Roger Berryment
24 Meadow Pathway Drive
Fletcher, NC 28732
603-767-5759
Experience:
30 years’ experience in heavy industrial multi trade construction projects in the
Pulp and Paper, Energy, Bio-Pharmaceutical, Hydro Electric, and Manufacturing
industries. Primary responsibilities include the development of project estimates,
award negotiations, pre-construction planning, constructability reviews, project
scheduling, procurement of materials, equipment and sub-contracts, generation
and maintenance of project budgets, client interface and contract management.
Projects types include Plan and Spec., Design Build and Conceptual projects
ranging in value from $200,000 to $10,000,000.
Attributes:
 Conceptual, Plan and Spec. and Design Build estimating,
material and equipment take off, sub-contract solicitations,
and constructability review.
 Primavera Scheduling Software schedule development
 Budget and Cost Report generation and maintenance.
 Multi Craft knowledge in Civil , Structural, Mechanical
Equipment and Piping Installations, Controls and Electrical
Integration, and Heavy Rigging.
Project Credentials:
2011-Present Construction Engineer
Engineered Construction Services, Inc. Raymond, Me
Responsible for procurement, scheduling and supervision and Management of all
on site activities for Sub-Contractors and site crews for multi craft heavy
industrial projects ranging from $200,000 to $4,500,000 in value. Projects
completed in the past four years have been a design build Biomass facility,
HRSG Gas Burner Conversion on two 2MM BTU Steam Boilers and an HVAC
project at the Portsmouth Naval Shipyard that included 14,000 LF of High
Pressure Steam Piping, Compressed Air, 15# Steam Piping. Installation of 3
274,000 CFM Air Rotation units, Trane Air Handlers and Ductwork ranging
from 60” down to 8” as well as 4 Air Cooled Condensers, office space and
mechanical equipment support and Building Management Controls integration.
2009-2011 Project Manager
Keystone Construction & Maintenance Services, Inc. Rowley, MA
Responsible for reviewing, estimating and development of multi craft projects
from $200,000 to $10,000,000 in value, start up, turnover and maintenance of
projects as well as the procurement of materials and sub-contractors and
oversight throughout the entire project.
2000-2008 Construction Engineer
Abington Group Portsmouth, NH
Responsible for procurement, scheduling, crew supervision, field estimating and
cost engineering for various projects in the pulp and paper, power and
manufacturing facilities throughout New England.
1999-2000 Project Manager
Bio kinetics Philadelphia, PA
Cost Control and scheduling for biopharmaceutical capital projects ranging in
value from $5,000,000 to $60,000,000 million in North Carolina and Stamford
Connecticut.
1988-1999 Construction Engineer
Abington Group Portsmouth, NH
Responsible for procurement, scheduling, crew supervision, field estimating and
cost engineering for various projects in the pulp and paper, power and
manufacturing facilities throughout New England.
Project Experience:
2000-2001 PNSY Cogeneration Project, PNSY Kittery Maine- Project Engineer
for the Installation of a 5.2 MW Solar Turbine, HRSG Boilers, Support
structures, foundations selective demolition and installation of all
supporting mechanical and piping systems (5MM). Responsible for all
layout, scheduling, procurement of all materials, subcontracts and
equipment. Additional responsible included crew productivity oversight,
cost control and analysis as well as CPM scheduling and updates
2002 PSNY Mechanical Utilities Project, PSNY Kittery, Maine- Project
Engineer for the Installation of over 15,000 LF 12” through 2” CS steam,
Condensate, Water and Air piping as well as site excavation,
foundations, pre-cast structures and site development (4MM). Primary
responsibilities were procurement, subcontract supervision, site
management as well as const controls and scheduling.
2002-2004 UCONN Power Plant Project, Storres, CT- Lead Construction
Engineer for the Installation of (3) 5.2 MW Solar Turbine, (3) HRSG
Boilers, (3) Cooling Towers, (3) Steam Absorption Chillers, installation
of all supporting mechanical and piping systems, (10MM). Responsible
for all layout, scheduling, procurement of all material, subcontracts and
equipment, site coordination. Additional responsibility for productivity,
cost controls and analysis as well as CPM scheduling and updates.
2006-2007 Trigen Power SDA Installation, Syracuse, NY- Lead Construction
Engineer for the Installation of an SDA Flue Gas Scrubber Unit including
Vessel installation, rigging, and welding of ducting as well as various
mechanical and piping support systems (6MM). Responsible for all layout,
scheduling, procurement of all materials, subcontracts and equipment. Also
responsible for productivity, cost controls and analysis as well as CPM
scheduling and updates.
2006-2008 Amherst College Co Gen, Amherst, MA- Lead Construction Engineer for
the Installation of a 3.2 MW Solar Turbine, HRSG Boiler, Feedwater and
Condensate recovery system and a 500 kw Steam Turbine. Responsible for
all layout, scheduling, procurement of all material, subcontracts and
equipment. Also responsible for productivity, cost controls and analysis as
well as CPM scheduling and updates.
2009-2011 P&G Gillette Co Gen, Boston, MA- Project Manager for the Installation of
a 7 MW Solar Turbine, HRSG Boiler, Feed water, High Pressure Steam,
Condensate and support processes for an existing 1 mw Steam Turbine. Also
responsible for project scheduling, procurement of project materials,
subcontracts and equipment in addition to productivity, cost controls and
analysis as well as CPM scheduling, project management, craft over sight
and daily client interface.
2011-2012 Rockingham County – Brentwood, NH- Project Manager for a
Biomass Project. Installation of a Messersmith Biomass System with
Hurst Boiler, New Dearator / Feedwater Pump system. Connected to the
existing steam systems in the facility Nursing Home and Prison.
2012 TRT Quincy, MA- Project Engineer for a Fuel Oil to Gas burner
conversion project at a TRT facility in Quincy, MA. Removal of existing
Fuel Oil burners, installation of new FD and ID fans, Burners gas piping,
breeching, and refractory and start up.
2012-2013 PNSY Kittery, Maine – Project Engineer for a 130,000 SF building
conversion from an abandoned shipways building to a
warehousing/office facility. Scope included removal of existing Steam,
Condensate and Compressed Air systems. Make safe and removal of
existing MAPP, Oxygen and Hydrogen piping systems. Installation of
14,000 LF of large and small bore High Pressure Steam, Low Pressure
Steam, Condensate recovery system, Compressed Air and Domestic
Water piping. HVAC supply, return and air handling systems including
erection of 3 – 79’ high, 270,000 CFM Air Rotation Units and associated
piping and BMS controls, Testing and Balancing and facility start up.
EDUCATION:
30 Hour OSHA
Primavera Scheduling Training Suretrak, P3, P6 and Finest Hour
Construction Survey and Layout-CMVTI
Timberline Cost Systems
Foundation Cost Systems

