Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl
1
Ed Grave
Verifying Performance and Capability
of New Technology for Surface and
Subsea Facilities
Presentation Outline
• Why Qualify?
• Technology Qualifying Program (TQP)
• Technical Readiness Level (TRL)
• TQP Pitfalls
• Subsea Separation Qualification Example
• Summary
2
Why Qualify?
• Enables new technology implementation
– Reduces capital costs
– Increases production/efficiency
– Improves reliability
• Identifies and reduces risks that can be
managed
• Confirmation that a technology will
function with confidence
3
Qualification Program
• Is a process that identifies & reduces
uncertainties that are manageable
• Two very useful documents for subsea:
– Det Norske Veritas (DNV-RP-A203)
– American Petroleum Institute (API-RP-17N)
• Most companies have their own
customized qualification programs
4
Qualification Program
Technology qualification
steps
5
Steps Description
1 Qualification Basis Facts & objective identified
2 Technology Assessment Novelty, challenges, gaps
3 Threat Assessment Identifies failure modes & risks
4 Technology Qualification
Plan (TQP)
Strategy to manage risks
5 Execution Plan Execution of TQP (tests, analysis)
6 Performance Assessment Review of collected evidence
Reference: Horpestad, Eirik; “Technology Qualification of
Equipment in Subsea Production Systems”, Master Thesis,
NTNU University 2012
API17N TRL Interpretation
Specific for Subsea Production System
6
TRL Stage Description
0 Unproven Concept No Analysis
1 Analytically Proven Experimental Research
2 Physically Proven Lab Tested
3 Prototype Tested Pilot Test-Robust & Reliable
4 Environment Tested Commercial Demonstration
5 System Tested System Integration
6 System Installed Full Scale System Test
7 Field Proven Proving Operation Over Time
1
2
3
Gate Reviews – assessment at different phases…
API17N TRC/TRL
Interpretation
7
Significant development required/unachievable during project timeline
Work required before the next stage of the project
Ready for use
Some additional required- achievable during project
TRL
Field
Proven
System
Installed
System
Tested
Environment
Tested
Prototype
Tested
Physically
Proven
Proven
Concept
Unproven
Concept
Technical Risk Category (TRC) TRC 7 6 5 4 3 2 1 0
Very High Technical Risk/
Unacceptable Reliability
A
<20%
High Technical Risk/
Low Reliability
B
20-80%
Medium Technical Risk/
Moderate Reliability
C
80-95%
Low Technical Risk/
Acceptable Reliability
D
>95%
Reducing Risk/Increasing Reliability
TQP Pit Falls
• Too much focus on engineering
and little on the process
• Many teams do not understand
what they are trying to do
• Too much focus on component
tests and not on the system
• More analytical models are needed
• TQP should not be an addendum
8
Reference: Markussen, Christian; “Experience with Technology
Qualification and Subsea Processing”, SPE Subsea Processing
Workshop, Stresa Italy 2012
TQP Pit Falls
• One member is driving the show
• No representation by either research,
project or operations
• No involvement from supplier
• Insufficient stakeholders support
• Short cuts due to project pressure
• Insufficient expertise and experience
– Leads to incorrect assumptions
– Poor Execution Plan
9
Pit Fall Example
10
Performance
Difference
between N2
and NG
Reference: Austrheim, Trond; “Re-entrainment Correlations for
Demisting Cyclones at Elevated Pressures on a Range of Fluids”,
Energy & Fuels, May 2009
Verlaan Demisting Cyclones
High Pressure Separation – Not testing device/system at
expected operating conditions
Qualifying subsea separation for shallow
water applications <1500m of water depth
11
• Flexible to a wide range of fluid
and operating conditions
Example – Subsea Separation
Inlet nozzles with Inlet Vane Diffusers
Perforated
baffles
Sand removal devices
Dome with
demisting cyclones
Reference: “Qualification of a Subsea Separator…”, M.R. Anderson
& E.J. Grave, OTC 25367-MS, May 2014
Compact Separation for Deep
Water (<1500m)
