SlideShare une entreprise Scribd logo
1  sur  22
Télécharger pour lire hors ligne
Management of Safety during Construction and
Installation activities in Nuclear Power Plant
Marek Rolinec
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Introduction
MO34 Project
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human		
Behavior	
4	
CSI	
Program	
5		
HSE	
Ini+a+ves	
6	
Conclusion	
4.6	mld	€	>	150	
contractors	
5500	
workers	
>	800	
SE	/	Enel			
2/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Statistics
Construction Industry in Slovakia
•  Third	place	in	the	Employment	Rate		
•  Second	and	Third	place	in	the	Accident	Rate	
•  48	FataliCes	and	457	HBI	during	6	years	
•  Implementa+on	of	correct	tools	may	significantly	decrease	the	numbers	
Ac+vity	
Fatali+es	
Heavy	Body	Injury	(HBI)	HBI	+	42	Sick.	Leave	
HBI	based	on	111/1975	(2009-2010)	
2009	 2010	 2011	 2012	 2013	 2014	 2009	 2010	 2011	 2012	 2013	 2014	
Industry	 8	 11	 9	 12	 12	 7	 720	 750	 58	 61	 43	 46	
Transport,	Storage	 6	 13	 10	 9	 6	 9	 229	 205	 8	 27	 16	 16	
ConstrucCon	 14	 3	 3	 14	 7	 7	 299	 164	 25	 19	 22	 23	
Agriculture	and	
Forestry	
4	 3	 5	 5	 9	 5	 174	 144	 11	 16	 12	 11	
Injuries	in	total	 44	 48	 38	 53	 53	 39	
1948		
148		
1755	
162	
137	 167	 155	 146	
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human		
Behavior	
4	
CSI	
Program	
5		
HSE	
Ini+a+ves	
6	
Conclusion	
3/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human		
Behavior	
4	
CSI	
Program	
5		
HSE	
Ini+a+ves	
6	
Conclusion	
Statistics
European Union
Standardized incidence rate of fatal accidents at work for 2012 and average rate for 2009 - 2011 (Eurostat)
Member State
Eurostat - Standardised Incident Rate (per 100,000 workers)
2012 Average (2009-2011)
1,3 1,55
1 United Kingdom 0,58 0,67
2 Netherlands 0,72 0,76
3 Sweden 0,8 1,26
4 Germany 0,9 0,8
5 Estonia 1,02 2,43
6 Denmark 1,18 1,1
7 Greece 1,2 0,85
8 Italy 1,29 1,58
9 Poland 1,42 3,3
10 Ireland 1,43 1,19
11 Belgium 1,46 2,04
12 Hungary 1,6 2,18
13 Finland 1,62 1,04
14 Switzerland 1,68 1,57
15 Malta 1,7 0,5
16 Slovakia 1,78 0,59 (2/29)
17 Spain 1,99 1,98
18 Czech Republic 2,1 2,01
19 Cyprus 2,25 3,48
20 Austria 2,37 2,13
21 France 2,64 3,22
22 Slovenia 2,7 1,93
23 Portugal 2,71 2,9
24 Luxembourg 2,91 2,53
25 Romania 2,94 4,53
26 Bulgaria 3,06 2,26
27 Croatia 3,17 1,68
28 Lithuania 3,93 3,75
29 Latvia 4,7 3,52
Slovakia 2009 -2011
•  2 of 29
Slovakia 2012
•  16 of 29
4/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Statistics
MO34 Project status up to 31 Dec 2015
2010	 2011	 2012	 2013	 2014	 2015	
Fatality	/	HBI	 0/0	 0/0	 0/0	 0/0	 0/0	 1/0	
Injuries	with	SL	>	1	day	 5	 5	 4	 2	 6	 5	
Treatment	without	SL	 15	 8	 7	 22	 25	 14	
Dangerous	event	excl.	damage	 12	 11	 5	 11	 39	 40	
Dangerous	event	incl.	damage	 1	 2	 4	 2	 2	 0	
Fire	 2	 2	 2	 1	 0	 0	
Sickness	Leave	days	in	total	 97	 183	 124	 115	 148	 143	
Worked	out	hours	/	year	 4.741	662	 5.416	731	 5.820	423	 7.420	031	 11.424	854	 12.527	882		
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI		
Program	
5	
HSE	
Ini+a+ves	
Conclusion	
0,64
0,65 0,65 0,64
0,62
0,61
0,59
0,58
0,57
0,56
0,55 0,55
0,010
0,015
0,020
0,025
0,030
0,035
0,040
0,52
0,54
0,56
0,58
0,60
0,62
0,64
0,66
FI
SI
Yearly FR trend (FI – SI)Combined Frequency Rate (FI – SI)
0,68 0,63
0,57 0,55
0,0207
0,0180 0,0165 0,0155
0,0000
0,0100
0,0200
0,0300
0,0400
0,00
0,20
0,40
0,60
0,80
2013 2014 2015 2016
FI
SI
5/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Human Behavior
Human Factor Failure
Absence	of	personal	
precondi+on	for	
proper	job	
45%	
	Using	of	dangerous		
methods,	including	
ac+ng	without	
authority,	against	
order,	against	