Contenu connexe

Tendances (20)

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager Resume
 
RakeshShahCV
RakeshShahCVRakeshShahCV
RakeshShahCV
 
Steven Longman Resume 2016
Steven Longman Resume 2016Steven Longman Resume 2016
Steven Longman Resume 2016
 
Resume_Jan Gonzalez Madera
Resume_Jan Gonzalez MaderaResume_Jan Gonzalez Madera
Resume_Jan Gonzalez Madera
 
Resume
ResumeResume
Resume
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_August
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
Karthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical EngineerKarthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical Engineer
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 

En vedette

beacon Redesigned spread (6)
beacon Redesigned spread (6)beacon Redesigned spread (6)
beacon Redesigned spread (6)Patrick IP Abadom
 
Pre-Game.ppt
Pre-Game.pptPre-Game.ppt
Pre-Game.pptevans0191
 
Eris Industries - American Banker presentation deck.
Eris Industries - American Banker presentation deck. Eris Industries - American Banker presentation deck.
Eris Industries - American Banker presentation deck. Preston Byrne
 
Ppt teknologi pembuatan formaldehid
Ppt teknologi pembuatan formaldehid Ppt teknologi pembuatan formaldehid
Ppt teknologi pembuatan formaldehid Ridho Majid
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Indo pak war 1965
Indo pak war 1965Indo pak war 1965
Indo pak war 1965Falak_Sher
 

