WP5. Forest information system
development
•Task 5.1 Database to support novel inventory data content – MHG
• Partners: GRAPHITECH, CNR, COAST, FLY, TRE, ITENE
• MHG Portal Platform with MHG Biomass Manager and Iptim integration as
a basis
• M08-M17
• Task 5.2 Platform for near real time control of operations–TRE
• Partners: GRAPHITECH, CNR, MHG, TRE, ITENE
• M11-M22
Task’s objective is to develop a system (MHG) for near real time control of
operations that integrates the information about the timber material origin,
quality and quantities being processed along the supply chain in order to optimize
procedures and avoid delay times in operations (i.e. manage transport fleet in
order to avoid saturation of storage areas at the cable crane landing).
This will be achieved by the implementation of a series of different interfaces to
access the FIS and allow a number of different operations
• Note! Utilization of features and scalability of current services like the Forest
Warehouse, MHG Biomass Manager, MHG Mobile and Iptim
Kick-off Meeting
8-9/jan/2014
WP5. Forest information system
development
• Task 5.3 Online purchasing/invoicing of industrial timber and biomass – MHG
• Partners: GRAPHITECH, CNR, TRE, ITENE
• M19-M28
• Huge field for development!
• Task 5.4 Short-term optimization–BOKU
• Partners: CNR, MHG, TRE, ITENE
• M18-M27
• Note! Utilization of Iptim´s features and scalability
• Task 5.5 Mid-long term optimization; strategic and tactical planning - MHG
• Partners: GRAPHITECH, FLY, TRE, ITENE
• M18-M27
• Note! Utilization of Iptim´s features and scalability

Kick-off Meeting
8-9/jan/2014
T.5.5 – Mid-long term optimization;
strategic and tactical planning
MHG Systems
• Our state of the art
• Simulation and optimisation framework
• Simple user interface for the complex problem
• Beyond state of the art
• Simulations: growth models
• Simulations: management regimes
• Optimisation

Kick-off Meeting
8-9/jan/2014
Our state of the art: computation
Long term planning using the SIMO framework for predicting alternative future
states of forest stands using simulation, and using mathematical optimisation to
select the best alternatives based on the objective and constraints for forest
management.
The framework has been validated in Finland where the framework is in
operational use on close to all of the 26 million ha of forest land.
Key features of the framework:
• Adaptable: no fixed data model, type of silviculture or growth models, any of
these can be configured
• Extensible: it has been used from tree plantations in Africa to boreal forest in
Finland

Kick-off Meeting
8-9/jan/2014
Our state of the art: UI
Iptim:
• Long term planning Decision Support System built on top of the SIMO
framework
• Design goal: “Excel like user experience for forest planning without sacrificing
the power of describing the complex phenomenon”
The design goal expressed by putting the user in control of:
• The data model for forest inventory data
• The baseline definition of how forests are managed; the management regime
• The growth models on which the simulation is based;
• possibility to create user’s own growth models in situations where
there’s scarce research literature found
• Adopt specific models from research, calibrate with your own data if
necessary
Kick-off Meeting
8-9/jan/2014
Iptim – UI examples (1)

Kick-off Meeting
8-9/jan/2014
Iptim – UI examples (2)

Kick-off Meeting
8-9/jan/2014
Iptim – UI examples (3)

Kick-off Meeting
8-9/jan/2014
Beyond state of the art
Growth models:
• Integrate state of the art growth models from research literature for the
demonstration areas (from Task ?.? / ?)
Management regimes:
• Integrate baseline forest management regime for mountain forests (from Task
5.4 / BOKU)
Optimisation:
• Bridging the gap between strategic (long term) and tactical (mid term)
planning
• From tactical to operational
• Risk management

Kick-off Meeting
8-9/jan/2014
Typical strategic plan
Long term plans are typically “shot gun” solutions; i.e. there is no spatial aspect
in the solution, the stands to harvest are “all over the place”.
This is especially true for plans for areas bigger than couple of hundred/thousand
hectares.

