CONSTRUCTION DIVISION NO-1, PWD 
LUCKNOW (U.P) 
A 
Vocational Training Report 
Submitted in Partial fulfillment of the requirement for the award of 
Degree of 
BACHELOR OF ENGINEERING 
IN 
CIVIL ENGINEERING 
Submitted By 
Sachin Gupta 
(0127CE111044) 
Submitted to the 
Department Of Civil Engineering 
BANSAL COLLEGE OF ENGINEERING 
MANDIDEEP, BHOPAL 
BATCH 2011-15
CERTIFICATE 
This is to certify that Sachin Gupta (0127CE111044), student of B.E. Final year 7th 
semester (Civil engineering) has completed the Vocational Training entitled 
“CONSTRUCTION OF ROAD” from CONSTRUCTION DIVISION NO-1, PWD 
LUCKNOW (U.P) during the academic session 2014-15 under my guidance & 
supervision. I approve the summer training report for submission as required 
for partial fulfillment for completion of engineering degree in Civil Engineering. 
OM PRAKASH GUPTA 
Assistant Engineer (IV) 
Construction Division No.1, 
P.W.D. Lucknow (U.P.)
ACKNOWLEDGEMENT 
I express my satisfaction on the completion of this summer training program 
and project report submission as a part of the curriculum for the Degree of 
Bachelor of Engineering, Civil Engineering. I express my deepest gratitude to 
my supervisor and mentor Mr. O. P. Gupta for his kind guidance during the 
entire period of training. His consistent support and advices has helped me to 
complete this research project successfully. Also I thank all the members of 
CONSTRUCTION DIVISION NO-1, PWD, Lucknow (U.P.) Department for their 
kind support. They have always been a source of inspiration to me. 
DATE: 15/07/2014 SACHIN GUPTA
Content 
1. 
PWD Introduction 
2. About Cement road 
4. Material 
5. Tests 
6. Cement road construction 
6.1 Preparation of subgrade 
6.2 Preparation of base 
6.3 Form work 
6.4 Watering of base 
6.5 Joints 
6.6 Material mix & placing
6.7 Compaction 
6.8 Finishing of surface 
6.9 Curing 
6.10 Filling joint 
6.11 Edging 
6.12 open to traffic 
7 Reference
Introduction 
Point of view geographic and population of the state is the nation's largest 
state. State Industrial, economic and social development of the state and the 
population of each village is absolutely necessary to re-connect to the main 
roads. In addition to state important national roads, state roads and district 
roads and their proper broad be made to improve the quality of traffic point of 
view is of particular importance. Public Works Department to build roads and 
improve connectivity in rural zones, Other District Road and State broad and 
improvement of rural roads and main routes narrow construction of zones and 
depleted bridges brides reconstruction of the bases are transacted on a 
priority basis . Also under Pradhan Mantri Gram Sadak Yojana and pre-fabricated 
construction of rural roads linking the work of other district roads 
broad Suddikrn the scale bases are edited. 
Successful operation of various schemes for the Public Works Department 
engineers and supervisory boards in different districts of the engineer’s office 
has been settled. Activities by planning, execution, and quality control etc. 
remove impediments find joy in relation to the supervision over the activities 
are focused. Various schemes operated by the Department of the Office of the 
Regional Chief Engineers and Chief Engineers office.
About Road 
A road is a thoroughfare, route, or way on land between two places, which has 
been paved or otherwise improved to allow travel by some conveyance, 
including a horse, cart, or motor vehicle. Roads consist of one, or sometimes 
two, roadways (carriageways) each with one or more lanes and also any 
associated sidewalks (British English: pavement) and road verges. Roads that 
are available for use by the public may be referred to as public roads 
or highways. 
MATERIAL 
Concrete is widely used in domestic, commercial, recreational, rural and 
educational construction. 
Communities around the world rely on concrete as a safe, strong and simple 
building material. It is used in all types of construction; from domestic work to 
multi-storey office blocks and shopping complexes. 
Despite the common usage of concrete, few people are aware of the 
considerations involved in designing strong, durable, high quality concrete. 
There are mainly three types- 
1-Cement 
2-Sand 
3-Aggregate
1. Cement 
A cement is a binder, a substance that sets and hardens independently, and 
can bind other materials together. The word "cement" traces to the Romans, 
who used the term caementicium to describe masonry resembling 
modern concrete that was made from crushed rock with burnt lime as binder. 
The volcanic ash and pulverized brick additives that were added to the burnt 
lime to obtain a hydraulic binder were later referred to as cementum, 
cimentum, cement, and cement. 
Cements used in construction can be characterized as being 
either hydraulic or non-hydraulic. Hydraulic cements (e.g., Portland cement) 
harden because of hydration, a chemical reaction between 
the anhydrous cement powder and water. Thus, they can harden underwater 
or when constantly exposed to wet weather. The chemical reaction results in 
hydrates that are not very water-soluble and so are quite durable in water. 
Non-hydraulic cements do not harden underwater; for example, slaked limes 
harden by reaction with atmospheric carbon dioxide. 
The most important uses of cement are as an ingredient in the production 
of mortar in masonry, and of concrete, a combination of cement and an 
aggregate to form a strong building material. 
Types of Cement:- 
1 Portland cement 
Portland cement is by far the most common type of cement in general use 
around the world. This cement is made by heating limestone (calcium 
carbonate) with small quantities of other materials (such as clay) to 1450 °C in 
a kiln, in a process known as calcination, whereby a molecule of carbon 
dioxide is liberated from the calcium carbonate to form calcium oxide, or 
quicklime, which is then blended with the other materials that have been 
included in the mix. The resulting hard substance, called 'clinker', is then 
ground with a small amount of gypsum into a powder to make 'Ordinary 
Portland Cement', the most commonly used type of cement (often referred to 
as OPC). Concrete is a composite material consisting 
of aggregate (gravel and sand), cement, and water. As a construction material, 
concrete can be cast in almost any shape desired, and once hardened, can
become a structural (load bearing) element. Portland cement may be grey or 
white. 
2 Portland fly ash cement 
Its contains up to 35% fly ash. The fly ash is pozzolanic, so that ultimate 
strength is maintained. Because fly ash addition allows a lower concrete water 
content, early strength can also be maintained. Where good quality cheap fly 
ash is available, this can be an economic alternative to ordinary Portland 
cement. 
3 Portland pozzolana cement 
Its includes fly ash cement, since fly ash is a pozzolana , but also includes 
cements made from other natural or artificial pozzolans. In countries 
where volcanic ashes are available. 
4 Portland silica fume cement 
Addition of silica fume can yield exceptionally high strengths, and cements 
containing 5–20% silica fume are occasionally produced. However, silica fume 
is more usually added to Portland cement at the concrete mixer.
2. Sand 
Sand is a naturally occurring granular material composed of finely 
divided rock and mineral particles. The composition of sand is highly variable, 
depending on the local rock sources and conditions, but the most common 
constituent of sand in inland continental settings and non-tropical coastal 
settings is silica (silicon dioxide, or SiO2), usually in the form of quartz. 
