SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
PERSONAL SUMMARY:
An Experienced Manufacturing/Projects/Quality Assurance Manager in the automotive and ship building/construction industries with skills on
Programs/Project/Launch Management, Manufacturing Engineering, High & Low Volume Manufacturing/Production, Project Costing, Quality
Assurance/Control, Business Case & Feasibility Studies process disciplines. A certified 6Sigma Greenbelt, VSM – Value Stream Mapping SME, Lean
Manufacturing Lead/SME, QMR (Quality Management Representative) and a TPM (Total Productivity Management) Practitioner.
KEY ACCOMPLISHMENTS:
General Manufacturing:
 TPM / Administration and Logistics Division Manager (Twinpack Container Corporation)
January 4, 2016 to Present
 TPM ( Total Productivity Management ) Operational Excellence Implementation
 Operations Audit on Total Manufacturing Processes
 Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations
 Executive Assistant to the President and TPM Operational Excellence Head/Lead (Twinpack Container Corporation)
October 7, 2015 to January 4, 2016
 TPM ( Total Productivity Management ) Operational Excellence Implementation
 Operations Audit on Total Manufacturing Processes
Ship Industry:
 Programs and Quality – Programs, Project and Quality Assurance (Austal Philippines PTY. LTD.)
June 2, 2014 – March 26, 2015 (Project Management and Quality –Ship Construction and QMS)
 Manage the New vessel/ships with the Project Management Process (PMP)
 Business case and Feasibility studies for incoming and new projects
 Project Costing Estimates for All Current, On-going and Future Projects
 Sales Process Gate reviews for in-coming goods and products
 Quality Assurance – Inspection and Warranty Operations through QOS DQM
 QMS development to meet ISO 9001 version 2008 certification
 Leadership Team member reporting to the President and General Manager
Automotive Industry:
 Vehicle Launch – Manufacturing Body Shop Organization (Ford Motor Company Thailand, LTD.)
April 1, 2013 – May 15, 2014 (Manufacturing Body Shop Launch – Build Phases Deliverables to Scheduled timeline)
 Manage the New Product Launch consistent with the Launch Quality Operating System (LQOS)
 Launch and Deliver 3 models in a given timeline for ASEAN and Asia Pacific Markets (ECO Sport, Fiesta, Focus)
 2nd
Shift Launch for FTM ( Ford Thailand Manufacturing )
 8% Efficiency and 8% Cost Per Unit Calculations for Body Shop World Class Targets for 2013-14.
 Vehicle Operations – Manufacturing Paint Shop and Body Shop Organization (Ford Motor Company Philippines, Inc.)
July 2012 – February 28, 2013 (Manufacturing Operations Improvement cost 53.67% and 3.32% respectively)
 Manpower set-up and training to support its SQDCPME,FPS-Lean Manufacturing Process
 Overall Management and Strategic Planning for Paint Shop and Body Shop Operations
 Vehicle Operations – Manufacturing Quality Organization (Ford Motor Company Philippines. Inc.)
July 2011 – June 2012 (Manufacturing Operations Improvement on Cost 38.94% and Customer Satisfaction 8%)
 Manpower set-up and Training to Global Quality Process and External PDI Operations
 Quality Management Representative for ISO 9001 (Asia Pacific Africa certification)
 Overall Management and Strategic Planning for Quality and Lean Manufacturing Operations
 Best in Class Products Achievement (Mazda3, Focus FMCP lowest TGW a high Customer Sat.)
 Power Train Organization (Engine Plant) Manufacturing and Body Shop Operations (Ford Motor Company Philippines. Inc.)
July 2009 – July 2011 (Manufacturing Operations Improvement of 20% and 12.49% respectively)
 Total Plant Overall Management & Strategic Planning for Engine, Machining & Body Shop Operations (Manpower, Material, etc.)
 Productivity improvement to fully utilize resources to build Engine, Cylinder Heads from knock down parts to finished product.
 Ford Production System (FPS) set up focusing on SQDCME deliverables achieving its highest metrics (EP & Body Shop)