2009 From Concept to Deployment 2014
Conceptual Design
• Robust, flexible design
• Wide API Gravity
• Sand handling system
• Integrated Degassing
High Pressure
System Testing
• Half scale testing
• Real crudes, natural
gas
• Simulated operating
conditions
Proof of Concept
• CFD analysis, Dynamic
modeling
• Low pressure testing w/
model oils, brine, sand
12
TRL 0-1 TRL 2-3 TRL 4-5 TRL 6-7
Example – Subsea Separation
• CFD Simulations – screened a number of
designs, improved feed inlet, flow profile, etc.
• Model Fluid Tests – validate CFD models
– Test Matrix cover range of fluid properties
– Appropriate scale to minimize geometry effects
– Attention to sampling points, repeatability…
• High Pressure Tests
– Crude oil, synthesized water, methane gas
– Similar test matrix & fluid properties
– Same scale with the same internals
13
• Data & visual observations used to validate CFD models
• Provides ability to see fluid flow patterns
• Further improvements made and tested prior to high pressure test
14
Model Fluid Testing
• CFD models correctly predicted biased flow
patterns in the inlet and settling sections
• CFD does not predict effect on emulsion and
foam due to pressure drop across baffles
Splashing
through baffles
15
CFD & Models Validation
• Tests are most representative of field applications
• Tests performed at different flow rates,
temperatures, & water cuts using three different
crudes, saline water & methane gas at 45 bar-g
16
Separator is the same
diameter, length and
with the same
internals as tested
with model oils
High Pressure Testing With
Crude Oil and Natural Gas
• Although the physical properties (density, viscosity,
surface tension) are similar, chemical interactions
and emulsion stability are not the same
• For this case, model oil performed poorly
17
High Pressure Testing With Crude Oil
and Natural Gas
Model Oil 50 C⁰
Total Flowrate, (m3/hr)
Crude Oil at
Pressure 50 C⁰
Oil in Water (OIW) vs Total Flow Rate; API 35⁰
10000
8000
2000
6000
4000
0
Oil in Water (OIW) vs Total Flow Rate; API 35⁰
20%WC
40%WC
70%WC
• …but the oil quality was worse during the high pressure
tests compared to the model oil at the same interface
level
18
High Pressure Testing With Crude Oil
and Natural Gas
Model Oil 50⁰C
Total Flowrate, (m3/hr)
Crude Oil 50⁰C
Water in Oil (WiO) vs Total Flow Rate; API35⁰Water in Oil (WiO) vs Total Flow Rate;
API35⁰
Total Flowrate, (m3/hr)
20%WC
40%WC
70%WC
35%
30%
25%
20%
15%
10%
5%
0%
WIOOut
Summary
• Technology Qualification is an enabler!!
– Mitigates risks
– Implements technology
• Existing industry standards are a good
starting point
• Not all TQPs are equal…leads to confusion
• Careful selection of the Qualification team
• Standardized tests will lead to savings
• Don’t cheat!!
19
Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl 20
Your Feedback is Important
Enter your section in the DL Evaluation Contest by
completing the evaluation form for this presentation
Visit SPE.org/dl
Back-up
21
COMPUTATIONAL FLUID DYNAMICS (CFD)
• Evaluate original separator design
• Optimized inlet piping, feed
arrangement, and perforated baffle
design
• Comparison between full and
small-scale geometries
• Fixed separator design used
during model fluid tests and high-
pressure, “live” crude tests
22
Original
Design
Improved
Example – Subsea Separation
• Computational Fluid Dynamics (CFD) is a
good tool to inexpensively vet or improve
technology
• CFDs must be validated with model fluids
resembling expected field conditions
• Model fluids emulsion and foaming tendencies
do not reflect real crudes
• For the examples presented model oil testing
alone would have resulted in an incorrect
design
23
Summary
Technical Readiness Level
• Developed by NASA (1970’s)
– Risk management tool
– Communication tool between
technologists & managers
– Keeps track of technology
development stage
– Reinforces the Qualification
Process
24
Reference: Warwick, Alistair; “Meeting The Challenge of
Deepwater Development”, Offshore Magazine, Feb 2011
$

