SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
Sadiq Bata
Sadiq Bata
Not to Scale
Biomass Boiler WF2-100 D2
MUD DRUM
STEAM DRUM
FURNACE
To Blowdown
WF2-200 LT
115
To BT-102
WF2-200
A 1st Nov 2015 In Progress
From Pump
WF2-200
To Turbine Facility
WF1-100
B 6th Nov 2015 In Progress
E-101
E-101
Superheater
E-102
Economizer
D-101
Steam Drum
FU-101
Furnace
D-102
Mud Drum
TI
121
TI
119
PI
120
TI
113
PI
114
C
E-102
LC
115
12th Nov 2015 In Progress
PI
122
PI
116PSV
118
PSV
117
FU-101
D-101
D-102
D 27th Nov 2015 In Progress
Lucas Faustini
28thOct 2015
27th Nov 2015
27th Nov 2015
SI-102
Another Silencer
SI-101
Silencer
SI-101 SI-102
Sadiq Bata
Sadiq Bata
Not to Scale
Biomass Boiler WF2-200 F
LT
202
TI
208
V-201
BT-201 BT-202
P-202
From Steam Drum
BF-100
To Drain
PI
214
TI
217
Anikke Rioux
LT
216
25thOct 2015
30thOct 2015
30thOct 2015
To Turbine
Group
WF1-400
FI
201
FI
213
DIESEL
GENERATOR
V-201
Deaerator
BT-201
Blowdown Tank
at 2 bar(g)
P-201
Pump
P-202
Standby Pump
P-203
Emergency Pump
BT-202
Atmospheric
Blowdown Tank
Feed Water
P-203
PI
212
P-201
LC
202
LC
216
From Mud Drum
WF2-100
LT
206
LC
206
PSV
207
PSV
215
To Economizer
WF2-100
PT
205
TI
204
FI
203
Incoming Steam
WF1-400
PC
205
PI
211
PI
210
Cooling Water
From Air Preheater
WF2-300
B 2nd Nov 2015 In Progress
C 6th Nov 2015 In Progress
D 6th Nov 2015 In Progress
E 11th Nov 2015 In Progress
F 28th Nov 2015 In Progress
YI
209
Conc
To atmosphere
To Drain
SI-202
SI-201
Silencer
SI-201
SI-202
Another Silencer
Sadiq Bata
Sadiq Bata
Not to Scale
PI
310
TI
311
PI
312
TI
313
PI
317
TI
314
TI
316
PI
319
Biomass Boiler WF2-300
A Oct 23rd 2015 In Progress
C
E-302
ESP-301 S-301
OI
318
Conc
ASH
12th Oct 2015
12th Oct 2015
23rd Oct 2015
PI
320
Lucas Faustini
PI
315
Incoming
Air
To the Furnace
BF-100
From Economizer
BF-100
TI
321
F-301
F-302
F-301
Forced Draft Fan
E-301
Secondary Air
Preheater
ESP-301
Electrostatic Precipitator
F-302
Induced Draft Fan
S-301
Stack
B Nov 11th 2015 In Progress
AB-301SC-301
SC-301
Screw
Conveyor
CIncoming Steam
WF1-400 PI
301
TI
302
E-301
TI
307
PI
308
TI
305
PI
306
PI
303
TI
304
AB-301
Fly Ash Bin
Nov 27th 2015 In Progress
-
E-302
Air Preheater
To Blowdown Tank
WF2-200
ST
FI
309
FC
309
RV-301 RV-302RV-302
RV-301
Rotary
Valve 1
RV-302
Rotary
Valve 2
RV-303
Rotary
Valve 3

Contenu connexe

Tendances

02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation DiagramsShakeel Vakkil
 
practicum report on steam boiler
practicum report on steam boiler practicum report on steam boiler
practicum report on steam boiler Mosuud jilani lipon
 
Pinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerPinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerK Vivek Varkey
 
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659chu aimee
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and designHéctor Nguema Ondo
 
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptx
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptxSTART_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptx
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptxAlan1986
 
Manufacturing of propylene oxide
Manufacturing of propylene oxideManufacturing of propylene oxide
Manufacturing of propylene oxideAjjay Kumar Gupta
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGlorenzo Monasca
 
Naphtha Cracker Plant
Naphtha Cracker Plant Naphtha Cracker Plant
Naphtha Cracker Plant shreenath modi
 
B E Project - Manufacturing of Phosphoric Acid
B E Project - Manufacturing of Phosphoric AcidB E Project - Manufacturing of Phosphoric Acid
B E Project - Manufacturing of Phosphoric AcidAniket Mali
 
PSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfPSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfmitesh979351
 
Steam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) SystemSteam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) SystemAditya Deshpande
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumarpradeepdeepi
 
column packing in mass transfer
column packing in mass transfercolumn packing in mass transfer
column packing in mass transferdnyaneshwar bande
 
PRESSURE VESSEL NEW-GENERAL ARRANGEMENT
PRESSURE VESSEL NEW-GENERAL ARRANGEMENTPRESSURE VESSEL NEW-GENERAL ARRANGEMENT
PRESSURE VESSEL NEW-GENERAL ARRANGEMENTsourabh arora
 

Tendances (20)

02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
 
practicum report on steam boiler
practicum report on steam boiler practicum report on steam boiler
practicum report on steam boiler
 
