SlideShare une entreprise Scribd logo
1  sur  11
Techniques for Resolving
Disputes Quickly and Efficiently
Seema Lal
PBLI – March 31, 2016
“Peace is not absence of conflict, it is the ability
to handle conflict by peaceful means.”
Ronald Reagan
“The harder the conflict, the more glorious the
triumph.”
Thomas Paine
• Disputes are likely to arise in almost all construction
projects
• Having clear and effective dispute resolution clauses
will assist in minimizing disruptions to the schedule if
and when a dispute arises
• Generally speaking, the parties will engage in
discussions and negotiations prior to moving into
more formal dispute resolution processes
• The keys to avoiding a dispute include:
– Identifying the problem or issue as early as
possible
– Taking action to address the problem or issue as
soon as possible
– Keeping the focus on the specific problem or issue
at hand
– Maintaining an open line of communication with
the other party
• Negotiation best practices include:
– Being prepared
• This includes having access to and reviewing all of the
relevant information and documents relating to the
dispute, as well as seeking opinions, if appropriate,
from consultants or outside experts
• Need to ensure you are familiar with and adhering to
the contractual provisions, in particular, notice
provisions
– Flexibility
• If the goal is to resolve the dispute as efficiently as
possible so as to avoid disruptions in the project
schedule, both parties must maintain a degree of
flexibility in their positions
• The utterance of threats or ultimatums will likely lead
to a termination of the negotiations and, at worst, a
potential termination of the Contract and ensuing
litigation/arbitration
– Understanding the position of the “other side”
• Communicating an understanding of the position of the
other party and attempting to find some common
ground will go a long way toward an early resolution of
a dispute
• Understanding the other party’s objectives will assist
you in preparing a proposal that attempts to meet
those objectives without significantly compromising
yours
• Will also assist you in assessing the merits of your
position
- Looking at the dispute objectively
• May be effective to include senior representatives (or
other senior members not intimately involved with the
facts underlying the dispute) in negotiations as these
individuals will be able to view the disputed issues with
some level of objectivity
• Take emotion out of the equation
- Develop and understand your “BATNA”
• Developing and understanding your “Best Alternative to a
Negotiated Agreement” will assist you in assessing and
testing the strengths and weaknesses of your position
• Developing your BATNA early in the process will assist you
in establishing the best negotiation strategy to reach your
settlement goal
• Understanding the other party’s BATNA will also assist you
in your negotiations
- Recognizing the End
• At some stage in the negotiation process, it may become
clear that you are not prepared to make any further
concessions or compromises and are prepared to take the
claim to the next stage of the dispute resolution process
• If it is clear that there is no hope for resolution, best to
terminate negotiations at that point and proceed with
your BATNA
QUESTIONS?
Seema Lal
SHK Law Corporation
sl@shk.ca
604.408.2026

Contenu connexe

Plus de SHKLaw

Procurement and Subcontractors
Procurement and SubcontractorsProcurement and Subcontractors
Procurement and SubcontractorsSHKLaw
 
An Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation ActAn Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation ActSHKLaw
 
Tendering and Procurement Best Practices
Tendering and Procurement Best PracticesTendering and Procurement Best Practices
Tendering and Procurement Best PracticesSHKLaw
 
Tendering and Procuremen
Tendering and ProcuremenTendering and Procuremen
Tendering and ProcuremenSHKLaw
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project DeliverySHKLaw
 
Canada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and OpportunityCanada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and OpportunitySHKLaw
 
Builders liens in Canada
Builders liens in CanadaBuilders liens in Canada
Builders liens in CanadaSHKLaw
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014SHKLaw
 

Plus de SHKLaw (9)

Procurement and Subcontractors
Procurement and SubcontractorsProcurement and Subcontractors
Procurement and Subcontractors
 
An Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation ActAn Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation Act
 
Tendering and Procurement Best Practices
Tendering and Procurement Best PracticesTendering and Procurement Best Practices
Tendering and Procurement Best Practices
 
Tendering and Procuremen
Tendering and ProcuremenTendering and Procuremen
Tendering and Procuremen
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Canada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and OpportunityCanada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and Opportunity
 
Builders liens in Canada
Builders liens in CanadaBuilders liens in Canada
Builders liens in Canada
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 

Dernier

589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdfSUSHMITAPOTHAL
 
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersPhilippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersJillianAsdala
 
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxIBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxRRR Chambers
 
The Active Management Value Ratio: The New Science of Benchmarking Investment...
The Active Management Value Ratio: The New Science of Benchmarking Investment...The Active Management Value Ratio: The New Science of Benchmarking Investment...
The Active Management Value Ratio: The New Science of Benchmarking Investment...James Watkins, III JD CFP®
 
Contract law. Indemnity
Contract law.                     IndemnityContract law.                     Indemnity
Contract law. Indemnitymahikaanand16
 
ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.tanughoshal0
 
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...PsychicRuben LoveSpells
 
Navigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptxNavigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptxelysemiller87
 
3 Formation of Company.www.seribangash.com.ppt
3 Formation of Company.www.seribangash.com.ppt3 Formation of Company.www.seribangash.com.ppt
3 Formation of Company.www.seribangash.com.pptseri bangash
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsAurora Consulting
 
