SlideShare une entreprise Scribd logo
1  sur  18
Télécharger pour lire hors ligne
Project SLOPE
1
WP 8 – Openness with other activities,
dissemination and exploitation of results
Kick-off Meeting
8-9/jan/2014
WP8 – Objectives
• Disseminate the SLOPE results broadly
among stakeholders of the whole
production process.
• Ensure the visibility of SLOPE activities
and results, and maximize its utilisation by
the European forestry and
agricultural industry (including machinery
and software solutions).
• Ensure follow up on results by the
industry to create new economic activity.
The first aim of this work package is to
achieve the widest dissemination of the
technical results of the project within:
• The membership of the consortium,
• The scientific community
• and, more important, within the
European forestry and agricultural
sector.
MAIN OBJECTIVES
Kick-off Meeting
8-9/jan/2014
WP8 – Objectives
No actual commercial exploitation and any
concrete preparation thereof, as well as
related activities (e.g. marketing)
will be reported in this work package and
under the project SLOPE in general as
these activities are not eligible
for EU funding.
A second big aim has been established in
this work package:
Develop a committed exploitation plan in
order to ensure a proper and fair
exploitation of the project results.
MAIN OBJECTIVES
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
a) Overall guidelines to awareness, networking and dissemination activities.
The internal procedure for communication and dissemination activities will be as follows:
• The DisseminationWP Leader ITENE will design the materials (brochure, newsletters,
and poster), which will be approved by partners and finally by the project leader.
• ITENE shall ask all partners involved in dissemination and communication activities
for the materials and documents required every time this will be needed.
• Each partner shall complete the tasks described in the dissemination plan for each
activity before the given deadline as the results depend on all partners involvement.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
a) Overall guidelines to awareness, networking and dissemination activities.
WEBSITE The project partners’ home pages will be linked to the website to draw attention to this project and its
aims.
Send interesting pictures related to the project to be used with dissemination purposes
Upload documents on Intranet.
SOCIAL MEDIA Participate on groups or pages.
Cooperate, give feedback, promote the project within each one’s contacts.
Send messages, tweets mentioning project’s profiles, etc.
PRESS RELEASES Translate press release in local language.
Send to local general and specialized media.
DISSEMINATION ARTICLE Translate article in local language (optional)
Send to local specialized media.
PROJECT BROCHURE Use them at events, trade fairs related to the project.
Show them in a visible place in your headquarter.
NEWSLETTER Send to main professional interesting contacts.
Participate with articles, pictures.
REPORTING Follow instructions given to complete the spreadsheet.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
b) Dissemination plan
2 0 1 4 2 0 1 5 2 0 1 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DISSEMINATION STRATEGY (3 rep.)
BROCHURE
PROJECT WEBSITE
WEB 2.0
NEWSLETTERS (6)
POSTER
TRADE FAIRS, DEMOS
TECHNICAL WORKSHOPS (4)
FINAL CONFERENCE (1)
RELATED PROJECTS FORUMS (5)
SCIENTIFIC PUBLICATIONS (4)
PRESS RELEASES (4)
A general document with all the planned dissemination activities and the material to
achieve a large diffusion of project results will be prepared.
Deliverables: Month 6, 18, 30.
In advance, a timetable has initially being planned:
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
Task 8.1 - Dissemination planning and publications of results
Task leader: ITENE; Participants: GRAPHITECH, CNR, BOKU, ITENE
DISSEMINATION STRATEGY
Document with all the
planned dissemination activities and
the material to achieve a large
diffusion of project results.
It will include, for example:
- Detailed target audience.
- Concrete Objectives.
- Press releases and Publications /
Interviews in business and general
media.
BROCHURE
Date: Month 1.
Available in electronic format
NEWSLETTERS
Date: Every 6 months
Available to download in the website
POSTER
Date: Month 6.
Use:Workshops, conferences, trade
fairs, and other events.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
Task 8.1 - Dissemination planning and publications of results
TRADE FAIRS AND DEMOS
In order to have the widest
dissemination and largest
involvement of industrial
stakeholders, SLOPE project and
results will be presented at the most
relevant fairs and demos, mainly
organized in the participating
countries.To be defined.
SCIENTIFIC ARTICLES
In selected journals and targeted
publications at highly visible and
relevant industrial and research
conferences . At least 4 in 2015 & 2016
TECHNICALWORKSHOPS (4. Beginning in
2015)
BOKU will organize four technical workshops
targeted on industry, including SME, from the
forestry and agricultural sector.
These one-day seminars will take place during
the execution of the project, once we have
consolidated relevant results to disseminate.
FINAL CONFERENCE (end of the project)
A large-scale conference will be organized by
CNR as final event of the project
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
Task 8.1 - Dissemination planning and publications of results
WEBSITE
GRAPHITECH will be in charge for the
deployment and maintenance of the
project web-site and web 2.0
communication channels
Date: Month 2.
PUBLIC SITE
Download section.
News section and an e-newsletter.
Easy-friendly interactive area.
INTRANET SITE
Only accessible for the projet’s members
WEB 2.0
The project will also promote the use of web
2.0 social networks as LinkedIn, Twitter,
Facebook, YouTube, in order to reach a huge
number of target group members that are
followers of topics addressed by the SLOPE
project.
The dissemination manager, who will update
the information on a regular basis, will ensure
