Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
CV Samir A Azeem 2016
1. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
NAME : SAMIR ABDEL AZEEM
Date of birth : 30/03/1956
Nationality : Egyptian
Languages : Arabic, English
Position : Projects Manager and Senior Electrical Engineer
Parent company : ABB
Telephone : 0122397 8468 / 010631 9921
E- mail : Samir.Abel-azeem@eg.abb.com
Samir.Azeem@gmail.com
---------------------------------------------------------------------------------------------------------------------------
EDUCATION :
1980 : B. Sc. in Electrical Engineering
Faculty of Engineering Ain Shams University
---------------------------------------------------------------------------------------------------------------------------
QUALIFICATION/MEMBERSHIP :
• Member of the Egyptian Syndicate of Engineers.
• Member of the Egyptian Society for Engineers.
• PMP / George Washington University / ESI International
• ABB Management Development Program
---------------------------------------------------------------------------------------------------------------------------
EXPERIENCE :
07/2015 – Present : ABB ARAB
Technical Support
Under take the technical support for Power system in steel
& Cement factories at Egypt and Oman, sharing electrical
design , shop drawing details and installation details.
04/2014 – 06/2015 : ABB ARAB
Bid & Proposal Manager
Under takes the managerial responsibilities of issuing
bid proposal for Petrochemicals, Oil& Gas, cement,
papers industries, customer negocaition, suppliers offers
Value engineering sharing of Electrical design for optimum
Solution .
01/ 2003 – 2014 : ABB Automation
Projects Manager
Undertakes technical, managerial responsibilities
Safety rules apply and achievement ,contract
administration, cost estimate and improving gross
margin of concerned projects for several projects
related to Petrochemical, administration, offices and
industrials activities in Egypt and Gulf Area including
the following: -
Page 1of 6
2. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
Project Manager for Design, Supply and erection of rectifier
test station , power transformers, and Medium Voltage
switchgear for Semaf Co.
Project Manager for Supply and erection of 4 containerized
Sub-station, Sokhna Port (end user: Worldwide Dubai Ports)
Project Manager for Danone Egypt – Up grading the Main
Power System of Danone Factory Obour city.
Project Manager for Petrosilah Petroleum Co. – Supply and
Erection of 14 storage tanks.
Project Manager for Abo Zaabal Fertilizer Co. –Erection of
instruments and power system.
Project Manager for Abo Rawash waste water treatment
plant Erection of instruments system, cables , control panels
and cable pulling.
Project Manager for feeding power supply to Belayim
Petroleum Co. “Petrobel” from authority of Sinai field
consists of laying more than 40 Km M.V , including main
road crossing by tunnel method
Project Manager for instrumentation Works in Taurt LNG
Train 1 in Gupco West harbor Port Said district.
Project Manager for supply and installation of power
shelter module for Belayim Petroleum Co. “Petrobel”.
Project Manager for Supply and construction
supervision for Power Transformer and Medium
Voltage switchgear and Low Voltage switchgear for
MEGA investment compound area
Project Manager for Supply and construction
supervision for Power Transformer Medium Voltage
switchgear and Low Voltage switchgear for Marbel
factory.
Project Manager for construction of Electrical network
upgrading for Belayim Petroleum Co. “Petrobel”
consists of laying more than 10,000 Km M.V cables
and 4,00 Km LV cables direct and in concrete
trenches, installation of 10 MV switchgear , 10 Motor
Control Center and lighting panels )
Project Manager for Supply and installation,
modifications of Power Transformers (6 units dry type)
and Low Voltage switchgear for el-Marg water
treatment plant (contractor BAMAG Germany)
Page 2of 6
3. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
Project Manager for Supply and construction
supervision for Power Transformer and Low Voltage
switchgear for three water treatment plant (contractor
BAMAG Germany) project include 2x2 MVA power
transformers, Main LV switchgear, bus duct
(3000ampere) and related MCCs and instrumentation
for each water treatment plant.
Project Manager for supply and installation of Power
Shelter modules ( 6 unit ) for Belayim Petroleum Co.
