1. PERSONAL SUMMARY:
An Experienced Manufacturing/Projects/Quality Assurance Manager in the automotive and ship building/construction industries with skills on
Programs/Project/Launch Management, Manufacturing Engineering, High & Low Volume Manufacturing/Production, Project Costing, Quality
Assurance/Control, Business Case & Feasibility Studies process disciplines. A certified 6Sigma Greenbelt, VSM – Value Stream Mapping SME, Lean
Manufacturing Lead/SME, QMR (Quality Management Representative) and a TPM (Total Productivity Management) Practitioner.
KEY ACCOMPLISHMENTS:
General Manufacturing:
TPM / Administration and Logistics Division Manager (Twinpack Container Corporation)
January 4, 2016 to Present
TPM ( Total Productivity Management ) Operational Excellence Implementation
Operations Audit on Total Manufacturing Processes
Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations
Executive Assistant to the President and TPM Operational Excellence Head/Lead (Twinpack Container Corporation)
October 7, 2015 to January 4, 2016
TPM ( Total Productivity Management ) Operational Excellence Implementation
Operations Audit on Total Manufacturing Processes
Ship Industry:
Programs and Quality – Programs, Project and Quality Assurance (Austal Philippines PTY. LTD.)
June 2, 2014 – March 26, 2015 (Project Management and Quality –Ship Construction and QMS)
Manage the New vessel/ships with the Project Management Process (PMP)
Business case and Feasibility studies for incoming and new projects
Project Costing Estimates for All Current, On-going and Future Projects
Sales Process Gate reviews for in-coming goods and products
Quality Assurance – Inspection and Warranty Operations through QOS DQM
QMS development to meet ISO 9001 version 2008 certification
Leadership Team member reporting to the President and General Manager
Automotive Industry:
Vehicle Launch – Manufacturing Body Shop Organization (Ford Motor Company Thailand, LTD.)
April 1, 2013 – May 15, 2014 (Manufacturing Body Shop Launch – Build Phases Deliverables to Scheduled timeline)
Manage the New Product Launch consistent with the Launch Quality Operating System (LQOS)
Launch and Deliver 3 models in a given timeline for ASEAN and Asia Pacific Markets (ECO Sport, Fiesta, Focus)
2nd
Shift Launch for FTM ( Ford Thailand Manufacturing )
8% Efficiency and 8% Cost Per Unit Calculations for Body Shop World Class Targets for 2013-14.
Vehicle Operations – Manufacturing Paint Shop and Body Shop Organization (Ford Motor Company Philippines, Inc.)
July 2012 – February 28, 2013 (Manufacturing Operations Improvement cost 53.67% and 3.32% respectively)
Manpower set-up and training to support its SQDCPME,FPS-Lean Manufacturing Process
Overall Management and Strategic Planning for Paint Shop and Body Shop Operations
Vehicle Operations – Manufacturing Quality Organization (Ford Motor Company Philippines. Inc.)
July 2011 – June 2012 (Manufacturing Operations Improvement on Cost 38.94% and Customer Satisfaction 8%)
Manpower set-up and Training to Global Quality Process and External PDI Operations
Quality Management Representative for ISO 9001 (Asia Pacific Africa certification)
Overall Management and Strategic Planning for Quality and Lean Manufacturing Operations
Best in Class Products Achievement (Mazda3, Focus FMCP lowest TGW a high Customer Sat.)
Power Train Organization (Engine Plant) Manufacturing and Body Shop Operations (Ford Motor Company Philippines. Inc.)
July 2009 – July 2011 (Manufacturing Operations Improvement of 20% and 12.49% respectively)
Total Plant Overall Management & Strategic Planning for Engine, Machining & Body Shop Operations (Manpower, Material, etc.)
Productivity improvement to fully utilize resources to build Engine, Cylinder Heads from knock down parts to finished product.
Ford Production System (FPS) set up focusing on SQDCME deliverables achieving its highest metrics (EP & Body Shop)
President's Awards Model Employee (2010)
Vehicle Operations – Manufacturing Quality and Lean Manufacturing Organization Set Up (Ford Motor Company Philippines. Inc.)