 President's Awards Model Employee (2010)
 Vehicle Operations – Manufacturing Quality and Lean Manufacturing Organization Set Up (Ford Motor Company Philippines. Inc.)
July 2008 – July 2009 (Manufacturing Operations Improvement on Cost 3%, $47/u and Plant FPS at 6.1 level)
 Manpower set-up and training to introduce Regional Quality process
 Quality Management Representative for ISO 9001
 Lean Manufacturing Management through Ford Production System Implementation
 Overall Management and Strategic Planning for Quality Assurance and Lean Manufacturing Operations
 Vehicle Operations - Trim Chassis Final Organization Set Up (Ford Motor Company Philippines, Inc.)
July 2007 – July 2008 (Manufacturing Operations Improvement on Cost 10.87%)
 Management of Vehicle Operations – TCF to its Ford Production Systems and related processes deliverables.
B3 L3 (20B), Phase2, Kansas Street, Greenland Newtown Executive. Village, Ampid, San Mateo, Rizal, Philippines
CCellphone No. +63 (0)927-722-5755 Home Phone No. +63 (2) 212-2134
dongpedro2@yahoo.com, dongpedro2@gmail.com
Romualdo Orine Pedro
 Officer in Charge – Vehicle Operations TCF (Ford Motor Company Philippines, Inc.)
July 2006 – July 2007
 Overall Management and Strategic Planning for Trim Chassis Final Assembly Operations
 Vehicle Operations 2nd
Shift Organization set up and supervision (Ford Motor Company Philippines, Inc.)
May 2005 – Feb 2006
 Manpower selection and training to double the production output.
 Supervision of Vehicle Assembly Manufacturing Operations on shift production.
 Vehicle Operations - Manufacturing Engineering (Ford Motor Company Philippines, Inc.)
June 2001 – May 2005
 Lead, Facilities, Tooling & Equip Set Up: Ford Ranger for Philippines & transfer to Thailand. Ford Escape/Mazda Tribute for ASEAN
 Equipment upgrade to improve the process and support the volume ramp-up
 Six Sigma – Greenbelt Certified
 Vehicle Operations Plant Launch Preparations and Set up - TCF (Ford Motor Company Philippines, Inc.) Feb. 1, 1999–June 2001
 Manpower selection , training and vehicle assembly supervision to support the new organization and its launch
 Production Process set up from Knock down parts to finished product focusing on 4M's
 Ford Production System (FPS) set up focusing on Safety, Quality, Delivery, Cost, Morale, and Environment deliverables
KEY POSITIONS:
 TPM / Administration and Logistics Division Manager – Twinpack Container Corporation –January4, 2016 to Present
 TPM ( Total Productivity Management ) Operational Excellence Implementation
 Operations Audit on Total Manufacturing Processes
 Leads and manages Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations
 Executive Assistant to the President – Twinpack Container Corporation – October 7, 2015 – January 4, 2016
 Operational Excellence Implementation through TPM (Total Productivity Management)
 Programs Manager – Programs (Austal Philippines Pty Ltd.) – January 5, 2015 –March 26,2015
 Programs – Responsible for the development of New Projects and its Contract, Feasibility study, Project Costing of new & incoming
projects to convert into a business case for a possible project to meet and contribute to the profitability and growth of the company.
 Programs and Quality Manager – Programs and Quality Organization (Austal Philippines Pty Ltd.) : June 2, 2014 – March 26,2015
 Programs – Responsible for Project Mgt Process to Build/Launch New Vessels & associated goods to meet its contracted timeline
 Quality Assurance – Responsible for QMS, Inspection, Warranty and Client
 Team Manager - Vehicle Launch –Manufacturing Body Shop Organization (Ford Motor Company Thailand, Ltd.): Apr. 1, 2013–May 15, 2014
 Vehicle Operations for Manufacturing Body Shop Launch Activities – Build Phases Deliverables to Scheduled timeline
 Manage the new product launch consistent with the Launch Quality Operating System (LQOS)