En vedette (9)

beacon Redesigned spread (6)
beacon Redesigned spread (6)beacon Redesigned spread (6)
beacon Redesigned spread (6)
 
CLSClosetPhotosLogo
CLSClosetPhotosLogoCLSClosetPhotosLogo
CLSClosetPhotosLogo
 
Pre-Game.ppt
Pre-Game.pptPre-Game.ppt
Pre-Game.ppt
 
Eris Industries - American Banker presentation deck.
Eris Industries - American Banker presentation deck. Eris Industries - American Banker presentation deck.
Eris Industries - American Banker presentation deck.
 
Ppt teknologi pembuatan formaldehid
Ppt teknologi pembuatan formaldehid Ppt teknologi pembuatan formaldehid
Ppt teknologi pembuatan formaldehid
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
TATA STEEL
TATA STEELTATA STEEL
TATA STEEL
 
TATA VS Cyrus Pallonji Mistry
TATA VS Cyrus Pallonji MistryTATA VS Cyrus Pallonji Mistry
TATA VS Cyrus Pallonji Mistry
 
Indo pak war 1965
Indo pak war 1965Indo pak war 1965
Indo pak war 1965
 

Similaire à Roger Berryment Resume

Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016ivan fletcher
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Miguel Ramirez
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsKoshalendra Pandey
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 

Similaire à Roger Berryment Resume (20)

Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Jordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - ResumeJordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - Resume
 
