Utility-Scale Solar Power on Federal Lands
U.S. Creates Clean Energy Jobs with Historic Project Permits
Overview
Some of the best solar resources in the world are located in the western United States on public land overseen by the
federal government. Federal agencies developed extensive processes to authorize use of these lands for a variety of
purposes, including recreation, grazing, mining and energy development. From initial application to final Right-of-Way
grant, the current process for a utility-scale solar project requires between three and five years to complete. In contrast,
federal agencies approved over 74,000 permits to drill for oil and gas on public lands in the last 20 years.1 New initiatives
undertaken in 2009 led to the first-ever permits for utility-scale solar projects on public lands in 2010. Today, BLM has
permitted 16 projects, which will provide nearly 6,058 megawatts of generating capacity, enough to power approximately
1.2 million homes.


The Bureau of Land Management Permitting Process
The Bureau of Land Management (BLM), within the U.S. Department of the Interior, manages 258 million acres of land in the
West. The BLM is responsible for authorizing utility-scale solar energy developments through a Right-of-Way (ROW) permit
under Title V of the Federal Land Policy and Management Act (FLPMA) of 1976.

The Right-of-Way Approval Process
Solar energy developers must complete the following process to secure a Right-of-Way permit
allowing them to develop a project on public lands:                                                       Notice of Intent

Step 1: Submit Right-of-Way grant application (0-30 days)

   • Upon submission of an application by the solar developer, BLM determines an appropriate             Scoping Process
     processing fee, which must be paid by developer prior to processing.
Step 2: Submit Plan of Development (BLM’s goal is 60 days, but may take 4-6 months)
                                                                                                             Draft EIS
   • Once payment has been received for the application fees, BLM notifies the applicant in
     writing and requests a comprehensive Plan of Development.
                                                                                                        Agency and Public
   • Applications are generally processed in the order they are received. Processing may be            Review & Comment
     delayed as BLM specialists complete required inventories or consult with other agencies.
Step 3: Conduct environmental review (24-48 months)                                                          Final EIS

   • BLM publishes Notice of Intent to prepare an Environmental Impact Statement (EIS) in the
     Federal Register.                                                                                  Record of Decision

   • A National Environmental Policy Act (NEPA) review is conducted by BLM with input from the U.S. Fish and Wildlife
     Service, state, and local authorities. The process requires months of detailed surveys and analyses of the project site
     to identify any potential impacts. Multiple public meetings are scheduled for community input. The EIS concludes
     with the issuance of a Final Environmental Impact Statement. (See the NEPA Review Process above.)

1
SEIA | www.seia.org                                                                                              May 31, 2012
Step 4: Issue Record of Decision (ROD)

   • Following the successful completion of the environmental review process, inventories, and reports, the BLM will issue
     a Record of Decision, either granting or denying the ROW application. If granted, the applicant also receives a Notice
     to Proceed (NTP), allowing the construction phase to begin.
Step 5: After a ROW grant is issued

   • ROW holders pay an annual rent to the United States Treasury based on the BLM’s solar rent formula.2

Fast-Track Projects
In mid‐2009, Secretary of the Interior Ken Salazar announced a “Fast‐Track” initiative for solar project application
demonstrating the most promise to complete the necessary environmental reviews.3 “Fast‐track” projects do not forego
environmental review requirements necessary to receive a Right‐of‐Way permit, but receive priority processing.




                                  About the Solar Energy Industries Association®
Established in 1974, the Solar Energy Industries Association is the national trade association of the U.S. solar energy
industry. Through advocacy and education, SEIA® and its 1,100 member companies are building a strong solar industry to
power America. As the voice of the industry, SEIA works to make solar a mainstream and significant energy source by
expanding markets, removing market barriers, strengthening the industry and educating the public on the benefits of solar
energy.
                                      For more information, please visit www.seia.org.




2
SEIA | www.seia.org                                                                                           May 31, 2012
1
  “Number of APDs approved by Year on Federal Lands.” 2009. U.S. Bureau of Land Management. Accessed online 26 March 2010.
http://www.blm.gov/pgdata/etc/medialib/blm/wo/MINERALS__REALTY__AND_RESOURCE_PROTECTION_/energy/oil___gas_statistics.P
ar.5146.File.dat/chart_2009_07.pdf
2
  “Solar Energy Interim Rental Policy.” 10 June 2010. U.S. Bureau of Land Management. Accessed Online 1 August 2010.
http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/national_instruction/2010/IM_2010-141.html
3
  For more information on “Fast-Track” solar projects, please visit: http://www.blm.gov/wo/st/en/prog/energy/renewable_energy/fast-
track_renewable.html




3
SEIA | www.seia.org                                                                                                  May 31, 2012

Contenu connexe

Tendances

Europe and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesEurope and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesClimate_Change_Conference
 
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDItem 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDOECD Environment
 
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014India Water Portal
 
Slide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeSlide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeKim Mitchell
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate changenihal navin
 
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryEngaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryWorld Resources Institute (WRI)
 
