2016 Measure B Program
Areas
2016 Measure B Programwide Topics
2
Program Areas
3
2016 Measure B Program Areas
4
Program Category Amount (in 2017 Dollars)
BART Phase II $1.5 Billion
Bicycle/Pedestrian $250 Million
Caltrain Corridor Capacity Improvements $314 Million
Caltrain Grade Separation $700 Million
County Expressways $750 Million
Highway Interchange $750 Million
Local Streets and Roads $1.2 Billion
SR 85 Corridor $350 Million
Transit Operations $500 Million
Local Streets & Roads -
Program Description
• $1.2 Billion
• PCI ≤ 69: Repair & maintain street
system
• PCI ≥ 70: Congestion relief
projects
• Allocation based on population of
cities and the County of Santa
Clara’s road and expressway
lane mileage
• Maintenance of Effort requirement
• Complete Streets best practices
5
Local Streets & Roads – Proposed
Guidelines
• Determine program budget in 2-
year increments
• VTA calculates formula share
• Agencies submit annual program
of projects
• Expenditures reimbursed
• Maintenance of Effort – Baseline
of FY16 levels
6
Bicycle/Pedestrian –
Program Description
• $250 Million
• Countywide significant projects
• Priority to projects that:
◦ Connect schools, transit, &
employment centers
◦ Fill gaps in existing bike/ped network
◦ Safely cross barriers to mobility
◦ Make walking or biking a safer &
more convenient means of
transportation
• Bike/Ped educational programs
eligible
• Candidate projects listed in
Resolution Attachment A
7
Bicycle/Pedestrian – Proposed
Guidelines
• Competitive Grant Program
◦ Three categories
• Capital Projects
• Planning Projects
• Education Program
◦ 2-year cycle
• Criteria developed through TAC CIP WG
• Scoring committee comprised of BPAC
and Member Agency staff
• Complete Streets Policy
• 10% minimum non-VTA and non-2016
Measure B contribution
• Maintenance of Effort required for
Education Program
8
Highway Interchanges –
Program Description
• $750 Million
• Congestion relief
• Improved highway operations and
freeway access
• Noise abatement
• Roadway connection
overcrossings
• Advanced technology through ITS
• Candidate projects listed in
Resolution Attachment B
9
Highway Interchanges – Proposed
Guidelines
• 2-year prioritized Candidate List
◦ VTA BOD adopted Criteria
◦ Project readiness
◦ Level of local contribution
• Complete Streets Policy
• 20% minimum of non-VTA and
non-2016 Measure B contribution
• Separate Noise Abatement
Program
◦ VTA BOD adopted soundwall criteria
10
Transit Operations –
Program Description
• $500 Million
• Program Goals:
◦ Increase ridership
◦ Improve efficiency
◦ Enhance mobility services for seniors
and disabled
◦ Improve affordability for underserved
and vulnerable populations in SCCo
• Four categories per the Resolution
• Candidate projects & programs
listed in Resolution Attachment D
11
Transit Operations – Proposed
Guidelines
• 2-year allocation
• Four categories per the
Resolution
◦ Expand mobility options & fares for
most vulnerable population
◦ Enhance Frequent Core Network
◦ Improve bus stop amenities
◦ First/last mile connections
12
Caltrain Grade Separation –
Program Description
• $700 Million
• Projects in cities of:
◦ Sunnyvale
◦ Mountain View
◦ Palo Alto
• Increase safety for
◦ Drivers
◦ Bicyclists
◦ Pedestrians
• Reduce congestion at crossings
intersections
13
Caltrain Grade Separation –
Proposed Guidelines
• 2-year allocation
◦ Implementation plan
◦ Planning & Environmental activities
• Cities apply for State §190 Grade
Separation Program
• Complete Streets Policy
• 10% minimum of non-VTA non-
2016 Measure B contribution
• Discussions with cities identified
in Resolution to define
implementation plan
14
Caltrain Corridor Capacity Improvements
– Program Description
• $314 Million
• Corridor capacity improvements
and increased service in Santa
Clara County including:
◦ Increased service to Morgan Hill
and Gilroy
◦ Station improvements
◦ Level boarding
◦ Extended platforms
◦ Service enhancements
15
Caltrain Corridor Capacity Improvements
– Proposed Guidelines
• Funds for increased operations to
Morgan Hill & Gilroy distributed
annually
• Improvement projects after
completion of Peninsula Corridor
Electrification Project
16
SR 85 Corridor –
Program Description
• $350 Million
• Funds new transit and congestion
relief projects on SR 85
◦ Includes new transit lane from SR
87 in San Jose to US 101 in
Mountain View
• Funds noise abatement
• Transportation alternatives study
17
SR 85 Corridor – Proposed
Guidelines
• 2-year allocation
• Projects identified by the SR 85
Corridor Study
• Projects identified in the SR 85
Noise Abatement Study
• Complete Streets Policy
• 10% minimum non-VTA and non-
2016 Measure B contribution for
capital projects
18
County Expressways –
Program Description
• $750 Million
• Tier 1 improvements projects in
the County’s Expressway Plan
• Relieves congestion, improves
safety and increases
effectiveness of expressway
system
• Candidate projects identified on
Resolution Attachment C.
19
County Expressways – Proposed
Guidelines
• 2-year allocation
• Discussion with County to define
5-year implementation plan and
10-year capital improvements
plan
• Complete Streets Policy
• 10% minimum non-VTA and non-
2016 Measure B contribution
• Projects prioritized by SCCo
Expressway PAB adopted criteria
20
BART Phase II –
Program Description
• $1.5 Billion
• Capped at 25% of Program Tax
Revenues
• Planning, engineering,
construction, and delivery costs
• Extend BART from Berryessa in
San Jose to Santa Clara
• Station locations:
◦ Alum Rock/28th Street
◦ Downtown San Jose
◦ San Jose Diridon
◦ Santa Clara
21
BART Phase II – Proposed
Guidelines
• Allocation based on funding plan
to be developed as part of Federal
Full Funding Grant Agreement
22
Next Steps
23
Measure B Implementation Committee Work Plan
December 2016 January 2017
February-April
2017
April-May 2017 June 2017
Schedule & Work Plan Overview
TAC Workshop on Program Structures
Program Guidelines Development
Review Program Guidelines
Review Final Draft Program
Approve Final Draft Program
Submit Draft Measure B FY18/FY19
Allocation
Approve Measure B FY18/FY19
Allocation with VTA Budget

