A new approach for refurbishment projects
Saco Heijboer - project manager NedTrain
24 November 2009
2
Overview
•  About NedTrain
•  A projects as it should be
•  Questions
•  The reality that isn t any help either
•  The alternative approach
•  Goals and stake holders
•  Baselines and control loops
•  The benefits
3
NedTrain: Who are we?
•  Part of Dutch Railways
•  Maintenance of rolling stock
•  € 400 million turnover
•  3.000 employees
•  3.000 units (coaches and locomotives)
•  Established all over the Netherlands:
•  35 Service locations
•  5 Maintenance locations
•  2 Overhaul locations (1 also refurbishment)
•  7x24 at your service!
4
NedTrain goals
•  For service and maintenance:
•  Development towards Maintenance Integrator
•  For refurbishment & overhaul:
•  Development towards
•  System Integrator
•  Key aspects:
•  Connect disciplines
•  Connect information
•  Connect supply chain
•  Ambition to become Best in class
5
a project as it should be
•  Define Scope and requirements
•  Define constraints (planning, cost, means, etc.)
•  Design the train conform requirements
•  Verify whether the requirements are met
•  Deliver trains
•  During the project: manage scope changes and make
sure the customer is paying for them.
1
solution finding principle
designing is a process of generating possible solutions
and selecting the best one with respect to all applicable
requirements
divergence convergencerequirements
brainstorms
creative process
looking for solutions
filtering
evaluation
making choices
solution
7
Scope change control
•  Define the requirements as detailed as you can
•  Include requirements about maintainability, weight, energy
consumption, environment friendly solutions, etc.
•  Control deviations of requirements
•  Make a decision loop with your customer to deal with those
deviations and to manage additional cost
8
And now....
9
Questions
•  Is an extensive scope and requirement description a
warranty for getting what you want?
•  Is a fixed and massive contract a warranty for getting what
you want?
•  Can you describe in advance exactly what you want?
•  Is the cheapest supplier always the preferred one?
•  What is smarter: helping your supplier to solve his
problem or pointing out to him which penalty is applicable
if he doesn t solve it?
•  The questions above are relevant for
all supply chain parties.
10
The reality in real life projects
•  During a project the scope is always evolving.
•  Several requirements will remain contradictory.
•  The demands of all stake holders can never be met.
•  Design decisions always come to soon
•  It s not always clear how to meet requirements
1
solution finding principle again
•  designing is an iterative process of generating
possible solutions and selecting the best one with respect
to all applicable requirements
divergence convergencerequirements
brainstorms
creative process
looking for solutions
filtering
evaluation
making choices
solution
12
Alternative approach
•  Define the requirements not too detailed and as functional
as possible.
•  Define the goals of the requirements.
•  Determine which performance shall be optimised.
•  Allocate targets for the performance to be optimised.
•  Train your design teams.
•  Give the design teams decision rules and tools.
•  Take the whole chain into account.
•  Make a decision loop with your stake holders to deal with
those optimisations (budget change control)
13
Goals and stake holders
•  Design for reliability
•  Design for maintenance
•  Design for assembly
•  Design for logistics
•  Design for environment
•  Design for weight
•  Design to cost
•  Design for cleaning
•  Design for ...
14
Communicating vessels
•  Balancing by levelling project goals
•  E.G.: adding cost and weight might reduce LCC and Reliability
Energy
Weight
Reliability
LifeCycleCost
ProjectCost
15
Optimisation iteration
•  Start with top down targets in the first baseline
•  Let the design teams create a bottom up baseline based on
their conceptual designs
•  Update your baselines regularly,
at least with each design review
•  Formulate business cases for difficult or important design
decisions.
16
iterative baseline principle
Configuratie
info
New baseline budgets
generate
solutions
analyse
solutions
select
solution
define
problem
Realisation
Keep in control
And give room for
control to the team
Closed loop
Iteration process
Baseline budgets
17
Customer intimacy
• For all involved parties:
• Open communication is essential
• Close co-operation is essential
• Looking for the benefit of all parties is essential
• Sharing available information is essential
18
The benefit of it all
•  Better designs: not just performing well,
but optimised for all relevant aspects!
•  An involved and satisfied customer
•  Involved and satisfied stake holders in general
•  And therefore: less surprises when the train is delivered.
19
Thank you for your attention

Contenu connexe

En vedette (13)

Finalnuestrohogar
FinalnuestrohogarFinalnuestrohogar
Finalnuestrohogar
 
Todd-Pearce_Cutting-Edge Technology_ International mining Technology Group pt...
Todd-Pearce_Cutting-Edge Technology_ International mining Technology Group pt...Todd-Pearce_Cutting-Edge Technology_ International mining Technology Group pt...
Todd-Pearce_Cutting-Edge Technology_ International mining Technology Group pt...
 
Gaming
GamingGaming
Gaming
 
Projeto prnto para o blog
Projeto prnto para o blogProjeto prnto para o blog
Projeto prnto para o blog
 
Anil Resume
Anil ResumeAnil Resume
Anil Resume
 
Didactica
DidacticaDidactica
Didactica
 
Arte
ArteArte
Arte
 
Parcial comunicacion
Parcial comunicacionParcial comunicacion
Parcial comunicacion
 
Plagio en la era digital
Plagio en la era digitalPlagio en la era digital
Plagio en la era digital
 
Edublogs
EdublogsEdublogs
Edublogs
 
Computer based
Computer basedComputer based
Computer based
 
The Perfect Lie
The Perfect LieThe Perfect Lie
The Perfect Lie
 
Tiscar
TiscarTiscar
Tiscar
 

Similaire à Ddz project new-approach-091124

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
Terry Bunio
 
Agile Method requirement engineering.ppt
Agile Method requirement engineering.pptAgile Method requirement engineering.ppt
Agile Method requirement engineering.ppt
ubaidullah75790
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531
Jason Hudspeth
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531
Jason Hudspeth
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agile
Est
 

