Civilverse Admin 30 May 2021
Most Popular 20 Evergreen Project Management Terms
civilverse.org/project-management-terms
The understanding of project management terms is important to manage the project. The
project ranges from small and simple to big and complex. As the scope and complexity of
the project increases, the need to manage the project also increases. The project
management is done through the framework as defined in the selected project
management methodology.
To effectively manage the project, the project manager needs to be well versed with the
terms used in the domain.
The top twenty project management terms in alphabetical order are as listed below-
1. Activity and Activity Network
An activity is the smallest unit of project work. A project is broken down into work
packages. The work packages are further divided into smaller activities. The main
characteristics of activity are that it is easily measurable and deliverable. The activity is
such decided that the duration and resource can be easily assigned.
2/9
Activity Network
The activities arranged in a logical sequence create an activity network. It is helpful in
visualising the workflow and developing the project schedule.
2. Agile Project Management
Agile project management is an iterative approach to project management. The
methodology consists of incremental and iterative phases. These phases are called sprints
having a duration of up to two weeks.
This methodology is very useful in projects where execution and testing are done
simultaneously. The shortfalls identified in the subsequent testings are corrected. The
process is repeated until the desired results are achieved. This approach is very flexible as
rework is permitted.
3. Baseline Project Schedule
The project schedule agreed and signed off between the employer and the contractor is
called the baseline schedule. A project baseline schedule is an important tool of project
management.
The baseline schedule serves as the benchmark for measuring the time, resource, and
cost. The variances are calculated against the baseline schedule. The cost associated with
the baseline schedule is called the baseline cost of the project or the budgeted cost of the
project. The project schedule should be deeply checked by qualitative and quantitative
methods before setting the baseline.
A project should have at least one baseline. The upper limit for baselines is not defined.
However, too many baselines signify inefficient planning and poor execution.
4. Critical Path Method
The Critical Path Method is the process of finding the longest path in the activity network.
The longest path has the least amount of time required to complete the project. The
longest path is called the critical path. The activities lying on the critical path are called
critical activities and have zero floats (slack).
3/9
The main advantage of the Critical Path Method is that it helps in prioritising the
activities. Thus, the resources for the critical activities are made available first. Any delay
in the critical activity leads to the project delay.
The Critical Path Test as defined by DCMA in 14-point assessment is the method to
determine the correctness of the critical path. It is conducted by increasing the duration of
any critical activity, if the project duration increases by the same amount, the test is said
to be passed. If the schedule fails, the fault needs to be detected and rectified.
5. Earned Value Management
The EVM is a technique to assess the schedule effectiveness and the project status. The
Earned Value Management uses the following terms very commonly-
1. Earned Value- The cost of work performed.
2. Planned Value- The planned value of the work performed.
3. Budget at Completion- The planned cost to complete the project.
4. Actual Cost- The cost incurred till the point of consideration.
5. Estimate at Completion- The estimated cost to be incurred at the project
completion.
6. Gantt Chart
The Gantt Chart is a popular tool for creating the project schedule. The baseline schedules
are generally set on Gantt Chart. The popularity is due to its’ simplicity. In addition, it is
easier to create and understand.
The Gantt Chart shows the horizontal bar of each activity spread over the timeline. Also,
the dependency of each activity can be shown by arrows.
Gantt Chart
The project management software like Microsoft Project and Primavera P6 uses Gantt
Chart for the project schedule.
7. Kanban
Kanban is a visual project management technique. It is a relatively simpler and lean
technique. The Kanban board is used for managing it. It manages the process flow and the
actual workflow.
4/9
Kanban Board Example. Source
8. Milestone
A milestone in project management is a deliverable of significant value. Every project
should have at least two milestones- start and end. However, the project may have as
many milestones as per the scope and complexity of the project.
The milestones are such decided that they can summarise the entire project deliverables.
Expert judgement should be used to set the milestones.
The milestones have zero duration in project schedule.
9. Project Budget
The allotted cost to the project is called the project budget. It covers all the material cost,
capital expenditure to purchase/acquire/hire/lease equipment, salaries & wages, office
establishment, transportation of material, power & water charges. In addition, the taxes,
customs, statutory clearance fees, CSR, environmental preservation cost, contingency etc.
are also included in the project.
The project budget estimates are made tentatively at the initiation stage for business case
development. Generally, the details of the budget are added at a later stage when the
scope is made clearer. The budgeting should be done after thorough market research and
the market price forecast for the project execution stage.
10. Project Charter
5/9
The project charter is a document prepared at the initiation stage of the project. It
presents a brief introduction to the project, project objectives, scope, cost, business case,
risks and timeline etc.
The project charter formalises the transition from the project conceptualisation to the
project execution. It sets the outline for developing a project management plan.
11. Project Management Lifecycle
Every project passes through various phases during its’ lifetime. The project lifecycle is
defined through the following five steps or process groups-
Initiation- The initial phase of a project sets the outline for the project objectives.
The approvals are obtained and the financial system is set up.
Planning- The outlines set in the initiation phase are put in details. The project
