SlideShare une entreprise Scribd logo
1  sur  48
Télécharger pour lire hors ligne
VTA Next Network:
Your Transit Choices
Agenda Item #7.1
About Jarrett Walker + Assoc
• Stanford PhD, Caltrain Advocate in
the 80s.
• 22 Years Experience in Transit
Network Design.
• >50 metro areas in 9 countries.
• Author Human Transit.
• Long track record as transit
explainer. HumanTransit.org
• Successful designs in many cities
including San Antonio, Auckland,
Minneapolis, LA Suburbs
• Houston redesign implemented
August 2015
2
Outline
• Where We Are Now
• What High Ridership Transit Looks Like
• The Ridership-Coverage Tradeoff
• Options for the Summer 2017 Network (BART opening)
3
Timeline
March 2016 Choices Report Released
April 7, 2016 Alternative Network Concepts Released
April 14, 2016 Report on Alternative Concepts
May‐Aug 2016 Outreach on Alternative Concepts
Aug‐Oct 2016 Board Direction on Alternative Concepts
Dec. 2016 Recommended Draft '17 Network Released
Jan‐Feb 2017 Outreach on Draft Plan
March 2017 Final Recommended Plan Prepared
April 2017 Board Adopts Final Plan
Summer 2017 Next Network Service Begins
Fall 2017 BART Service Begins
4
Where We Are Now
5
Falling Behind Population Growth
Figure 1: Sant a Clara Count y populat ion, VTA Ridership and Revenue Hours, cumulat ive change 2000 - 2013
6
Understanding Farebox Recovery
Farebox Recovery (Fare Revenue / Operating Cost) has
three big elements
• From Cost to Service. (Operating Cost / Service Hour)
– Labor contract, management, overhead
• From Service to Ridership (Riders / Service Hour)
– Network Design, Customer Experience, Etc.
• From Ridership to Fare Revenue (Average Fare)
– Fare policy, fare enforcement, etc.
Focus of this project.
7
Why Focus on Local Bus?
Bus (Non-Express)
63%
Bus (Express)
4%
Light Rail
23%
ADA Paratransit
5%
Caltrain
2%
Special Events
1%ACE
1%
Other
1%
VTA Operating Expenses by Mode, FY15
8
The Ridership Recipe
IFyou want higher ridership, higher farebox return …
9
How Ridership Happens
• By “ridership” we always mean “productivity,” riders per
unit of service cost. This tracks with farebox recovery.
• Transit outcomes arise from “three legged stool”:
– Service
– Land Use
– Street Design
• VTA controls only one leg!
10
The Ridership Recipe
• High All-Day Frequency …
• … following patterns of ...
– Density
– Walkability
– Linearity
– Proximity
Why? Because this is how you
bring the most useful
destinations within reasonable
travel time of the most people.
11
Why Frequency Matters
Speed and reliability matter too, but frequency is the most
neglected element.
Frequency is a “cubed” benefit:
• Go when you want to go.
• Make connections easily, so that you can get to more
places.
• Less risk of being stranded by a reliability problem.
For trips <5 mi or so, frequency is the dominant element of
travel time.
12
Top performers are frequent …
Higher FREQUENCY
High PRODUCTIVITY (Riders / Op. Cost)
13
Current All-day Frequency
14
Current Ridership
15
Why All-Day Matters
• VTA ridership is not very peaked.
• VTA service is more crowded midday than peak.
• Lower income people, and people in dense urban centers,
rely mostly on all-day service.
‐‐‐1
0
0%   
‐‐‐8
0
%   
‐‐‐6
0
%   
‐‐‐4
0
%   
‐‐‐2
0
%   
0%  
20%  
40%  
60%  
80%  
100%  
12:00  
AM  
1:00  
AM  
2:00  
AM  
3:00  
AM  
4:00  
AM  
5:00  
AM  
6:00  
AM  
7:00  
AM  
8:00  
AM  
9:00  
AM  
10:00  
AM  
11:00  
AM  
12:00  
PM  
1:00  
PM  
2:00  
PM  
3:00  
PM  
4:00  
PM  
5:00  
PM  
6:00  
PM  
7:00  
PM  
8:00  
PM  
9:00  
PM  
10:00  
PM  
11:00  
PM  
Hour  compared  to  avrage  of  all  hors  
Mismatch  b
e
t we en   se
r
vice   qua
n
9ty      
a n
d  ridership  b
y
  ho ur  of   day   
Ridership  (Boardings)  
Service  Q
u
an9t y   (Bus  Tr ips)   
16
Limits of VTA Peak-Only Service
• Adding service only during rush hour creates three
added costs for VTA.
– Cost to own/store/maintain fleet that is used rarely.
– Cost of very short shifts, esp. without part time drivers.
– Costs of one-way operation: all vehicles have to come back.
17
Land Use Drivers of Ridership
• Density
• Walkability
• Linearity
• Proximity
18
Density How many people are going to and from
the area around each stop?
High
Ridership
Lower
Ridership
19
Walkability Can the people around the stop
walk to the stop?
High
Ridership
Lower
Ridership
20
Linearity
High
Ridership
Lower
Ridership
Can transit run in straight lines that are
useful to through-riders?
21
Proximity
High
Ridership
Lower
Ridership
Does transit have to cross long
low-ridership gaps?
22