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptxKEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptxRRR Chambers
 
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptx
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptxAnalysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptx
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptxadvabhayjha2627
 
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理A AA
 
一比一原版伦敦南岸大学毕业证如何办理
一比一原版伦敦南岸大学毕业证如何办理一比一原版伦敦南岸大学毕业证如何办理
一比一原版伦敦南岸大学毕业证如何办理Airst S
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理Airst S
 
The doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statuteThe doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statuteDeepikaK245113
 
Clarifying Land Donation Issues Memo for
Clarifying Land Donation Issues Memo forClarifying Land Donation Issues Memo for
Clarifying Land Donation Issues Memo forRoger Valdez
 
Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.Nilendra Kumar
 
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理e9733fc35af6
 

Dernier (20)

589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf
 
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersPhilippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
 
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxIBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
 
The Active Management Value Ratio: The New Science of Benchmarking Investment...
The Active Management Value Ratio: The New Science of Benchmarking Investment...The Active Management Value Ratio: The New Science of Benchmarking Investment...
The Active Management Value Ratio: The New Science of Benchmarking Investment...
 
Contract law. Indemnity
Contract law.                     IndemnityContract law.                     Indemnity
Contract law. Indemnity
 
ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.
 
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
 
Navigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptxNavigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptx
 
3 Formation of Company.www.seribangash.com.ppt
3 Formation of Company.www.seribangash.com.ppt3 Formation of Company.www.seribangash.com.ppt
3 Formation of Company.www.seribangash.com.ppt
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction Fails
 
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptxKEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
 
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptx
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptxAnalysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptx
Analysis of R V Kelkar's Criminal Procedure Code ppt- chapter 1 .pptx
 
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理
一比一原版(USYD毕业证书)澳洲悉尼大学毕业证如何办理
 
一比一原版伦敦南岸大学毕业证如何办理
一比一原版伦敦南岸大学毕业证如何办理一比一原版伦敦南岸大学毕业证如何办理
一比一原版伦敦南岸大学毕业证如何办理
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
 
The doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statuteThe doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statute
 
Clarifying Land Donation Issues Memo for
Clarifying Land Donation Issues Memo forClarifying Land Donation Issues Memo for
Clarifying Land Donation Issues Memo for
 
Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.
 
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
 

Techniques for Resolving Disputes Quickly and Efficiently

  • 1. Techniques for Resolving Disputes Quickly and Efficiently Seema Lal PBLI – March 31, 2016
  • 2. “Peace is not absence of conflict, it is the ability to handle conflict by peaceful means.” Ronald Reagan “The harder the conflict, the more glorious the triumph.” Thomas Paine
  • 3. • Disputes are likely to arise in almost all construction projects • Having clear and effective dispute resolution clauses will assist in minimizing disruptions to the schedule if and when a dispute arises • Generally speaking, the parties will engage in discussions and negotiations prior to moving into more formal dispute resolution processes
  • 4. • The keys to avoiding a dispute include: – Identifying the problem or issue as early as possible – Taking action to address the problem or issue as soon as possible – Keeping the focus on the specific problem or issue at hand – Maintaining an open line of communication with the other party
  • 5. • Negotiation best practices include: – Being prepared • This includes having access to and reviewing all of the relevant information and documents relating to the dispute, as well as seeking opinions, if appropriate, from consultants or outside experts • Need to ensure you are familiar with and adhering to the contractual provisions, in particular, notice provisions
  • 6. – Flexibility • If the goal is to resolve the dispute as efficiently as possible so as to avoid disruptions in the project schedule, both parties must maintain a degree of flexibility in their positions • The utterance of threats or ultimatums will likely lead to a termination of the negotiations and, at worst, a potential termination of the Contract and ensuing litigation/arbitration
  • 7. – Understanding the position of the “other side” • Communicating an understanding of the position of the other party and attempting to find some common ground will go a long way toward an early resolution of a dispute • Understanding the other party’s objectives will assist you in preparing a proposal that attempts to meet those objectives without significantly compromising yours • Will also assist you in assessing the merits of your position
  • 8. - Looking at the dispute objectively • May be effective to include senior representatives (or other senior members not intimately involved with the facts underlying the dispute) in negotiations as these individuals will be able to view the disputed issues with some level of objectivity • Take emotion out of the equation
  • 9. - Develop and understand your “BATNA” • Developing and understanding your “Best Alternative to a Negotiated Agreement” will assist you in assessing and testing the strengths and weaknesses of your position • Developing your BATNA early in the process will assist you in establishing the best negotiation strategy to reach your settlement goal • Understanding the other party’s BATNA will also assist you in your negotiations
  • 10. - Recognizing the End • At some stage in the negotiation process, it may become clear that you are not prepared to make any further concessions or compromises and are prepared to take the claim to the next stage of the dispute resolution process • If it is clear that there is no hope for resolution, best to terminate negotiations at that point and proceed with your BATNA
  • 11. QUESTIONS? Seema Lal SHK Law Corporation sl@shk.ca 604.408.2026