permanent information in the online media.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
Task 8.1 - Dissemination planning and publications of results
RELATED PROJECTS
all partners will collaborate in
identifying projects related to SLOPE,
regional, European and
extra-European (e.g.Canadian).
ITENE will be in charge of establishing
relationships with most of these
projects to ensure synergy and
exchange of results.
(All detailed in point d of this
presentation).
COST ACTION
COST Action platform will be also
used to facilitate information
exchange with the experts
community. In particular, activity of
the following COST Actions will be
monitored and exchanges promoted:
•FP1206 - European mixed forests. Integrating Scientific
Knowledge in Sustainable Forest Management.
(EuMIXFOR);
• FP1201 - Forest LAnd Ownership Changes in Europe:
Significance for Management And Policy (FACESMAP);
• FP1106 - STReESS - Studying Tree Responses to extreme
Events: a SynthesiS;
• FP1001 - Improving Data and Information on the Potential
Supply of Wood Resources: A European Approach
from Multisource National Forest Inventories (USEWOOD).
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
Template to collect feedback from partners – Follow instructions given to report activities
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
c) Social networking (illustrating how to contribute to them)
We can create accounts, pages and groups
related to the project in Linkedin, Twitter,
Facebook, andYoutube.
All partners can contribute sending us
material to be published in the different
social networks, for example:
• Pictures of events, trade fairs,
conferences.
• Relevant videos related to the project.
• News related to the project, about your
company or other relevant initiatives.
• Pictures of meetings, etc.
• All materials (pdf, presentations, etc)
which can have interest to our audience.
Then each partner can contribute personally to each
social network, for example:
Participate in debates, open new discussions.
Recommend debates, updates, news, etc.
Invite your contacts to join SLOPE Group
Retweet messages with your company’s profile or
your own profile.
Make tweets with news related to the project.
Mention @slopeproject in your messages
Click “I like” with your profile to all project’s updates.
Share updates and page of the project.
Reccommend the Slope Page to your contacts
Click “I like” to the project’s videos.
Follow the channels.
Share with your contacts and invite to follow the
SLOPEs channel.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
d) How to implement and monitor linkage activities with other EU projects
1) Contact with other projects. Some examples:
Finished projects
• Trees4Future. Forestry genetics. Involved partners: BOKU,CNR
• BISYPLAN. Bioenergy. Involved partners: BOKU, CNR
• SATMODO. ”live” monitoring of harvest processes. Involved partners:TREEMETRICS
• FLEXWOOD logistic system. Involved partner: BOKU,TREEMETRICS.
On-going projects:
• ARANGE. Strategies for the multifunctional management of mountain ranges. Involved partners: BOKU
(Coordinator)
• INFRESAccelerate the technological development and open new paths to EU’s renewable targets.
Involved partners: CNR, BOKU,KESLA.
• LogistEC. Sustainable biomass supply chains Involved partner: MHG
• Developing and Piloting a Platform and Database for Biomass and Bioenergy ResourceAssessment.
A distributed monitoring and planning platform for biomass feedstock and land use. Involved partners:
MHG
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
d) How to implement and monitor linkage activities with other EU projects
2) Establish a meeting to discuss common issues and identify once per year:
• 1st one before/after the Project meeting in Finland (june 2014).
• Tentative calendar
• STRUCTURE:
• Individual Project presentations
• Discuss in groups with other project representatives regarding selected
topics
2 0 1 4 2 0 1 5 2 0 1 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
RELATED PROJECTS FORUMS (5)
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
e) OTHER ACTIVITIES INTHE WP
Task 8.2 – Exploitation, business planning and IPR & licensing policies
Task leader: MHG; Participants: KESLA, COAST, BOKU, FLY, GRE, TRE
• Identification of the business scenarios
• Creation of the appropriate SLOPE business model
• Production of a business plan
• Development of a detailed exploitation strategy by each partner
• Continuous technology and market watch
• Development of an intellectual property rights (IPR) strategy.
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
e) OTHER ACTIVITIES IN THE WP
Task 8.3 - Contribution to standardization
Task leader: CNR; Participants: ITENE
The main objective of this task is to contribute to both update existing standards and to
develop new ones in the field of sustainable forest production:
• Communication with standardization committees via the interactive section of the
SLOPE website and social networks.
• Physical meetings between SLOPE members and the StandardizationTechnical
Committee.
• The SLOPE consortium will show interest in participating in the working groups of
standard committees.
• Consensus with CEN and other standardization
Kick-off Meeting
8-9/jan/2014
WP8 -TASKS
e) OTHER ACTIVITIES IN THE WP
Task 8.4 - Industrial Advisory Board
Task leader: MHG; Participants: KESLA,COAST, BOKU, FLY,TRE
The main objective of this task will be to involve industrial members from the forestry,
agricultural and related logistics and machinery industry. The main activities of the
advisory board will be interchange opinions and knowledge by means of meetings and
discussions.
This information will be used as inputs for the execution of the tasks defined in SLOPE
project, and redefine them when needed. The Advisory board will be set up at an early
stage (first project meeting) of the project in order to follow all the activities starting from
the requirements analysis.
WP 8 PRESENTATION
Kick-off Meeting
8-9/jan/2014
Thanks for your attention!
egonzalez@itene.com
Emilio González, ITENE