Kick-off Meeting
8-9/jan/2014
A feasible tactical plan
That kind of plan is not ready for operation as such, yearly replanning needed to
have something realistic to execute for that year. Currently lack of tools at this
level.
Let’s introduce the spatial constraints already at the strategic phase
=> guarantee that our long term plan really is feasible
=> shorten the planning cycle & gain visibility for resource and infrastructure
demand

Kick-off Meeting
8-9/jan/2014
From tactical to operational
“Gain visibility for resource and infrastructure demand” taken one step further:
introduce infrastructure, machine and workforce capacity as parameters in the
planning problem
• Identify production bottlenecks prior to running into them in operations
• Plan harvesting, infrastructure investments and capacity investments
concurrently
Same framework spans from strategic to operational planning; possibility to use
subsets of the functionality for optimising operational plans (workforce and
machine capacity utilisation including logistics)

Kick-off Meeting
8-9/jan/2014
A note about contingency planning
Introducing uncertainty analysis and risk management already at the planning
level.
• Monte Carlo simulation for introducing the effects of uncertainty of different
components in the plan at the simulation stage
• Robust optimisation for introducing the uncertainties at the optimisation
stage
=> Tools for the planner to take their position on risk already at the long term
planning stage

Kick-off Meeting
8-9/jan/2014
Timeline and deliverables
August 2014

January 2015

January 2016

WP5. Forest information system development

M08

M09

M10

M11

M12

M13

M14

M15

M16

T.5.1. Database to support novel inventory data content

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

M17
X

M18

M19

M20

M21 M22

M23

M24

M25

x

x

x

x

x

x

x

x

x

x

x

x

x

M26

M27

M28

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

D5.01 Inventory module for the FIS: MHG
x

T.5.2. Database to support novel inventory data content

x

D5.02 Real-time supply chain control module of the FIS: TRE
x

T.5.3. Online purchasing/invoicing of timber and biomass
D5.03 Platform for purchasing/invoicing: MHG
T.5.4. Short-term optimization: operational planning
D5.04 Short-term optimization module of the FIS: BOKU
T.5.5.Mid-long-term optimization: strategic and tactical
D5.05 Mid-long-term optimization module of the FIS: MHG
Annual meeting
Project meeting
Skype

Kick-off Meeting
8-9/jan/2014
Communication and risk control
• Timeframe months: M08-M28
• Strict schedule, real-time information sharing needed
• Communication
• Skype in 2-3 weeks & physical meetings every two months
• Communication platform
• Immediate access to current services for key persons in
order to innovate; MHG Biomass Manager, MHG Mobile
Iptim, Forest Warehouse etc.
• Person in charge
• ITENE:
• GRAPHITECH
• CNR:
• COAST:
• BOKU:
• FLY:
• TRE:
Kick-off Meeting
8-9/jan/2014
Communication and risk control
• Timeframe months: M08-M28
• Strict schedule, real-time information sharing needed
• Communication
• Skype in 2-3 weeks & physical meetings every two months
• Communication platform
• Immediate access to current services for key persons in
order to innovate; MHG Biomass Manager, MHG Mobile
Iptim, Forest Warehouse etc.
• Person in charge
• ITENE:
• GRAPHITECH
• CNR:
• COAST:
• BOKU:
• FLY:
• TRE:
Kick-off Meeting
8-9/jan/2014

Contenu connexe

En vedette (13)

Slope Task 7.3 – Trials and validation cycle (by BOKU)
Slope Task 7.3 – Trials and validation cycle (by BOKU) Slope Task 7.3 – Trials and validation cycle (by BOKU)
Slope Task 7.3 – Trials and validation cycle (by BOKU)
 
Presentazione wp3 Greifenberg
Presentazione wp3 GreifenbergPresentazione wp3 Greifenberg
Presentazione wp3 Greifenberg
 
Task 3.2 greifenberg
Task 3.2 greifenbergTask 3.2 greifenberg
Task 3.2 greifenberg
 
