MODULAR CONSTRUCTION
PRESENTED BY
TUSHITH S
VACHANDEEP C D
VIVEK H C
YADUVARA Y S
YUKTHA SRIRAM K
CONTENTS
 What is modular construction
 Application of modular construction
 Types of Modular construction
 Why modular construction
 Modular construction process
 Comparison between modular and conventional construction
 Advantages
 Limitations of Modular construction
 Conclusion
WHATISMODULARCONSTRUCTION
 “ Modular construction is a pre – engineered process of making
any structures or elements in a factory that is off-site and are
delivered to the sites and assembled as large as volumetric
components or As substantial of any students”.
 Modular construction in case of buildings are generally six sided
boxes called modules ,they can be joined by side by side on top of
each other.The modular buildings should have roof. , floor,walls
etc... These modules are constructed in a factory to various levels
of completion from Basic Modules to completely fitted rooms that
are fully functional.
.
.
APPLICATIONS OF MODULAR
CONSTRUCTION
 Private housing
 Social housing
 Apartments
 Education sector and student residences
 Health sector buildings
 Hotel
TYPES OF MODULAR CONSTRUCTION
.
Permanent modular
construction (PMC)
.
Relocatable
buildings
.
.
WHY MODULAR CONSTRUCTION
 One of the major reason to adopt modular construction isnthat not only can
one save up to 35% on the initial construction costs like labour and materials,
but there are the other benefits as well
 Another major reason is about the quality as one can attain a suitable quality in
the elements of any structures that are to be pre –fabricated or pre- cast in the
construction factory
 Modular construction takes most of the construction phase away from the
building site . Quicker and efficient factory process are replacing the slow ,less
productive site
 Sustainability in modular construction can be achieved through the factory
production of the modular units.
 For a modular construction project to complete with a good result,proper
planning, coordination and communication must exist between various relevant
parties involved from the early-stage of project.
MODULAR CONSTRUCTION PROCESS
Process in modular construction
1. Designing the structure
2. Engineering review
3. Permit and approvals
4. Site development
5. Plant fabrication
6. Transportation
7. installation
COMPARISON
SITE- CAST
 No transportation
 The size limitation is depending on the
elevation capacity only.
 Lower the quality because directly affected
by weather.
 Proper , large free space required
PRECAST AT PLANT
 Transportation and elevation capacity
limits the size .
 Higher , industrialized quality less affected
by weather.
 No space requirement on the site for
fabrication.
 Unlimited opportunities of architectural
appearance
 Option of standardized components
MODULAR CONSTRUCTION REDUCED
CONSTRUCTION TIME
.
BENEFITS OF MODULAR CONSTRUCTION
 Greater flexibility and reuse
 Less material waste
 Improved air quality
 Reduced construction schedule
 Elimination of weather delays
 Built to code with quality materials
 Safer construction
 Faster construction
 Quality construction
 Eco friendly
DRAWBACKS OF MODULAR
CONSTRUCTION
 Handling and transportation may cause breakages of members during the transit
and extra provision is to be made
 Difficulty in connecting precast units so as to produce same effect as monolithic.
This leads to non –monolithic construction
 They are to be exactly placed in position, otherwise the loads coming on them are
likely to get changed and the member may be affected.
 High transport cost.
 Need of erection equipment.
 Skilled labour and supervision is required.
CONCLUSION
 The use of Precast concrete construction can significantly reduce the amount of
construction waste generated on construction sites
 Reduce adverse environmental impact on sites
 Enhance quality control of concreting work
 Reduce the amount of site labour
 Increase worker safety
DISCRIPTION
 Main category: Modular Building design
 Company : Guerdon, LLC
 Affiliate: Guerdon Modular Buildings
 Location: San Jose , California
 Building use: Apartments
 Gross Size of project: 481569 square Feet
 Days to complete:609
Thank you
.

Contenu connexe

Similaire à innovation.pptx

Prefabricated structures | Primexbuildings
Prefabricated structures | PrimexbuildingsPrefabricated structures | Primexbuildings
Prefabricated structures | PrimexbuildingsPrimexBuildingSystems
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notesFluidconstructions
 
TCE Paper on Modular Engineering
TCE Paper on Modular EngineeringTCE Paper on Modular Engineering
TCE Paper on Modular EngineeringPrashant Kumar
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptxArpitGautam20
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...civej
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET Journal
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovationSJVijay
 
Advanced Construction Technology Project
Advanced Construction Technology ProjectAdvanced Construction Technology Project
Advanced Construction Technology ProjectCKMCforstudents
 
Introduction to prefabricated structures
Introduction to prefabricated structuresIntroduction to prefabricated structures
Introduction to prefabricated structuresAtharva Naik
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete StructureArchit Ahmad
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report ForestedTiger
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction TechnologiesRahul Saraswat
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industryYamini K
 

Similaire à innovation.pptx (20)

Prefabricated structures | Primexbuildings
Prefabricated structures | PrimexbuildingsPrefabricated structures | Primexbuildings
Prefabricated structures | Primexbuildings
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notes
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
neotech.pptx
neotech.pptxneotech.pptx
neotech.pptx
 
TCE Paper on Modular Engineering
TCE Paper on Modular EngineeringTCE Paper on Modular Engineering
TCE Paper on Modular Engineering
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 
Advanced Construction Technology Project
Advanced Construction Technology ProjectAdvanced Construction Technology Project
Advanced Construction Technology Project
 
PREFRICATIONN.pptx
PREFRICATIONN.pptxPREFRICATIONN.pptx
PREFRICATIONN.pptx
 
Introduction to prefabricated structures
Introduction to prefabricated structuresIntroduction to prefabricated structures
Introduction to prefabricated structures
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete Structure
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 

