PMP® Exam Preparation
Project Management Processes
www.wizardea.com | contact@wizardea.com
Learning Objectives
Upon completion of this topic you will learn about
– What is done during Initiation process
– What is done during Planning process
– What is done during Executing process
– What is done during Monitoring & controlling process
– What is done during Closing process
– Project Management Knowledge Areas
3
www.wizardea.com | contact@wizardea.com
Project Management Processes
Project management processes
are grouped into five categories
known as Project Management
Process Groups (or Process
Groups)
– Initiating process group
– Planning process group
– Executing process group
– Monitoring & controlling
process group
– Closing process group
4
www.wizardea.com | contact@wizardea.com
Process Group Interaction
5
www.wizardea.com | contact@wizardea.com
Initiating Process Group Activities
• Develop project charter
• Identify project stakeholders
6
www.wizardea.com | contact@wizardea.com
Planning Process Group Activities
• Develop Project Management Plan
• Collect Requirements
• Define Scope
• Define WBS
• Define Activities
• Sequence Activities
• Estimate Activity Resources
• Estimate Activity Durations
• Develop Schedule
• Estimate Costs
• Determine Budget
• Plan Quality
• Develop Human Resource Plan
• Plan Communications
• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis
• Perform Quantitative Risk Analysis
• Plan Risk Responses
• Plan Procurements
7
www.wizardea.com | contact@wizardea.com
Executing Process Group Activities
• Direct and Manage Project Execution
• Perform Quality Assurance
• Acquire Project Team
• Develop Project Team
• Manage Project Team
• Distribute Information
• Manage Stakeholder Expectations
• Conduct Procurements
8
www.wizardea.com | contact@wizardea.com
Monitoring & Controlling Process Group
Activities
• Monitor and Control Project Work
• Perform Integrated Change Control
• Verify Scope
• Control Scope
• Control Schedule
• Control Costs
• Perform Quality Control
• Report Performance
• Monitor and Control Risks
• Administer Procurements
9
www.wizardea.com | contact@wizardea.com
Closing Process Group Activities
• Close Project or Phase
• Close Procurements
10
www.wizardea.com | contact@wizardea.com
Project Management Knowledge Areas
11
www.wizardea.com | contact@wizardea.com
Project Management Process Mapping
Knowledge Area
Process Group
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring
Process Group
Closing Process
Group
Project
Integration
Management
Develop Project
Charter
Develop Project
Management Plan
Direct and Manage
Project Execution
Monitor and
Control Project
Work
Perform Integrated
Change Control
Close Project or
Phase
Project Scope
Management
Collect
Requirements
Define Scope
Create WBS
Verify Scope
Control Scope
Project Time
Management
Define Activities
Sequence
Activities
Estimate Activity
Resources
Estimate Activity
Durations
Develop Schedule
Control Schedule
Project Cost
Management
Estimate Costs
Determine Budget
Control Cost
Project Quality
Management
Plan Quality Perform Quality
Assurance
Perform Quality
Control
12
www.wizardea.com | contact@wizardea.com
Project Management Process Mapping
Knowledge Area
Process Group
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring
Process Group
Closing Process
Group
Project Human
Resource
Management
Develop Human
Resource Plan
Acquire Project
Team
Develop Project
Team
Manage Project
Team
Project
Communication
Management
Identify
Stakeholders
Plan
Communications
Distribute
Information
Manage
Stakeholder
Expectation
Report
Performance
Project Risk
Management
Plan Risk
Management
Identify Risks
Perform
Qualitative Risk
Analysis
Perform
Quantitative Risk
Analysis
Plan Risk
Responses
Monitor and
Control Risk
Project
Procurement
Management
Plan Procurements Conduct
Procurements
Administer
Procurements
Close
Procurements
www.wizardea.com | contact@wizardea.com
Questions
14
• [mail.shahrier@gmail.com]
• http://bd.linkedin.com/in/shahrier

Contenu connexe

Tendances

Project Management Course slide 1
Project Management Course slide 1Project Management Course slide 1
Project Management Course slide 1Ahmed Alageed
 
Project integration management
Project integration managementProject integration management
Project integration managementEhsan Ullah
 
PMP Training Course - Lecture I
PMP Training Course - Lecture IPMP Training Course - Lecture I
PMP Training Course - Lecture IThe Daily PM
 