But is Ridership What You Want?
The Ridership-Coverage Tradeoff
23
The Ridership-Coverage Tradeoff
• Maximizing Ridership (and farebox return) requires
thinking like a business.
• Businesses choose which markets to enter, based on
where their product can succeed.
• This is not the same as meeting people’s needs or
expectations.
24
How should a transit agency allocate its
resources?
Fictional Urban Area
Dots = residents and
jobs
You have 18 buses
25
Ridership Goal “Maximum Ridership”
Performance Measure: Productivity
Ridership relative to cost
Ridership
Network
Think like a business, choosing
which markets you will enter.
The straight lines offer density,
walkability, and an efficient transit
path, so you focus frequent,
attractive service there.
Frequency’s payoff is “cubed”
26
Coverage Goal “Some service for everyone”
Performance Measure: Availability
% of population and jobs near some service
Coverage Network
Think like a government service.
Try to serve everyone, even
those in expensive-to-serve
places.
The result is more routes
covering everyone, but less
frequency, more complexity, and
lower ridership.
27
Both goals are important,
… but they lead opposite directions!
Ridership Goal
• “Think like a business.”
• Focus where ridership
potential is highest.
• Support dense and
walkable development.
• Max. competition with cars
• Maximum VMT reduction
Coverage Goal
• “Think like a gov’t service.”
• “Access for all”
• Support suburban low-density
development.
• Lifeline access for everyone.
• Service to every member city
or electoral district.
28
So it helps to choose a point on the spectrum …
Ridership Goal Coverage Goal
Existing
System
~ 70%
ridership
About 70% of your service is where it 
would be if ridership were VTA’s only 
network design goal.
29
3 Alternative Concepts for ‘17
70% Ridership? 80%? 90%?
30
So it helps to choose a point on the spectrum …
Ridership Goal Coverage Goal
Concept
70
How much should VTA focus on 
ridership?  70%?  80%  90%?
Concept
80
Concept
90
31
All Concepts Integrate with BART
• All Fremont express lines are replaced by local
connections to BART at Milpitas and Berryessa.
• Direct service from BART to:
– Most of inner and eastside San Jose.
– San Jose Mineta Airport
– Tasman LRT corridor: Great America, Lockheed area, Mtn View
– Montague / Scott / Arques corridor: Jobsites in Santa Clara,
Sunnyvale, and Mtn View.
– North 1st LRT to northern San Jose jobsites.
– Winchester corridor: Santa Clara, Santana Row, Campbell.
– Stevens Creek corridor to Cupertino.
32
Not Shown but Still There
• VTA Express Network (100s) except lines to Fremont.
• VTA Limited (300s) except where fully replaced by new
rapid-stop service.
• Caltrain shuttles
• ACE shuttles
• FLEX service.
33
Please Learn 4 Colors
These will be used consistently throughout the project.
Rapid. Every 15 min or 
better and widely spaced 
stops.
Every 15 minutes. 
Every 30 minutes.
Every 60 minutes. 
Frequent Network
34
Concept 70 (70% Ridership, 30% Coverage)
35
Concept 80 (80% Ridership, 20% Coverage)
36
Concept 90 (90% Ridership, 10% Coverage)
37
Access to jobs …
As you move toward a higher ridership network …
• People and jobs near frequent transit go up …
• People and jobs near any transit go down.
38
Access by residents …
As you move toward a higher ridership network …
• People and jobs near frequent transit go up …
• People and jobs near any transit go down.
39
Visualizing Access
Mission College
12 noon
Existing 
Network
40
Visualizing Access
Mission College
12 noon
Concept 70
(70% ridership)
41
Visualizing Access
Mission College
12 noon
Concept 80
(80% ridership)
42
Visualizing Access
Mission College
12 noon
Concept 90
(90% ridership)
43
So How Many People Is That?
44
Cautions
• These are not proposals!
• They are illustrations of a policy choice.
• They are starting points for defining the final network.
• View these at high altitude. Not all micro details are
meaningful yet.
• Public reaction to these concepts will help you decide
where you want to be on the ridership-coverage
spectrum.
45
Outreach
46
Timeline
March 2016 Choices Report Released
April 7, 2016 Alternative Network Concepts Released
April 14, 2016 Report on Alternative Concepts
May‐Aug 2016 Outreach on Alternative Concepts
Aug‐Oct 2016 Board Direction on Alternative Concepts
Dec. 2016 Recommended Draft '17 Network Released
Jan‐Feb 2017 Outreach on Draft Plan
March 2017 Final Recommended Plan Prepared
April 2017 Board Adopts Final Plan
Summer 2017 Next Network Service Begins
Fall 2017 BART Service Begins
47
Discussion
48