July 2008 – July 2009 (Manufacturing Operations Improvement on Cost 3%, $47/u and Plant FPS at 6.1 level)
Manpower set-up and training to introduce Regional Quality process
Quality Management Representative for ISO 9001
Lean Manufacturing Management through Ford Production System Implementation
Overall Management and Strategic Planning for Quality Assurance and Lean Manufacturing Operations
Vehicle Operations - Trim Chassis Final Organization Set Up (Ford Motor Company Philippines, Inc.)
July 2007 – July 2008 (Manufacturing Operations Improvement on Cost 10.87%)
Management of Vehicle Operations – TCF to its Ford Production Systems and related processes deliverables.
B3 L3 (20B), Phase2, Kansas Street, Greenland Newtown Executive. Village, Ampid, San Mateo, Rizal, Philippines
CCellphone No. +63 (0)927-722-5755 Home Phone No. +63 (2) 212-2134
dongpedro2@yahoo.com, dongpedro2@gmail.com
Romualdo Orine Pedro
2. Officer in Charge – Vehicle Operations TCF (Ford Motor Company Philippines, Inc.)
July 2006 – July 2007
Overall Management and Strategic Planning for Trim Chassis Final Assembly Operations
Vehicle Operations 2nd
Shift Organization set up and supervision (Ford Motor Company Philippines, Inc.)
May 2005 – Feb 2006
Manpower selection and training to double the production output.
Supervision of Vehicle Assembly Manufacturing Operations on shift production.
Vehicle Operations - Manufacturing Engineering (Ford Motor Company Philippines, Inc.)
June 2001 – May 2005
Lead, Facilities, Tooling & Equip Set Up: Ford Ranger for Philippines & transfer to Thailand. Ford Escape/Mazda Tribute for ASEAN
Equipment upgrade to improve the process and support the volume ramp-up
Six Sigma – Greenbelt Certified
Vehicle Operations Plant Launch Preparations and Set up - TCF (Ford Motor Company Philippines, Inc.) Feb. 1, 1999–June 2001
Manpower selection , training and vehicle assembly supervision to support the new organization and its launch
Production Process set up from Knock down parts to finished product focusing on 4M's
Ford Production System (FPS) set up focusing on Safety, Quality, Delivery, Cost, Morale, and Environment deliverables
KEY POSITIONS:
TPM / Administration and Logistics Division Manager – Twinpack Container Corporation –January4, 2016 to Present
TPM ( Total Productivity Management ) Operational Excellence Implementation
Operations Audit on Total Manufacturing Processes
Leads and manages Administration and Logistics for HRD, Purchasing, Shipping/Delivery and IT Operations
Executive Assistant to the President – Twinpack Container Corporation – October 7, 2015 – January 4, 2016
Operational Excellence Implementation through TPM (Total Productivity Management)
Programs Manager – Programs (Austal Philippines Pty Ltd.) – January 5, 2015 –March 26,2015
Programs – Responsible for the development of New Projects and its Contract, Feasibility study, Project Costing of new & incoming
projects to convert into a business case for a possible project to meet and contribute to the profitability and growth of the company.
