1. Sculpture Making Risk Assessment
2010
Persons Affected A=Amar B=Ryan C=Marie D=Irbaaz
Risk Level: 1(No Problem) – 10 (Severe)
Hazard Those Risk Level Control Measure
affected
Sculpture ABCD 7 • Make sure the statue is
falls of near the middle of the
table table.
Cut our ABCD 8 • Where safety gloves
self on the • Have a first aid kit near
plastic by.
Burnt by a ABD 6 • Were gloves and a
glue gun jumper
Drop 6 • Make sure the
Equipment equipment is in the
on the middle of the table.
floor and • Put the equipment back
break it from were you got it
from.
Drop ABCD 7 • Have a first kit near by
equipment • Where proper shoes
on some • Put the equipment back
ones foot from where you got it
from.
Spill paint 8 • Cover it up with more
on the paint.
statue • Put the paint in a
different area.
Run out of ABCD 4 • Always make sure we
equipment have enough equipment.
• Don’t make the
sculpture to big.
Something ABCD 7 • Wheat safety goggles
goes in
your eyes