 Manager – VO Mfg Paint Shop and Body Shop (Ford Motor Company Philippines, Inc.): June 2012 – Feb. 28, 2013
 Responsible for the overall SQDCPME programs at Paint Shop and Body Shop Areas
 Overall Management and Strategic Planning for Painting and Welding Processes Operations
 Chairman – BOD, Ford Philippines Employees' Cooperative ( Ford in the Philippines ) ; June 2012 – Feb. 28, 2013
 Overall Lead and Strategic Planning for FPEC Operations
 Manager/QMR – VO Mfg Quality (Ford Motor Company Philippines, Inc.) : July 2011 – June 2012
 Responsible for Mfg Quality Operations and Philippines' Representative to APA for Quality
 Responsible for the overall operation of Quality to meet customers' expectations for domestic and export markets
 Responsible for ISO 9001 / 14001 Certification
 Manager – PTO Eng. Plant and VO Body Shop (Ford Motor Company Philippines, Inc.) : July 2009 – July 2011
 Responsible for the overall wellness of Engines, Cylinder Head, Body Weld production for domestic and export markets
 Responsible for the overall operation of the engine plant and body shop
 Manager/QMR - VO Mfg Quality and Lean Manufacturing (Ford Motor Company Philippines, Inc.) ; Jul 2008– July 2009
 Manages the overall quality requirements of the Plant
 Leads the team in ensuring that all market requirements are met on the right time with the right quality.
 Leads overall plant Lean Manufacturing and FPS implementation
 Manager – VO Trim Chassis Final Area (Ford Motor Company Philippines, Inc.) ; July 2007 – July 2008
 In Charge of the Overall management and strategic planning for TCF assembly operations.
 Supervisor - VO -Trim Chassis Final (Ford Motor Company Philippines, Inc.) : May 2005 – Feb 2007
 Responsible for the overall wellness of production domestic and export products
 Handles SQDCME, FPS for Shop floor programs of the company
 Manufacturing Engineer – VO Manufacturing Engineering (Ford Motor Company Philippines., Inc.) ; June 2000 – May 2005
 Responsible for the launch of products and numerous process and system improvements on the production line
 Launch of new products ( Ford Escape / Mazda Tribute / Ford Ranger / Focus )
 Team Leader - VO – Trim Chassis Final (Ford Motor Company Philippines, Inc.) : Feb 1999 – June 2000
 Overall in charge in managing a work group operations in Vehicle Assembly
 Foreman - Car Assembly (Nissan Motor Philippines, Inc.) : Feb 1998 – June 1999
 Overall in charge in managing a work group operations in Vehicle Assembly
 Leads the Team to Kaizen and Genba / Hoshin Kanri Manufacturing Operations and Activities/deliverables
 Quality Engineer (Nissan Motor Company Philippines, Inc.) ; Mar 14, 1994 – Feb 1999
 Responsible for the Numerous Quality Process and System improvements on the production line
 Launch Support to New Products (Nissan Sentra S3, Cefiro)
 Product Support Group – Quality Assurance/Engineering
SKILLS:
 Total Productivity Management Operational Excellence
 Project Management Implementation and its Process Discipline (Business Case/Feasibility/Costing/Analytics)
 Vessel/Ship Construction, Manufacturing
 Vehicle Launch with Multiple Knowledge in Manufacturing Processes
 Quality and QMS Development : QMR, 6Sigma Greenbelt, QOS, Microsoft Applications
 Lean Manufacturing Lead/SME for Manufacturing Engineering, VSM, Cost Reduction, TPM (Total Productivity Management)
ACADEMIC BACKGROUND:
 Bachelor of Science in Mechanical Engineering (BSME)
Saint Louis University, Baguio City, Graduated March, 1993
DESIRED SALARY AND AVAILABILITY:
 TBD
 Availability : TBD
REFERENCES: Available upon request
OTHER INFORMATION:
 DOB : May 16, 1971
 Married
 Two Children
 Passport No.: EB744xxxx
 Philippines Driver’s License No.: N04-94-29xxxx
 Thailand Driver’s License No.: 5700xxxx
I hereby attest that the information indicated in this document are true and correct to the best of my knowledge.
Romualdo O. Pedro
Available Upon Request:
SSS No., BIR-TIN, PAG-IBIG ID No., PhilHealth No.