Contenu connexe

Tendances

RV 2015: Pecha Kucha by Jacob Splan
RV 2015: Pecha Kucha by Jacob SplanRV 2015: Pecha Kucha by Jacob Splan
RV 2015: Pecha Kucha by Jacob Splan
Rail~Volution
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
BRTCoE
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
Trailnet
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
BRTCoE
 

Tendances (20)

BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieBRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
 
RV 2015: Pecha Kucha by Jacob Splan
RV 2015: Pecha Kucha by Jacob SplanRV 2015: Pecha Kucha by Jacob Splan
RV 2015: Pecha Kucha by Jacob Splan
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Integrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesIntegrating Community Development and Transportation Strategies
Integrating Community Development and Transportation Strategies
 
What to Know in Today's Rapidly Changing Landscape of Transportation
What to Know in Today's Rapidly Changing Landscape of TransportationWhat to Know in Today's Rapidly Changing Landscape of Transportation
What to Know in Today's Rapidly Changing Landscape of Transportation
 
FIU REAAC presentation
FIU REAAC presentationFIU REAAC presentation
FIU REAAC presentation
 
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
 
Lost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyLost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and Safety
 
Vision plan spur 11.30 presentation - hires
Vision plan   spur 11.30 presentation - hiresVision plan   spur 11.30 presentation - hires
Vision plan spur 11.30 presentation - hires
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Overview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding PolicyOverview of the RSA Roads Funding Policy
Overview of the RSA Roads Funding Policy
 
Interdepartmental Coordination
Interdepartmental CoordinationInterdepartmental Coordination
Interdepartmental Coordination
 
Growing and understanding passenger rail demand
Growing and understanding passenger rail demandGrowing and understanding passenger rail demand
Growing and understanding passenger rail demand
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
 
Pavement Management Systems: A local agency perspective
Pavement Management Systems: A local agency perspectivePavement Management Systems: A local agency perspective
Pavement Management Systems: A local agency perspective
 
AITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_ClurgAITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_Clurg
 

Similaire à VTA's Next Network: Your Transit Choices

Surrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit ProposalSurrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit Proposal
paradigm4
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
BRTCoE
 
Urban Data Challenge - Christopher A. Pangilinan
Urban Data Challenge - Christopher A. PangilinanUrban Data Challenge - Christopher A. Pangilinan
Urban Data Challenge - Christopher A. Pangilinan
swissnex San Francisco
 

Similaire à VTA's Next Network: Your Transit Choices (20)

How to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceHow to Design an On-Demand Transit Service
How to Design an On-Demand Transit Service
 