Plus de SFASEEHM

Computer science Color image processing.pdf
Computer science Color image processing.pdfComputer science Color image processing.pdf
Computer science Color image processing.pdfSFASEEHM
 
CAED - PROCEDURE.pptx
CAED - PROCEDURE.pptxCAED - PROCEDURE.pptx
CAED - PROCEDURE.pptxSFASEEHM
 
Jack Ma.pptx
Jack Ma.pptxJack Ma.pptx
Jack Ma.pptxSFASEEHM
 
INDIAN ENTREPRENUR.pptx
INDIAN ENTREPRENUR.pptxINDIAN ENTREPRENUR.pptx
INDIAN ENTREPRENUR.pptxSFASEEHM
 
Innovation in roads.pptx
Innovation in roads.pptxInnovation in roads.pptx
Innovation in roads.pptxSFASEEHM
 
YAYAY.pptx
YAYAY.pptxYAYAY.pptx
YAYAY.pptxSFASEEHM
 

Plus de SFASEEHM (6)

Computer science Color image processing.pdf
Computer science Color image processing.pdfComputer science Color image processing.pdf
Computer science Color image processing.pdf
 
CAED - PROCEDURE.pptx
CAED - PROCEDURE.pptxCAED - PROCEDURE.pptx
CAED - PROCEDURE.pptx
 
Jack Ma.pptx
Jack Ma.pptxJack Ma.pptx
Jack Ma.pptx
 
INDIAN ENTREPRENUR.pptx
INDIAN ENTREPRENUR.pptxINDIAN ENTREPRENUR.pptx
INDIAN ENTREPRENUR.pptx
 
Innovation in roads.pptx
Innovation in roads.pptxInnovation in roads.pptx
Innovation in roads.pptx
 
YAYAY.pptx
YAYAY.pptxYAYAY.pptx
YAYAY.pptx
 

Dernier

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Dernier (20)

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

innovation.pptx

  • 1. Jss science and technology MODULAR CONSTRUCTION PRESENTED BY TUSHITH S VACHANDEEP C D VIVEK H C YADUVARA Y S YUKTHA SRIRAM K
  • 2. CONTENTS  What is modular construction  Application of modular construction  Types of Modular construction  Why modular construction  Modular construction process  Comparison between modular and conventional construction  Advantages  Limitations of Modular construction  Conclusion
  • 3. WHATISMODULARCONSTRUCTION  “ Modular construction is a pre – engineered process of making any structures or elements in a factory that is off-site and are delivered to the sites and assembled as large as volumetric components or As substantial of any students”.  Modular construction in case of buildings are generally six sided boxes called modules ,they can be joined by side by side on top of each other.The modular buildings should have roof. , floor,walls etc... These modules are constructed in a factory to various levels of completion from Basic Modules to completely fitted rooms that are fully functional.
  • 4. . .
  • 5. APPLICATIONS OF MODULAR CONSTRUCTION  Private housing  Social housing  Apartments  Education sector and student residences  Health sector buildings  Hotel
  • 6. TYPES OF MODULAR CONSTRUCTION . Permanent modular construction (PMC) . Relocatable buildings . .
  • 7. WHY MODULAR CONSTRUCTION  One of the major reason to adopt modular construction isnthat not only can one save up to 35% on the initial construction costs like labour and materials, but there are the other benefits as well  Another major reason is about the quality as one can attain a suitable quality in the elements of any structures that are to be pre –fabricated or pre- cast in the construction factory  Modular construction takes most of the construction phase away from the building site . Quicker and efficient factory process are replacing the slow ,less productive site  Sustainability in modular construction can be achieved through the factory production of the modular units.  For a modular construction project to complete with a good result,proper planning, coordination and communication must exist between various relevant parties involved from the early-stage of project.
  • 8. MODULAR CONSTRUCTION PROCESS Process in modular construction 1. Designing the structure 2. Engineering review 3. Permit and approvals 4. Site development 5. Plant fabrication 6. Transportation 7. installation
  • 9. COMPARISON SITE- CAST  No transportation  The size limitation is depending on the elevation capacity only.  Lower the quality because directly affected by weather.  Proper , large free space required PRECAST AT PLANT  Transportation and elevation capacity limits the size .  Higher , industrialized quality less affected by weather.  No space requirement on the site for fabrication.  Unlimited opportunities of architectural appearance  Option of standardized components
  • 11. BENEFITS OF MODULAR CONSTRUCTION  Greater flexibility and reuse  Less material waste  Improved air quality  Reduced construction schedule  Elimination of weather delays  Built to code with quality materials  Safer construction  Faster construction  Quality construction  Eco friendly
  • 12. DRAWBACKS OF MODULAR CONSTRUCTION  Handling and transportation may cause breakages of members during the transit and extra provision is to be made  Difficulty in connecting precast units so as to produce same effect as monolithic. This leads to non –monolithic construction  They are to be exactly placed in position, otherwise the loads coming on them are likely to get changed and the member may be affected.  High transport cost.  Need of erection equipment.  Skilled labour and supervision is required.
  • 13. CONCLUSION  The use of Precast concrete construction can significantly reduce the amount of construction waste generated on construction sites  Reduce adverse environmental impact on sites  Enhance quality control of concreting work  Reduce the amount of site labour  Increase worker safety
  • 14. DISCRIPTION  Main category: Modular Building design  Company : Guerdon, LLC  Affiliate: Guerdon Modular Buildings  Location: San Jose , California  Building use: Apartments  Gross Size of project: 481569 square Feet  Days to complete:609