The second most common type of sand is calcium carbonate, for 
example aragonite, which has mostly been created, over the past half billion 
years, by various forms of life, like coral and shellfish. It is, for example, the 
primary form of sand apparent in areas where reefs have dominated the 
ecosystem for millions of years like the Caribbean. 
 Composition of Sand 
In terms of particle size as used by geologists, sand particles range in diameter 
from 0.0625 mm (or 1⁄16 mm) to 2 mm. An individual particle in this range size 
is termed a sand grain. Sand grains are between gravel (with particles ranging 
from 2 mm up to 64 mm) and silt (particles smaller than 0.0625 mm down to 
0.004 mm). The size specification between sand and gravel has remained 
constant for more than a century, but particle diameters as small as 0.02 mm 
were considered sand under the Alter berg standard in use during the early 
20th century. A 1953 engineering standard published by the American 
Association of State Highway and Transportation Officials set the minimum 
sand size at 0.074 mm.
3. Aggregate 
Aggregates are inert granular materials such as sand, gravel, or crushed stone 
that, along with water and Portland cement, are an essential ingredient in 
concrete. For a good concrete mix, aggregates need to be clean, hard, strong 
particles free of absorbed chemicals or coatings of clay and other fine 
materials that could cause the deterioration of concrete. Aggregates, which 
account for 60 to 75 percent of the total volume of concrete, are divided into 
two distinct categories-fine and coarse. Fine aggregates generally consist of 
natural sand or crushed stone with most particles passing through a 3/8-inch 
(9.5-mm) sieve. Coarse aggregates are any particles greater than 0.19 inch 
(4.75 mm), but generally range between 3/8 and 1.5 inches (9.5 mm to 37.5 
mm) in diameter. Gravels constitute the majority of coarse aggregate used in 
concrete with crushed stone making up most of the remainder. 
Natural gravel and sand are usually dug or dredged from a pit, river, lake, or 
seabed. Crushed aggregate is produced by crushing quarry rock, boulders, 
cobbles, or large-size gravel. Recycled concrete is a viable source of aggregate 
and has been satisfactorily used in granular subbases, soil-cement, and in new 
concrete. Aggregate processing consists of crushing, screening, and washing 
the aggregate to obtain proper cleanliness and gradation. If necessary, a 
benefaction process such as jigging or heavy media separation can be used to 
upgrade the quality. 
Once processed, the aggregates are handled and stored in a way that 
minimizes segregation and degradation and prevents contamination. 
Aggregates strongly influence concrete's freshly mixed and hardened 
properties, mixture proportions, and economy. Consequently, selection of 
aggregates is an important process. Although some variation in aggregate 
properties is expected.
Characteristics that are considered when selecting aggregate include: 
 grading 
 durability 
 particle shape and surface texture 
 abrasion and skid resistance 
 unit weights and voids 
 absorption and surface moisture 
Grading refers to the determination of the particle-size distribution for 
aggregate. Grading limits and maximum aggregate size are specified because 
grading and size affect the amount of aggregate used as well as cement and 
water requirements, workability 
 Shape and size 
Particle shape and surface texture influence the properties of freshly mixed 
concrete more than the properties of hardened concrete. Rough-textured, 
angular, and elongated particles require more water to produce workable 
concrete than smooth, rounded compact aggregate. Consequently, the cement 
content must also be increased to maintain the water-cement ratio. Generally, 
flat and elongated particles are avoided or are limited to about 15 percent by 
weight of the total aggregate. Unit-weight measures the volume that graded 
aggregate and the voids between them will occupy in concrete. The void 
content between particles affects the amount of cement paste required for the 
mix. Angular aggregate increase the void content. Larger sizes of well-graded 
aggregate and improved grading decrease the void content. Absorption and 
surface moisture of aggregate are measured when selecting aggregate because 
the internal structure of aggregate is made up of solid material and voids that 
may or may not contain water. The amount of water in the concrete mixture 
must be adjusted to include the moisture conditions of the aggregate. 
Abrasion and skid resistance of an aggregate are essential when the aggregate 
is to be used in concrete constantly subject to abrasion as in heavy-duty floors 
or pavements. Different minerals in the aggregate wear and polish at different 
rates. Harder aggregate can be selected in highly abrasive conditions to 
minimize wear.
 Tests 
1-The Slump Test. 
2-Compression Test 
3-Impact Test 
4-Cube Test 
 THE SLUMP TEST 
The slump test is done to make sure a concrete mix is workable. 
Workability measures how easy the concrete is to place and handle . 
TOOLS REQUIRED: 
 Standard slump cone (100 mm top diameter x 200 mm bottom diameter 
x 300 mm high) 
 Small scoop Bullet-nosed rod (600mm long x 16 mm diameter 
 Slump plate (500 mm x 500 mm)
Method 
1 Clean the cone. Dampen with water and place on the slump plate. 
The slump plate should be clean, firm, level and non-absorbent. 
2 Collect a sample. 
3 Stand firmly on the footpieces and fill /3 the volume of the cone with 
the sample. Compact the concrete by 'rodding' 25 times. 
Rodding: Rodding means to push a steel rod in and out of the 
concrete to compact it into the cylinder, or slump cone. 
Always rod in a definite pattern, working from outside into the middle. 
4 Now fill to 2 / 3 and again rod 25 times, just into the top 
of the first layer. 
5 Fill to overflowing, rodding again this time just into the top 
of the second layer. Top up the cone till it overflows. 
6 Level off the surface with the steel rod using a rolling 
action. Clean any concrete from around 
the base and top of the cone, push down on the 
handles and step off the footpieces. 
7 Carefully lift the cone straight up making sure 
not to move the sample. 
8 Tu rn the cone upside down and place the rod across the 
up-turned cone.
 THE COMPRESSION TEST 
The compression test shows the compressive strength of hardened concrete. 
The testing is done in a laboratory off-site. The only work done on-site is to 
make a concrete cylinder for the compression test. 
The strength is measured in Megapascals (MPa) and is commonly specified as 
a characteristic strength of concrete measured at 28 days after mixing. The 
compressive strength is a measure of the concrete’s ability to resist loads 
which tend to crush it. 
Tools 
 Cylinders (100 mm diameter x 200 mm high or 150 mm diameter x 
300 mm high) 
( The small cylinders are 
normally used for most 
testing due to their lighter 
weight ) 
 Small scoop 
Bullet-nosed rod (600 mm x 
16 mm) 
 Steel float 
 Steel plate 
Method 
1 Clean the cylinder mould and coat the inside lightly with form 
oil, then place on a clean, level and firm surface, ie the steel 
plate. 
2 Collect a sample.
3 Fill 1/2 the volume of the mould with concrete then 
compact by rodding 25 times. Cylinders may also be 
compacted by vibrating using a vibrating table. 
4 Fill the cone to overflowing and rod 25 times into 
the top of the first layer, then top up the mould till 
overflowing. 
5 Level off the top with the steel float and clean any 
concrete from around the mould. 
6 Cap, clearly tag the cylinder 
and put it in a cool dry place 