plan is set up with the schedule, quality plan, risk plan, resource plan,
communication plan, procurement plan etc.
Execution- The project is put into action mode. The planning done earlier is
implemented.
Monitoring & Controlling- The project monitoring mechanism is used to
monitor the progress and evaluated against the planned progress. The control
methods are used to control the deviation from planned progress.
Closing- The project is completed and closed formally. The documentation is
completed and a certificate of completion is handed over.
12. Project Plan-
The project plan is a document consisting of all the requirement of the project and actions
required to complete the project. It is the outcome of the planning phase of the project
management lifecycle. A project plan consists of various sub-plans for schedule, resource,
cost, quality, risk, communication, and procurement etc.
13. Project Schedule
A project schedule is the project activities arranged over a timeline in the order of their
sequence. The project schedule covers the entire scope of the project. In other words, it is
a document containing the answer to ‘when’ for the project activities.
A project schedule is prepared by following three simple steps-
Activity Breakdown from WBS.
Sequencing of Activities with suitable lead and lag.
Duration Estimation of each activity.
The schedule can be loaded with the resource and cost. Such schedules help in planning
for the resource, resource levelling, cashflow projections, cost control.
6/9
Project Schedule
14. Quality Management
Quality is the level of excellence. Similarly, the higher the quality, the higher is the level of
satisfaction. However, the quality comes with a cost. The cost increases with the increase
in quality. So, it becomes important to set the quality standards for the project that enable
the project manager to control the quality within the budget.
Ensuring the quality of the delivered project is an important objective of project
management. The quality management plan consists of evaluation methods,
implementation of quality planning and assurance of completed and in-progress
activities.
15. Resource Management
An activity requires resources to be completed. The resource may be material, machinery
or men. The scope of the project sets the outlines for the resource identification for the
project. Every resource has a cost associated with it. Thus, the usage of resource incurs the
cost. The productivity of resource also defines the time taken by the project.
As the resources are closely linked with the scope, cost and time of the project, a resource
management plan needs to be devised. The resource management plan helps in the
proper planning of resource and ensures maximum productivity. It also helps in
scheduling the resource mobilisation that further helps in saving the cost.
16. Risk Management
7/9
The uncertainties in any project are called risks. The correct identification of risks helps in
their analysis, evaluation, ranking and treatment. The risks can either be positive or
negative. Improper risk management may lead to the missed opportunities or
detrimental effects on the project or both.
The risks are of two types- individual risk and overall risk. The individual risk affects one
or more than project objectives. The overall risk affects the whole project and may even
close the project.
The project risks can be broadly classified into financial risks, legal risks, laws &
clearances related risks, project risks, and safety risks.
The steps of preparing an efficient risk management plan are listed below.
Steps of Risk Management
1. Setting the objectives of the Risk Management Plan (RMP)
2. Identification of Risk
3. Analysis of Risk
4. Evaluation of Risk
5. Treatment of Risk
17. Stakeholder
The stakeholders are people who get affected by the project outcome. The project
manager, team members, promoters, users, government authorities, communities, etc.
are stakeholders. Every project is designed to cater to a specific need; thus, every project
has a different set of stakeholders.
Stakeholder identification and management are important in project management. The
stakeholders directly or indirectly influence the project objectives and decisions. Hence,
the proper stakeholder management plan helps in the smooth running of the project.
18. Triple Constraint
The cost, time and scope of the project are called a triple constraint. These three metrics
set the constraint for the project manager to manage the project. Every project operates
within these three boundaries. Also, the uniqueness of every project is due to the change
in at least any one of these metrics.
8/9
Project Management Triangle
The variation in either cost, time and scope
lead to the change in another metric. The
project success is also measured in the cost,
time and scope management terms. These
metrics are often represented as the vertices
of an equilateral triangle with quality at the
centre. Thus, called the project management
triangle.
19. Waterfall Project Management
Waterfall project management is the non-iterative approach to project management. As
the name suggests, the workflow is like a waterfall i.e., if the process completes it can’t be
attended again for rework. Waterfall project management is seen as the opposite of Agile
Project Management.
Each work activity has at least one successor and one predecessor. The workflow is
unidirectional. The progress measurement and control are easier but the whole process is
heavily documented. But, the documentation also helps in ensuring the smooth
onboarding of the new team member, recalling assumptions and setting the new
guidelines for the project.
20. Work Breakdown Structure
The work breakdown structure is the hierarchical decomposition of the project scope. The
WBS breaks the project into small deliverables that are managed easily. The planned work
is contained within the lowest level of WBS components, which are called work packages.
A work package can be used to group the activities where work is scheduled and
estimated, monitored, and controlled. In the context of the WBS, work refers to work
products or deliverables that are the result of the activity and not to the activity itself.
Levels of Work Breakdown Structure
9/9
The activities of WBS are defined strictly within the scope of the project. The scope of the
project is defined in the contract agreement signed between the parties. The activities are
such defined that their duration and cost can be estimated easily.
Learned something new? Or have a suggestion or a doubt? Let me know in the comments.
Share the article with your friends and colleagues.