Programs and Quality Manager – Programs and Quality Organization (Austal Philippines Pty Ltd.) : June 2, 2014 – March 26,2015
Programs – Responsible for Project Mgt Process to Build/Launch New Vessels & associated goods to meet its contracted timeline
Quality Assurance – Responsible for QMS, Inspection, Warranty and Client
Team Manager - Vehicle Launch –Manufacturing Body Shop Organization (Ford Motor Company Thailand, Ltd.): Apr. 1, 2013–May 15, 2014
Vehicle Operations for Manufacturing Body Shop Launch Activities – Build Phases Deliverables to Scheduled timeline
Manage the new product launch consistent with the Launch Quality Operating System (LQOS)
Manager – VO Mfg Paint Shop and Body Shop (Ford Motor Company Philippines, Inc.): June 2012 – Feb. 28, 2013
Responsible for the overall SQDCPME programs at Paint Shop and Body Shop Areas
Overall Management and Strategic Planning for Painting and Welding Processes Operations
Chairman – BOD, Ford Philippines Employees' Cooperative ( Ford in the Philippines ) ; June 2012 – Feb. 28, 2013
Overall Lead and Strategic Planning for FPEC Operations
Manager/QMR – VO Mfg Quality (Ford Motor Company Philippines, Inc.) : July 2011 – June 2012
Responsible for Mfg Quality Operations and Philippines' Representative to APA for Quality
Responsible for the overall operation of Quality to meet customers' expectations for domestic and export markets
Responsible for ISO 9001 / 14001 Certification
Manager – PTO Eng. Plant and VO Body Shop (Ford Motor Company Philippines, Inc.) : July 2009 – July 2011
Responsible for the overall wellness of Engines, Cylinder Head, Body Weld production for domestic and export markets
Responsible for the overall operation of the engine plant and body shop
Manager/QMR - VO Mfg Quality and Lean Manufacturing (Ford Motor Company Philippines, Inc.) ; Jul 2008– July 2009
Manages the overall quality requirements of the Plant
Leads the team in ensuring that all market requirements are met on the right time with the right quality.
Leads overall plant Lean Manufacturing and FPS implementation
Manager – VO Trim Chassis Final Area (Ford Motor Company Philippines, Inc.) ; July 2007 – July 2008
In Charge of the Overall management and strategic planning for TCF assembly operations.
Supervisor - VO -Trim Chassis Final (Ford Motor Company Philippines, Inc.) : May 2005 – Feb 2007
Responsible for the overall wellness of production domestic and export products
Handles SQDCME, FPS for Shop floor programs of the company
Manufacturing Engineer – VO Manufacturing Engineering (Ford Motor Company Philippines., Inc.) ; June 2000 – May 2005
Responsible for the launch of products and numerous process and system improvements on the production line
Launch of new products ( Ford Escape / Mazda Tribute / Ford Ranger / Focus )
Team Leader - VO – Trim Chassis Final (Ford Motor Company Philippines, Inc.) : Feb 1999 – June 2000
Overall in charge in managing a work group operations in Vehicle Assembly
Foreman - Car Assembly (Nissan Motor Philippines, Inc.) : Feb 1998 – June 1999
Overall in charge in managing a work group operations in Vehicle Assembly
Leads the Team to Kaizen and Genba / Hoshin Kanri Manufacturing Operations and Activities/deliverables
Quality Engineer (Nissan Motor Company Philippines, Inc.) ; Mar 14, 1994 – Feb 1999
Responsible for the Numerous Quality Process and System improvements on the production line
Launch Support to New Products (Nissan Sentra S3, Cefiro)
Product Support Group – Quality Assurance/Engineering
SKILLS:
Total Productivity Management Operational Excellence
Project Management Implementation and its Process Discipline (Business Case/Feasibility/Costing/Analytics)
Vessel/Ship Construction, Manufacturing
Vehicle Launch with Multiple Knowledge in Manufacturing Processes
Quality and QMS Development : QMR, 6Sigma Greenbelt, QOS, Microsoft Applications
Lean Manufacturing Lead/SME for Manufacturing Engineering, VSM, Cost Reduction, TPM (Total Productivity Management)
3. ACADEMIC BACKGROUND:
Bachelor of Science in Mechanical Engineering (BSME)
Saint Louis University, Baguio City, Graduated March, 1993
DESIRED SALARY AND AVAILABILITY:
TBD
Availability : TBD
REFERENCES: Available upon request
OTHER INFORMATION:
DOB : May 16, 1971
Married
Two Children
Passport No.: EB744xxxx
Philippines Driver’s License No.: N04-94-29xxxx
Thailand Driver’s License No.: 5700xxxx
I hereby attest that the information indicated in this document are true and correct to the best of my knowledge.
Romualdo O. Pedro
Available Upon Request:
SSS No., BIR-TIN, PAG-IBIG ID No., PhilHealth No.