to set for at least 24 hours. 
7 After the mould is removed the cylinder is sent to the laboratory 
where it is cured and crushed to test compressive strength.
 Impact Testing 
An impact test is a dynamic test conducted on a selected specimen which is 
usually notched. The specimen is struck and broken by a single blow in a 
specially designed machine. 
This demo illustrates the experiment setup, procedure and the energy absorbed 
in an impact test.
 Cube Test 
Test applied to the concrete, this is the 
utmost important which gives an idea about 
all the characteristics of concrete. By this 
single test one judge that whether Concreting 
has been done properly or not. For cube test 
two types of specimens either cubes of 15 cm 
X 15 cm X 15 cm or 10cm X 10 cm x 10 cm depending upon the 
size of aggregate are used. For most of the works cubical moulds of size 15 cm x 15cm 
x 15 cm are commonly used. 
This concrete is poured in the mould and tempered properly so as not to have 
any voids. After 24 hours these moulds are removed and test specimens are 
put in water for curing. The top surface of these specimen should be made 
even and smooth. This is done by putting cement paste and spreading 
smoothly on whole area of specimen. 
These specimens are tested by compression testing machine after 7 days 
curing or 28 days curing. Load should be applied gradually at the rate of 140 
kg/cm2 per minute till the Specimens fails. Load at the failure divided by area 
of specimen gives the compressive strength of concrete. 
 APPARATUS 
Compression testing machine. 
 PREPARATION OF CUBE SPECIMENS 
The proportion and material for making these test specimens are from the 
same concrete used in the field. 
SPECIMEN 
6 cubes of 15 cm size Mix. M15 or above.
 MIXING 
Mix the concrete either by hand or in a laboratory batch mixer. 
HAND MIXING 
(i)Mix the cement and fine aggregate on a water tight none-absorbent 
platform until the mixture is thoroughly blended and is of uniform color 
(ii)Add the coarse aggregate and mix with cement and fine aggregate until the 
coarse aggregate is uniformly distributed throughout the batch 
(iii)Add water and mix it until the concrete appears to be homogeneous and of 
the desired consistency. 
 PRECAUTIONS 
The water for curing should be tested every 7days and the temperature of water must be at 
27+-2oC. 
 PROCEDURE 
(I) Remove the specimen from water after specified curing time and wipe out excess water 
from the surface. 
(II) Take the dimension of the specimen to the nearest 0.2m 
(III) Clean the bearing surface of the testing machine 
(IV) Place the specimen in the machine in such a manner that the load shall be applied to 
the opposite sides of the cube cast. 
(V) Align the specimen centrally on the base plate of the machine. 
(VI) Rotate the movable portion gently by hand so that it touches the top surface of the 
specimen. 
(VII) Apply the load gradually without shock and continuously at the rate of 
140kg/cm2/minute till the specimen fails 
(VIII) Record the maximum load and note any unusual features in the type of failure.
Using mix Concrete , there some Point 
to construct the road: 
1. Preparation of base 
2. Form working 
3. Preparation of subgrade 
4. Watering of base 
5. Joints 
6. Material mix & placing 
7. Compaction 
8. Finishing of surface 
8A. Floating 
8B. Belting 
8C. Brooming 
9. Curing 
10. Joint filling 
11. Edging 
12. Open to traffic
1. Preparation of subgrade 
1. Rolling on sub grade by roller 
2. Filling the granular soil in the weak part and pot holes 
3. Correct the soil coat , Camber , longitudinal slop 
When concrete direct laid on subgrade, For preventing the water-seepaging 
into the soil , used water proof paper on entire length. 
1. Rolling on sub grade by roller 
2. Filling the granular soil in the weak part and pot holes 
3. Correct the soil coat , Camber , longitudinal slop 
When concrete direct laid on subgrade, For preventing the water-seepaging 
into the soil , used water proof paper on entire length.
2. Preparation of base 
Choose any one type of base 
1. W.B.M. base 
As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are 
used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on 
W.B.M. 
2. Concrete base 
On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64) 
3. Granular medium material layer 
10-15cm composite layer of sand , moorum , bajri are used for better 
drainage facilities 
4. Stabilization soil
3. Form work 
Material for form work- 
Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, 
minerals. 
1. before using form work, it should free from all type material like as dust 
,cement. 
2. To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr 
long wooden sheeting. 
3. The depth of wooden block must be same as level of slab thick. 
4. After 24hrs form work displaced next length of road. 
4. Watering of base 
If base is dry then using the sprinkling process on it properly after that 
placing the concrete. 
5. Joints 
Where is necessary to provide transverse, Longitudinal joints; there wedge 
of woods, metals fix on level of concrete. 
After setting of concrete it should be pull out. 
If provided the dowel bar in joints, bars should be fit at right position.
6.Material mix & placing 
Mixer is equipment that mix the concrete using distinct amount of 
cement , concrete, sand and water. Concrete slab should have more 
than 5-10cm thick cause of drying. 
Used two type mixer- 
1. Batch mixer-at 
site, used for small road construction 
2. Continuous mixer- 
Continuous mixer used for large construction . 
if distance is more from site , mix concrete transported at site within 
setting time. 
Two methods generally used in placing of concrete- 
1. Alternate bay method- 
Placed the concrete on both side of road alternatively like as1,3,5… 
part at one side and 2,4,6… part other side . 
1st side 
2nd side 
This method have slow process due to road traffic problems. 
2. Continuous bay method-construct 
one side of road regularly, if completed some part of 
first side than construct other side. This method have fast process 
without no obstruction of traffic
7. Compaction 
Purpose of compaction is that to pull out air from void and make 
concrete harden. 
Compaction done by- 
1. mechanically surface vibrator 
2. manually hand tempers 
8. Finishing of surface 
1.Floating- 
For levelling the surface use floating, scree-ding , power trowel. So 
that there is no acceptable more than 3mm variation in concrete level 
surface. 
2.Belting- 
For making surface clean used belting process. Belt is nothing but a 
15-30cm thick sheets of canvass which have more length than road. 
3. Brooming- 
Brooming is the process in which we made rough surface parallel to 
road by brush. It is useful in avoiding slip & comfortable travelling on 
road . 
The depth of line on road no more than 1.5mm.
9.Curing 
Curing is the name of increasing the hydration process of cement. 
after setting the concrete , curing process done till 14-28days. 
Some methods of curing are- 
1.Shading concrete works 
2. Covering with hessian & gunny bags 
3. Sprinkling of water 
4.By ponding 
5. Membrane curing 
6. Steam curing
10. Filling joint 
After drying road, clean the joints and fill the shelling compound or hot 
bitumen . 
11. Edging 
To protect damaging the sides of concrete pavements used over 
burnt brick work. In place of bricks, provide kerb of pre mix concrete. 
12.open to traffic 
Generally after a month, road should be open to traffic. 
If used rapid hardening cement it take 7 days to open traffic.
Reference 
Websites; 
 www.Google.com 
 www.concrete.net.au 
 www.res.gov.in 
 www.upjl.com 
 www.concrete.com 
 www.sand.uk 
Books;