Contenu connexe

Tendances

The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
Society of Petroleum Engineers
 
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
Mohanned Mahjoup
 
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr..."Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
Society of Petroleum Engineers
 
How Can Microfracturing Improve Reservoir Management?
How Can Microfracturing Improve Reservoir Management?How Can Microfracturing Improve Reservoir Management?
How Can Microfracturing Improve Reservoir Management?
Society of Petroleum Engineers
 

Tendances (20)

Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem Lawal
 
Charles Hinrichsen
Charles HinrichsenCharles Hinrichsen
Charles Hinrichsen
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
 
Paul Mitchell
Paul MitchellPaul Mitchell
Paul Mitchell
 
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
 
Cosan Ayan
Cosan AyanCosan Ayan
Cosan Ayan
 
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr..."Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
 
Waterflood Design and Operational Best Practices
Waterflood Design and Operational Best PracticesWaterflood Design and Operational Best Practices
Waterflood Design and Operational Best Practices
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
The Fracts of Life - Martin Rylance
The Fracts of Life - Martin RylanceThe Fracts of Life - Martin Rylance
The Fracts of Life - Martin Rylance
 
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
 
Compositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsCompositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell Johns
 
Srikanta Mishra
Srikanta MishraSrikanta Mishra
Srikanta Mishra
 
EOR (feasibility to execution)
EOR (feasibility to execution)EOR (feasibility to execution)
EOR (feasibility to execution)
 
Silviu Livescu
Silviu LivescuSilviu Livescu
Silviu Livescu
 
Jim Galford
Jim GalfordJim Galford
Jim Galford
 
2018-2019 SPE Distinguished Lecturers
2018-2019 SPE Distinguished Lecturers 2018-2019 SPE Distinguished Lecturers
2018-2019 SPE Distinguished Lecturers
 
Roberto Aguilera
Roberto AguileraRoberto Aguilera
Roberto Aguilera
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
How Can Microfracturing Improve Reservoir Management?
How Can Microfracturing Improve Reservoir Management?How Can Microfracturing Improve Reservoir Management?
How Can Microfracturing Improve Reservoir Management?
 

Similaire à Verifying Performance and Capability of New Technology for Surface and Subsurface Facilities

Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...
Society of Petroleum Engineers
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
HPHT Wells Summit
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 

Similaire à Verifying Performance and Capability of New Technology for Surface and Subsurface Facilities (20)

Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow Measurement
 
160122 pva mari trends presentation 2016 rev 2
160122 pva mari trends presentation 2016 rev 2160122 pva mari trends presentation 2016 rev 2
160122 pva mari trends presentation 2016 rev 2
 
Europe User Conference: ADNOC predictive model of gas oil hydrotreater unit f...
Europe User Conference: ADNOC predictive model of gas oil hydrotreater unit f...Europe User Conference: ADNOC predictive model of gas oil hydrotreater unit f...
Europe User Conference: ADNOC predictive model of gas oil hydrotreater unit f...
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
ALT
ALTALT
ALT
 
The influence of mixing in the process
The influence of mixing in the processThe influence of mixing in the process
The influence of mixing in the process
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
Global flow measurement consistency
Global flow measurement consistencyGlobal flow measurement consistency
Global flow measurement consistency
 
Improving Operational Performance With Smarter, Cost-Effective Training Programs
Improving Operational Performance With Smarter, Cost-Effective Training ProgramsImproving Operational Performance With Smarter, Cost-Effective Training Programs
Improving Operational Performance With Smarter, Cost-Effective Training Programs
 
Automating Leak Testing
Automating Leak TestingAutomating Leak Testing
Automating Leak Testing
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...
 
Ex des workshops Julian Wilson
Ex des workshops Julian WilsonEx des workshops Julian Wilson
Ex des workshops Julian Wilson
 
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh RajputHAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
 
Arizona State University Test Lecture
Arizona State University Test LectureArizona State University Test Lecture
Arizona State University Test Lecture
 

Plus de Society of Petroleum Engineers

Using Fractals To Determine a Reservoir's Hydrocarbon Distribution
Using Fractals To Determine a  Reservoir's Hydrocarbon DistributionUsing Fractals To Determine a  Reservoir's Hydrocarbon Distribution
Using Fractals To Determine a Reservoir's Hydrocarbon Distribution
Society of Petroleum Engineers
 
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Society of Petroleum Engineers
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Society of Petroleum Engineers
 

Plus de Society of Petroleum Engineers (16)

Who Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of UnitizationWho Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of Unitization
 
A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...
 
CO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to StorageCO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to Storage
 
Mark Van Domelen
Mark Van DomelenMark Van Domelen
Mark Van Domelen
 
Robert Hawkes
Robert HawkesRobert Hawkes
Robert Hawkes
 
Leroy Ledgerwood
Leroy LedgerwoodLeroy Ledgerwood
Leroy Ledgerwood
 
John Hedengren
John HedengrenJohn Hedengren
John Hedengren
 
Hank Rawlins
Hank RawlinsHank Rawlins
Hank Rawlins
 
George Stosur
George StosurGeorge Stosur
George Stosur
 
Christiaan Luca
Christiaan LucaChristiaan Luca
Christiaan Luca
 
2019–2020 SPE Distinguished Lecturers
2019–2020 SPE Distinguished Lecturers2019–2020 SPE Distinguished Lecturers
2019–2020 SPE Distinguished Lecturers
 
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
 
The Importance of Contact, Conductivity, and Connectivity in Multifractured ...
The Importance of Contact, Conductivity, and Connectivity in  Multifractured ...The Importance of Contact, Conductivity, and Connectivity in  Multifractured ...
The Importance of Contact, Conductivity, and Connectivity in Multifractured ...
 