prohibi+on	and	
instruc+on,	
remaining	in	
dangerous	zone		
30%	
Cause	of	accidents	2009	-2015	
71,4	%	
30	%	
45	%	
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5		
HSE	
Ini+a+ves	
6	
Conclusion	
V-45	Staircase,	
ladders,	ascents	-	
fall	of	workers	on		
20%	
III-24	Grinders,	
cleaning	and	
polishing	machines		
10%	
IV-44	In-plant	
workplaces	(roads,	
pathways,	
corridors)	-	
horizontal	fall	of	
workers	
10%	
V-47	Depressions,	
pits,	not	covered	
openings	-	fall	of	
workers	into	depth	
10%	
Vb-50	Loads	-	
accidents	caused	
by	loads	
10%	
VII-61	Toxic	
substances	-	solid,	
liquid,	toxic	and	
unbreathable	gases	
10%	
Source	of	accidents	2015	
6/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Human Behavior
Human Factor Failure
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5		
HSE	
Ini+a+ves	
6	
Conclusion	
•  32 fatalities
•  Dozens of injured
•  Francesco Schettina – 16 years of sentence
7/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
•  approx.	80%	of	injuries	on	MO34	may	be	assigned	to	hazardous	behavior		
Selection of
Activity
Observing the
activity
Filling in the
Checklist
Feedback Data completion
Observation
One Safety - important
no.
2	014	
Observers 28	
Checklists filled in 1	234	
Observations in total 2	482	
Safe Behavior 2	073	
Hazardous	Behavior	 409	
Hazardous	Behavior	in	%	 20	
Tab	4:	ONE	SAFETY		basic	data	
Human behavior initiatives
ONE SAFETY
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
8/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Outcomes from CSI
•  Detailed information on all nonconformities
•  Analysis focusing on critical workplaces
•  Detection of new possible hazards
•  Data about contractors’ Safety performance
•  Analysis on efficiency of actions’ taken
•  Analysis on human behavior
•  Data about activities of all Safety Supervisors
•  Data about all Yellow and Red cards applied
•  Environment included
PPA TOTAL October 2015
November
2016
December
2015
Januray 2016
February
2016
March 2016 April 2016
Počet kontrol / NO. of inspections 14409 2789 1837 2113 2122 2999 2549
Počet zistení / NO. of findings 2444 302 262 306 428 640 506
Žlté karty / Yellow cards 164 30 37 23 29 26 19
Červené karty / Red cards 5 0 0 2 0 3 0
October November December January February March April
FR = Počet zistení na 100 kontrol / No. of
findings on 100 inspection
17 11 14 14 20 21 20
Areas of findings
FR Q4
PPA
2015
FR Q4
MO34
2015
FR Q1
PPA
2016
FR Q1
MO34
2016
FR
Januray
FR
February
FR
March
El. Equipment 13 11 20 17 19 22 19
Chemical substances N/A N/A N/A N/A N/A N/A N/A
Scaffold 31 31 38 39 42 38 33
Waste 3 16 4 13 6 6 0
PPE 23 26 40 36 41 38 42
Fire Prevention 12 17 21 24 13 21 29
PráWork at height 14 13 18 15 19 16 18
Machine, Crane N/A N/A N/A N/A N/A N/A N/A
Human behavior 2 3 3 4 1 4 4
Povolenie na práce 3 4 6 5 7 7 3
FR = Počet zistení na 100 kontrol / No. of findings on 100 inspection
Program introduction
Construction Safety Indicator program
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
9/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Construction Safety Indicator program
CSI – figures
•  CSI	System	focuses	on	findings’	iden+fica+on	(not	having	character	of	incident)	
•  CAPA	are	submiged	to	the	Safety	Coordinator	and	to	Contractors		
•  Evalua+on	of	collected	data	results	from	defined	selec+on	criteria		
•  The	best	CAPA	effec+vity	is	found	in	range	65	%	-	80	%	
•  CAPA	efficiency	shall	be	counted	based	on	periodicity	of	findings	as	follows:	
January	–	December	2015	 Observers	 No.	of	inspecCons	/	2015	
Shortcomings	with	high	level	of	
hazard	
CSI 42 65.045 635
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