Task 3.3 greifenberg
Task 3.3 greifenbergTask 3.3 greifenberg
Task 3.3 greifenberg
 
Treemetrics introduction slope
Treemetrics introduction slopeTreemetrics introduction slope
Treemetrics introduction slope
 
Wp 4 sandak general overview
Wp 4 sandak general overviewWp 4 sandak general overview
Wp 4 sandak general overview
 
T.2.5 – road and logistic planning (by itene)
T.2.5 – road and logistic planning (by itene)T.2.5 – road and logistic planning (by itene)
T.2.5 – road and logistic planning (by itene)
 
SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1
 
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7
 
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4
 
T.5.4 – Short-term optimization: operational, ongoing and contingency plannin...
T.5.4 – Short-term optimization: operational, ongoing and contingency plannin...T.5.4 – Short-term optimization: operational, ongoing and contingency plannin...
T.5.4 – Short-term optimization: operational, ongoing and contingency plannin...
 
SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3
 
SLOPE 1st workshop - presentation 1
SLOPE 1st workshop - presentation 1SLOPE 1st workshop - presentation 1
SLOPE 1st workshop - presentation 1
 

Similaire à Slope wp5 task 5.5 by MHG

Mhg company presentation
Mhg company presentationMhg company presentation
Mhg company presentation
SLOPE Project
 
Plan4all newsletter 5
Plan4all newsletter 5Plan4all newsletter 5
Plan4all newsletter 5
plan4all
 
E chain optimization at st. microelectronics
E  chain optimization at st. microelectronicsE  chain optimization at st. microelectronics
E chain optimization at st. microelectronics
shwetabakshi
 

Similaire à Slope wp5 task 5.5 by MHG (20)

Kick-Off Meeting - WP5
Kick-Off Meeting - WP5Kick-Off Meeting - WP5
Kick-Off Meeting - WP5
 
1st Technical Meeting - WP5
1st Technical Meeting - WP51st Technical Meeting - WP5
1st Technical Meeting - WP5
 
Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5Slope Final Review Meeting - WP5
Slope Final Review Meeting - WP5
 
Mhg company presentation
Mhg company presentationMhg company presentation
Mhg company presentation
 
DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
 
4th Technical Meeting - WP5
4th Technical Meeting - WP54th Technical Meeting - WP5
4th Technical Meeting - WP5
 
Ensuring solution performance in large-scale smart installations”, Showcase t...
Ensuring solution performance in large-scale smart installations”, Showcase t...Ensuring solution performance in large-scale smart installations”, Showcase t...
Ensuring solution performance in large-scale smart installations”, Showcase t...
 
sap-apo overview
sap-apo overviewsap-apo overview
sap-apo overview
 
Feed the Future indicators and the Africa RISING project mapping and monitori...
Feed the Future indicators and the Africa RISING project mapping and monitori...Feed the Future indicators and the Africa RISING project mapping and monitori...
Feed the Future indicators and the Africa RISING project mapping and monitori...
 
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction
 
FutureFarm
FutureFarmFutureFarm
FutureFarm
 
FutureFarm
FutureFarmFutureFarm
FutureFarm
 
Solving advanced research problems with real time open data from satellites a...
Solving advanced research problems with real time open data from satellites a...Solving advanced research problems with real time open data from satellites a...
Solving advanced research problems with real time open data from satellites a...
 
SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1
 
Plan4all newsletter 5
Plan4all newsletter 5Plan4all newsletter 5
Plan4all newsletter 5
 
E chain optimization at st. microelectronics
E  chain optimization at st. microelectronicsE  chain optimization at st. microelectronics
E chain optimization at st. microelectronics
 
Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5
 
Fitman webinar 2015 06 Dynamic CEP
Fitman webinar 2015 06 Dynamic CEPFitman webinar 2015 06 Dynamic CEP
Fitman webinar 2015 06 Dynamic CEP
 
1st Technical Meeting - WP1
1st Technical Meeting - WP11st Technical Meeting - WP1
1st Technical Meeting - WP1
 
NextGEOSS: The Next Generation European Data Hub and Cloud Platform for Earth...
NextGEOSS: The Next Generation European Data Hub and Cloud Platform for Earth...NextGEOSS: The Next Generation European Data Hub and Cloud Platform for Earth...
NextGEOSS: The Next Generation European Data Hub and Cloud Platform for Earth...
 