Contenu connexe

Tendances

CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report Vikas Sukhwal
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPTVikas Sukhwal
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionSelf-employed
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Roadshashanksingh593
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....RaazYadav6
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement Awinash Tiwari
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road constructionManavSinghal8
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC roadvikash mishra
 

Tendances (20)

Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road construction
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 

En vedette

project report on pwd work.....
project report on pwd work.....project report on pwd work.....
project report on pwd work.....Thakur Sankhyan
 
PWD department of chhattisgarh
PWD department of chhattisgarhPWD department of chhattisgarh
PWD department of chhattisgarhvinayakkumar04
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarDocumentStory
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALRandhir Kumar
 
Pwd department of chhattisgarh
Pwd department of chhattisgarhPwd department of chhattisgarh
Pwd department of chhattisgarhAdarshKirmani
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricingAjinkya Deshpande
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in indiaRenosh R
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential buildingSumit Singh
 
Summar tranning report of pwd
Summar tranning report of pwdSummar tranning report of pwd
Summar tranning report of pwdAlankar jaiswal
 
Role of youth in indian politics
Role of youth in indian politicsRole of youth in indian politics
Role of youth in indian politicsJaimin Dave
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,pptPawankumarm65
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel
 

En vedette (20)

project report on pwd work.....
project report on pwd work.....project report on pwd work.....
project report on pwd work.....
 
PWD department of chhattisgarh
PWD department of chhattisgarhPWD department of chhattisgarh
PWD department of chhattisgarh
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
3rd Street Project Overview
3rd Street Project Overview3rd Street Project Overview
3rd Street Project Overview
 
road construction project
road construction projectroad construction project
road construction project
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisar
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIAL
 
Pwd department of chhattisgarh
Pwd department of chhattisgarhPwd department of chhattisgarh
Pwd department of chhattisgarh
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricing
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
 
Contract costing
Contract costingContract costing
Contract costing
 
Rupsha
RupshaRupsha
Rupsha
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
Summar tranning report of pwd
Summar tranning report of pwdSummar tranning report of pwd
Summar tranning report of pwd
 
Role of youth in indian politics
Role of youth in indian politicsRole of youth in indian politics
Role of youth in indian politics
 
Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
 

Similaire à Sachin gupta summer training in pwd

Anshulpwdtrainingreport 131122214149-phpapp02
Anshulpwdtrainingreport 131122214149-phpapp02Anshulpwdtrainingreport 131122214149-phpapp02
Anshulpwdtrainingreport 131122214149-phpapp02taye2020
 