10/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Measures	
taken	ajer	
injuries	and	
CSI	results	
Ini+a+ves	set		up	for	
year	
PRACUJTE BEZPEČNE
CHRÁNITE TÝM SEBA
AJ SVOJU RODINU
WORK SAFELY
PROTECT YOURSELF
AND YOUR FAMILY
HSE Initiatives
HSE Integrated Improvement Program
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
11/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
•  How many of you find the positive motivation as the most effective tool
for improvement of the human behavior (bonuses, rewards, etc.)?
•  How many of you find the negative motivation as the most effective tool
for improvement of the human behavior (penalization, stopping of
activities, etc.)?
•  How many of you use the positive and negative tool of motivation?
HSE Initiatives
Reward and Punishment
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
12/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Reward and Punishment
627 vouchers issued in total
In 2015 issued
2425 Yellow and 80 Red Cards
100 pcs in total
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
13/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Induction Periodical and topic trainings
1	640	
48	032	
51	668	
17	908	
11	080	
16	792	
22	212	
20	592	
0	
1000	
2000	
3000	
4000	
5000	
6000	
7000	
8000	
9000	
0	
10000	
20000	
30000	
40000	
50000	
60000	
2008	 2009	 2010	 2011	 2012	 2013	 2014	 2015	
Manhours	
of	trainings	
No.	of	
workers	
265,50	
2	739,60	
13	266,40	
14	155,90	
22	658,65	
16	828,05	
23	766,90	
24	774,90	
0	
2000	
4000	
6000	
8000	
10000	
12000	
14000	
16000	
18000	
20000	
0	
5000	
10000	
15000	
20000	
25000	
30000	
2008	 2009	 2010	 2011	 2012	 2013	 2014	 2015	
Manhours	of	
trainings	
No.	of	workers	
HSE Initiatives
Trainings and Education
Scaffolders, Head of Works, Pre Job Brief, Load Binders, Work at Height, Use of
Harness, Work in Confined Spaces, etc.
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
14/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Trainings and Education
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
15/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Communication Campaigns
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
16/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Communication Campaigns
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
17/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Communication Campaigns
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
18/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Communication Campaigns
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
19/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
HSE Initiatives
Communication Campaigns
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
20/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Conclusion
Achieved results
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
21/22
Safety during nuclear power plant construction
HSE Excellence Europe 2016, 18.5.2016
Use: External
Author: Marek Rolinec HSE MO34
Conclusion
Achieved results
Tab	5:	Accident	Rate	of	MO34	+	SK*	
MO34
Construction
SK
Construction
MO34
Effectivity Index
1 ml. of man hours
6 years
1 ml. of man hours
6 years
Fatality Indicator / HBI (FaR) 0,019 0,056 + 300 %
Frequency Rate (FR) 0,55 1,979 + 360 %
Severity Index (SI) 0,015 0,113 + 750 %
Posi+ves	in	the	HSE	Area	
9.160.000	hours	without	registered	Occupa+onal	Injury	
Safe	Enterprise	in	2012		
Good	Prac+ce	3rd	place	in	2014	
*	Ing.	Robert	Bulla	Hlavný	inšpektor	práce	IP	Nitra		:	SYSTÉM CELOŽIVOTNÉHO VZDELÁVANIA V BOZP V PODMIENKACH SR
1	
Introduc+on	
2	
Sta+s+cs	
3	
Human	
Behavior	
4	
CSI	
Program	
5	
HSE	
Ini+a+ves	
6	
Conclusion	
22/22