Second Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaSecond Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaOECD Environment
 
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalCFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalILOAHawaii
 
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018World Resources Institute (WRI)
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...AnnArborSPARK
 
City of Chico Climate Action Plan
City of Chico Climate Action PlanCity of Chico Climate Action Plan
City of Chico Climate Action PlanGreat Valley Center
 
History of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaHistory of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaAmit Prakash
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate changeNitin Nigam
 
Renewable energy country attractiveness indices
Renewable energy country attractiveness indicesRenewable energy country attractiveness indices
Renewable energy country attractiveness indicesProjetoBr
 
At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)DepEd-Bataan
 
Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries OECD Environment
 

Tendances (17)

Europe and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesEurope and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of Initiatives
 
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDItem 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
 
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
 
Slide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeSlide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering Committee
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate change
 
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryEngaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
 
Second Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaSecond Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - Georgia
 
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalCFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
 
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
 
City of Chico Climate Action Plan
City of Chico Climate Action PlanCity of Chico Climate Action Plan
City of Chico Climate Action Plan
 
History of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaHistory of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, india
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate change
 
Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020
 
Renewable energy country attractiveness indices
Renewable energy country attractiveness indicesRenewable energy country attractiveness indices
Renewable energy country attractiveness indices
 
At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)
 
Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries
 

En vedette (6)

EatApp Biz Invest
EatApp Biz InvestEatApp Biz Invest
EatApp Biz Invest
 
Solar.Presentation PV market Germany USA
Solar.Presentation PV market Germany USASolar.Presentation PV market Germany USA
Solar.Presentation PV market Germany USA
 
US Solar Market Insight Report Q1 2012
US Solar Market Insight Report Q1 2012US Solar Market Insight Report Q1 2012
US Solar Market Insight Report Q1 2012
 
The Solar Power Revolution
The Solar Power RevolutionThe Solar Power Revolution
The Solar Power Revolution
 
Issues of Procedure in AD/CVD Cases
Issues of Procedure in AD/CVD CasesIssues of Procedure in AD/CVD Cases
Issues of Procedure in AD/CVD Cases
 
DASH Diet : 100 Recipes
DASH Diet : 100 Recipes DASH Diet : 100 Recipes
DASH Diet : 100 Recipes
 

Similaire à Utility-Scale Solar Power on Federal Lands

Cherrytree group slideshow final
Cherrytree group slideshow finalCherrytree group slideshow final
Cherrytree group slideshow finalWarren Kirshenbaum
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmissiondlbelin
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyKevin Haroff
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 jlarndt_51
 
K Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 PresentationK Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 Presentationkaroek
 
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!Stan Curtis
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basicsnado-web
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsMarcellus Drilling News
 
Solar Power Analysis and Design Specifications
 Solar Power Analysis and Design Specifications Solar Power Analysis and Design Specifications
Solar Power Analysis and Design SpecificationsCalifornia Free Solar
 
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 John Marshall, Georgia State University – “Large-scale Disasters and Federal... John Marshall, Georgia State University – “Large-scale Disasters and Federal...
John Marshall, Georgia State University – “Large-scale Disasters and Federal...EERI
 
Thurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramThurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramNisqually River Council
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageAndrew Ratzkin
 
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...World Resources Institute (WRI)
 
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...South Shore Clean Cities
 
Renewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA JournalRenewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA Journaldwortman
 
Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...awaltner
 

Similaire à Utility-Scale Solar Power on Federal Lands (20)

Cherrytree group slideshow final
Cherrytree group slideshow finalCherrytree group slideshow final
Cherrytree group slideshow final
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmission
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009
 
K Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 PresentationK Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 Presentation
 
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
 
Clean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant WorkshopClean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant Workshop
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basics
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
 
Solar Power Analysis and Design Specifications
 Solar Power Analysis and Design Specifications Solar Power Analysis and Design Specifications
Solar Power Analysis and Design Specifications
 
Houston solar
Houston solarHouston solar
Houston solar
 
43 cfr part3160
43 cfr part316043 cfr part3160
43 cfr part3160
 
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 John Marshall, Georgia State University – “Large-scale Disasters and Federal... John Marshall, Georgia State University – “Large-scale Disasters and Federal...
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 
Thurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramThurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation Program
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus Package
 
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
 
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
 
Renewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA JournalRenewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA Journal
 
Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...
 

Plus de Solar Energy Industries Association (6)

Top 10 Solar States Infographic
Top 10 Solar States InfographicTop 10 Solar States Infographic
Top 10 Solar States Infographic
 
Enlisting the sun final-5.14.13-r6
Enlisting the sun final-5.14.13-r6Enlisting the sun final-5.14.13-r6
Enlisting the sun final-5.14.13-r6
 
2012 Year in Review Solar Market Insight
2012 Year in Review Solar Market Insight2012 Year in Review Solar Market Insight
2012 Year in Review Solar Market Insight
 
US Solar Market Insight Report Q3 2012
US Solar Market Insight Report Q3 2012 US Solar Market Insight Report Q3 2012
US Solar Market Insight Report Q3 2012
 
Solar Means Business: Top Commercial Solar Customers in the U.S.
Solar Means Business: Top Commercial Solar Customers in the U.S. Solar Means Business: Top Commercial Solar Customers in the U.S.
Solar Means Business: Top Commercial Solar Customers in the U.S.
 