Contenu connexe

Tendances

Tendances (20)

final report 1
final report 1final report 1
final report 1
 
Challenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsChallenges in Automotive Quality Standards
Challenges in Automotive Quality Standards
 
MS CV New v2
MS CV New v2MS CV New v2
MS CV New v2
 
Resume 18- June-16 Operational excellence
Resume 18- June-16 Operational excellence Resume 18- June-16 Operational excellence
Resume 18- June-16 Operational excellence
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
Abhishek Kumar
Abhishek KumarAbhishek Kumar
Abhishek Kumar
 
Gauravcv
GauravcvGauravcv
Gauravcv
 
Oracle-NAIO: A CMMI based Process Improvement
Oracle-NAIO: A CMMI based Process ImprovementOracle-NAIO: A CMMI based Process Improvement
Oracle-NAIO: A CMMI based Process Improvement
 
Mallappa Beleri Resume
Mallappa Beleri ResumeMallappa Beleri Resume
Mallappa Beleri Resume
 
Cv ajay
Cv   ajayCv   ajay
Cv ajay
 
S Saravana Kumar Resume 2020 INDIA
S Saravana Kumar Resume 2020 INDIAS Saravana Kumar Resume 2020 INDIA
S Saravana Kumar Resume 2020 INDIA
 
David Boland Oct 15 2016
David Boland Oct 15 2016David Boland Oct 15 2016
David Boland Oct 15 2016
 
Rajeev jindal mm_sd_ewm
Rajeev jindal mm_sd_ewmRajeev jindal mm_sd_ewm
Rajeev jindal mm_sd_ewm
 
Nandan_1_ (3)
Nandan_1_ (3)Nandan_1_ (3)
Nandan_1_ (3)
 
Madhusudhan
MadhusudhanMadhusudhan
Madhusudhan
 
Vinay 2016
Vinay  2016Vinay  2016
Vinay 2016
 
Resume_Arun_Kothari_29_November_2015
Resume_Arun_Kothari_29_November_2015Resume_Arun_Kothari_29_November_2015
Resume_Arun_Kothari_29_November_2015
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
CV Sanjay Joshi 2016
CV Sanjay Joshi 2016CV Sanjay Joshi 2016
CV Sanjay Joshi 2016
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 

En vedette (19)

REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016
 
CRISLY C. Resume
CRISLY C. ResumeCRISLY C. Resume
CRISLY C. Resume
 
Mark
MarkMark
Mark
 
Hycinth Homeres CV
Hycinth Homeres CVHycinth Homeres CV
Hycinth Homeres CV
 
Resume_ALEX DGF
Resume_ALEX DGFResume_ALEX DGF
Resume_ALEX DGF
 
MERCEDES CONSTANTINO RESUME
MERCEDES CONSTANTINO RESUMEMERCEDES CONSTANTINO RESUME
MERCEDES CONSTANTINO RESUME
 
Daisy Bell Vosotros' CV
Daisy Bell Vosotros' CVDaisy Bell Vosotros' CV
Daisy Bell Vosotros' CV
 
JohnRaymondCifra
JohnRaymondCifraJohnRaymondCifra
JohnRaymondCifra
 
NyphoPareno-FPGA Engineer
NyphoPareno-FPGA EngineerNyphoPareno-FPGA Engineer
NyphoPareno-FPGA Engineer
 
Cynthia Ondillo_CV_September 2015
Cynthia Ondillo_CV_September 2015Cynthia Ondillo_CV_September 2015
Cynthia Ondillo_CV_September 2015
 
CV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QCCV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QC
 
Engr Ronnie Austria CV
Engr Ronnie Austria CVEngr Ronnie Austria CV
Engr Ronnie Austria CV
 
Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
CV
CVCV
CV
 
Resume - Pdf
Resume - PdfResume - Pdf
Resume - Pdf
 
ericgtrz local updated nov11
ericgtrz local updated nov11ericgtrz local updated nov11
ericgtrz local updated nov11
 
CVs Honey Lou Dela Cerna Conag
CVs Honey Lou Dela Cerna ConagCVs Honey Lou Dela Cerna Conag
CVs Honey Lou Dela Cerna Conag
 
Civitano_resume_2017
Civitano_resume_2017Civitano_resume_2017
Civitano_resume_2017
 

Similaire à ROPedro_resume_2016_r01

Similaire à ROPedro_resume_2016_r01 (20)

Taehyun Kim RESUME(D-1)
Taehyun Kim RESUME(D-1)Taehyun Kim RESUME(D-1)
Taehyun Kim RESUME(D-1)
 
SBC 16 L Kach Dec14
SBC 16 L Kach Dec14SBC 16 L Kach Dec14
SBC 16 L Kach Dec14
 
Pradeep Resume
Pradeep ResumePradeep Resume
Pradeep Resume
 
suleyman_pasay_cv_rev2
suleyman_pasay_cv_rev2suleyman_pasay_cv_rev2
suleyman_pasay_cv_rev2
 