Similaire à Ddz project new-approach-091124 (20)

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Production System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & ConsultingProduction System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & Consulting
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 BarcelonaRick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
 
Requirements engineering for agile methods
Requirements engineering for agile methodsRequirements engineering for agile methods
Requirements engineering for agile methods
 
Strategies For A Meaningful Design Review by Tom Anderson
Strategies For A Meaningful Design Review by Tom AndersonStrategies For A Meaningful Design Review by Tom Anderson
Strategies For A Meaningful Design Review by Tom Anderson
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
 
Client cases by industry
Client cases by industryClient cases by industry
Client cases by industry
 
Agile Method requirement engineering.ppt
Agile Method requirement engineering.pptAgile Method requirement engineering.ppt
Agile Method requirement engineering.ppt
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agile
 
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_
 
Using Agile Approach with Fixed Budget Projects
Using Agile Approach with Fixed Budget ProjectsUsing Agile Approach with Fixed Budget Projects
Using Agile Approach with Fixed Budget Projects
 
FMP Event - City of London - Barbara crabb
FMP Event - City of London - Barbara crabb FMP Event - City of London - Barbara crabb
FMP Event - City of London - Barbara crabb
 
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization ProblemsAddressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
 
Presentation1
Presentation1Presentation1
Presentation1
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013
 

Dernier

一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 

Dernier (20)

Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 

Ddz project new-approach-091124

  • 1. A new approach for refurbishment projects Saco Heijboer - project manager NedTrain 24 November 2009
  • 2. 2 Overview •  About NedTrain •  A projects as it should be •  Questions •  The reality that isn t any help either •  The alternative approach •  Goals and stake holders •  Baselines and control loops •  The benefits
  • 3. 3 NedTrain: Who are we? •  Part of Dutch Railways •  Maintenance of rolling stock •  € 400 million turnover •  3.000 employees •  3.000 units (coaches and locomotives) •  Established all over the Netherlands: •  35 Service locations •  5 Maintenance locations •  2 Overhaul locations (1 also refurbishment) •  7x24 at your service!
  • 4. 4 NedTrain goals •  For service and maintenance: •  Development towards Maintenance Integrator •  For refurbishment & overhaul: •  Development towards •  System Integrator •  Key aspects: •  Connect disciplines •  Connect information •  Connect supply chain •  Ambition to become Best in class
  • 5. 5 a project as it should be •  Define Scope and requirements •  Define constraints (planning, cost, means, etc.) •  Design the train conform requirements •  Verify whether the requirements are met •  Deliver trains •  During the project: manage scope changes and make sure the customer is paying for them.
  • 6. 1 solution finding principle designing is a process of generating possible solutions and selecting the best one with respect to all applicable requirements divergence convergencerequirements brainstorms creative process looking for solutions filtering evaluation making choices solution
  • 7. 7 Scope change control •  Define the requirements as detailed as you can •  Include requirements about maintainability, weight, energy consumption, environment friendly solutions, etc. •  Control deviations of requirements •  Make a decision loop with your customer to deal with those deviations and to manage additional cost
  • 9. 9 Questions •  Is an extensive scope and requirement description a warranty for getting what you want? •  Is a fixed and massive contract a warranty for getting what you want? •  Can you describe in advance exactly what you want? •  Is the cheapest supplier always the preferred one? •  What is smarter: helping your supplier to solve his problem or pointing out to him which penalty is applicable if he doesn t solve it? •  The questions above are relevant for all supply chain parties.
  • 10. 10 The reality in real life projects •  During a project the scope is always evolving. •  Several requirements will remain contradictory. •  The demands of all stake holders can never be met. •  Design decisions always come to soon •  It s not always clear how to meet requirements
  • 11. 1 solution finding principle again •  designing is an iterative process of generating possible solutions and selecting the best one with respect to all applicable requirements divergence convergencerequirements brainstorms creative process looking for solutions filtering evaluation making choices solution
  • 12. 12 Alternative approach •  Define the requirements not too detailed and as functional as possible. •  Define the goals of the requirements. •  Determine which performance shall be optimised. •  Allocate targets for the performance to be optimised. •  Train your design teams. •  Give the design teams decision rules and tools. •  Take the whole chain into account. •  Make a decision loop with your stake holders to deal with those optimisations (budget change control)
  • 13. 13 Goals and stake holders •  Design for reliability •  Design for maintenance •  Design for assembly •  Design for logistics •  Design for environment •  Design for weight •  Design to cost •  Design for cleaning •  Design for ...
  • 14. 14 Communicating vessels •  Balancing by levelling project goals •  E.G.: adding cost and weight might reduce LCC and Reliability Energy Weight Reliability LifeCycleCost ProjectCost
  • 15. 15 Optimisation iteration •  Start with top down targets in the first baseline •  Let the design teams create a bottom up baseline based on their conceptual designs •  Update your baselines regularly, at least with each design review •  Formulate business cases for difficult or important design decisions.
  • 16. 16 iterative baseline principle Configuratie info New baseline budgets generate solutions analyse solutions select solution define problem Realisation Keep in control And give room for control to the team Closed loop Iteration process Baseline budgets
  • 17. 17 Customer intimacy • For all involved parties: • Open communication is essential • Close co-operation is essential • Looking for the benefit of all parties is essential • Sharing available information is essential
  • 18. 18 The benefit of it all •  Better designs: not just performing well, but optimised for all relevant aspects! •  An involved and satisfied customer •  Involved and satisfied stake holders in general •  And therefore: less surprises when the train is delivered.
  • 19. 19 Thank you for your attention