Top 20 Best Project Management Software
Top 20 Best Project Management SoftwareTop 20 Best Project Management Software
Top 20 Best Project Management SoftwareMopinion
 
PMP Preparation 2 - Processes
PMP Preparation 2 - ProcessesPMP Preparation 2 - Processes
PMP Preparation 2 - ProcessesAndrew Mikityuk
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementAndrew Mikityuk
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication ManagementDavidMcLachlan1
 
Project integration management
Project integration managementProject integration management
Project integration managementPrabudh Dhingra
 
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideNetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideSwati Chhabra
 
Project integration management
Project  integration managementProject  integration management
Project integration managementdeep sharma
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope ManagementDavidMcLachlan1
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sampleNada Sallam
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Fida Karim 🇵🇰
 
Initiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate VancouverInitiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate VancouverInnovate Vancouver
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 

Tendances (20)

Project Management Course slide 1
Project Management Course slide 1Project Management Course slide 1
Project Management Course slide 1
 
Project integration management
Project integration managementProject integration management
Project integration management
 
PMP Training Course - Lecture I
PMP Training Course - Lecture IPMP Training Course - Lecture I
PMP Training Course - Lecture I
 
Pmi kenya starting a pmo
Pmi kenya starting a pmoPmi kenya starting a pmo
Pmi kenya starting a pmo
 
Top 20 Best Project Management Software
Top 20 Best Project Management SoftwareTop 20 Best Project Management Software
Top 20 Best Project Management Software
 
PMP Preparation 2 - Processes
PMP Preparation 2 - ProcessesPMP Preparation 2 - Processes
PMP Preparation 2 - Processes
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration Management
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
 
Project integration management
Project integration managementProject integration management
Project integration management
 
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideNetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
 
Project integration management
Project  integration managementProject  integration management
Project integration management
 
Pm training day 1
Pm training   day 1Pm training   day 1
Pm training day 1
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...
 
Initiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate VancouverInitiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate Vancouver
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
Pmp integration management
Pmp integration managementPmp integration management
Pmp integration management
 
CAPM week 1 chapter 3
CAPM week 1 chapter 3CAPM week 1 chapter 3
CAPM week 1 chapter 3
 
Pm training day 3
Pm training   day 3Pm training   day 3
Pm training day 3
 

Similaire à PMP Project Management Processes

Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
Innovate vancouver project management book
Innovate vancouver   project management bookInnovate vancouver   project management book
Innovate vancouver project management bookInnovate Vancouver
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
Topic 7 - Project Scope Management.pdf
Topic 7 - Project Scope Management.pdfTopic 7 - Project Scope Management.pdf
Topic 7 - Project Scope Management.pdfHuyNguyen657394
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2test prod1
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1test prod1
 
Pmp training sigmora
Pmp training sigmoraPmp training sigmora
Pmp training sigmorabgadicha
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1test prod1
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1test prod1
 
Top Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad ThaljiTop Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad ThaljiTop Pillars
 
Project_Integration_Managemen.pptx
Project_Integration_Managemen.pptxProject_Integration_Managemen.pptx
Project_Integration_Managemen.pptxIvarsLinde1
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training programParamjit Arora
 

Similaire à PMP Project Management Processes (20)

Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Innovate vancouver project management book
Innovate vancouver   project management bookInnovate vancouver   project management book
Innovate vancouver project management book
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
9.5 Manage Team
9.5 Manage Team9.5 Manage Team
9.5 Manage Team
 
9.5 Manage Team
9.5 Manage Team9.5 Manage Team
9.5 Manage Team
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
Topic 7 - Project Scope Management.pdf
Topic 7 - Project Scope Management.pdfTopic 7 - Project Scope Management.pdf
Topic 7 - Project Scope Management.pdf
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
Nine Things-in-the-PMBoK
Nine Things-in-the-PMBoKNine Things-in-the-PMBoK
Nine Things-in-the-PMBoK
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1
 
PMP Course syllabus.pdf
PMP Course syllabus.pdfPMP Course syllabus.pdf
PMP Course syllabus.pdf
 
Pmp training sigmora
Pmp training sigmoraPmp training sigmora
Pmp training sigmora
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1
 
Top Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad ThaljiTop Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad Thalji
 