Contenu connexe

Tendances

Tendances (20)

DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
 
How to change working days and time in MS Project?
How to change working days and time in MS Project?How to change working days and time in MS Project?
How to change working days and time in MS Project?
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
 
Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gert
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Baseline Compliance Analysis
Baseline Compliance AnalysisBaseline Compliance Analysis
Baseline Compliance Analysis
 
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft ProjectResource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft Project
 
PERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLSPERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLS
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
 

Similaire à Most Popular 20 Evergreen Project Management Terms

Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
farouq umar
 

Similaire à Most Popular 20 Evergreen Project Management Terms (20)

Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
Project Management
Project ManagementProject Management
Project Management
 
Project schedule- What, How, Tools & Techniques
Project schedule- What, How, Tools & TechniquesProject schedule- What, How, Tools & Techniques
Project schedule- What, How, Tools & Techniques
 
Project typed
Project typedProject typed
Project typed
 
Project Management
Project ManagementProject Management
Project Management
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
Project management
Project managementProject management
Project management
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Aaqib
AaqibAaqib
Aaqib
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
A Software For Project Management Process
A Software For Project Management ProcessA Software For Project Management Process
A Software For Project Management Process
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 

Plus de SHAZEBALIKHAN1

Plus de SHAZEBALIKHAN1 (18)

5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works
 
5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel Template
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at Site
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and Deep
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract Management
 
Bamboo Reinforced Concrete - Criteria & Performance
Bamboo Reinforced Concrete - Criteria & PerformanceBamboo Reinforced Concrete - Criteria & Performance
Bamboo Reinforced Concrete - Criteria & Performance
 
Bricks- Size, Classification, Composition & Quality Control
Bricks- Size, Classification, Composition & Quality ControlBricks- Size, Classification, Composition & Quality Control
Bricks- Size, Classification, Composition & Quality Control
 
Design of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced BeamDesign of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced Beam
 
Pile foundation -Types, Advantages & Load Carrying Capacity
Pile foundation -Types, Advantages & Load Carrying CapacityPile foundation -Types, Advantages & Load Carrying Capacity
Pile foundation -Types, Advantages & Load Carrying Capacity
 
Steel Reinforcement Facts Every Civil Engineer Must Know
Steel Reinforcement Facts Every Civil Engineer Must KnowSteel Reinforcement Facts Every Civil Engineer Must Know
Steel Reinforcement Facts Every Civil Engineer Must Know
 
Civil Design of Structures -WSM & LSM
Civil Design of Structures -WSM & LSMCivil Design of Structures -WSM & LSM
Civil Design of Structures -WSM & LSM
 
Cement -Types, Composition & QC
Cement -Types, Composition & QCCement -Types, Composition & QC
Cement -Types, Composition & QC
 

Dernier

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Most Popular 20 Evergreen Project Management Terms