“Petrobel” project consist of installation of MV (4
MVA) and LV switchgear and their related services
panels, HVAC system, cable trays lighting system and
fire alarm and fighting system for each power module.
01/99-12/2002 : ABB Petroleum Technology
Projects Manager
Undertakes technical, managerial responsibilities
contract administration, cost estimate and improving
gross margin of concerned projects for several projects
related to Petrochemical and industrials activities in
Egypt including the following: -
Project Manager for supply and installation of 450KW
Diesel Generator and related work (daily tank, piping
ATS and MTS, civil work….) for US Naval Medical
Research Unit No. 3
Project Manager for supply and installation of MV
switchgear (2 MVA) for US Naval Medical Research
Unit No. 3, follow up installation , QC , factory test
pre-commissioning and commissioning activities.
Project Manager for supplying and installation of MV
Power Factor Correction (1050KVAR) for Arab
American for Vehicles Co. responsibilities include
project management for teamwork and installation
activities, factory test pre-commissioning and
commissioning activities.
.
Project Manager for supplying and installation of main
LV switchgears (two units) and the related main
feeders for industrial factory each 2000 ampere,
installation follow up , pre-commissioning and
commissioning activities.
Project Manger for supplying of Motor Control Center
and Variable Frequency Drive for Water & Irrigation
ministry Sudan project consists of 4 VFD each 400KW
Page 3of 6
4. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
and MCC is 2000 ampere each, taking care for Factory
acceptance test, QC , export follow up, LC ,banking
activities and third party inspection by SGS.
Project Manager for supplying Instrument and Control
Equipment for Schlumberger taking care for imported
activities and invoices follow up.
Project Manager for Supply and installation of Medium
Voltage Switchgear for Suez Oil Processing Co.
included installation of MV cable splices, termination,
cable tray, (4.5 Km length), and battery charger and
grounding system, taking care of follow up team work,
procurements, progress meeting, invoices up to
commissioning.
Project Manager for supply and erection of Medium
Voltage (4MVA) , Low Voltage Switchgear and Power
Transformer 2x2 MVA , 22 / 0.4 KV for United food Industry
Bader City.
Project Manager for Supply and Erection of Power
Factor Correction (2x850 KVAR) for Morshedy tex
El-Obour City.
Project Manager for On-site and Off-site test
equipment Calibration (more than 300 instruments) for
Midor Refinery at Al Amerya Free zone- Alex. Including
repair, rental, and supply of test equipment, taking care
of team work, invoices , progress meeting with Clients
and other parties.
Project Manager of Supply , pre-commissioning and
Commissioning of LPG Pumping Station for Petroleum
Pipelines Co. project including measurement skids,
receiving and sending skids, also main pump. Factory
inspection of equipment at supplier’s workshop in Italy.
Pre-commissioning and commissioning activities include
preparing of commissioning schedule and final report .
Senior Electrical Engineer
Design coordination leader of Alexandria Company for
Petroleum Additives ACPA project consists of 2 power
transformer 2 MVA, MV cable feeder 5 KM length, MV
switchgear LV switchgear , MCC, process area , storage area,
tank farms cable and piping racks , land escape including
street lighting , material requisition follow up and progress
report for project schedule ( turn key project).
Page 4of 6
5. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
Design Team Leader of Tarek Diesel Storage Tank
responsibilities include design of electrical work as will as
follow up of other activities.
Participated in the following project as a Senior Electrical
Engineer:
- Project: Western desert Gas Development
- Client: Khalda Petroleum Co. / Samsung Engineering Co.
Responsibilities include construction supervision a
quality control and assurance of some task and month
certificate supporting.
- Bidding studying of electrical activities for deferent
proposals
- Water injection pump, Client: Khalda Petroleum Co.
preparing of electrical detail design and construction
drawings (Pump motor 1950 kw, step down transformer
2300 kva-3300/ 1150v).
- Grounding system of western desert field Client: Khalda
Petroleum Co.
-Oriental Petrochemicals Co. (OPC) Off-Site Facilities
- Participated of document preparation as a Package Engineer
responsible of coordination of Hydrogen Generation
Package to produce 200 Ncu.M/H of hydrogen.