Contenu connexe

Tendances

Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6SLOPE Project
 
4th Technical Meeting - WP7
4th Technical Meeting - WP74th Technical Meeting - WP7
4th Technical Meeting - WP7SLOPE Project
 
4th Technical Meeting - WP5
4th Technical Meeting - WP54th Technical Meeting - WP5
4th Technical Meeting - WP5SLOPE Project
 
1st Technical Meeting - WP1
1st Technical Meeting - WP11st Technical Meeting - WP1
1st Technical Meeting - WP1SLOPE Project
 
1st Technical Meeting - WP5
1st Technical Meeting - WP51st Technical Meeting - WP5
1st Technical Meeting - WP5SLOPE Project
 
2nd Technical Meeting - WP2
2nd Technical Meeting - WP22nd Technical Meeting - WP2
2nd Technical Meeting - WP2SLOPE Project
 
Kick-Off Meeting - WP5
Kick-Off Meeting - WP5Kick-Off Meeting - WP5
Kick-Off Meeting - WP5SLOPE Project
 
Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1SLOPE Project
 
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction SLOPE Project
 
Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3SLOPE Project
 
Kick-Off Meeting - WP7
Kick-Off Meeting - WP7Kick-Off Meeting - WP7
Kick-Off Meeting - WP7SLOPE Project
 
Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 SLOPE Project
 
2nd Technical Meeting - WP7
2nd Technical Meeting - WP72nd Technical Meeting - WP7
2nd Technical Meeting - WP7SLOPE Project
 
3rd Technical Meeting - WP7
3rd Technical Meeting - WP73rd Technical Meeting - WP7
3rd Technical Meeting - WP7SLOPE Project
 
3rd Technical Meeting - WP6
3rd Technical Meeting - WP63rd Technical Meeting - WP6
3rd Technical Meeting - WP6SLOPE Project
 
Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2SLOPE Project
 
Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3SLOPE Project
 
Kick-Off Meeting - WP2
Kick-Off Meeting - WP2Kick-Off Meeting - WP2
Kick-Off Meeting - WP2SLOPE Project
 
1st Technical Meeting - WP7
1st Technical Meeting - WP71st Technical Meeting - WP7
1st Technical Meeting - WP7SLOPE Project
 
Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2SLOPE Project
 

Tendances (20)

Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6
 
4th Technical Meeting - WP7
4th Technical Meeting - WP74th Technical Meeting - WP7
4th Technical Meeting - WP7
 
4th Technical Meeting - WP5
4th Technical Meeting - WP54th Technical Meeting - WP5
4th Technical Meeting - WP5
 
1st Technical Meeting - WP1
1st Technical Meeting - WP11st Technical Meeting - WP1
1st Technical Meeting - WP1
 
1st Technical Meeting - WP5
1st Technical Meeting - WP51st Technical Meeting - WP5
1st Technical Meeting - WP5
 
2nd Technical Meeting - WP2
2nd Technical Meeting - WP22nd Technical Meeting - WP2
2nd Technical Meeting - WP2
 
Kick-Off Meeting - WP5
Kick-Off Meeting - WP5Kick-Off Meeting - WP5
Kick-Off Meeting - WP5
 
Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1
 
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction
 
Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3
 
Kick-Off Meeting - WP7
Kick-Off Meeting - WP7Kick-Off Meeting - WP7
Kick-Off Meeting - WP7
 
Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1
 
2nd Technical Meeting - WP7
2nd Technical Meeting - WP72nd Technical Meeting - WP7
2nd Technical Meeting - WP7
 
3rd Technical Meeting - WP7
3rd Technical Meeting - WP73rd Technical Meeting - WP7
3rd Technical Meeting - WP7
 
3rd Technical Meeting - WP6
3rd Technical Meeting - WP63rd Technical Meeting - WP6
3rd Technical Meeting - WP6
 
Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2
 
Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3
 
Kick-Off Meeting - WP2
Kick-Off Meeting - WP2Kick-Off Meeting - WP2
Kick-Off Meeting - WP2
 
1st Technical Meeting - WP7
1st Technical Meeting - WP71st Technical Meeting - WP7
1st Technical Meeting - WP7
 
Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2
 

En vedette

Mid-term Review Meeting - WP4
Mid-term Review Meeting - WP4Mid-term Review Meeting - WP4
Mid-term Review Meeting - WP4SLOPE Project
 
1st Technical Meeting - WP4
1st Technical Meeting - WP41st Technical Meeting - WP4
1st Technical Meeting - WP4SLOPE Project
 
1st Technical Meeting - WP3
1st Technical Meeting - WP31st Technical Meeting - WP3
1st Technical Meeting - WP3SLOPE Project
 
2nd Technical Meeting - WP4
2nd Technical Meeting - WP42nd Technical Meeting - WP4
2nd Technical Meeting - WP4SLOPE Project
 
2nd Technical Meeting - WP3
2nd Technical Meeting - WP32nd Technical Meeting - WP3
2nd Technical Meeting - WP3SLOPE Project
 
2nd Technical Meeting - WP6
2nd Technical Meeting - WP62nd Technical Meeting - WP6
2nd Technical Meeting - WP6SLOPE Project
 
SLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Project
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3SLOPE Project
 
SLOPE Final Conference - novel planning tool
SLOPE Final Conference - novel planning toolSLOPE Final Conference - novel planning tool
SLOPE Final Conference - novel planning toolSLOPE Project
 
SLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Project
 
4th Technical Meeting - WP6
4th Technical Meeting - WP64th Technical Meeting - WP6
4th Technical Meeting - WP6SLOPE Project
 
Kick-Off Meeting - WP4
Kick-Off Meeting - WP4Kick-Off Meeting - WP4
Kick-Off Meeting - WP4SLOPE Project
 
SLOPE Final Conference - online purchase of timber and biomass
SLOPE Final Conference - online purchase of timber and biomassSLOPE Final Conference - online purchase of timber and biomass
SLOPE Final Conference - online purchase of timber and biomassSLOPE Project
 
SLOPE Final Conference - intelligent truck
SLOPE Final Conference - intelligent truckSLOPE Final Conference - intelligent truck
SLOPE Final Conference - intelligent truckSLOPE Project
 
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7SLOPE Project
 
1st Technical Meeting - WP6
1st Technical Meeting - WP61st Technical Meeting - WP6
1st Technical Meeting - WP6SLOPE Project
 
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Project
 

En vedette (17)