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 

Roger Berryment Resume

  • 1. Roger Berryment 24 Meadow Pathway Drive Fletcher, NC 28732 603-767-5759 Experience: 30 years’ experience in heavy industrial multi trade construction projects in the Pulp and Paper, Energy, Bio-Pharmaceutical, Hydro Electric, and Manufacturing industries. Primary responsibilities include the development of project estimates, award negotiations, pre-construction planning, constructability reviews, project scheduling, procurement of materials, equipment and sub-contracts, generation and maintenance of project budgets, client interface and contract management. Projects types include Plan and Spec., Design Build and Conceptual projects ranging in value from $200,000 to $10,000,000. Attributes:  Conceptual, Plan and Spec. and Design Build estimating, material and equipment take off, sub-contract solicitations, and constructability review.  Primavera Scheduling Software schedule development  Budget and Cost Report generation and maintenance.  Multi Craft knowledge in Civil , Structural, Mechanical Equipment and Piping Installations, Controls and Electrical Integration, and Heavy Rigging. Project Credentials: 2011-Present Construction Engineer Engineered Construction Services, Inc. Raymond, Me Responsible for procurement, scheduling and supervision and Management of all on site activities for Sub-Contractors and site crews for multi craft heavy industrial projects ranging from $200,000 to $4,500,000 in value. Projects completed in the past four years have been a design build Biomass facility, HRSG Gas Burner Conversion on two 2MM BTU Steam Boilers and an HVAC project at the Portsmouth Naval Shipyard that included 14,000 LF of High Pressure Steam Piping, Compressed Air, 15# Steam Piping. Installation of 3 274,000 CFM Air Rotation units, Trane Air Handlers and Ductwork ranging from 60” down to 8” as well as 4 Air Cooled Condensers, office space and mechanical equipment support and Building Management Controls integration.
  • 2. 2009-2011 Project Manager Keystone Construction & Maintenance Services, Inc. Rowley, MA Responsible for reviewing, estimating and development of multi craft projects from $200,000 to $10,000,000 in value, start up, turnover and maintenance of projects as well as the procurement of materials and sub-contractors and oversight throughout the entire project. 2000-2008 Construction Engineer Abington Group Portsmouth, NH Responsible for procurement, scheduling, crew supervision, field estimating and cost engineering for various projects in the pulp and paper, power and manufacturing facilities throughout New England. 1999-2000 Project Manager Bio kinetics Philadelphia, PA Cost Control and scheduling for biopharmaceutical capital projects ranging in value from $5,000,000 to $60,000,000 million in North Carolina and Stamford Connecticut. 1988-1999 Construction Engineer Abington Group Portsmouth, NH Responsible for procurement, scheduling, crew supervision, field estimating and cost engineering for various projects in the pulp and paper, power and manufacturing facilities throughout New England. Project Experience: 2000-2001 PNSY Cogeneration Project, PNSY Kittery Maine- Project Engineer for the Installation of a 5.2 MW Solar Turbine, HRSG Boilers, Support structures, foundations selective demolition and installation of all supporting mechanical and piping systems (5MM). Responsible for all layout, scheduling, procurement of all materials, subcontracts and equipment. Additional responsible included crew productivity oversight, cost control and analysis as well as CPM scheduling and updates 2002 PSNY Mechanical Utilities Project, PSNY Kittery, Maine- Project Engineer for the Installation of over 15,000 LF 12” through 2” CS steam, Condensate, Water and Air piping as well as site excavation, foundations, pre-cast structures and site development (4MM). Primary responsibilities were procurement, subcontract supervision, site management as well as const controls and scheduling. 2002-2004 UCONN Power Plant Project, Storres, CT- Lead Construction Engineer for the Installation of (3) 5.2 MW Solar Turbine, (3) HRSG
  • 3. Boilers, (3) Cooling Towers, (3) Steam Absorption Chillers, installation of all supporting mechanical and piping systems, (10MM). Responsible for all layout, scheduling, procurement of all material, subcontracts and equipment, site coordination. Additional responsibility for productivity, cost controls and analysis as well as CPM scheduling and updates. 2006-2007 Trigen Power SDA Installation, Syracuse, NY- Lead Construction Engineer for the Installation of an SDA Flue Gas Scrubber Unit including Vessel installation, rigging, and welding of ducting as well as various mechanical and piping support systems (6MM). Responsible for all layout, scheduling, procurement of all materials, subcontracts and equipment. Also responsible for productivity, cost controls and analysis as well as CPM scheduling and updates. 2006-2008 Amherst College Co Gen, Amherst, MA- Lead Construction Engineer for the Installation of a 3.2 MW Solar Turbine, HRSG Boiler, Feedwater and Condensate recovery system and a 500 kw Steam Turbine. Responsible for all layout, scheduling, procurement of all material, subcontracts and equipment. Also responsible for productivity, cost controls and analysis as well as CPM scheduling and updates. 2009-2011 P&G Gillette Co Gen, Boston, MA- Project Manager for the Installation of a 7 MW Solar Turbine, HRSG Boiler, Feed water, High Pressure Steam, Condensate and support processes for an existing 1 mw Steam Turbine. Also responsible for project scheduling, procurement of project materials, subcontracts and equipment in addition to productivity, cost controls and analysis as well as CPM scheduling, project management, craft over sight and daily client interface. 2011-2012 Rockingham County – Brentwood, NH- Project Manager for a Biomass Project. Installation of a Messersmith Biomass System with Hurst Boiler, New Dearator / Feedwater Pump system. Connected to the existing steam systems in the facility Nursing Home and Prison. 2012 TRT Quincy, MA- Project Engineer for a Fuel Oil to Gas burner conversion project at a TRT facility in Quincy, MA. Removal of existing Fuel Oil burners, installation of new FD and ID fans, Burners gas piping, breeching, and refractory and start up. 2012-2013 PNSY Kittery, Maine – Project Engineer for a 130,000 SF building conversion from an abandoned shipways building to a warehousing/office facility. Scope included removal of existing Steam, Condensate and Compressed Air systems. Make safe and removal of
  • 4. existing MAPP, Oxygen and Hydrogen piping systems. Installation of 14,000 LF of large and small bore High Pressure Steam, Low Pressure Steam, Condensate recovery system, Compressed Air and Domestic Water piping. HVAC supply, return and air handling systems including erection of 3 – 79’ high, 270,000 CFM Air Rotation Units and associated piping and BMS controls, Testing and Balancing and facility start up. EDUCATION: 30 Hour OSHA Primavera Scheduling Training Suretrak, P3, P6 and Finest Hour Construction Survey and Layout-CMVTI Timberline Cost Systems Foundation Cost Systems