Contenu connexe

En vedette

safety aspects of nuclear reactor
safety aspects of nuclear reactorsafety aspects of nuclear reactor
safety aspects of nuclear reactor
Rajan Lanjekar
 
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
Sayeed Mohammed
 

En vedette (7)

Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
 
Safety of nuclear power plant operation. Lecture 8.
Safety of nuclear power plant operation. Lecture 8.Safety of nuclear power plant operation. Lecture 8.
Safety of nuclear power plant operation. Lecture 8.
 
Basic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear EngineeringBasic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear Engineering
 
safety aspects of nuclear reactor
safety aspects of nuclear reactorsafety aspects of nuclear reactor
safety aspects of nuclear reactor
 
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
nuclear reactors
nuclear reactors nuclear reactors
nuclear reactors
 

Similaire à Rolinec_M_Case study Nuclear power plant construction EN final

Shortage of Skilled Labour in Construction Industry of Sri Lanka
Shortage of Skilled Labour in Construction Industry of Sri LankaShortage of Skilled Labour in Construction Industry of Sri Lanka
Shortage of Skilled Labour in Construction Industry of Sri Lanka
Prasan Premathilaka
 

Similaire à Rolinec_M_Case study Nuclear power plant construction EN final (20)

Annual report card Owen Barry
Annual report card   Owen BarryAnnual report card   Owen Barry
Annual report card Owen Barry
 
Air quality montoring system
Air quality montoring systemAir quality montoring system
Air quality montoring system
 
Doing The Right Things Easy Tools.pdf
Doing The Right Things Easy Tools.pdfDoing The Right Things Easy Tools.pdf
Doing The Right Things Easy Tools.pdf
 
Technical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNOTechnical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNO
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives
 
LPG GAS DETECTOR presentation for engineers
LPG GAS DETECTOR presentation for engineersLPG GAS DETECTOR presentation for engineers
LPG GAS DETECTOR presentation for engineers
 
Shortage of Skilled Labour in Construction Industry of Sri Lanka
Shortage of Skilled Labour in Construction Industry of Sri LankaShortage of Skilled Labour in Construction Industry of Sri Lanka
Shortage of Skilled Labour in Construction Industry of Sri Lanka
 
New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...
 
Cba guide 2008
Cba guide 2008Cba guide 2008
Cba guide 2008
 
Paper 8 - SoHELP presentation SMI 2017 2.pdf
Paper 8 - SoHELP  presentation SMI  2017 2.pdfPaper 8 - SoHELP  presentation SMI  2017 2.pdf
Paper 8 - SoHELP presentation SMI 2017 2.pdf
 
Agency decision-making in merger cases – Simon VANDE WALLE – European Commiss...
Agency decision-making in merger cases – Simon VANDE WALLE – European Commiss...Agency decision-making in merger cases – Simon VANDE WALLE – European Commiss...
Agency decision-making in merger cases – Simon VANDE WALLE – European Commiss...
 