Mid-term Review Meeting - WP4
Mid-term Review Meeting - WP4Mid-term Review Meeting - WP4
Mid-term Review Meeting - WP4
 
1st Technical Meeting - WP4
1st Technical Meeting - WP41st Technical Meeting - WP4
1st Technical Meeting - WP4
 
1st Technical Meeting - WP3
1st Technical Meeting - WP31st Technical Meeting - WP3
1st Technical Meeting - WP3
 
2nd Technical Meeting - WP4
2nd Technical Meeting - WP42nd Technical Meeting - WP4
2nd Technical Meeting - WP4
 
2nd Technical Meeting - WP3
2nd Technical Meeting - WP32nd Technical Meeting - WP3
2nd Technical Meeting - WP3
 
2nd Technical Meeting - WP6
2nd Technical Meeting - WP62nd Technical Meeting - WP6
2nd Technical Meeting - WP6
 
SLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarder
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3
 
SLOPE Final Conference - novel planning tool
SLOPE Final Conference - novel planning toolSLOPE Final Conference - novel planning tool
SLOPE Final Conference - novel planning tool
 
SLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systems
 
4th Technical Meeting - WP6
4th Technical Meeting - WP64th Technical Meeting - WP6
4th Technical Meeting - WP6
 
Kick-Off Meeting - WP4
Kick-Off Meeting - WP4Kick-Off Meeting - WP4
Kick-Off Meeting - WP4
 
SLOPE Final Conference - online purchase of timber and biomass
SLOPE Final Conference - online purchase of timber and biomassSLOPE Final Conference - online purchase of timber and biomass
SLOPE Final Conference - online purchase of timber and biomass
 
SLOPE Final Conference - intelligent truck
SLOPE Final Conference - intelligent truckSLOPE Final Conference - intelligent truck
SLOPE Final Conference - intelligent truck
 
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7
 
1st Technical Meeting - WP6
1st Technical Meeting - WP61st Technical Meeting - WP6
1st Technical Meeting - WP6
 
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machines
 

Similaire à Optimize Forestry Project Dissemination

Slope presentation wp8
Slope presentation wp8Slope presentation wp8
Slope presentation wp8SLOPE Project
 
LOCIMAP dissemination activities - end of project report
LOCIMAP dissemination activities - end of project reportLOCIMAP dissemination activities - end of project report
LOCIMAP dissemination activities - end of project reportMark Macaré
 
TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI Network
 
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGvj8pcsccj9
 
Formato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTFormato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTdeisyvero
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination PlanKarel Janečka
 
HoCare Interreg Europe project
HoCare Interreg Europe projectHoCare Interreg Europe project
HoCare Interreg Europe projectJan Kubalík
 
ESCAPE Kick-off meeting - WP1 (Feb 2019)
ESCAPE Kick-off meeting - WP1 (Feb 2019)ESCAPE Kick-off meeting - WP1 (Feb 2019)
ESCAPE Kick-off meeting - WP1 (Feb 2019)ESCAPE EU
 
10 management issues-20130221
10 management issues-2013022110 management issues-20130221
10 management issues-20130221fruitbreedomics
 
LinkedTV Dissemination and Standardisation Report
LinkedTV Dissemination and Standardisation ReportLinkedTV Dissemination and Standardisation Report
LinkedTV Dissemination and Standardisation ReportLinkedTV
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFOSTEr in MED
 
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...Screenbrusselscluster
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGCENTA3
 
EC-funded Projects and CAPs Webinar slides
EC-funded Projects and CAPs Webinar slidesEC-funded Projects and CAPs Webinar slides
EC-funded Projects and CAPs Webinar slidesweADAPT
 
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdfweADAPT
 

Similaire à Optimize Forestry Project Dissemination (20)

Slope presentation wp8
Slope presentation wp8Slope presentation wp8
Slope presentation wp8
 
LOCIMAP dissemination activities - end of project report
LOCIMAP dissemination activities - end of project reportLOCIMAP dissemination activities - end of project report
LOCIMAP dissemination activities - end of project report
 
6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting
 
FP7-ICT Programme
FP7-ICT ProgrammeFP7-ICT Programme
FP7-ICT Programme
 
TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks
 
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
 
Formato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTFormato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACT
 