Fine aggregate with quarry dust and red soil in concrete
Fine aggregate with quarry dust and red soil in concreteFine aggregate with quarry dust and red soil in concrete
Fine aggregate with quarry dust and red soil in concreteVipin Rao
 
Cement Manufacturing & Sustainability Reports
Cement Manufacturing & Sustainability ReportsCement Manufacturing & Sustainability Reports
Cement Manufacturing & Sustainability Reportsabhibft
 
Introduction to civil Engg.pptx
Introduction to civil Engg.pptxIntroduction to civil Engg.pptx
Introduction to civil Engg.pptxpriyanka415514
 
BFM-Presentation-On-Concrete.pptx
BFM-Presentation-On-Concrete.pptxBFM-Presentation-On-Concrete.pptx
BFM-Presentation-On-Concrete.pptxIsratJahan994671
 
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONS
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONSCELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONS
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONSIjripublishers Ijri
 
Chaitra 2016 batch REPORT
Chaitra 2016 batch REPORT Chaitra 2016 batch REPORT
Chaitra 2016 batch REPORT Chaithra M
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07aryan kumar
 
lec#4Cementatious Mat.ppt
lec#4Cementatious Mat.pptlec#4Cementatious Mat.ppt
lec#4Cementatious Mat.pptUsamaSatti11
 
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...IRJET Journal
 
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...IRJET Journal
 
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ash
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly AshPartial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ash
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ashsushendhukc
 
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptx
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptxModule-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptx
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptxSilasChaudhari
 

Similaire à Sachin gupta summer training in pwd (20)

Anshulpwdtrainingreport 131122214149-phpapp02
Anshulpwdtrainingreport 131122214149-phpapp02Anshulpwdtrainingreport 131122214149-phpapp02
Anshulpwdtrainingreport 131122214149-phpapp02
 
Pwd Repo1.docx
Pwd Repo1.docxPwd Repo1.docx
Pwd Repo1.docx
 
Fine aggregate with quarry dust and red soil in concrete
Fine aggregate with quarry dust and red soil in concreteFine aggregate with quarry dust and red soil in concrete
Fine aggregate with quarry dust and red soil in concrete
 
Building Materials: Concrete
Building Materials: Concrete Building Materials: Concrete
Building Materials: Concrete
 
Concrete
ConcreteConcrete
Concrete
 
Cement Manufacturing & Sustainability Reports
Cement Manufacturing & Sustainability ReportsCement Manufacturing & Sustainability Reports
Cement Manufacturing & Sustainability Reports
 
Introduction to civil Engg.pptx
Introduction to civil Engg.pptxIntroduction to civil Engg.pptx
Introduction to civil Engg.pptx
 
SACHIN CIVIL.docx
SACHIN CIVIL.docxSACHIN CIVIL.docx
SACHIN CIVIL.docx
 
BFM-Presentation-On-Concrete.pptx
BFM-Presentation-On-Concrete.pptxBFM-Presentation-On-Concrete.pptx
BFM-Presentation-On-Concrete.pptx
 
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONS
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONSCELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONS
CELLULAR LIGHT WEIGHT CONCRETE BLOCKS WITH DIFFERENT MIX PROPORTIONS
 
Damian Trevor - Construction Materials Concrete
Damian Trevor - Construction Materials ConcreteDamian Trevor - Construction Materials Concrete
Damian Trevor - Construction Materials Concrete
 
Chaitra 2016 batch REPORT
Chaitra 2016 batch REPORT Chaitra 2016 batch REPORT
Chaitra 2016 batch REPORT
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
lec#4Cementatious Mat.ppt
lec#4Cementatious Mat.pptlec#4Cementatious Mat.ppt
lec#4Cementatious Mat.ppt
 
Introduction to Cement
Introduction to CementIntroduction to Cement
Introduction to Cement
 
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...
IRJET- An Experimental Investigation on Concrete Manufactured by Partial Repl...
 
Building Materials.pptx
Building Materials.pptxBuilding Materials.pptx
Building Materials.pptx
 
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...
IRJET- Experimental Investigation on Self Compacting Concrete by Replacing Na...
 
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ash
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly AshPartial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ash
Partial replacement of Fine aggreggate by Copper Slag and Cement by Fly Ash
 
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptx
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptxModule-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptx
Module-1_INTRODUCTION TO CIVIL ENGINEERING AND CIVIL ENGINEERING MATERIALS.pptx
 

Dernier

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Dernier (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Sachin gupta summer training in pwd

