3. The Levels of Engagement
Public-Open invitation
Public-Limited Invitation
Public-Engagement Working Group
Advisory Committee
Coordinating Committee
Consultant Team
Consulting Firm
Lead Client
Mayor
Adapted from Interaction Institute for Social
Change - http://interactioninstitute.org/
4. Approaches to Engagement
• Street pop-ups
• Online
comment form
• Suggestion
box
• World Café
• Neighbor
Circles
• Choicework
• 21st Century
Town Hall
• Citizen
Panels
• Voting
• Poll
• Focus
GroupIndividual
Prioritization
Collective
Prioritization
Collective Ideation
Individual Ideation
Adapted from Interaction Institute for Social
Change - http://interactioninstitute.org/
16. ENGAGEMENT #2: Preparation
TEAM ROLES:
Consulting Team:
• Developed the proposed layout as part
of the as part of the Newton-in-Motion
engagement strategy
• Calculated material needs and ordered
temporary installation materials
• Lead the installation of the design
Planning Department:
• Coordinated with the consulting team
and all City departments
• Managed community engagement
before and during the event
• Managed installation, event, and
deconstruction
• Prepared event materials for community
members
Department of Public Works:
• The traffic engineer reviewed the
proposed plans for accuracy and impacts
• Provided digital message boards that
flashed “temporary traffic change June
9-10” starting a week before the event.
• Provided street cleaning in advance of
the project and during the
deconstruction
• Provided crew & equipment for
installation and deconstruction (paint
sprayer was most helpful for creating
temporary green bike lanes)
Department of Parks and Recreation:
• Provided crew and equipment for
installation and deconstruction (water
truck w/ power washer was most helpful
for deconstruction)
Police:
• Provided directed patrols and details
during installation and deconstruction
• Essential to provide a safe working
environment in the roadway in the
middle of the night
• Provided on-call support should
anything have gone wrong during the
event
ADDITIONAL
COORDINATION:
Fire Department:
• Team made the fire department aware
of the demonstration and invited them
to do a test run of the layout with their
largest vehicle (successfully made the
turns)
MBTA (operates bus routes through the
site)
• Team made the MBTA aware of the
event, and the reconfiguration.
MassDOT (owns a bridge that we were
utilizing in the site)
• Team had had previous conversations
about possibly restriping the bridge in
the future. In advance of the event, the
team made MassDOT aware of the
event. MassDOT allowed the temporary
restriping without a permit.
27. Strategies forSuccess
Go where the people are
Do outreach in advance
• Posters & Postcards
• CityWebsite
• Email Lists
• Networking &Word of
Mouth
Make meetings kid friendly
• Coloring & QuietToys
• Bubbles
• Snacks
Replicate in-person activities
online
Be organized
• Set up a meeting kit
• Have event summaries for
staff and volunteers
Remember to engage with
internal team too
Collect demographics
Collect input/feedback and
report back
31. PARKING STUDY GOALS
Understand the Town’s role in the current and future parking
situation by:
– Assessing how many parking
spaces exist today and how
they are used
– Maximizing efficiency of the
current parking system
– Planning for future
development
– Meeting parking need in a
way that strengthens the
historic character of North
Easton Village
36. PUBLIC RECEPTION
Created a buzz
Attracted walk-
ups
Wished it lasted
longer
LESSONS LEARNED
Be noticed
Create a buzz in real
time
Go to the people!
Where do people
wait??
Twice is nice
Insert picture you want (preferably one where color screen will appropriately highlight).
To turn photo black & white, select photo, then: Picture Tools>Format>Recolor>Color Mode>Grey Scale
NAME OF SECTION is a text box with an indent built-in. Adjust indent through Format Shape>Text Box
Duplicate slide and edit for use later on in slideshow
Change the picture…
Word
Safe
18
Pedestrian
12
Crosswalk
13
Bike Lane
11
Clear
3
Focus
2
Visible
2
Public
6
Help
5
Bike
24
Drive
4
Walk
21
Total
NAME OF SECTION is a text box with an indent built-in. Adjust indent through Format Shape>Text Box
Duplicate slide and edit for use later on in slideshow
Change the picture…
NAME OF SECTION is a text box with an indent built-in. Adjust indent through Format Shape>Text Box
Duplicate slide and edit for use later on in slideshow
Change the picture…