  • 1. 1/9 Civilverse Admin 30 May 2021 Most Popular 20 Evergreen Project Management Terms civilverse.org/project-management-terms The understanding of project management terms is important to manage the project. The project ranges from small and simple to big and complex. As the scope and complexity of the project increases, the need to manage the project also increases. The project management is done through the framework as defined in the selected project management methodology. To effectively manage the project, the project manager needs to be well versed with the terms used in the domain. The top twenty project management terms in alphabetical order are as listed below- 1. Activity and Activity Network An activity is the smallest unit of project work. A project is broken down into work packages. The work packages are further divided into smaller activities. The main characteristics of activity are that it is easily measurable and deliverable. The activity is such decided that the duration and resource can be easily assigned.
  • 2. 2/9 Activity Network The activities arranged in a logical sequence create an activity network. It is helpful in visualising the workflow and developing the project schedule. 2. Agile Project Management Agile project management is an iterative approach to project management. The methodology consists of incremental and iterative phases. These phases are called sprints having a duration of up to two weeks. This methodology is very useful in projects where execution and testing are done simultaneously. The shortfalls identified in the subsequent testings are corrected. The process is repeated until the desired results are achieved. This approach is very flexible as rework is permitted. 3. Baseline Project Schedule The project schedule agreed and signed off between the employer and the contractor is called the baseline schedule. A project baseline schedule is an important tool of project management. The baseline schedule serves as the benchmark for measuring the time, resource, and cost. The variances are calculated against the baseline schedule. The cost associated with the baseline schedule is called the baseline cost of the project or the budgeted cost of the project. The project schedule should be deeply checked by qualitative and quantitative methods before setting the baseline. A project should have at least one baseline. The upper limit for baselines is not defined. However, too many baselines signify inefficient planning and poor execution. 4. Critical Path Method The Critical Path Method is the process of finding the longest path in the activity network. The longest path has the least amount of time required to complete the project. The longest path is called the critical path. The activities lying on the critical path are called critical activities and have zero floats (slack).
  • 3. 3/9 The main advantage of the Critical Path Method is that it helps in prioritising the activities. Thus, the resources for the critical activities are made available first. Any delay in the critical activity leads to the project delay. The Critical Path Test as defined by DCMA in 14-point assessment is the method to determine the correctness of the critical path. It is conducted by increasing the duration of any critical activity, if the project duration increases by the same amount, the test is said to be passed. If the schedule fails, the fault needs to be detected and rectified. 5. Earned Value Management The EVM is a technique to assess the schedule effectiveness and the project status. The Earned Value Management uses the following terms very commonly- 1. Earned Value- The cost of work performed. 2. Planned Value- The planned value of the work performed. 3. Budget at Completion- The planned cost to complete the project. 4. Actual Cost- The cost incurred till the point of consideration. 5. Estimate at Completion- The estimated cost to be incurred at the project completion. 6. Gantt Chart The Gantt Chart is a popular tool for creating the project schedule. The baseline schedules are generally set on Gantt Chart. The popularity is due to its’ simplicity. In addition, it is easier to create and understand. The Gantt Chart shows the horizontal bar of each activity spread over the timeline. Also, the dependency of each activity can be shown by arrows. Gantt Chart The project management software like Microsoft Project and Primavera P6 uses Gantt Chart for the project schedule. 7. Kanban Kanban is a visual project management technique. It is a relatively simpler and lean technique. The Kanban board is used for managing it. It manages the process flow and the actual workflow.
  • 4. 4/9 Kanban Board Example. Source 8. Milestone A milestone in project management is a deliverable of significant value. Every project should have at least two milestones- start and end. However, the project may have as many milestones as per the scope and complexity of the project. The milestones are such decided that they can summarise the entire project deliverables. Expert judgement should be used to set the milestones. The milestones have zero duration in project schedule. 9. Project Budget The allotted cost to the project is called the project budget. It covers all the material cost, capital expenditure to purchase/acquire/hire/lease equipment, salaries & wages, office establishment, transportation of material, power & water charges. In addition, the taxes, customs, statutory clearance fees, CSR, environmental preservation cost, contingency etc. are also included in the project. The project budget estimates are made tentatively at the initiation stage for business case development. Generally, the details of the budget are added at a later stage when the scope is made clearer. The budgeting should be done after thorough market research and the market price forecast for the project execution stage. 10. Project Charter
