillette Co Gen, Boston, MA- Project Manager for the Installation of
a 7 MW Solar Turbine, HRSG Boiler, Feed water, High Pressure Steam,
Condensate and support processes for an existing 1 mw Steam Turbine. Also
responsible for project scheduling, procurement of project materials,
subcontracts and equipment in addition to productivity, cost controls and
analysis as well as CPM scheduling, project management, craft over sight
and daily client interface.
2011-2012 Rockingham County – Brentwood, NH- Project Manager for a
Biomass Project. Installation of a Messersmith Biomass System with
Hurst Boiler, New Dearator / Feedwater Pump system. Connected to the
existing steam systems in the facility Nursing Home and Prison.
2012 TRT Quincy, MA- Project Engineer for a Fuel Oil to Gas burner
conversion project at a TRT facility in Quincy, MA. Removal of existing
Fuel Oil burners, installation of new FD and ID fans, Burners gas piping,
breeching, and refractory and start up.
2012-2013 PNSY Kittery, Maine – Project Engineer for a 130,000 SF building
conversion from an abandoned shipways building to a
warehousing/office facility. Scope included removal of existing Steam,
Condensate and Compressed Air systems. Make safe and removal of
4. existing MAPP, Oxygen and Hydrogen piping systems. Installation of
14,000 LF of large and small bore High Pressure Steam, Low Pressure
Steam, Condensate recovery system, Compressed Air and Domestic
Water piping. HVAC supply, return and air handling systems including
erection of 3 – 79’ high, 270,000 CFM Air Rotation Units and associated
piping and BMS controls, Testing and Balancing and facility start up.
EDUCATION:
30 Hour OSHA
Primavera Scheduling Training Suretrak, P3, P6 and Finest Hour
Construction Survey and Layout-CMVTI
Timberline Cost Systems
Foundation Cost Systems