Antoine coefficient table
Antoine coefficient tableAntoine coefficient table
Antoine coefficient table
 
Pinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerPinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchanger
 
Pressure Relief Systems
Pressure Relief Systems Pressure Relief Systems
Pressure Relief Systems
 
Packed bed flooding
Packed bed floodingPacked bed flooding
Packed bed flooding
 
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659
Mitsubishi forklift spare parts manufacturer from zefeng 8618721729659
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptx
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptxSTART_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptx
START_TWO STAGE AMMONIA PLANT_CEP_rev08_2021-02-26.pptx
 
Catalogo Valmet 60 id
Catalogo Valmet 60 idCatalogo Valmet 60 id
Catalogo Valmet 60 id
 
Manufacturing of propylene oxide
Manufacturing of propylene oxideManufacturing of propylene oxide
Manufacturing of propylene oxide
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSG
 
Naphtha Cracker Plant
Naphtha Cracker Plant Naphtha Cracker Plant
Naphtha Cracker Plant
 
B E Project - Manufacturing of Phosphoric Acid
B E Project - Manufacturing of Phosphoric AcidB E Project - Manufacturing of Phosphoric Acid
B E Project - Manufacturing of Phosphoric Acid
 
PSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfPSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdf
 
Steam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) SystemSteam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) System
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumar
 
Steam.pptx
Steam.pptxSteam.pptx
Steam.pptx
 
column packing in mass transfer
column packing in mass transfercolumn packing in mass transfer
column packing in mass transfer
 
PRESSURE VESSEL NEW-GENERAL ARRANGEMENT
PRESSURE VESSEL NEW-GENERAL ARRANGEMENTPRESSURE VESSEL NEW-GENERAL ARRANGEMENT
PRESSURE VESSEL NEW-GENERAL ARRANGEMENT
 

P&ID-Biomass Boiler Facility

  • 1. Sadiq Bata Sadiq Bata Not to Scale Biomass Boiler WF2-100 D2 MUD DRUM STEAM DRUM FURNACE To Blowdown WF2-200 LT 115 To BT-102 WF2-200 A 1st Nov 2015 In Progress From Pump WF2-200 To Turbine Facility WF1-100 B 6th Nov 2015 In Progress E-101 E-101 Superheater E-102 Economizer D-101 Steam Drum FU-101 Furnace D-102 Mud Drum TI 121 TI 119 PI 120 TI 113 PI 114 C E-102 LC 115 12th Nov 2015 In Progress PI 122 PI 116PSV 118 PSV 117 FU-101 D-101 D-102 D 27th Nov 2015 In Progress Lucas Faustini 28thOct 2015 27th Nov 2015 27th Nov 2015 SI-102 Another Silencer SI-101 Silencer SI-101 SI-102
  • 2. Sadiq Bata Sadiq Bata Not to Scale Biomass Boiler WF2-200 F LT 202 TI 208 V-201 BT-201 BT-202 P-202 From Steam Drum BF-100 To Drain PI 214 TI 217 Anikke Rioux LT 216 25thOct 2015 30thOct 2015 30thOct 2015 To Turbine Group WF1-400 FI 201 FI 213 DIESEL GENERATOR V-201 Deaerator BT-201 Blowdown Tank at 2 bar(g) P-201 Pump P-202 Standby Pump P-203 Emergency Pump BT-202 Atmospheric Blowdown Tank Feed Water P-203 PI 212 P-201 LC 202 LC 216 From Mud Drum WF2-100 LT 206 LC 206 PSV 207 PSV 215 To Economizer WF2-100 PT 205 TI 204 FI 203 Incoming Steam WF1-400 PC 205 PI 211 PI 210 Cooling Water From Air Preheater WF2-300 B 2nd Nov 2015 In Progress C 6th Nov 2015 In Progress D 6th Nov 2015 In Progress E 11th Nov 2015 In Progress F 28th Nov 2015 In Progress YI 209 Conc To atmosphere To Drain SI-202 SI-201 Silencer SI-201 SI-202 Another Silencer
  • 3. Sadiq Bata Sadiq Bata Not to Scale PI 310 TI 311 PI 312 TI 313 PI 317 TI 314 TI 316 PI 319 Biomass Boiler WF2-300 A Oct 23rd 2015 In Progress C E-302 ESP-301 S-301 OI 318 Conc ASH 12th Oct 2015 12th Oct 2015 23rd Oct 2015 PI 320 Lucas Faustini PI 315 Incoming Air To the Furnace BF-100 From Economizer BF-100 TI 321 F-301 F-302 F-301 Forced Draft Fan E-301 Secondary Air Preheater ESP-301 Electrostatic Precipitator F-302 Induced Draft Fan S-301 Stack B Nov 11th 2015 In Progress AB-301SC-301 SC-301 Screw Conveyor CIncoming Steam WF1-400 PI 301 TI 302 E-301 TI 307 PI 308 TI 305 PI 306 PI 303 TI 304 AB-301 Fly Ash Bin Nov 27th 2015 In Progress - E-302 Air Preheater To Blowdown Tank WF2-200 ST FI 309 FC 309 RV-301 RV-302RV-302 RV-301 Rotary Valve 1 RV-302 Rotary Valve 2 RV-303 Rotary Valve 3