Using Fractals To Determine a Reservoir's Hydrocarbon Distribution
Using Fractals To Determine a  Reservoir's Hydrocarbon DistributionUsing Fractals To Determine a  Reservoir's Hydrocarbon Distribution
Using Fractals To Determine a Reservoir's Hydrocarbon Distribution
 
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
 

Dernier

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Dernier (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Verifying Performance and Capability of New Technology for Surface and Subsurface Facilities

  • 1. Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl 1 Ed Grave Verifying Performance and Capability of New Technology for Surface and Subsea Facilities
  • 2. Presentation Outline • Why Qualify? • Technology Qualifying Program (TQP) • Technical Readiness Level (TRL) • TQP Pitfalls • Subsea Separation Qualification Example • Summary 2
  • 3. Why Qualify? • Enables new technology implementation – Reduces capital costs – Increases production/efficiency – Improves reliability • Identifies and reduces risks that can be managed • Confirmation that a technology will function with confidence 3
  • 4. Qualification Program • Is a process that identifies & reduces uncertainties that are manageable • Two very useful documents for subsea: – Det Norske Veritas (DNV-RP-A203) – American Petroleum Institute (API-RP-17N) • Most companies have their own customized qualification programs 4
  • 5. Qualification Program Technology qualification steps 5 Steps Description 1 Qualification Basis Facts & objective identified 2 Technology Assessment Novelty, challenges, gaps 3 Threat Assessment Identifies failure modes & risks 4 Technology Qualification Plan (TQP) Strategy to manage risks 5 Execution Plan Execution of TQP (tests, analysis) 6 Performance Assessment Review of collected evidence Reference: Horpestad, Eirik; “Technology Qualification of Equipment in Subsea Production Systems”, Master Thesis, NTNU University 2012
  • 6. API17N TRL Interpretation Specific for Subsea Production System 6 TRL Stage Description 0 Unproven Concept No Analysis 1 Analytically Proven Experimental Research 2 Physically Proven Lab Tested 3 Prototype Tested Pilot Test-Robust & Reliable 4 Environment Tested Commercial Demonstration 5 System Tested System Integration 6 System Installed Full Scale System Test 7 Field Proven Proving Operation Over Time 1 2 3 Gate Reviews – assessment at different phases…
  • 7. API17N TRC/TRL Interpretation 7 Significant development required/unachievable during project timeline Work required before the next stage of the project Ready for use Some additional required- achievable during project TRL Field Proven System Installed System Tested Environment Tested Prototype Tested Physically Proven Proven Concept Unproven Concept Technical Risk Category (TRC) TRC 7 6 5 4 3 2 1 0 Very High Technical Risk/ Unacceptable Reliability A <20% High Technical Risk/ Low Reliability B 20-80% Medium Technical Risk/ Moderate Reliability C 80-95% Low Technical Risk/ Acceptable Reliability D >95% Reducing Risk/Increasing Reliability
  • 8. TQP Pit Falls • Too much focus on engineering and little on the process • Many teams do not understand what they are trying to do • Too much focus on component tests and not on the system • More analytical models are needed • TQP should not be an addendum 8 Reference: Markussen, Christian; “Experience with Technology Qualification and Subsea Processing”, SPE Subsea Processing Workshop, Stresa Italy 2012
  • 9. TQP Pit Falls • One member is driving the show • No representation by either research, project or operations • No involvement from supplier • Insufficient stakeholders support • Short cuts due to project pressure • Insufficient expertise and experience – Leads to incorrect assumptions – Poor Execution Plan 9
  • 10. Pit Fall Example 10 Performance Difference between N2 and NG Reference: Austrheim, Trond; “Re-entrainment Correlations for Demisting Cyclones at Elevated Pressures on a Range of Fluids”, Energy & Fuels, May 2009 Verlaan Demisting Cyclones High Pressure Separation – Not testing device/system at expected operating conditions