Unified Systems Engineering feasibility
Unified Systems Engineering feasibilityUnified Systems Engineering feasibility
Unified Systems Engineering feasibility
 
HCF 2016: Peter Kearns
HCF 2016: Peter KearnsHCF 2016: Peter Kearns
HCF 2016: Peter Kearns
 
IRJET- Air Pollution Monitporing System with IoT
IRJET- Air Pollution Monitporing System with IoTIRJET- Air Pollution Monitporing System with IoT
IRJET- Air Pollution Monitporing System with IoT
 
6 craglia
6 craglia6 craglia
6 craglia
 
ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?
 
IRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly Shop
 
Cv santiago borja en jn 2016
Cv santiago borja   en jn 2016Cv santiago borja   en jn 2016
Cv santiago borja en jn 2016
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Where are we in decarbonizing industrial logistics?
Where are we in decarbonizing industrial logistics?Where are we in decarbonizing industrial logistics?
Where are we in decarbonizing industrial logistics?
 

Rolinec_M_Case study Nuclear power plant construction EN final

  • 1. Management of Safety during Construction and Installation activities in Nuclear Power Plant Marek Rolinec
  • 2. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Introduction MO34 Project 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 4.6 mld € > 150 contractors 5500 workers > 800 SE / Enel 2/22
  • 3. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Statistics Construction Industry in Slovakia •  Third place in the Employment Rate •  Second and Third place in the Accident Rate •  48 FataliCes and 457 HBI during 6 years •  Implementa+on of correct tools may significantly decrease the numbers Ac+vity Fatali+es Heavy Body Injury (HBI) HBI + 42 Sick. Leave HBI based on 111/1975 (2009-2010) 2009 2010 2011 2012 2013 2014 2009 2010 2011 2012 2013 2014 Industry 8 11 9 12 12 7 720 750 58 61 43 46 Transport, Storage 6 13 10 9 6 9 229 205 8 27 16 16 ConstrucCon 14 3 3 14 7 7 299 164 25 19 22 23 Agriculture and Forestry 4 3 5 5 9 5 174 144 11 16 12 11 Injuries in total 44 48 38 53 53 39 1948 148 1755 162 137 167 155 146 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 3/22
  • 4. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion Statistics European Union Standardized incidence rate of fatal accidents at work for 2012 and average rate for 2009 - 2011 (Eurostat) Member State Eurostat - Standardised Incident Rate (per 100,000 workers) 2012 Average (2009-2011) 1,3 1,55 1 United Kingdom 0,58 0,67 2 Netherlands 0,72 0,76 3 Sweden 0,8 1,26 4 Germany 0,9 0,8 5 Estonia 1,02 2,43 6 Denmark 1,18 1,1 7 Greece 1,2 0,85 8 Italy 1,29 1,58 9 Poland 1,42 3,3 10 Ireland 1,43 1,19 11 Belgium 1,46 2,04 12 Hungary 1,6 2,18 13 Finland 1,62 1,04 14 Switzerland 1,68 1,57 15 Malta 1,7 0,5 16 Slovakia 1,78 0,59 (2/29) 17 Spain 1,99 1,98 18 Czech Republic 2,1 2,01 19 Cyprus 2,25 3,48 20 Austria 2,37 2,13 21 France 2,64 3,22 22 Slovenia 2,7 1,93 23 Portugal 2,71 2,9 24 Luxembourg 2,91 2,53 25 Romania 2,94 4,53 26 Bulgaria 3,06 2,26 27 Croatia 3,17 1,68 28 Lithuania 3,93 3,75 29 Latvia 4,7 3,52 Slovakia 2009 -2011 •  2 of 29 Slovakia 2012 •  16 of 29 4/22
  • 5. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Statistics MO34 Project status up to 31 Dec 2015 2010 2011 2012 2013 2014 2015 Fatality / HBI 0/0 0/0 0/0 0/0 0/0 1/0 Injuries with SL > 1 day 5 5 4 2 6 5 Treatment without SL 15 8 7 22 25 14 Dangerous event excl. damage 12 11 5 11 39 40 Dangerous event incl. damage 1 2 4 2 2 0 Fire 2 2 2 1 0 0 Sickness Leave days in total 97 183 124 115 148 143 Worked out hours / year 4.741 662 5.416 731 5.820 423 7.420 031 11.424 854 12.527 882 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves Conclusion 0,64 0,65 0,65 0,64 0,62 0,61 0,59 0,58 0,57 0,56 0,55 0,55 0,010 0,015 0,020 0,025 0,030 0,035 0,040 0,52 0,54 0,56 0,58 0,60 0,62 0,64 0,66 FI SI Yearly FR trend (FI – SI)Combined Frequency Rate (FI – SI) 0,68 0,63 0,57 0,55 0,0207 0,0180 0,0165 0,0155 0,0000 0,0100 0,0200 0,0300 0,0400 0,00 0,20 0,40 0,60 0,80 2013 2014 2015 2016 FI SI 5/22