Contenu connexe

Tendances

VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual ReportSCVTA
 
Georgia Department of Transportation T-SPLOST Update
Georgia Department of Transportation T-SPLOST UpdateGeorgia Department of Transportation T-SPLOST Update
Georgia Department of Transportation T-SPLOST Updatecolumbusgachamber
 
Capital Area Metropolitan Planning Organization
Capital Area Metropolitan Planning OrganizationCapital Area Metropolitan Planning Organization
Capital Area Metropolitan Planning OrganizationPaul Schumann
 
Presentation by Hon. Rita Saffioti, MLA
Presentation by Hon. Rita Saffioti, MLAPresentation by Hon. Rita Saffioti, MLA
Presentation by Hon. Rita Saffioti, MLAGemma Osiejak
 
Using Geospatial Analysis to Update the Region's Functional Classification
Using Geospatial Analysis to Update the Region's Functional ClassificationUsing Geospatial Analysis to Update the Region's Functional Classification
Using Geospatial Analysis to Update the Region's Functional ClassificationRPO America
 
Overview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding PolicyOverview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding PolicyTristan Wiggill
 
Proposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureProposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureSCVTA
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentationSCVTA
 
Ric mpo certification_review_presentation
Ric mpo certification_review_presentationRic mpo certification_review_presentation
Ric mpo certification_review_presentationpyoungkyova
 
VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015SCVTA
 
Kyova cert review_presentation
Kyova cert review_presentationKyova cert review_presentation
Kyova cert review_presentationpyoungkyova
 
Sharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemSharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemUGPTI
 
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Fairfax County
 
Bay Area SCS
Bay Area SCSBay Area SCS
Bay Area SCScriviere
 
Special Local Road Fund
Special Local Road FundSpecial Local Road Fund
Special Local Road FundAlvin Almo
 
Iowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on InvestmentIowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on InvestmentRPO America
 

Tendances (20)

VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
 
Georgia Department of Transportation T-SPLOST Update
Georgia Department of Transportation T-SPLOST UpdateGeorgia Department of Transportation T-SPLOST Update
Georgia Department of Transportation T-SPLOST Update
 
Capital Area Metropolitan Planning Organization
Capital Area Metropolitan Planning OrganizationCapital Area Metropolitan Planning Organization
Capital Area Metropolitan Planning Organization
 
Presentation by Hon. Rita Saffioti, MLA
Presentation by Hon. Rita Saffioti, MLAPresentation by Hon. Rita Saffioti, MLA
Presentation by Hon. Rita Saffioti, MLA
 
Using Geospatial Analysis to Update the Region's Functional Classification
Using Geospatial Analysis to Update the Region's Functional ClassificationUsing Geospatial Analysis to Update the Region's Functional Classification
Using Geospatial Analysis to Update the Region's Functional Classification
 
Overview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding PolicyOverview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding Policy
 
Proposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureProposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot Measure
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
Ric mpo certification_review_presentation
Ric mpo certification_review_presentationRic mpo certification_review_presentation
Ric mpo certification_review_presentation
 
VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
Kyova cert review_presentation
Kyova cert review_presentationKyova cert review_presentation
Kyova cert review_presentation
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
 
Sharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemSharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation System
 
TeamTX Austin 2015 Presentations
TeamTX Austin 2015 PresentationsTeamTX Austin 2015 Presentations
TeamTX Austin 2015 Presentations
 
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
 
Bay Area SCS
Bay Area SCSBay Area SCS
Bay Area SCS
 
Special Local Road Fund
Special Local Road FundSpecial Local Road Fund
Special Local Road Fund
 
Iowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on InvestmentIowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on Investment
 
Norpc
NorpcNorpc
Norpc
 

En vedette

VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanSCVTA
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineSCVTA
 
VTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationVTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationSCVTA
 
VTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramVTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramSCVTA
 
VTA 2013 Sustainability Report
VTA 2013 Sustainability ReportVTA 2013 Sustainability Report
VTA 2013 Sustainability ReportSCVTA
 
The Annual Sustainability Report 2014: Building New Tomorrows!
The Annual Sustainability Report 2014: Building New Tomorrows!The Annual Sustainability Report 2014: Building New Tomorrows!
The Annual Sustainability Report 2014: Building New Tomorrows!Cognizant
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationSCVTA
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014SCVTA
 
Evaluacion ecografica del sistema nervioso fetal
Evaluacion ecografica del sistema nervioso fetalEvaluacion ecografica del sistema nervioso fetal
Evaluacion ecografica del sistema nervioso fetalJuan Carlos Vaquen
 

En vedette (10)

VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement Plan
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan Outline
 
VTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationVTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey Presentation
 
VTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramVTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits Program
 
VTA 2013 Sustainability Report
VTA 2013 Sustainability ReportVTA 2013 Sustainability Report
VTA 2013 Sustainability Report
 
The Annual Sustainability Report 2014: Building New Tomorrows!
The Annual Sustainability Report 2014: Building New Tomorrows!The Annual Sustainability Report 2014: Building New Tomorrows!
The Annual Sustainability Report 2014: Building New Tomorrows!
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 Presentation
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
Evaluacion ecografica del sistema nervioso fetal
Evaluacion ecografica del sistema nervioso fetalEvaluacion ecografica del sistema nervioso fetal
Evaluacion ecografica del sistema nervioso fetal
 
Sesion cesi 2014 nuevo
Sesion cesi 2014 nuevoSesion cesi 2014 nuevo
Sesion cesi 2014 nuevo
 

Similaire à VTA 2016 Measure B Program Areas

2040RTP Committees Final Presentation
2040RTP Committees Final Presentation2040RTP Committees Final Presentation
2040RTP Committees Final PresentationCHCRPA
 
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Fairfax County
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)AGC of California
 
Integrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesIntegrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesMobility Lab
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Futurejacorbitt
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureFulton County Government
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesJustin Otternewzman
 
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...Rail~Volution
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024California Asphalt Pavement Association
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActJill Reeves
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Fairfax County
 

Similaire à VTA 2016 Measure B Program Areas (20)

Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
2040RTP Committees Final Presentation
2040RTP Committees Final Presentation2040RTP Committees Final Presentation
2040RTP Committees Final Presentation
 
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit PresentationMiami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit Presentation
 
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
Integrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesIntegrating Community Development and Transportation Strategies
Integrating Community Development and Transportation Strategies
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding Strategies
 
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
 
Complete Streets: Costs Questions Guides Powerpoint 2
 Complete Streets: Costs Questions Guides Powerpoint 2 Complete Streets: Costs Questions Guides Powerpoint 2
Complete Streets: Costs Questions Guides Powerpoint 2
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) Act
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
 
Pavement Management Systems -- Bay Area Perspective
Pavement Management Systems -- Bay Area PerspectivePavement Management Systems -- Bay Area Perspective
Pavement Management Systems -- Bay Area Perspective
 

Plus de SCVTA

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016SCVTA
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018SCVTA
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesSCVTA
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationSCVTA
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014SCVTA
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksSCVTA
 
VTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanVTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanSCVTA
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
April 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsApril 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsSCVTA
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014SCVTA
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014SCVTA
 

Plus de SCVTA (11)

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit Choices
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon Presentation
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning Talks
 
VTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanVTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement Plan
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
April 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsApril 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boards
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
 

Dernier

World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.Christina Parmionova
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaMiteshKumar471773
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...SUHANI PANDEY
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...nehasharma67844
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptxShovan Prita Paul .
 

Dernier (20)

Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of India
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
 