GM-Automotive
GM-AutomotiveGM-Automotive
GM-Automotive
 
Resume
ResumeResume
Resume
 
CV-Abhishek
CV-AbhishekCV-Abhishek
CV-Abhishek
 
resume1506
resume1506resume1506
resume1506
 
Alex Przebienda Resume
Alex Przebienda ResumeAlex Przebienda Resume
Alex Przebienda Resume
 
CV-Aziz FEB-16
CV-Aziz FEB-16CV-Aziz FEB-16
CV-Aziz FEB-16
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
 
Numan Noor
Numan NoorNuman Noor
Numan Noor
 
Jeerapan fox cv assembly engineer
Jeerapan fox cv   assembly engineerJeerapan fox cv   assembly engineer
Jeerapan fox cv assembly engineer
 
updated Resume
updated Resumeupdated Resume
updated Resume
 
Senthil prabhu vp.
Senthil prabhu vp.Senthil prabhu vp.
Senthil prabhu vp.
 
Cv arg
Cv argCv arg
Cv arg
 
John_Nader CV Mechanical engineer1 (1)
John_Nader CV Mechanical engineer1 (1)John_Nader CV Mechanical engineer1 (1)
John_Nader CV Mechanical engineer1 (1)
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
Atish new
Atish newAtish new
Atish new
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 