  • 11. Qualifying subsea separation for shallow water applications <1500m of water depth 11 • Flexible to a wide range of fluid and operating conditions Example – Subsea Separation Inlet nozzles with Inlet Vane Diffusers Perforated baffles Sand removal devices Dome with demisting cyclones Reference: “Qualification of a Subsea Separator…”, M.R. Anderson & E.J. Grave, OTC 25367-MS, May 2014
  • 12. Compact Separation for Deep Water (<1500m) 2009 From Concept to Deployment 2014 Conceptual Design • Robust, flexible design • Wide API Gravity • Sand handling system • Integrated Degassing High Pressure System Testing • Half scale testing • Real crudes, natural gas • Simulated operating conditions Proof of Concept • CFD analysis, Dynamic modeling • Low pressure testing w/ model oils, brine, sand 12 TRL 0-1 TRL 2-3 TRL 4-5 TRL 6-7
  • 13. Example – Subsea Separation • CFD Simulations – screened a number of designs, improved feed inlet, flow profile, etc. • Model Fluid Tests – validate CFD models – Test Matrix cover range of fluid properties – Appropriate scale to minimize geometry effects – Attention to sampling points, repeatability… • High Pressure Tests – Crude oil, synthesized water, methane gas – Similar test matrix & fluid properties – Same scale with the same internals 13
  • 14. • Data & visual observations used to validate CFD models • Provides ability to see fluid flow patterns • Further improvements made and tested prior to high pressure test 14 Model Fluid Testing
  • 15. • CFD models correctly predicted biased flow patterns in the inlet and settling sections • CFD does not predict effect on emulsion and foam due to pressure drop across baffles Splashing through baffles 15 CFD & Models Validation
  • 16. • Tests are most representative of field applications • Tests performed at different flow rates, temperatures, & water cuts using three different crudes, saline water & methane gas at 45 bar-g 16 Separator is the same diameter, length and with the same internals as tested with model oils High Pressure Testing With Crude Oil and Natural Gas
  • 17. • Although the physical properties (density, viscosity, surface tension) are similar, chemical interactions and emulsion stability are not the same • For this case, model oil performed poorly 17 High Pressure Testing With Crude Oil and Natural Gas Model Oil 50 C⁰ Total Flowrate, (m3/hr) Crude Oil at Pressure 50 C⁰ Oil in Water (OIW) vs Total Flow Rate; API 35⁰ 10000 8000 2000 6000 4000 0 Oil in Water (OIW) vs Total Flow Rate; API 35⁰ 20%WC 40%WC 70%WC
  • 18. • …but the oil quality was worse during the high pressure tests compared to the model oil at the same interface level 18 High Pressure Testing With Crude Oil and Natural Gas Model Oil 50⁰C Total Flowrate, (m3/hr) Crude Oil 50⁰C Water in Oil (WiO) vs Total Flow Rate; API35⁰Water in Oil (WiO) vs Total Flow Rate; API35⁰ Total Flowrate, (m3/hr) 20%WC 40%WC 70%WC 35% 30% 25% 20% 15% 10% 5% 0% WIOOut
  • 19. Summary • Technology Qualification is an enabler!! – Mitigates risks – Implements technology • Existing industry standards are a good starting point • Not all TQPs are equal…leads to confusion • Careful selection of the Qualification team • Standardized tests will lead to savings • Don’t cheat!! 19
  • 20. Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl 20 Your Feedback is Important Enter your section in the DL Evaluation Contest by completing the evaluation form for this presentation Visit SPE.org/dl
  • 22. COMPUTATIONAL FLUID DYNAMICS (CFD) • Evaluate original separator design • Optimized inlet piping, feed arrangement, and perforated baffle design • Comparison between full and small-scale geometries • Fixed separator design used during model fluid tests and high- pressure, “live” crude tests 22 Original Design Improved Example – Subsea Separation
  • 23. • Computational Fluid Dynamics (CFD) is a good tool to inexpensively vet or improve technology • CFDs must be validated with model fluids resembling expected field conditions • Model fluids emulsion and foaming tendencies do not reflect real crudes • For the examples presented model oil testing alone would have resulted in an incorrect design 23 Summary
  • 24. Technical Readiness Level • Developed by NASA (1970’s) – Risk management tool – Communication tool between technologists & managers – Keeps track of technology development stage – Reinforces the Qualification Process 24 Reference: Warwick, Alistair; “Meeting The Challenge of Deepwater Development”, Offshore Magazine, Feb 2011 $