  • 1. CONSTRUCTION DIVISION NO-1, PWD LUCKNOW (U.P) A Vocational Training Report Submitted in Partial fulfillment of the requirement for the award of Degree of BACHELOR OF ENGINEERING IN CIVIL ENGINEERING Submitted By Sachin Gupta (0127CE111044) Submitted to the Department Of Civil Engineering BANSAL COLLEGE OF ENGINEERING MANDIDEEP, BHOPAL BATCH 2011-15
  • 2. CERTIFICATE This is to certify that Sachin Gupta (0127CE111044), student of B.E. Final year 7th semester (Civil engineering) has completed the Vocational Training entitled “CONSTRUCTION OF ROAD” from CONSTRUCTION DIVISION NO-1, PWD LUCKNOW (U.P) during the academic session 2014-15 under my guidance & supervision. I approve the summer training report for submission as required for partial fulfillment for completion of engineering degree in Civil Engineering. OM PRAKASH GUPTA Assistant Engineer (IV) Construction Division No.1, P.W.D. Lucknow (U.P.)
  • 3. ACKNOWLEDGEMENT I express my satisfaction on the completion of this summer training program and project report submission as a part of the curriculum for the Degree of Bachelor of Engineering, Civil Engineering. I express my deepest gratitude to my supervisor and mentor Mr. O. P. Gupta for his kind guidance during the entire period of training. His consistent support and advices has helped me to complete this research project successfully. Also I thank all the members of CONSTRUCTION DIVISION NO-1, PWD, Lucknow (U.P.) Department for their kind support. They have always been a source of inspiration to me. DATE: 15/07/2014 SACHIN GUPTA
  • 4. Content 1. PWD Introduction 2. About Cement road 4. Material 5. Tests 6. Cement road construction 6.1 Preparation of subgrade 6.2 Preparation of base 6.3 Form work 6.4 Watering of base 6.5 Joints 6.6 Material mix & placing
  • 5. 6.7 Compaction 6.8 Finishing of surface 6.9 Curing 6.10 Filling joint 6.11 Edging 6.12 open to traffic 7 Reference
  • 6. Introduction Point of view geographic and population of the state is the nation's largest state. State Industrial, economic and social development of the state and the population of each village is absolutely necessary to re-connect to the main roads. In addition to state important national roads, state roads and district roads and their proper broad be made to improve the quality of traffic point of view is of particular importance. Public Works Department to build roads and improve connectivity in rural zones, Other District Road and State broad and improvement of rural roads and main routes narrow construction of zones and depleted bridges brides reconstruction of the bases are transacted on a priority basis . Also under Pradhan Mantri Gram Sadak Yojana and pre-fabricated construction of rural roads linking the work of other district roads broad Suddikrn the scale bases are edited. Successful operation of various schemes for the Public Works Department engineers and supervisory boards in different districts of the engineer’s office has been settled. Activities by planning, execution, and quality control etc. remove impediments find joy in relation to the supervision over the activities are focused. Various schemes operated by the Department of the Office of the Regional Chief Engineers and Chief Engineers office.
  • 7. About Road A road is a thoroughfare, route, or way on land between two places, which has been paved or otherwise improved to allow travel by some conveyance, including a horse, cart, or motor vehicle. Roads consist of one, or sometimes two, roadways (carriageways) each with one or more lanes and also any associated sidewalks (British English: pavement) and road verges. Roads that are available for use by the public may be referred to as public roads or highways. MATERIAL Concrete is widely used in domestic, commercial, recreational, rural and educational construction. Communities around the world rely on concrete as a safe, strong and simple building material. It is used in all types of construction; from domestic work to multi-storey office blocks and shopping complexes. Despite the common usage of concrete, few people are aware of the considerations involved in designing strong, durable, high quality concrete. There are mainly three types- 1-Cement 2-Sand 3-Aggregate
  • 8. 1. Cement A cement is a binder, a substance that sets and hardens independently, and can bind other materials together. The word "cement" traces to the Romans, who used the term caementicium to describe masonry resembling modern concrete that was made from crushed rock with burnt lime as binder. The volcanic ash and pulverized brick additives that were added to the burnt lime to obtain a hydraulic binder were later referred to as cementum, cimentum, cement, and cement. Cements used in construction can be characterized as being either hydraulic or non-hydraulic. Hydraulic cements (e.g., Portland cement) harden because of hydration, a chemical reaction between the anhydrous cement powder and water. Thus, they can harden underwater or when constantly exposed to wet weather. The chemical reaction results in hydrates that are not very water-soluble and so are quite durable in water. Non-hydraulic cements do not harden underwater; for example, slaked limes harden by reaction with atmospheric carbon dioxide. The most important uses of cement are as an ingredient in the production of mortar in masonry, and of concrete, a combination of cement and an aggregate to form a strong building material. Types of Cement:- 1 Portland cement Portland cement is by far the most common type of cement in general use around the world. This cement is made by heating limestone (calcium carbonate) with small quantities of other materials (such as clay) to 1450 °C in a kiln, in a process known as calcination, whereby a molecule of carbon dioxide is liberated from the calcium carbonate to form calcium oxide, or quicklime, which is then blended with the other materials that have been included in the mix. The resulting hard substance, called 'clinker', is then ground with a small amount of gypsum into a powder to make 'Ordinary Portland Cement', the most commonly used type of cement (often referred to as OPC). Concrete is a composite material consisting of aggregate (gravel and sand), cement, and water. As a construction material, concrete can be cast in almost any shape desired, and once hardened, can
  • 9. become a structural (load bearing) element. Portland cement may be grey or white. 2 Portland fly ash cement Its contains up to 35% fly ash. The fly ash is pozzolanic, so that ultimate strength is maintained. Because fly ash addition allows a lower concrete water content, early strength can also be maintained. Where good quality cheap fly ash is available, this can be an economic alternative to ordinary Portland cement. 3 Portland pozzolana cement Its includes fly ash cement, since fly ash is a pozzolana , but also includes cements made from other natural or artificial pozzolans. In countries where volcanic ashes are available. 4 Portland silica fume cement Addition of silica fume can yield exceptionally high strengths, and cements containing 5–20% silica fume are occasionally produced. However, silica fume is more usually added to Portland cement at the concrete mixer.