Project_Integration_Managemen.pptx
Project_Integration_Managemen.pptxProject_Integration_Managemen.pptx
Project_Integration_Managemen.pptx
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 

Plus de B M Shahrier Majumder, PMP, CSM (6)

PMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost ManagementPMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost Management
 
CMMI Appraisal Summary
CMMI Appraisal SummaryCMMI Appraisal Summary
CMMI Appraisal Summary
 
Southtech continues ISO 9001
Southtech continues ISO 9001Southtech continues ISO 9001
Southtech continues ISO 9001
 
Southtech Achieved CMMI L3
Southtech Achieved CMMI L3Southtech Achieved CMMI L3
Southtech Achieved CMMI L3
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
 
Information System Dashboard
Information System DashboardInformation System Dashboard
Information System Dashboard
 

Dernier

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 

Dernier (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 

PMP Project Management Processes

  • 1. www.wizardea.com | contact@wizardea.com B. M. Shahrier Majumder, PMP PMP® Exam Preparation
  • 3. www.wizardea.com | contact@wizardea.com Learning Objectives Upon completion of this topic you will learn about – What is done during Initiation process – What is done during Planning process – What is done during Executing process – What is done during Monitoring & controlling process – What is done during Closing process – Project Management Knowledge Areas 3
  • 4. www.wizardea.com | contact@wizardea.com Project Management Processes Project management processes are grouped into five categories known as Project Management Process Groups (or Process Groups) – Initiating process group – Planning process group – Executing process group – Monitoring & controlling process group – Closing process group 4
  • 6. www.wizardea.com | contact@wizardea.com Initiating Process Group Activities • Develop project charter • Identify project stakeholders 6
  • 7. www.wizardea.com | contact@wizardea.com Planning Process Group Activities • Develop Project Management Plan • Collect Requirements • Define Scope • Define WBS • Define Activities • Sequence Activities • Estimate Activity Resources • Estimate Activity Durations • Develop Schedule • Estimate Costs • Determine Budget • Plan Quality • Develop Human Resource Plan • Plan Communications • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis • Perform Quantitative Risk Analysis • Plan Risk Responses • Plan Procurements 7
  • 8. www.wizardea.com | contact@wizardea.com Executing Process Group Activities • Direct and Manage Project Execution • Perform Quality Assurance • Acquire Project Team • Develop Project Team • Manage Project Team • Distribute Information • Manage Stakeholder Expectations • Conduct Procurements 8
  • 9. www.wizardea.com | contact@wizardea.com Monitoring & Controlling Process Group Activities • Monitor and Control Project Work • Perform Integrated Change Control • Verify Scope • Control Scope • Control Schedule • Control Costs • Perform Quality Control • Report Performance • Monitor and Control Risks • Administer Procurements 9
  • 10. www.wizardea.com | contact@wizardea.com Closing Process Group Activities • Close Project or Phase • Close Procurements 10
  • 11. www.wizardea.com | contact@wizardea.com Project Management Knowledge Areas 11
  • 12. www.wizardea.com | contact@wizardea.com Project Management Process Mapping Knowledge Area Process Group Initiating Process Group Planning Process Group Executing Process Group Monitoring Process Group Closing Process Group Project Integration Management Develop Project Charter Develop Project Management Plan Direct and Manage Project Execution Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase Project Scope Management Collect Requirements Define Scope Create WBS Verify Scope Control Scope Project Time Management Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Control Schedule Project Cost Management Estimate Costs Determine Budget Control Cost Project Quality Management Plan Quality Perform Quality Assurance Perform Quality Control 12
  • 13. www.wizardea.com | contact@wizardea.com Project Management Process Mapping Knowledge Area Process Group Initiating Process Group Planning Process Group Executing Process Group Monitoring Process Group Closing Process Group Project Human Resource Management Develop Human Resource Plan Acquire Project Team Develop Project Team Manage Project Team Project Communication Management Identify Stakeholders Plan Communications Distribute Information Manage Stakeholder Expectation Report Performance Project Risk Management Plan Risk Management Identify Risks Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Responses Monitor and Control Risk Project Procurement Management Plan Procurements Conduct Procurements Administer Procurements Close Procurements
  • 14. www.wizardea.com | contact@wizardea.com Questions 14 • [mail.shahrier@gmail.com] • http://bd.linkedin.com/in/shahrier