  • 6. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Human Behavior Human Factor Failure Absence of personal precondi+on for proper job 45% Using of dangerous methods, including ac+ng without authority, against order, against prohibi+on and instruc+on, remaining in dangerous zone 30% Cause of accidents 2009 -2015 71,4 % 30 % 45 % 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion V-45 Staircase, ladders, ascents - fall of workers on 20% III-24 Grinders, cleaning and polishing machines 10% IV-44 In-plant workplaces (roads, pathways, corridors) - horizontal fall of workers 10% V-47 Depressions, pits, not covered openings - fall of workers into depth 10% Vb-50 Loads - accidents caused by loads 10% VII-61 Toxic substances - solid, liquid, toxic and unbreathable gases 10% Source of accidents 2015 6/22
  • 7. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Human Behavior Human Factor Failure 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion •  32 fatalities •  Dozens of injured •  Francesco Schettina – 16 years of sentence 7/22
  • 8. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 •  approx. 80% of injuries on MO34 may be assigned to hazardous behavior Selection of Activity Observing the activity Filling in the Checklist Feedback Data completion Observation One Safety - important no. 2 014 Observers 28 Checklists filled in 1 234 Observations in total 2 482 Safe Behavior 2 073 Hazardous Behavior 409 Hazardous Behavior in % 20 Tab 4: ONE SAFETY basic data Human behavior initiatives ONE SAFETY 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 8/22
  • 9. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Outcomes from CSI •  Detailed information on all nonconformities •  Analysis focusing on critical workplaces •  Detection of new possible hazards •  Data about contractors’ Safety performance •  Analysis on efficiency of actions’ taken •  Analysis on human behavior •  Data about activities of all Safety Supervisors •  Data about all Yellow and Red cards applied •  Environment included PPA TOTAL October 2015 November 2016 December 2015 Januray 2016 February 2016 March 2016 April 2016 Počet kontrol / NO. of inspections 14409 2789 1837 2113 2122 2999 2549 Počet zistení / NO. of findings 2444 302 262 306 428 640 506 Žlté karty / Yellow cards 164 30 37 23 29 26 19 Červené karty / Red cards 5 0 0 2 0 3 0 October November December January February March April FR = Počet zistení na 100 kontrol / No. of findings on 100 inspection 17 11 14 14 20 21 20 Areas of findings FR Q4 PPA 2015 FR Q4 MO34 2015 FR Q1 PPA 2016 FR Q1 MO34 2016 FR Januray FR February FR March El. Equipment 13 11 20 17 19 22 19 Chemical substances N/A N/A N/A N/A N/A N/A N/A Scaffold 31 31 38 39 42 38 33 Waste 3 16 4 13 6 6 0 PPE 23 26 40 36 41 38 42 Fire Prevention 12 17 21 24 13 21 29 PráWork at height 14 13 18 15 19 16 18 Machine, Crane N/A N/A N/A N/A N/A N/A N/A Human behavior 2 3 3 4 1 4 4 Povolenie na práce 3 4 6 5 7 7 3 FR = Počet zistení na 100 kontrol / No. of findings on 100 inspection Program introduction Construction Safety Indicator program 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 9/22
  • 10. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Construction Safety Indicator program CSI – figures •  CSI System focuses on findings’ iden+fica+on (not having character of incident) •  CAPA are submiged to the Safety Coordinator and to Contractors •  Evalua+on of collected data results from defined selec+on criteria •  The best CAPA effec+vity is found in range 65 % - 80 % •  CAPA efficiency shall be counted based on periodicity of findings as follows: January – December 2015 Observers No. of inspecCons / 2015 Shortcomings with high level of hazard CSI 42 65.045 635 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 10/22