Nanofutures and the European Pilot Production Network
Nanofutures and the European Pilot Production NetworkNanofutures and the European Pilot Production Network
Nanofutures and the European Pilot Production Network
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan
 
HoCare Interreg Europe project
HoCare Interreg Europe projectHoCare Interreg Europe project
HoCare Interreg Europe project
 
ESCAPE Kick-off meeting - WP1 (Feb 2019)
ESCAPE Kick-off meeting - WP1 (Feb 2019)ESCAPE Kick-off meeting - WP1 (Feb 2019)
ESCAPE Kick-off meeting - WP1 (Feb 2019)
 
10 management issues-20130221
10 management issues-2013022110 management issues-20130221
10 management issues-20130221
 
LinkedTV Dissemination and Standardisation Report
LinkedTV Dissemination and Standardisation ReportLinkedTV Dissemination and Standardisation Report
LinkedTV Dissemination and Standardisation Report
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
 
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...
Project Factory Horizon 2020 – Tips and tricks for a good proposal for Creati...
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIG
 
WelDest Exploitation Plan 2012 - 2014
WelDest Exploitation Plan 2012 - 2014WelDest Exploitation Plan 2012 - 2014
WelDest Exploitation Plan 2012 - 2014
 
LOD2 project: Work Packages 10: Training, Dissemination and Fertilization
LOD2 project: Work Packages 10: Training, Dissemination and FertilizationLOD2 project: Work Packages 10: Training, Dissemination and Fertilization
LOD2 project: Work Packages 10: Training, Dissemination and Fertilization
 
EC-funded Projects and CAPs Webinar slides
EC-funded Projects and CAPs Webinar slidesEC-funded Projects and CAPs Webinar slides
EC-funded Projects and CAPs Webinar slides
 
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf
07.02.2024_Master-slide-deck_EU-funded-projects-European-CAPs-webinar.pptx.pdf
 

Plus de SLOPE Project

Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6SLOPE Project
 
Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5SLOPE Project
 
Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4SLOPE Project
 
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE Project
 
SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE Project
 
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Project
 
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE Project
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE Project
 
SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE Project
 
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE Project
 
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE Project
 
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE Project
 
SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE Project
 
SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE Project
 
SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE Project
 
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE Project
 
SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE Project
 
SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE Project
 
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE Project
 
SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE Project
 

Plus de SLOPE Project (20)

Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6
 
Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5
 
Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4
 
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3
 
SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4
 
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forest
 
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4
 
SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1
 
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5
 
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4
 
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2
 
SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1
 
SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2
 
SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2
 
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7
 
SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6
 
SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5
 
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4
 
SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3
 

Dernier

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 

Dernier (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 

Optimize Forestry Project Dissemination

  • 1. Project SLOPE 1 WP 8 – Openness with other activities, dissemination and exploitation of results
  • 2. Kick-off Meeting 8-9/jan/2014 WP8 – Objectives • Disseminate the SLOPE results broadly among stakeholders of the whole production process. • Ensure the visibility of SLOPE activities and results, and maximize its utilisation by the European forestry and agricultural industry (including machinery and software solutions). • Ensure follow up on results by the industry to create new economic activity. The first aim of this work package is to achieve the widest dissemination of the technical results of the project within: • The membership of the consortium, • The scientific community • and, more important, within the European forestry and agricultural sector. MAIN OBJECTIVES
  • 3. Kick-off Meeting 8-9/jan/2014 WP8 – Objectives No actual commercial exploitation and any concrete preparation thereof, as well as related activities (e.g. marketing) will be reported in this work package and under the project SLOPE in general as these activities are not eligible for EU funding. A second big aim has been established in this work package: Develop a committed exploitation plan in order to ensure a proper and fair exploitation of the project results. MAIN OBJECTIVES
  • 4. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS a) Overall guidelines to awareness, networking and dissemination activities. The internal procedure for communication and dissemination activities will be as follows: • The DisseminationWP Leader ITENE will design the materials (brochure, newsletters, and poster), which will be approved by partners and finally by the project leader. • ITENE shall ask all partners involved in dissemination and communication activities for the materials and documents required every time this will be needed. • Each partner shall complete the tasks described in the dissemination plan for each activity before the given deadline as the results depend on all partners involvement.
  • 5. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS a) Overall guidelines to awareness, networking and dissemination activities. WEBSITE The project partners’ home pages will be linked to the website to draw attention to this project and its aims. Send interesting pictures related to the project to be used with dissemination purposes Upload documents on Intranet. SOCIAL MEDIA Participate on groups or pages. Cooperate, give feedback, promote the project within each one’s contacts. Send messages, tweets mentioning project’s profiles, etc. PRESS RELEASES Translate press release in local language. Send to local general and specialized media. DISSEMINATION ARTICLE Translate article in local language (optional) Send to local specialized media. PROJECT BROCHURE Use them at events, trade fairs related to the project. Show them in a visible place in your headquarter. NEWSLETTER Send to main professional interesting contacts. Participate with articles, pictures. REPORTING Follow instructions given to complete the spreadsheet.
  • 6. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS b) Dissemination plan 2 0 1 4 2 0 1 5 2 0 1 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 DISSEMINATION STRATEGY (3 rep.) BROCHURE PROJECT WEBSITE WEB 2.0 NEWSLETTERS (6) POSTER TRADE FAIRS, DEMOS TECHNICAL WORKSHOPS (4) FINAL CONFERENCE (1) RELATED PROJECTS FORUMS (5) SCIENTIFIC PUBLICATIONS (4) PRESS RELEASES (4) A general document with all the planned dissemination activities and the material to achieve a large diffusion of project results will be prepared. Deliverables: Month 6, 18, 30. In advance, a timetable has initially being planned:
  • 7. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS Task 8.1 - Dissemination planning and publications of results Task leader: ITENE; Participants: GRAPHITECH, CNR, BOKU, ITENE DISSEMINATION STRATEGY Document with all the planned dissemination activities and the material to achieve a large diffusion of project results. It will include, for example: - Detailed target audience. - Concrete Objectives. - Press releases and Publications / Interviews in business and general media. BROCHURE Date: Month 1. Available in electronic format NEWSLETTERS Date: Every 6 months Available to download in the website POSTER Date: Month 6. Use:Workshops, conferences, trade fairs, and other events.
  • 8. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS Task 8.1 - Dissemination planning and publications of results TRADE FAIRS AND DEMOS In order to have the widest dissemination and largest involvement of industrial stakeholders, SLOPE project and results will be presented at the most relevant fairs and demos, mainly organized in the participating countries.To be defined. SCIENTIFIC ARTICLES In selected journals and targeted publications at highly visible and relevant industrial and research conferences . At least 4 in 2015 & 2016 TECHNICALWORKSHOPS (4. Beginning in 2015) BOKU will organize four technical workshops targeted on industry, including SME, from the forestry and agricultural sector. These one-day seminars will take place during the execution of the project, once we have consolidated relevant results to disseminate. FINAL CONFERENCE (end of the project) A large-scale conference will be organized by CNR as final event of the project