  • 10. 2. Sand Sand is a naturally occurring granular material composed of finely divided rock and mineral particles. The composition of sand is highly variable, depending on the local rock sources and conditions, but the most common constituent of sand in inland continental settings and non-tropical coastal settings is silica (silicon dioxide, or SiO2), usually in the form of quartz. The second most common type of sand is calcium carbonate, for example aragonite, which has mostly been created, over the past half billion years, by various forms of life, like coral and shellfish. It is, for example, the primary form of sand apparent in areas where reefs have dominated the ecosystem for millions of years like the Caribbean.  Composition of Sand In terms of particle size as used by geologists, sand particles range in diameter from 0.0625 mm (or 1⁄16 mm) to 2 mm. An individual particle in this range size is termed a sand grain. Sand grains are between gravel (with particles ranging from 2 mm up to 64 mm) and silt (particles smaller than 0.0625 mm down to 0.004 mm). The size specification between sand and gravel has remained constant for more than a century, but particle diameters as small as 0.02 mm were considered sand under the Alter berg standard in use during the early 20th century. A 1953 engineering standard published by the American Association of State Highway and Transportation Officials set the minimum sand size at 0.074 mm.
  • 11. 3. Aggregate Aggregates are inert granular materials such as sand, gravel, or crushed stone that, along with water and Portland cement, are an essential ingredient in concrete. For a good concrete mix, aggregates need to be clean, hard, strong particles free of absorbed chemicals or coatings of clay and other fine materials that could cause the deterioration of concrete. Aggregates, which account for 60 to 75 percent of the total volume of concrete, are divided into two distinct categories-fine and coarse. Fine aggregates generally consist of natural sand or crushed stone with most particles passing through a 3/8-inch (9.5-mm) sieve. Coarse aggregates are any particles greater than 0.19 inch (4.75 mm), but generally range between 3/8 and 1.5 inches (9.5 mm to 37.5 mm) in diameter. Gravels constitute the majority of coarse aggregate used in concrete with crushed stone making up most of the remainder. Natural gravel and sand are usually dug or dredged from a pit, river, lake, or seabed. Crushed aggregate is produced by crushing quarry rock, boulders, cobbles, or large-size gravel. Recycled concrete is a viable source of aggregate and has been satisfactorily used in granular subbases, soil-cement, and in new concrete. Aggregate processing consists of crushing, screening, and washing the aggregate to obtain proper cleanliness and gradation. If necessary, a benefaction process such as jigging or heavy media separation can be used to upgrade the quality. Once processed, the aggregates are handled and stored in a way that minimizes segregation and degradation and prevents contamination. Aggregates strongly influence concrete's freshly mixed and hardened properties, mixture proportions, and economy. Consequently, selection of aggregates is an important process. Although some variation in aggregate properties is expected.
  • 12. Characteristics that are considered when selecting aggregate include:  grading  durability  particle shape and surface texture  abrasion and skid resistance  unit weights and voids  absorption and surface moisture Grading refers to the determination of the particle-size distribution for aggregate. Grading limits and maximum aggregate size are specified because grading and size affect the amount of aggregate used as well as cement and water requirements, workability  Shape and size Particle shape and surface texture influence the properties of freshly mixed concrete more than the properties of hardened concrete. Rough-textured, angular, and elongated particles require more water to produce workable concrete than smooth, rounded compact aggregate. Consequently, the cement content must also be increased to maintain the water-cement ratio. Generally, flat and elongated particles are avoided or are limited to about 15 percent by weight of the total aggregate. Unit-weight measures the volume that graded aggregate and the voids between them will occupy in concrete. The void content between particles affects the amount of cement paste required for the mix. Angular aggregate increase the void content. Larger sizes of well-graded aggregate and improved grading decrease the void content. Absorption and surface moisture of aggregate are measured when selecting aggregate because the internal structure of aggregate is made up of solid material and voids that may or may not contain water. The amount of water in the concrete mixture must be adjusted to include the moisture conditions of the aggregate. Abrasion and skid resistance of an aggregate are essential when the aggregate is to be used in concrete constantly subject to abrasion as in heavy-duty floors or pavements. Different minerals in the aggregate wear and polish at different rates. Harder aggregate can be selected in highly abrasive conditions to minimize wear.
  • 13.  Tests 1-The Slump Test. 2-Compression Test 3-Impact Test 4-Cube Test  THE SLUMP TEST The slump test is done to make sure a concrete mix is workable. Workability measures how easy the concrete is to place and handle . TOOLS REQUIRED:  Standard slump cone (100 mm top diameter x 200 mm bottom diameter x 300 mm high)  Small scoop Bullet-nosed rod (600mm long x 16 mm diameter  Slump plate (500 mm x 500 mm)
  • 14. Method 1 Clean the cone. Dampen with water and place on the slump plate. The slump plate should be clean, firm, level and non-absorbent. 2 Collect a sample. 3 Stand firmly on the footpieces and fill /3 the volume of the cone with the sample. Compact the concrete by 'rodding' 25 times. Rodding: Rodding means to push a steel rod in and out of the concrete to compact it into the cylinder, or slump cone. Always rod in a definite pattern, working from outside into the middle. 4 Now fill to 2 / 3 and again rod 25 times, just into the top of the first layer. 5 Fill to overflowing, rodding again this time just into the top of the second layer. Top up the cone till it overflows. 6 Level off the surface with the steel rod using a rolling action. Clean any concrete from around the base and top of the cone, push down on the handles and step off the footpieces. 7 Carefully lift the cone straight up making sure not to move the sample. 8 Tu rn the cone upside down and place the rod across the up-turned cone.
  • 15.  THE COMPRESSION TEST The compression test shows the compressive strength of hardened concrete. The testing is done in a laboratory off-site. The only work done on-site is to make a concrete cylinder for the compression test. The strength is measured in Megapascals (MPa) and is commonly specified as a characteristic strength of concrete measured at 28 days after mixing. The compressive strength is a measure of the concrete’s ability to resist loads which tend to crush it. Tools  Cylinders (100 mm diameter x 200 mm high or 150 mm diameter x 300 mm high) ( The small cylinders are normally used for most testing due to their lighter weight )  Small scoop Bullet-nosed rod (600 mm x 16 mm)  Steel float  Steel plate Method 1 Clean the cylinder mould and coat the inside lightly with form oil, then place on a clean, level and firm surface, ie the steel plate. 2 Collect a sample.