Infrastructure Investments for a Sustainable Downtown Nashville - The Circulator
Infrastructure Investments for a Sustainable Downtown Nashville - The CirculatorInfrastructure Investments for a Sustainable Downtown Nashville - The Circulator
Infrastructure Investments for a Sustainable Downtown Nashville - The Circulator
 
Moving-About-Paradise
Moving-About-ParadiseMoving-About-Paradise
Moving-About-Paradise
 
2018 San Diego Quickway Presentation
2018 San Diego Quickway Presentation2018 San Diego Quickway Presentation
2018 San Diego Quickway Presentation
 
Surrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit ProposalSurrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit Proposal
 
BRT Workshop - Intro
BRT Workshop - IntroBRT Workshop - Intro
BRT Workshop - Intro
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
 
Urban Data Challenge - Christopher A. Pangilinan
Urban Data Challenge - Christopher A. PangilinanUrban Data Challenge - Christopher A. Pangilinan
Urban Data Challenge - Christopher A. Pangilinan
 
TSR Fall Meetings Presentation
TSR Fall Meetings PresentationTSR Fall Meetings Presentation
TSR Fall Meetings Presentation
 
Caltrain_Equity_522
Caltrain_Equity_522Caltrain_Equity_522
Caltrain_Equity_522
 
Cultivating great transit related communities final
Cultivating great transit related communities finalCultivating great transit related communities final
Cultivating great transit related communities final
 
Secondary 2 : Geography : Chapter 4 : Transport
Secondary 2 : Geography : Chapter 4 : TransportSecondary 2 : Geography : Chapter 4 : Transport
Secondary 2 : Geography : Chapter 4 : Transport
 
CAP Metro Update 6/15/17
CAP Metro Update 6/15/17CAP Metro Update 6/15/17
CAP Metro Update 6/15/17
 
Full cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos MuñozFull cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos Muñoz
 
Tick mobility
Tick mobilityTick mobility
Tick mobility
 
Cnu Ne Summit Js
Cnu Ne Summit   JsCnu Ne Summit   Js
Cnu Ne Summit Js
 
Rural and Small Urban Mobility Innovations: Microtransit
Rural and Small Urban Mobility Innovations: MicrotransitRural and Small Urban Mobility Innovations: Microtransit
Rural and Small Urban Mobility Innovations: Microtransit
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Aerial Transit in San Francisco
Aerial Transit in San FranciscoAerial Transit in San Francisco
Aerial Transit in San Francisco
 
Keeping your stakeholders happy, 9 March 2017
Keeping your stakeholders happy, 9 March 2017Keeping your stakeholders happy, 9 March 2017
Keeping your stakeholders happy, 9 March 2017
 

Plus de SCVTA

VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
SCVTA
 

Plus de SCVTA (20)

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan Outline
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
 
VTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationVTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentation
 
Envision Outreach Report February 2016
Envision Outreach Report February 2016Envision Outreach Report February 2016
Envision Outreach Report February 2016
 
VTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationVTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project Evaluation
 
Funding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountyFunding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara County
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon Presentation
 
VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015
 
Current Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemCurrent Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation System
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax Measures
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning Talks
 
VTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanVTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement Plan
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
VTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramVTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits Program
 

Dernier

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Dernier (20)

Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 

VTA's Next Network: Your Transit Choices

  • 1. VTA Next Network: Your Transit Choices Agenda Item #7.1
  • 2. About Jarrett Walker + Assoc • Stanford PhD, Caltrain Advocate in the 80s. • 22 Years Experience in Transit Network Design. • >50 metro areas in 9 countries. • Author Human Transit. • Long track record as transit explainer. HumanTransit.org • Successful designs in many cities including San Antonio, Auckland, Minneapolis, LA Suburbs • Houston redesign implemented August 2015 2
  • 3. Outline • Where We Are Now • What High Ridership Transit Looks Like • The Ridership-Coverage Tradeoff • Options for the Summer 2017 Network (BART opening) 3
  • 4. Timeline March 2016 Choices Report Released April 7, 2016 Alternative Network Concepts Released April 14, 2016 Report on Alternative Concepts May‐Aug 2016 Outreach on Alternative Concepts Aug‐Oct 2016 Board Direction on Alternative Concepts Dec. 2016 Recommended Draft '17 Network Released Jan‐Feb 2017 Outreach on Draft Plan March 2017 Final Recommended Plan Prepared April 2017 Board Adopts Final Plan Summer 2017 Next Network Service Begins Fall 2017 BART Service Begins 4
  • 5. Where We Are Now 5
  • 6. Falling Behind Population Growth Figure 1: Sant a Clara Count y populat ion, VTA Ridership and Revenue Hours, cumulat ive change 2000 - 2013 6
  • 7. Understanding Farebox Recovery Farebox Recovery (Fare Revenue / Operating Cost) has three big elements • From Cost to Service. (Operating Cost / Service Hour) – Labor contract, management, overhead • From Service to Ridership (Riders / Service Hour) – Network Design, Customer Experience, Etc. • From Ridership to Fare Revenue (Average Fare) – Fare policy, fare enforcement, etc. Focus of this project. 7
  • 8. Why Focus on Local Bus? Bus (Non-Express) 63% Bus (Express) 4% Light Rail 23% ADA Paratransit 5% Caltrain 2% Special Events 1%ACE 1% Other 1% VTA Operating Expenses by Mode, FY15 8
  • 9. The Ridership Recipe IFyou want higher ridership, higher farebox return … 9
  • 10. How Ridership Happens • By “ridership” we always mean “productivity,” riders per unit of service cost. This tracks with farebox recovery. • Transit outcomes arise from “three legged stool”: – Service – Land Use – Street Design • VTA controls only one leg! 10
  • 11. The Ridership Recipe • High All-Day Frequency … • … following patterns of ... – Density – Walkability – Linearity – Proximity Why? Because this is how you bring the most useful destinations within reasonable travel time of the most people. 11
  • 12. Why Frequency Matters Speed and reliability matter too, but frequency is the most neglected element. Frequency is a “cubed” benefit: • Go when you want to go. • Make connections easily, so that you can get to more places. • Less risk of being stranded by a reliability problem. For trips <5 mi or so, frequency is the dominant element of travel time. 12
  • 13. Top performers are frequent … Higher FREQUENCY High PRODUCTIVITY (Riders / Op. Cost) 13
  • 16. Why All-Day Matters • VTA ridership is not very peaked. • VTA service is more crowded midday than peak. • Lower income people, and people in dense urban centers, rely mostly on all-day service. ‐‐‐1 0 0%    ‐‐‐8 0 %    ‐‐‐6 0 %    ‐‐‐4 0 %    ‐‐‐2 0 %    0%   20%   40%   60%   80%   100%   12:00   AM   1:00   AM   2:00   AM   3:00   AM   4:00   AM   5:00   AM   6:00   AM   7:00   AM   8:00   AM   9:00   AM   10:00   AM   11:00   AM   12:00   PM   1:00   PM   2:00   PM   3:00   PM   4:00   PM   5:00   PM   6:00   PM   7:00   PM   8:00   PM   9:00   PM   10:00   PM   11:00   PM   Hour  compared  to  avrage  of  all  hors   Mismatch  b e t we en   se r vice   qua n 9ty       a n d  ridership  b y   ho ur  of   day    Ridership  (Boardings)   Service  Q u an9t y   (Bus  Tr ips)    16
  • 17. Limits of VTA Peak-Only Service • Adding service only during rush hour creates three added costs for VTA. – Cost to own/store/maintain fleet that is used rarely. – Cost of very short shifts, esp. without part time drivers. – Costs of one-way operation: all vehicles have to come back. 17
  • 18. Land Use Drivers of Ridership • Density • Walkability • Linearity • Proximity 18
  • 19. Density How many people are going to and from the area around each stop? High Ridership Lower Ridership 19
  • 20. Walkability Can the people around the stop walk to the stop? High Ridership Lower Ridership 20
  • 21. Linearity High Ridership Lower Ridership Can transit run in straight lines that are useful to through-riders? 21