  • 9. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS Task 8.1 - Dissemination planning and publications of results WEBSITE GRAPHITECH will be in charge for the deployment and maintenance of the project web-site and web 2.0 communication channels Date: Month 2. PUBLIC SITE Download section. News section and an e-newsletter. Easy-friendly interactive area. INTRANET SITE Only accessible for the projet’s members WEB 2.0 The project will also promote the use of web 2.0 social networks as LinkedIn, Twitter, Facebook, YouTube, in order to reach a huge number of target group members that are followers of topics addressed by the SLOPE project. The dissemination manager, who will update the information on a regular basis, will ensure permanent information in the online media.
  • 10. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS Task 8.1 - Dissemination planning and publications of results RELATED PROJECTS all partners will collaborate in identifying projects related to SLOPE, regional, European and extra-European (e.g.Canadian). ITENE will be in charge of establishing relationships with most of these projects to ensure synergy and exchange of results. (All detailed in point d of this presentation). COST ACTION COST Action platform will be also used to facilitate information exchange with the experts community. In particular, activity of the following COST Actions will be monitored and exchanges promoted: •FP1206 - European mixed forests. Integrating Scientific Knowledge in Sustainable Forest Management. (EuMIXFOR); • FP1201 - Forest LAnd Ownership Changes in Europe: Significance for Management And Policy (FACESMAP); • FP1106 - STReESS - Studying Tree Responses to extreme Events: a SynthesiS; • FP1001 - Improving Data and Information on the Potential Supply of Wood Resources: A European Approach from Multisource National Forest Inventories (USEWOOD).
  • 11. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS Template to collect feedback from partners – Follow instructions given to report activities
  • 12. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS c) Social networking (illustrating how to contribute to them) We can create accounts, pages and groups related to the project in Linkedin, Twitter, Facebook, andYoutube. All partners can contribute sending us material to be published in the different social networks, for example: • Pictures of events, trade fairs, conferences. • Relevant videos related to the project. • News related to the project, about your company or other relevant initiatives. • Pictures of meetings, etc. • All materials (pdf, presentations, etc) which can have interest to our audience. Then each partner can contribute personally to each social network, for example: Participate in debates, open new discussions. Recommend debates, updates, news, etc. Invite your contacts to join SLOPE Group Retweet messages with your company’s profile or your own profile. Make tweets with news related to the project. Mention @slopeproject in your messages Click “I like” with your profile to all project’s updates. Share updates and page of the project. Reccommend the Slope Page to your contacts Click “I like” to the project’s videos. Follow the channels. Share with your contacts and invite to follow the SLOPEs channel.
  • 13. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS d) How to implement and monitor linkage activities with other EU projects 1) Contact with other projects. Some examples: Finished projects • Trees4Future. Forestry genetics. Involved partners: BOKU,CNR • BISYPLAN. Bioenergy. Involved partners: BOKU, CNR • SATMODO. ”live” monitoring of harvest processes. Involved partners:TREEMETRICS • FLEXWOOD logistic system. Involved partner: BOKU,TREEMETRICS. On-going projects: • ARANGE. Strategies for the multifunctional management of mountain ranges. Involved partners: BOKU (Coordinator) • INFRESAccelerate the technological development and open new paths to EU’s renewable targets. Involved partners: CNR, BOKU,KESLA. • LogistEC. Sustainable biomass supply chains Involved partner: MHG • Developing and Piloting a Platform and Database for Biomass and Bioenergy ResourceAssessment. A distributed monitoring and planning platform for biomass feedstock and land use. Involved partners: MHG
  • 14. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS d) How to implement and monitor linkage activities with other EU projects 2) Establish a meeting to discuss common issues and identify once per year: • 1st one before/after the Project meeting in Finland (june 2014). • Tentative calendar • STRUCTURE: • Individual Project presentations • Discuss in groups with other project representatives regarding selected topics 2 0 1 4 2 0 1 5 2 0 1 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RELATED PROJECTS FORUMS (5)
  • 15. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS e) OTHER ACTIVITIES INTHE WP Task 8.2 – Exploitation, business planning and IPR & licensing policies Task leader: MHG; Participants: KESLA, COAST, BOKU, FLY, GRE, TRE • Identification of the business scenarios • Creation of the appropriate SLOPE business model • Production of a business plan • Development of a detailed exploitation strategy by each partner • Continuous technology and market watch • Development of an intellectual property rights (IPR) strategy.
  • 16. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS e) OTHER ACTIVITIES IN THE WP Task 8.3 - Contribution to standardization Task leader: CNR; Participants: ITENE The main objective of this task is to contribute to both update existing standards and to develop new ones in the field of sustainable forest production: • Communication with standardization committees via the interactive section of the SLOPE website and social networks. • Physical meetings between SLOPE members and the StandardizationTechnical Committee. • The SLOPE consortium will show interest in participating in the working groups of standard committees. • Consensus with CEN and other standardization
  • 17. Kick-off Meeting 8-9/jan/2014 WP8 -TASKS e) OTHER ACTIVITIES IN THE WP Task 8.4 - Industrial Advisory Board Task leader: MHG; Participants: KESLA,COAST, BOKU, FLY,TRE The main objective of this task will be to involve industrial members from the forestry, agricultural and related logistics and machinery industry. The main activities of the advisory board will be interchange opinions and knowledge by means of meetings and discussions. This information will be used as inputs for the execution of the tasks defined in SLOPE project, and redefine them when needed. The Advisory board will be set up at an early stage (first project meeting) of the project in order to follow all the activities starting from the requirements analysis.
  • 18. WP 8 PRESENTATION Kick-off Meeting 8-9/jan/2014 Thanks for your attention! egonzalez@itene.com Emilio González, ITENE