  • 16. 3 Fill 1/2 the volume of the mould with concrete then compact by rodding 25 times. Cylinders may also be compacted by vibrating using a vibrating table. 4 Fill the cone to overflowing and rod 25 times into the top of the first layer, then top up the mould till overflowing. 5 Level off the top with the steel float and clean any concrete from around the mould. 6 Cap, clearly tag the cylinder and put it in a cool dry place to set for at least 24 hours. 7 After the mould is removed the cylinder is sent to the laboratory where it is cured and crushed to test compressive strength.
  • 17.  Impact Testing An impact test is a dynamic test conducted on a selected specimen which is usually notched. The specimen is struck and broken by a single blow in a specially designed machine. This demo illustrates the experiment setup, procedure and the energy absorbed in an impact test.
  • 18.  Cube Test Test applied to the concrete, this is the utmost important which gives an idea about all the characteristics of concrete. By this single test one judge that whether Concreting has been done properly or not. For cube test two types of specimens either cubes of 15 cm X 15 cm X 15 cm or 10cm X 10 cm x 10 cm depending upon the size of aggregate are used. For most of the works cubical moulds of size 15 cm x 15cm x 15 cm are commonly used. This concrete is poured in the mould and tempered properly so as not to have any voids. After 24 hours these moulds are removed and test specimens are put in water for curing. The top surface of these specimen should be made even and smooth. This is done by putting cement paste and spreading smoothly on whole area of specimen. These specimens are tested by compression testing machine after 7 days curing or 28 days curing. Load should be applied gradually at the rate of 140 kg/cm2 per minute till the Specimens fails. Load at the failure divided by area of specimen gives the compressive strength of concrete.  APPARATUS Compression testing machine.  PREPARATION OF CUBE SPECIMENS The proportion and material for making these test specimens are from the same concrete used in the field. SPECIMEN 6 cubes of 15 cm size Mix. M15 or above.
  • 19.  MIXING Mix the concrete either by hand or in a laboratory batch mixer. HAND MIXING (i)Mix the cement and fine aggregate on a water tight none-absorbent platform until the mixture is thoroughly blended and is of uniform color (ii)Add the coarse aggregate and mix with cement and fine aggregate until the coarse aggregate is uniformly distributed throughout the batch (iii)Add water and mix it until the concrete appears to be homogeneous and of the desired consistency.  PRECAUTIONS The water for curing should be tested every 7days and the temperature of water must be at 27+-2oC.  PROCEDURE (I) Remove the specimen from water after specified curing time and wipe out excess water from the surface. (II) Take the dimension of the specimen to the nearest 0.2m (III) Clean the bearing surface of the testing machine (IV) Place the specimen in the machine in such a manner that the load shall be applied to the opposite sides of the cube cast. (V) Align the specimen centrally on the base plate of the machine. (VI) Rotate the movable portion gently by hand so that it touches the top surface of the specimen. (VII) Apply the load gradually without shock and continuously at the rate of 140kg/cm2/minute till the specimen fails (VIII) Record the maximum load and note any unusual features in the type of failure.
  • 20. Using mix Concrete , there some Point to construct the road: 1. Preparation of base 2. Form working 3. Preparation of subgrade 4. Watering of base 5. Joints 6. Material mix & placing 7. Compaction 8. Finishing of surface 8A. Floating 8B. Belting 8C. Brooming 9. Curing 10. Joint filling 11. Edging 12. Open to traffic
  • 21. 1. Preparation of subgrade 1. Rolling on sub grade by roller 2. Filling the granular soil in the weak part and pot holes 3. Correct the soil coat , Camber , longitudinal slop When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , used water proof paper on entire length. 1. Rolling on sub grade by roller 2. Filling the granular soil in the weak part and pot holes 3. Correct the soil coat , Camber , longitudinal slop When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , used water proof paper on entire length.
  • 22. 2. Preparation of base Choose any one type of base 1. W.B.M. base As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on W.B.M. 2. Concrete base On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64) 3. Granular medium material layer 10-15cm composite layer of sand , moorum , bajri are used for better drainage facilities 4. Stabilization soil
  • 23. 3. Form work Material for form work- Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, minerals. 1. before using form work, it should free from all type material like as dust ,cement. 2. To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden sheeting. 3. The depth of wooden block must be same as level of slab thick. 4. After 24hrs form work displaced next length of road. 4. Watering of base If base is dry then using the sprinkling process on it properly after that placing the concrete. 5. Joints Where is necessary to provide transverse, Longitudinal joints; there wedge of woods, metals fix on level of concrete. After setting of concrete it should be pull out. If provided the dowel bar in joints, bars should be fit at right position.
  • 24. 6.Material mix & placing Mixer is equipment that mix the concrete using distinct amount of cement , concrete, sand and water. Concrete slab should have more than 5-10cm thick cause of drying. Used two type mixer- 1. Batch mixer-at site, used for small road construction 2. Continuous mixer- Continuous mixer used for large construction . if distance is more from site , mix concrete transported at site within setting time. Two methods generally used in placing of concrete- 1. Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side . 1st side 2nd side This method have slow process due to road traffic problems. 2. Continuous bay method-construct one side of road regularly, if completed some part of first side than construct other side. This method have fast process without no obstruction of traffic
  • 25. 7. Compaction Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1. mechanically surface vibrator 2. manually hand tempers 8. Finishing of surface 1.Floating- For levelling the surface use floating, scree-ding , power trowel. So that there is no acceptable more than 3mm variation in concrete level surface. 2.Belting- For making surface clean used belting process. Belt is nothing but a 15-30cm thick sheets of canvass which have more length than road. 3. Brooming- Brooming is the process in which we made rough surface parallel to road by brush. It is useful in avoiding slip & comfortable travelling on road . The depth of line on road no more than 1.5mm.
  • 26. 9.Curing Curing is the name of increasing the hydration process of cement. after setting the concrete , curing process done till 14-28days. Some methods of curing are- 1.Shading concrete works 2. Covering with hessian & gunny bags 3. Sprinkling of water 4.By ponding 5. Membrane curing 6. Steam curing
  • 27. 10. Filling joint After drying road, clean the joints and fill the shelling compound or hot bitumen . 11. Edging To protect damaging the sides of concrete pavements used over burnt brick work. In place of bricks, provide kerb of pre mix concrete. 12.open to traffic Generally after a month, road should be open to traffic. If used rapid hardening cement it take 7 days to open traffic.
  • 28. Reference Websites;  www.Google.com  www.concrete.net.au  www.res.gov.in  www.upjl.com  www.concrete.com  www.sand.uk Books;