  • 11. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Measures taken ajer injuries and CSI results Ini+a+ves set up for year PRACUJTE BEZPEČNE CHRÁNITE TÝM SEBA AJ SVOJU RODINU WORK SAFELY PROTECT YOURSELF AND YOUR FAMILY HSE Initiatives HSE Integrated Improvement Program 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 11/22
  • 12. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 •  How many of you find the positive motivation as the most effective tool for improvement of the human behavior (bonuses, rewards, etc.)? •  How many of you find the negative motivation as the most effective tool for improvement of the human behavior (penalization, stopping of activities, etc.)? •  How many of you use the positive and negative tool of motivation? HSE Initiatives Reward and Punishment 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 12/22
  • 13. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Reward and Punishment 627 vouchers issued in total In 2015 issued 2425 Yellow and 80 Red Cards 100 pcs in total 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 13/22
  • 14. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Induction Periodical and topic trainings 1 640 48 032 51 668 17 908 11 080 16 792 22 212 20 592 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 10000 20000 30000 40000 50000 60000 2008 2009 2010 2011 2012 2013 2014 2015 Manhours of trainings No. of workers 265,50 2 739,60 13 266,40 14 155,90 22 658,65 16 828,05 23 766,90 24 774,90 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 0 5000 10000 15000 20000 25000 30000 2008 2009 2010 2011 2012 2013 2014 2015 Manhours of trainings No. of workers HSE Initiatives Trainings and Education Scaffolders, Head of Works, Pre Job Brief, Load Binders, Work at Height, Use of Harness, Work in Confined Spaces, etc. 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 14/22
  • 15. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Trainings and Education 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 15/22
  • 16. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Communication Campaigns 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 16/22
  • 17. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Communication Campaigns 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 17/22
  • 18. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Communication Campaigns 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 18/22
  • 19. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Communication Campaigns 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 19/22
  • 20. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 HSE Initiatives Communication Campaigns 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 20/22
  • 21. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Conclusion Achieved results 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 21/22
  • 22. Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016 Use: External Author: Marek Rolinec HSE MO34 Conclusion Achieved results Tab 5: Accident Rate of MO34 + SK* MO34 Construction SK Construction MO34 Effectivity Index 1 ml. of man hours 6 years 1 ml. of man hours 6 years Fatality Indicator / HBI (FaR) 0,019 0,056 + 300 % Frequency Rate (FR) 0,55 1,979 + 360 % Severity Index (SI) 0,015 0,113 + 750 % Posi+ves in the HSE Area 9.160.000 hours without registered Occupa+onal Injury Safe Enterprise in 2012 Good Prac+ce 3rd place in 2014 * Ing. Robert Bulla Hlavný inšpektor práce IP Nitra : SYSTÉM CELOŽIVOTNÉHO VZDELÁVANIA V BOZP V PODMIENKACH SR 1 Introduc+on 2 Sta+s+cs 3 Human Behavior 4 CSI Program 5 HSE Ini+a+ves 6 Conclusion 22/22