  • 22. Proximity High Ridership Lower Ridership Does transit have to cross long low-ridership gaps? 22
  • 23. But is Ridership What You Want? The Ridership-Coverage Tradeoff 23
  • 24. The Ridership-Coverage Tradeoff • Maximizing Ridership (and farebox return) requires thinking like a business. • Businesses choose which markets to enter, based on where their product can succeed. • This is not the same as meeting people’s needs or expectations. 24
  • 25. How should a transit agency allocate its resources? Fictional Urban Area Dots = residents and jobs You have 18 buses 25
  • 26. Ridership Goal “Maximum Ridership” Performance Measure: Productivity Ridership relative to cost Ridership Network Think like a business, choosing which markets you will enter. The straight lines offer density, walkability, and an efficient transit path, so you focus frequent, attractive service there. Frequency’s payoff is “cubed” 26
  • 27. Coverage Goal “Some service for everyone” Performance Measure: Availability % of population and jobs near some service Coverage Network Think like a government service. Try to serve everyone, even those in expensive-to-serve places. The result is more routes covering everyone, but less frequency, more complexity, and lower ridership. 27
  • 28. Both goals are important, … but they lead opposite directions! Ridership Goal • “Think like a business.” • Focus where ridership potential is highest. • Support dense and walkable development. • Max. competition with cars • Maximum VMT reduction Coverage Goal • “Think like a gov’t service.” • “Access for all” • Support suburban low-density development. • Lifeline access for everyone. • Service to every member city or electoral district. 28
  • 29. So it helps to choose a point on the spectrum … Ridership Goal Coverage Goal Existing System ~ 70% ridership About 70% of your service is where it  would be if ridership were VTA’s only  network design goal. 29
  • 30. 3 Alternative Concepts for ‘17 70% Ridership? 80%? 90%? 30
  • 31. So it helps to choose a point on the spectrum … Ridership Goal Coverage Goal Concept 70 How much should VTA focus on  ridership?  70%?  80%  90%? Concept 80 Concept 90 31
  • 32. All Concepts Integrate with BART • All Fremont express lines are replaced by local connections to BART at Milpitas and Berryessa. • Direct service from BART to: – Most of inner and eastside San Jose. – San Jose Mineta Airport – Tasman LRT corridor: Great America, Lockheed area, Mtn View – Montague / Scott / Arques corridor: Jobsites in Santa Clara, Sunnyvale, and Mtn View. – North 1st LRT to northern San Jose jobsites. – Winchester corridor: Santa Clara, Santana Row, Campbell. – Stevens Creek corridor to Cupertino. 32
  • 33. Not Shown but Still There • VTA Express Network (100s) except lines to Fremont. • VTA Limited (300s) except where fully replaced by new rapid-stop service. • Caltrain shuttles • ACE shuttles • FLEX service. 33
  • 34. Please Learn 4 Colors These will be used consistently throughout the project. Rapid. Every 15 min or  better and widely spaced  stops. Every 15 minutes.  Every 30 minutes. Every 60 minutes.  Frequent Network 34
  • 35. Concept 70 (70% Ridership, 30% Coverage) 35
  • 36. Concept 80 (80% Ridership, 20% Coverage) 36
  • 37. Concept 90 (90% Ridership, 10% Coverage) 37
  • 38. Access to jobs … As you move toward a higher ridership network … • People and jobs near frequent transit go up … • People and jobs near any transit go down. 38
  • 39. Access by residents … As you move toward a higher ridership network … • People and jobs near frequent transit go up … • People and jobs near any transit go down. 39
  • 44. So How Many People Is That? 44
  • 45. Cautions • These are not proposals! • They are illustrations of a policy choice. • They are starting points for defining the final network. • View these at high altitude. Not all micro details are meaningful yet. • Public reaction to these concepts will help you decide where you want to be on the ridership-coverage spectrum. 45
  • 47. Timeline March 2016 Choices Report Released April 7, 2016 Alternative Network Concepts Released April 14, 2016 Report on Alternative Concepts May‐Aug 2016 Outreach on Alternative Concepts Aug‐Oct 2016 Board Direction on Alternative Concepts Dec. 2016 Recommended Draft '17 Network Released Jan‐Feb 2017 Outreach on Draft Plan March 2017 Final Recommended Plan Prepared April 2017 Board Adopts Final Plan Summer 2017 Next Network Service Begins Fall 2017 BART Service Begins 47