Plus de SLOPE Project

Plus de SLOPE Project (20)

Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8
 
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7
 
Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6Slope Final Review Meeting - WP6
Slope Final Review Meeting - WP6
 
Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4
 
Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3
 
Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2
 
Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1
 
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3
 
SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4
 
SLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarder
 
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forest
 
SLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systems
 
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4
 
SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1
 
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machines
 
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5
 
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4
 
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2
 
SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Dernier (20)

Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

Slope wp5 task 5.5 by MHG

  • 1. WP5. Forest information system development •Task 5.1 Database to support novel inventory data content – MHG • Partners: GRAPHITECH, CNR, COAST, FLY, TRE, ITENE • MHG Portal Platform with MHG Biomass Manager and Iptim integration as a basis • M08-M17 • Task 5.2 Platform for near real time control of operations–TRE • Partners: GRAPHITECH, CNR, MHG, TRE, ITENE • M11-M22 Task’s objective is to develop a system (MHG) for near real time control of operations that integrates the information about the timber material origin, quality and quantities being processed along the supply chain in order to optimize procedures and avoid delay times in operations (i.e. manage transport fleet in order to avoid saturation of storage areas at the cable crane landing). This will be achieved by the implementation of a series of different interfaces to access the FIS and allow a number of different operations • Note! Utilization of features and scalability of current services like the Forest Warehouse, MHG Biomass Manager, MHG Mobile and Iptim Kick-off Meeting 8-9/jan/2014
  • 2. WP5. Forest information system development • Task 5.3 Online purchasing/invoicing of industrial timber and biomass – MHG • Partners: GRAPHITECH, CNR, TRE, ITENE • M19-M28 • Huge field for development! • Task 5.4 Short-term optimization–BOKU • Partners: CNR, MHG, TRE, ITENE • M18-M27 • Note! Utilization of Iptim´s features and scalability • Task 5.5 Mid-long term optimization; strategic and tactical planning - MHG • Partners: GRAPHITECH, FLY, TRE, ITENE • M18-M27 • Note! Utilization of Iptim´s features and scalability Kick-off Meeting 8-9/jan/2014
  • 3. T.5.5 – Mid-long term optimization; strategic and tactical planning MHG Systems • Our state of the art • Simulation and optimisation framework • Simple user interface for the complex problem • Beyond state of the art • Simulations: growth models • Simulations: management regimes • Optimisation Kick-off Meeting 8-9/jan/2014
  • 4. Our state of the art: computation Long term planning using the SIMO framework for predicting alternative future states of forest stands using simulation, and using mathematical optimisation to select the best alternatives based on the objective and constraints for forest management. The framework has been validated in Finland where the framework is in operational use on close to all of the 26 million ha of forest land. Key features of the framework: • Adaptable: no fixed data model, type of silviculture or growth models, any of these can be configured • Extensible: it has been used from tree plantations in Africa to boreal forest in Finland Kick-off Meeting 8-9/jan/2014
  • 5. Our state of the art: UI Iptim: • Long term planning Decision Support System built on top of the SIMO framework • Design goal: “Excel like user experience for forest planning without sacrificing the power of describing the complex phenomenon” The design goal expressed by putting the user in control of: • The data model for forest inventory data • The baseline definition of how forests are managed; the management regime • The growth models on which the simulation is based; • possibility to create user’s own growth models in situations where there’s scarce research literature found • Adopt specific models from research, calibrate with your own data if necessary Kick-off Meeting 8-9/jan/2014