- Preparation and studying of electrical work of SHELL fuel
depot till awarding.
-Preparing and studying of cathodic protection tender for
10" Gas Pipeline for Khalda Pet. Co.
06/98 - 01/99 : Construction Management of two residential compound in
Oct. 6th
(200 villa with their facilities and 2nd
is 70 multi story
building contain 2000 flats with their facilities)
Responsibilities include design review issued by consultant's
tender issued and evaluation, value engineering, material
requisitions and construction supervision.
03/97-06/98 : Sharm International For Touristic Development
Head of Electrical Department
Construction management of two Five stars Resorts
“Holiday Inn Crown Plaza 320 rooms and their facilities.
Responsibilities included design review issued by consultants,
tenders evaluation, value engineering, material requisition,
construction supervision as an owner representative to budget
and quality control for both projects.
01/91-01/97 Dar El Handasah
Senior Electrical Engineer
Development of central area of Madinah, Saudi Arabia. The
project included new construction of infrastructure in the action
area, and Munakha underpass extension, as well as upgrading
of the existing area. Responsibilities included supervision of all
installations and electrical works including (conduit systems,
related civil works, cable installation / termination, street
lighting, grounding system,
Page 5of 6
6. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
studying of MV cable installation inside culvert system,
studying obstructions encountered during the execution of the
works/ recommending suitable solutions, tender
preparation/analysis, commissioning and testing.
Responsibilities also included the review of designs according
to the national local standards and the recommendations of
the executive committee (owner) for construction regulations.
01/81-01/91 : Engineering Consultants Group (ECG)
Senior Electrical Engineer
Carry out design engineering packages and construction
supervision related to:
Design of electrical systems and construction supervision,
industrial pollution control project, Egypt.
Preparing construction, Shop drawing and procurement
services related to electrical and instrumentation systems, El
Hamra-Sidi Krir crude oil storage area.
Construction, supervision of all electrical systems including,
Cable installation, conduits, substation, switchgear, panel
boards, instrumentation systems, Cathodic protection and
lighting systems indoor and outdoor- Rod El Farag filtration
plant-Cairo.
- Participated in pre-feasibility study for construction of
electrical workshops in Egypt for Thomson - Canada.
- Market survey study of Alex. Construction business.
- Construction supervision and design of electrical
systems including lighting cable sizing, panel board and switch
gear design and specification of Port-Said Authority’s office
building.
10/80-12/81 : Egyptian Armed Forces
• Preparation of construction drawings, construction supervision
and monthly certificate of a telephone network with AEG-
Telefunken.
Page 6of 6
7. CURRICULUM VITAE
---------------------------------------------------------------------------------------------------------------------------
studying of MV cable installation inside culvert system,
studying obstructions encountered during the execution of the
works/ recommending suitable solutions, tender
preparation/analysis, commissioning and testing.
Responsibilities also included the review of designs according
to the national local standards and the recommendations of
the executive committee (owner) for construction regulations.
01/81-01/91 : Engineering Consultants Group (ECG)
Senior Electrical Engineer
Carry out design engineering packages and construction
supervision related to:
Design of electrical systems and construction supervision,
industrial pollution control project, Egypt.
Preparing construction, Shop drawing and procurement
services related to electrical and instrumentation systems, El
Hamra-Sidi Krir crude oil storage area.
Construction, supervision of all electrical systems including,
Cable installation, conduits, substation, switchgear, panel
boards, instrumentation systems, Cathodic protection and
lighting systems indoor and outdoor- Rod El Farag filtration
plant-Cairo.
- Participated in pre-feasibility study for construction of
electrical workshops in Egypt for Thomson - Canada.
- Market survey study of Alex. Construction business.
- Construction supervision and design of electrical
systems including lighting cable sizing, panel board and switch
gear design and specification of Port-Said Authority’s office
building.
10/80-12/81 : Egyptian Armed Forces
• Preparation of construction drawings, construction supervision
and monthly certificate of a telephone network with AEG-
Telefunken.
Page 6of 6