ROPedro_resume_2016_r01

  • 1. PERSONAL SUMMARY: An Experienced Manufacturing/Projects/Quality Assurance Manager in the automotive and ship building/construction industries with skills on Programs/Project/Launch Management, Manufacturing Engineering, High & Low Volume Manufacturing/Production, Project Costing, Quality Assurance/Control, Business Case & Feasibility Studies process disciplines. A certified 6Sigma Greenbelt, VSM – Value Stream Mapping SME, Lean Manufacturing Lead/SME, QMR (Quality Management Representative) and a TPM (Total Productivity Management) Practitioner. KEY ACCOMPLISHMENTS: General Manufacturing:  TPM / Administration and Logistics Division Manager (Twinpack Container Corporation) January 4, 2016 to Present  TPM ( Total Productivity Management ) Operational Excellence Implementation  Operations Audit on Total Manufacturing Processes  Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations  Executive Assistant to the President and TPM Operational Excellence Head/Lead (Twinpack Container Corporation) October 7, 2015 to January 4, 2016  TPM ( Total Productivity Management ) Operational Excellence Implementation  Operations Audit on Total Manufacturing Processes Ship Industry:  Programs and Quality – Programs, Project and Quality Assurance (Austal Philippines PTY. LTD.) June 2, 2014 – March 26, 2015 (Project Management and Quality –Ship Construction and QMS)  Manage the New vessel/ships with the Project Management Process (PMP)  Business case and Feasibility studies for incoming and new projects  Project Costing Estimates for All Current, On-going and Future Projects  Sales Process Gate reviews for in-coming goods and products  Quality Assurance – Inspection and Warranty Operations through QOS DQM  QMS development to meet ISO 9001 version 2008 certification  Leadership Team member reporting to the President and General Manager Automotive Industry:  Vehicle Launch – Manufacturing Body Shop Organization (Ford Motor Company Thailand, LTD.) April 1, 2013 – May 15, 2014 (Manufacturing Body Shop Launch – Build Phases Deliverables to Scheduled timeline)  Manage the New Product Launch consistent with the Launch Quality Operating System (LQOS)  Launch and Deliver 3 models in a given timeline for ASEAN and Asia Pacific Markets (ECO Sport, Fiesta, Focus)  2nd Shift Launch for FTM ( Ford Thailand Manufacturing )  8% Efficiency and 8% Cost Per Unit Calculations for Body Shop World Class Targets for 2013-14.  Vehicle Operations – Manufacturing Paint Shop and Body Shop Organization (Ford Motor Company Philippines, Inc.) July 2012 – February 28, 2013 (Manufacturing Operations Improvement cost 53.67% and 3.32% respectively)  Manpower set-up and training to support its SQDCPME,FPS-Lean Manufacturing Process  Overall Management and Strategic Planning for Paint Shop and Body Shop Operations  Vehicle Operations – Manufacturing Quality Organization (Ford Motor Company Philippines. Inc.) July 2011 – June 2012 (Manufacturing Operations Improvement on Cost 38.94% and Customer Satisfaction 8%)  Manpower set-up and Training to Global Quality Process and External PDI Operations  Quality Management Representative for ISO 9001 (Asia Pacific Africa certification)  Overall Management and Strategic Planning for Quality and Lean Manufacturing Operations  Best in Class Products Achievement (Mazda3, Focus FMCP lowest TGW a high Customer Sat.)  Power Train Organization (Engine Plant) Manufacturing and Body Shop Operations (Ford Motor Company Philippines. Inc.) July 2009 – July 2011 (Manufacturing Operations Improvement of 20% and 12.49% respectively)  Total Plant Overall Management & Strategic Planning for Engine, Machining & Body Shop Operations (Manpower, Material, etc.)  Productivity improvement to fully utilize resources to build Engine, Cylinder Heads from knock down parts to finished product.  Ford Production System (FPS) set up focusing on SQDCME deliverables achieving its highest metrics (EP & Body Shop)  President's Awards Model Employee (2010)  Vehicle Operations – Manufacturing Quality and Lean Manufacturing Organization Set Up (Ford Motor Company Philippines. Inc.) July 2008 – July 2009 (Manufacturing Operations Improvement on Cost 3%, $47/u and Plant FPS at 6.1 level)  Manpower set-up and training to introduce Regional Quality process  Quality Management Representative for ISO 9001  Lean Manufacturing Management through Ford Production System Implementation  Overall Management and Strategic Planning for Quality Assurance and Lean Manufacturing Operations  Vehicle Operations - Trim Chassis Final Organization Set Up (Ford Motor Company Philippines, Inc.) July 2007 – July 2008 (Manufacturing Operations Improvement on Cost 10.87%)  Management of Vehicle Operations – TCF to its Ford Production Systems and related processes deliverables. B3 L3 (20B), Phase2, Kansas Street, Greenland Newtown Executive. Village, Ampid, San Mateo, Rizal, Philippines CCellphone No. +63 (0)927-722-5755 Home Phone No. +63 (2) 212-2134 dongpedro2@yahoo.com, dongpedro2@gmail.com Romualdo Orine Pedro