VTA 2016 Measure B Program Areas

  • 1. 2016 Measure B Program Areas
  • 2. 2016 Measure B Programwide Topics 2
  • 4. 2016 Measure B Program Areas 4 Program Category Amount (in 2017 Dollars) BART Phase II $1.5 Billion Bicycle/Pedestrian $250 Million Caltrain Corridor Capacity Improvements $314 Million Caltrain Grade Separation $700 Million County Expressways $750 Million Highway Interchange $750 Million Local Streets and Roads $1.2 Billion SR 85 Corridor $350 Million Transit Operations $500 Million
  • 5. Local Streets & Roads - Program Description • $1.2 Billion • PCI ≤ 69: Repair & maintain street system • PCI ≥ 70: Congestion relief projects • Allocation based on population of cities and the County of Santa Clara’s road and expressway lane mileage • Maintenance of Effort requirement • Complete Streets best practices 5
  • 6. Local Streets & Roads – Proposed Guidelines • Determine program budget in 2- year increments • VTA calculates formula share • Agencies submit annual program of projects • Expenditures reimbursed • Maintenance of Effort – Baseline of FY16 levels 6
  • 7. Bicycle/Pedestrian – Program Description • $250 Million • Countywide significant projects • Priority to projects that: ◦ Connect schools, transit, & employment centers ◦ Fill gaps in existing bike/ped network ◦ Safely cross barriers to mobility ◦ Make walking or biking a safer & more convenient means of transportation • Bike/Ped educational programs eligible • Candidate projects listed in Resolution Attachment A 7
  • 8. Bicycle/Pedestrian – Proposed Guidelines • Competitive Grant Program ◦ Three categories • Capital Projects • Planning Projects • Education Program ◦ 2-year cycle • Criteria developed through TAC CIP WG • Scoring committee comprised of BPAC and Member Agency staff • Complete Streets Policy • 10% minimum non-VTA and non-2016 Measure B contribution • Maintenance of Effort required for Education Program 8
  • 9. Highway Interchanges – Program Description • $750 Million • Congestion relief • Improved highway operations and freeway access • Noise abatement • Roadway connection overcrossings • Advanced technology through ITS • Candidate projects listed in Resolution Attachment B 9
  • 10. Highway Interchanges – Proposed Guidelines • 2-year prioritized Candidate List ◦ VTA BOD adopted Criteria ◦ Project readiness ◦ Level of local contribution • Complete Streets Policy • 20% minimum of non-VTA and non-2016 Measure B contribution • Separate Noise Abatement Program ◦ VTA BOD adopted soundwall criteria 10
  • 11. Transit Operations – Program Description • $500 Million • Program Goals: ◦ Increase ridership ◦ Improve efficiency ◦ Enhance mobility services for seniors and disabled ◦ Improve affordability for underserved and vulnerable populations in SCCo • Four categories per the Resolution • Candidate projects & programs listed in Resolution Attachment D 11
  • 12. Transit Operations – Proposed Guidelines • 2-year allocation • Four categories per the Resolution ◦ Expand mobility options & fares for most vulnerable population ◦ Enhance Frequent Core Network ◦ Improve bus stop amenities ◦ First/last mile connections 12
  • 13. Caltrain Grade Separation – Program Description • $700 Million • Projects in cities of: ◦ Sunnyvale ◦ Mountain View ◦ Palo Alto • Increase safety for ◦ Drivers ◦ Bicyclists ◦ Pedestrians • Reduce congestion at crossings intersections 13
  • 14. Caltrain Grade Separation – Proposed Guidelines • 2-year allocation ◦ Implementation plan ◦ Planning & Environmental activities • Cities apply for State §190 Grade Separation Program • Complete Streets Policy • 10% minimum of non-VTA non- 2016 Measure B contribution • Discussions with cities identified in Resolution to define implementation plan 14
  • 15. Caltrain Corridor Capacity Improvements – Program Description • $314 Million • Corridor capacity improvements and increased service in Santa Clara County including: ◦ Increased service to Morgan Hill and Gilroy ◦ Station improvements ◦ Level boarding ◦ Extended platforms ◦ Service enhancements 15
  • 16. Caltrain Corridor Capacity Improvements – Proposed Guidelines • Funds for increased operations to Morgan Hill & Gilroy distributed annually • Improvement projects after completion of Peninsula Corridor Electrification Project 16
  • 17. SR 85 Corridor – Program Description • $350 Million • Funds new transit and congestion relief projects on SR 85 ◦ Includes new transit lane from SR 87 in San Jose to US 101 in Mountain View • Funds noise abatement • Transportation alternatives study 17
  • 18. SR 85 Corridor – Proposed Guidelines • 2-year allocation • Projects identified by the SR 85 Corridor Study • Projects identified in the SR 85 Noise Abatement Study • Complete Streets Policy • 10% minimum non-VTA and non- 2016 Measure B contribution for capital projects 18
  • 19. County Expressways – Program Description • $750 Million • Tier 1 improvements projects in the County’s Expressway Plan • Relieves congestion, improves safety and increases effectiveness of expressway system • Candidate projects identified on Resolution Attachment C. 19
  • 20. County Expressways – Proposed Guidelines • 2-year allocation • Discussion with County to define 5-year implementation plan and 10-year capital improvements plan • Complete Streets Policy • 10% minimum non-VTA and non- 2016 Measure B contribution • Projects prioritized by SCCo Expressway PAB adopted criteria 20
  • 21. BART Phase II – Program Description • $1.5 Billion • Capped at 25% of Program Tax Revenues • Planning, engineering, construction, and delivery costs • Extend BART from Berryessa in San Jose to Santa Clara • Station locations: ◦ Alum Rock/28th Street ◦ Downtown San Jose ◦ San Jose Diridon ◦ Santa Clara 21
  • 22. BART Phase II – Proposed Guidelines • Allocation based on funding plan to be developed as part of Federal Full Funding Grant Agreement 22
  • 23. Next Steps 23 Measure B Implementation Committee Work Plan December 2016 January 2017 February-April 2017 April-May 2017 June 2017 Schedule & Work Plan Overview TAC Workshop on Program Structures Program Guidelines Development Review Program Guidelines Review Final Draft Program Approve Final Draft Program Submit Draft Measure B FY18/FY19 Allocation Approve Measure B FY18/FY19 Allocation with VTA Budget