Development of a Modern Scale House at The City of Calgary’s Shepard Waste Management Facility
Presented by:
Chuck Smith, P. Eng.
Prime Consultant
CH2M HILL (Canada) Ltd.
John Leszkowicz, P. Eng.
Project Delivery Leader
Waste & Recycling Services The City of Calgary
6. Timeline for Shepard Landfill New Entrance, Scale
House & Thrown Go Project 9 09
08 09 /0 /
/0
6 7 08 8 /0
8
1 6 10
l/0 ay
/
l/0 v/ ec b/ v v 1 pr
/
N ov Ju M Ju No D Fe No No A
Tender Contract 2
Scales and Contract #2
Building Facilities Structures
Starts
Launch
Communications
Campaign 52nd Street
Widening
By Nov 30 Grading
closes old scale
Substantially Completed
New Scale
Operational
Contract
#1 Started
All systems in,
Tender Contract 1 troubleshooti
Grading & Earth ng, staff
Works orientation
and SOPs
development
Preliminary
Design Starts
RFP ‐06‐6911
Consultant Selection Last Updated: April12/09
6
7. Location Selected for New Shepard Scale House
Old Scale / Throw & Go
Shepard Landfill Site (Via 52nd ST SE)
Landfill Wetland
LFG Plant
New Scale House / Throw
& Go Location Selected
68
th
St.
SE
SE
thAve
114
7
8. Site Design
Approach lanes
Scale House
Throw & Go
8
9. Site Layout
Ent
r an
ce
To T
hro
w &G
o
Throw & Go Site
New Scale House
To L
a ndf
ill
9
10. Scale House Building Design Features
• Design Basis Included
4 scales and 2 controlled access bypass lanes
Fully-contained / serviced building
Scale building canopy
2 manned / un-manned scales with kiosks
Scale room with large work area (up to 3 work stations)
Office, lunch/meeting room, kitchen, washroom, server room
Barrier-free access
Ergonomic work stations
Security
10
15. Design Features - Operation
• Static Scale System
• GEOWARE System – 4 traffic control stations
• Barrier Arm Gates and Traffic Lights
• Intercom system all lanes with card access on bypass lanes
• Overhead lane electronic signage
• RFID – Lanes 1 & 4
• Portal radiation Detection System (I/B lanes 1 & 2)
• Security and license plate cameras
• City Server
• UPS / Battery backup system
• Emergency standby power generator set
16. Devices and Controls
Security Camera
Electronic RFID
Lane Signs
Signals
License Plate
Cameras
Barrier Arm
Gate and
Intercom
16
17. Devices and Controls
Traffic Controller
Drivers Printer
Terminal
Barrier Arm Gate Controls Ergonomic Work Work Station
Scale Operator Station
17
19. Coordination of City Business Units / Services
• W&RS
• Corporate Properties
• Calgary Roads
• City IT – and integration with Geoware System
• Transportation Network Planning
• Corporate Security
• Water Resources
• TELUS / ENMAX / ATCO Gas
19
20. Throw & Go
• Design Basis
– Large surface area for drop-off
and storage
– Ease of access from scale and
site
– Adaptability to City’s 80/20 by
2020 diversion strategy
– Expandability for roll-off bins
– Pre-engineered heated storage
building with covered drop-off
area for used oil, HHW, batteries,
etc.
– Site trailer for outside attendant 20
21. Throw & Go Features
Storage/Expansion
Storage Building
Throw & Go Drop-off Area
Site Attendant Trailer
roll off bins
21
22. Considerations During Construction
• Future stub-out connection points for City Water and Sewer
services
• Conduit for future fibre-optic line
• Electronic/remote controls for main gate
• Windbreak for used oil drop off area
• Paving of entire Throw and Go
22
23. Key Lessons Learned
• Entire site is relatively flat
Design for wind and addition of windbreaks
• Site Services
Add more redundancy and future service capacity
• Coordination with City Business Units
Need to be brought in at the conceptual/initial development
stage
• Add more flexibility in the sliding transaction service windows
23
24. Next Steps
• Planting trees in the spring to provide natural wind break for site
• RFID use for private haulers
• Development of new scale houses at East Calgary and Spyhill
landfill site
24
26. Thank You
Contact information:
Chuck Smith - CH2M HILL
(chuck.smith@ch2m.com)
John Leszkowicz – The City of Calgary
(John.Leszkowicz@calgary.ca)
26