  • 5. 5/9 The project charter is a document prepared at the initiation stage of the project. It presents a brief introduction to the project, project objectives, scope, cost, business case, risks and timeline etc. The project charter formalises the transition from the project conceptualisation to the project execution. It sets the outline for developing a project management plan. 11. Project Management Lifecycle Every project passes through various phases during its’ lifetime. The project lifecycle is defined through the following five steps or process groups- Initiation- The initial phase of a project sets the outline for the project objectives. The approvals are obtained and the financial system is set up. Planning- The outlines set in the initiation phase are put in details. The project plan is set up with the schedule, quality plan, risk plan, resource plan, communication plan, procurement plan etc. Execution- The project is put into action mode. The planning done earlier is implemented. Monitoring & Controlling- The project monitoring mechanism is used to monitor the progress and evaluated against the planned progress. The control methods are used to control the deviation from planned progress. Closing- The project is completed and closed formally. The documentation is completed and a certificate of completion is handed over. 12. Project Plan- The project plan is a document consisting of all the requirement of the project and actions required to complete the project. It is the outcome of the planning phase of the project management lifecycle. A project plan consists of various sub-plans for schedule, resource, cost, quality, risk, communication, and procurement etc. 13. Project Schedule A project schedule is the project activities arranged over a timeline in the order of their sequence. The project schedule covers the entire scope of the project. In other words, it is a document containing the answer to ‘when’ for the project activities. A project schedule is prepared by following three simple steps- Activity Breakdown from WBS. Sequencing of Activities with suitable lead and lag. Duration Estimation of each activity. The schedule can be loaded with the resource and cost. Such schedules help in planning for the resource, resource levelling, cashflow projections, cost control.
  • 6. 6/9 Project Schedule 14. Quality Management Quality is the level of excellence. Similarly, the higher the quality, the higher is the level of satisfaction. However, the quality comes with a cost. The cost increases with the increase in quality. So, it becomes important to set the quality standards for the project that enable the project manager to control the quality within the budget. Ensuring the quality of the delivered project is an important objective of project management. The quality management plan consists of evaluation methods, implementation of quality planning and assurance of completed and in-progress activities. 15. Resource Management An activity requires resources to be completed. The resource may be material, machinery or men. The scope of the project sets the outlines for the resource identification for the project. Every resource has a cost associated with it. Thus, the usage of resource incurs the cost. The productivity of resource also defines the time taken by the project. As the resources are closely linked with the scope, cost and time of the project, a resource management plan needs to be devised. The resource management plan helps in the proper planning of resource and ensures maximum productivity. It also helps in scheduling the resource mobilisation that further helps in saving the cost. 16. Risk Management
  • 7. 7/9 The uncertainties in any project are called risks. The correct identification of risks helps in their analysis, evaluation, ranking and treatment. The risks can either be positive or negative. Improper risk management may lead to the missed opportunities or detrimental effects on the project or both. The risks are of two types- individual risk and overall risk. The individual risk affects one or more than project objectives. The overall risk affects the whole project and may even close the project. The project risks can be broadly classified into financial risks, legal risks, laws & clearances related risks, project risks, and safety risks. The steps of preparing an efficient risk management plan are listed below. Steps of Risk Management 1. Setting the objectives of the Risk Management Plan (RMP) 2. Identification of Risk 3. Analysis of Risk 4. Evaluation of Risk 5. Treatment of Risk 17. Stakeholder The stakeholders are people who get affected by the project outcome. The project manager, team members, promoters, users, government authorities, communities, etc. are stakeholders. Every project is designed to cater to a specific need; thus, every project has a different set of stakeholders. Stakeholder identification and management are important in project management. The stakeholders directly or indirectly influence the project objectives and decisions. Hence, the proper stakeholder management plan helps in the smooth running of the project. 18. Triple Constraint The cost, time and scope of the project are called a triple constraint. These three metrics set the constraint for the project manager to manage the project. Every project operates within these three boundaries. Also, the uniqueness of every project is due to the change in at least any one of these metrics.
  • 8. 8/9 Project Management Triangle The variation in either cost, time and scope lead to the change in another metric. The project success is also measured in the cost, time and scope management terms. These metrics are often represented as the vertices of an equilateral triangle with quality at the centre. Thus, called the project management triangle. 19. Waterfall Project Management Waterfall project management is the non-iterative approach to project management. As the name suggests, the workflow is like a waterfall i.e., if the process completes it can’t be attended again for rework. Waterfall project management is seen as the opposite of Agile Project Management. Each work activity has at least one successor and one predecessor. The workflow is unidirectional. The progress measurement and control are easier but the whole process is heavily documented. But, the documentation also helps in ensuring the smooth onboarding of the new team member, recalling assumptions and setting the new guidelines for the project. 20. Work Breakdown Structure The work breakdown structure is the hierarchical decomposition of the project scope. The WBS breaks the project into small deliverables that are managed easily. The planned work is contained within the lowest level of WBS components, which are called work packages. A work package can be used to group the activities where work is scheduled and estimated, monitored, and controlled. In the context of the WBS, work refers to work products or deliverables that are the result of the activity and not to the activity itself. Levels of Work Breakdown Structure
  • 9. 9/9 The activities of WBS are defined strictly within the scope of the project. The scope of the project is defined in the contract agreement signed between the parties. The activities are such defined that their duration and cost can be estimated easily. Learned something new? Or have a suggestion or a doubt? Let me know in the comments. Share the article with your friends and colleagues.