Federal Energy Incentives Fact Sheet
Federal Energy Incentives Fact SheetFederal Energy Incentives Fact Sheet
Federal Energy Incentives Fact Sheet
 

Dernier

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 

Dernier (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 

Utility-Scale Solar Power on Federal Lands

  • 1. Utility-Scale Solar Power on Federal Lands U.S. Creates Clean Energy Jobs with Historic Project Permits Overview Some of the best solar resources in the world are located in the western United States on public land overseen by the federal government. Federal agencies developed extensive processes to authorize use of these lands for a variety of purposes, including recreation, grazing, mining and energy development. From initial application to final Right-of-Way grant, the current process for a utility-scale solar project requires between three and five years to complete. In contrast, federal agencies approved over 74,000 permits to drill for oil and gas on public lands in the last 20 years.1 New initiatives undertaken in 2009 led to the first-ever permits for utility-scale solar projects on public lands in 2010. Today, BLM has permitted 16 projects, which will provide nearly 6,058 megawatts of generating capacity, enough to power approximately 1.2 million homes. The Bureau of Land Management Permitting Process The Bureau of Land Management (BLM), within the U.S. Department of the Interior, manages 258 million acres of land in the West. The BLM is responsible for authorizing utility-scale solar energy developments through a Right-of-Way (ROW) permit under Title V of the Federal Land Policy and Management Act (FLPMA) of 1976. The Right-of-Way Approval Process Solar energy developers must complete the following process to secure a Right-of-Way permit allowing them to develop a project on public lands: Notice of Intent Step 1: Submit Right-of-Way grant application (0-30 days) • Upon submission of an application by the solar developer, BLM determines an appropriate Scoping Process processing fee, which must be paid by developer prior to processing. Step 2: Submit Plan of Development (BLM’s goal is 60 days, but may take 4-6 months) Draft EIS • Once payment has been received for the application fees, BLM notifies the applicant in writing and requests a comprehensive Plan of Development. Agency and Public • Applications are generally processed in the order they are received. Processing may be Review & Comment delayed as BLM specialists complete required inventories or consult with other agencies. Step 3: Conduct environmental review (24-48 months) Final EIS • BLM publishes Notice of Intent to prepare an Environmental Impact Statement (EIS) in the Federal Register. Record of Decision • A National Environmental Policy Act (NEPA) review is conducted by BLM with input from the U.S. Fish and Wildlife Service, state, and local authorities. The process requires months of detailed surveys and analyses of the project site to identify any potential impacts. Multiple public meetings are scheduled for community input. The EIS concludes with the issuance of a Final Environmental Impact Statement. (See the NEPA Review Process above.) 1 SEIA | www.seia.org May 31, 2012
  • 2. Step 4: Issue Record of Decision (ROD) • Following the successful completion of the environmental review process, inventories, and reports, the BLM will issue a Record of Decision, either granting or denying the ROW application. If granted, the applicant also receives a Notice to Proceed (NTP), allowing the construction phase to begin. Step 5: After a ROW grant is issued • ROW holders pay an annual rent to the United States Treasury based on the BLM’s solar rent formula.2 Fast-Track Projects In mid‐2009, Secretary of the Interior Ken Salazar announced a “Fast‐Track” initiative for solar project application demonstrating the most promise to complete the necessary environmental reviews.3 “Fast‐track” projects do not forego environmental review requirements necessary to receive a Right‐of‐Way permit, but receive priority processing. About the Solar Energy Industries Association® Established in 1974, the Solar Energy Industries Association is the national trade association of the U.S. solar energy industry. Through advocacy and education, SEIA® and its 1,100 member companies are building a strong solar industry to power America. As the voice of the industry, SEIA works to make solar a mainstream and significant energy source by expanding markets, removing market barriers, strengthening the industry and educating the public on the benefits of solar energy. For more information, please visit www.seia.org. 2 SEIA | www.seia.org May 31, 2012
  • 3. 1 “Number of APDs approved by Year on Federal Lands.” 2009. U.S. Bureau of Land Management. Accessed online 26 March 2010. http://www.blm.gov/pgdata/etc/medialib/blm/wo/MINERALS__REALTY__AND_RESOURCE_PROTECTION_/energy/oil___gas_statistics.P ar.5146.File.dat/chart_2009_07.pdf 2 “Solar Energy Interim Rental Policy.” 10 June 2010. U.S. Bureau of Land Management. Accessed Online 1 August 2010. http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/national_instruction/2010/IM_2010-141.html 3 For more information on “Fast-Track” solar projects, please visit: http://www.blm.gov/wo/st/en/prog/energy/renewable_energy/fast- track_renewable.html 3 SEIA | www.seia.org May 31, 2012