  • 2.  Officer in Charge – Vehicle Operations TCF (Ford Motor Company Philippines, Inc.) July 2006 – July 2007  Overall Management and Strategic Planning for Trim Chassis Final Assembly Operations  Vehicle Operations 2nd Shift Organization set up and supervision (Ford Motor Company Philippines, Inc.) May 2005 – Feb 2006  Manpower selection and training to double the production output.  Supervision of Vehicle Assembly Manufacturing Operations on shift production.  Vehicle Operations - Manufacturing Engineering (Ford Motor Company Philippines, Inc.) June 2001 – May 2005  Lead, Facilities, Tooling & Equip Set Up: Ford Ranger for Philippines & transfer to Thailand. Ford Escape/Mazda Tribute for ASEAN  Equipment upgrade to improve the process and support the volume ramp-up  Six Sigma – Greenbelt Certified  Vehicle Operations Plant Launch Preparations and Set up - TCF (Ford Motor Company Philippines, Inc.) Feb. 1, 1999–June 2001  Manpower selection , training and vehicle assembly supervision to support the new organization and its launch  Production Process set up from Knock down parts to finished product focusing on 4M's  Ford Production System (FPS) set up focusing on Safety, Quality, Delivery, Cost, Morale, and Environment deliverables KEY POSITIONS:  TPM / Administration and Logistics Division Manager – Twinpack Container Corporation –January4, 2016 to Present  TPM ( Total Productivity Management ) Operational Excellence Implementation  Operations Audit on Total Manufacturing Processes  Leads and manages Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations  Executive Assistant to the President – Twinpack Container Corporation – October 7, 2015 – January 4, 2016  Operational Excellence Implementation through TPM (Total Productivity Management)  Programs Manager – Programs (Austal Philippines Pty Ltd.) – January 5, 2015 –March 26,2015  Programs – Responsible for the development of New Projects and its Contract, Feasibility study, Project Costing of new & incoming projects to convert into a business case for a possible project to meet and contribute to the profitability and growth of the company.  Programs and Quality Manager – Programs and Quality Organization (Austal Philippines Pty Ltd.) : June 2, 2014 – March 26,2015  Programs – Responsible for Project Mgt Process to Build/Launch New Vessels & associated goods to meet its contracted timeline  Quality Assurance – Responsible for QMS, Inspection, Warranty and Client  Team Manager - Vehicle Launch –Manufacturing Body Shop Organization (Ford Motor Company Thailand, Ltd.): Apr. 1, 2013–May 15, 2014  Vehicle Operations for Manufacturing Body Shop Launch Activities – Build Phases Deliverables to Scheduled timeline  Manage the new product launch consistent with the Launch Quality Operating System (LQOS)  Manager – VO Mfg Paint Shop and Body Shop (Ford Motor Company Philippines, Inc.): June 2012 – Feb. 28, 2013  Responsible for the overall SQDCPME programs at Paint Shop and Body Shop Areas  Overall Management and Strategic Planning for Painting and Welding Processes Operations  Chairman – BOD, Ford Philippines Employees' Cooperative ( Ford in the Philippines ) ; June 2012 – Feb. 28, 2013  Overall Lead and Strategic Planning for FPEC Operations  Manager/QMR – VO Mfg Quality (Ford Motor Company Philippines, Inc.) : July 2011 – June 2012  Responsible for Mfg Quality Operations and Philippines' Representative to APA for Quality  Responsible for the overall operation of Quality to meet customers' expectations for domestic and export markets  Responsible for ISO 9001 / 14001 Certification  Manager – PTO Eng. Plant and VO Body Shop (Ford Motor Company Philippines, Inc.) : July 2009 – July 2011  Responsible for the overall wellness of Engines, Cylinder Head, Body Weld production for domestic and export markets  Responsible for the overall operation of the engine plant and body shop  Manager/QMR - VO Mfg Quality and Lean Manufacturing (Ford Motor Company Philippines, Inc.) ; Jul 2008– July 2009  Manages the overall quality requirements of the Plant  Leads the team in ensuring that all market requirements are met on the right time with the right quality.  Leads overall plant Lean Manufacturing and FPS implementation  Manager – VO Trim Chassis Final Area (Ford Motor Company Philippines, Inc.) ; July 2007 – July 2008  In Charge of the Overall management and strategic planning for TCF assembly operations.  Supervisor - VO -Trim Chassis Final (Ford Motor Company Philippines, Inc.) : May 2005 – Feb 2007  Responsible for the overall wellness of production domestic and export products  Handles SQDCME, FPS for Shop floor programs of the company  Manufacturing Engineer – VO Manufacturing Engineering (Ford Motor Company Philippines., Inc.) ; June 2000 – May 2005  Responsible for the launch of products and numerous process and system improvements on the production line  Launch of new products ( Ford Escape / Mazda Tribute / Ford Ranger / Focus )  Team Leader - VO – Trim Chassis Final (Ford Motor Company Philippines, Inc.) : Feb 1999 – June 2000  Overall in charge in managing a work group operations in Vehicle Assembly  Foreman - Car Assembly (Nissan Motor Philippines, Inc.) : Feb 1998 – June 1999  Overall in charge in managing a work group operations in Vehicle Assembly  Leads the Team to Kaizen and Genba / Hoshin Kanri Manufacturing Operations and Activities/deliverables  Quality Engineer (Nissan Motor Company Philippines, Inc.) ; Mar 14, 1994 – Feb 1999  Responsible for the Numerous Quality Process and System improvements on the production line  Launch Support to New Products (Nissan Sentra S3, Cefiro)  Product Support Group – Quality Assurance/Engineering SKILLS:  Total Productivity Management Operational Excellence  Project Management Implementation and its Process Discipline (Business Case/Feasibility/Costing/Analytics)  Vessel/Ship Construction, Manufacturing  Vehicle Launch with Multiple Knowledge in Manufacturing Processes  Quality and QMS Development : QMR, 6Sigma Greenbelt, QOS, Microsoft Applications  Lean Manufacturing Lead/SME for Manufacturing Engineering, VSM, Cost Reduction, TPM (Total Productivity Management)
  • 3. ACADEMIC BACKGROUND:  Bachelor of Science in Mechanical Engineering (BSME) Saint Louis University, Baguio City, Graduated March, 1993 DESIRED SALARY AND AVAILABILITY:  TBD  Availability : TBD REFERENCES: Available upon request OTHER INFORMATION:  DOB : May 16, 1971  Married  Two Children  Passport No.: EB744xxxx  Philippines Driver’s License No.: N04-94-29xxxx  Thailand Driver’s License No.: 5700xxxx I hereby attest that the information indicated in this document are true and correct to the best of my knowledge. Romualdo O. Pedro Available Upon Request: SSS No., BIR-TIN, PAG-IBIG ID No., PhilHealth No.