  • 6. Iptim – UI examples (1) Kick-off Meeting 8-9/jan/2014
  • 7. Iptim – UI examples (2) Kick-off Meeting 8-9/jan/2014
  • 8. Iptim – UI examples (3) Kick-off Meeting 8-9/jan/2014
  • 9. Beyond state of the art Growth models: • Integrate state of the art growth models from research literature for the demonstration areas (from Task ?.? / ?) Management regimes: • Integrate baseline forest management regime for mountain forests (from Task 5.4 / BOKU) Optimisation: • Bridging the gap between strategic (long term) and tactical (mid term) planning • From tactical to operational • Risk management Kick-off Meeting 8-9/jan/2014
  • 10. Typical strategic plan Long term plans are typically “shot gun” solutions; i.e. there is no spatial aspect in the solution, the stands to harvest are “all over the place”. This is especially true for plans for areas bigger than couple of hundred/thousand hectares. Kick-off Meeting 8-9/jan/2014
  • 11. A feasible tactical plan That kind of plan is not ready for operation as such, yearly replanning needed to have something realistic to execute for that year. Currently lack of tools at this level. Let’s introduce the spatial constraints already at the strategic phase => guarantee that our long term plan really is feasible => shorten the planning cycle & gain visibility for resource and infrastructure demand Kick-off Meeting 8-9/jan/2014
  • 12. From tactical to operational “Gain visibility for resource and infrastructure demand” taken one step further: introduce infrastructure, machine and workforce capacity as parameters in the planning problem • Identify production bottlenecks prior to running into them in operations • Plan harvesting, infrastructure investments and capacity investments concurrently Same framework spans from strategic to operational planning; possibility to use subsets of the functionality for optimising operational plans (workforce and machine capacity utilisation including logistics) Kick-off Meeting 8-9/jan/2014
  • 13. A note about contingency planning Introducing uncertainty analysis and risk management already at the planning level. • Monte Carlo simulation for introducing the effects of uncertainty of different components in the plan at the simulation stage • Robust optimisation for introducing the uncertainties at the optimisation stage => Tools for the planner to take their position on risk already at the long term planning stage Kick-off Meeting 8-9/jan/2014
  • 14. Timeline and deliverables August 2014 January 2015 January 2016 WP5. Forest information system development M08 M09 M10 M11 M12 M13 M14 M15 M16 T.5.1. Database to support novel inventory data content x x x x x x x x x x x x x x x M17 X M18 M19 M20 M21 M22 M23 M24 M25 x x x x x x x x x x x x x M26 M27 M28 x x x x x x x x x x x x x x x x x x x x D5.01 Inventory module for the FIS: MHG x T.5.2. Database to support novel inventory data content x D5.02 Real-time supply chain control module of the FIS: TRE x T.5.3. Online purchasing/invoicing of timber and biomass D5.03 Platform for purchasing/invoicing: MHG T.5.4. Short-term optimization: operational planning D5.04 Short-term optimization module of the FIS: BOKU T.5.5.Mid-long-term optimization: strategic and tactical D5.05 Mid-long-term optimization module of the FIS: MHG Annual meeting Project meeting Skype Kick-off Meeting 8-9/jan/2014
  • 15. Communication and risk control • Timeframe months: M08-M28 • Strict schedule, real-time information sharing needed • Communication • Skype in 2-3 weeks & physical meetings every two months • Communication platform • Immediate access to current services for key persons in order to innovate; MHG Biomass Manager, MHG Mobile Iptim, Forest Warehouse etc. • Person in charge • ITENE: • GRAPHITECH • CNR: • COAST: • BOKU: • FLY: • TRE: Kick-off Meeting 8-9/jan/2014
  • 16. Communication and risk control • Timeframe months: M08-M28 • Strict schedule, real-time information sharing needed • Communication • Skype in 2-3 weeks & physical meetings every two months • Communication platform • Immediate access to current services for key persons in order to innovate; MHG Biomass Manager, MHG Mobile Iptim, Forest Warehouse etc. • Person in charge • ITENE: • GRAPHITECH • CNR: • COAST: • BOKU: • FLY: • TRE: Kick-off Meeting 8-9/jan/2014