Transport challenges and priorities for
east and south east London
What we do
2
More than 30 million journeys every day
Public transport mode share for London has
increased by 10.6% since 2000
We are delivering one of the world's largest
investment programmes
We manage 580km of London's busiest
roads and all 6,200 traffic signals
We regulate taxis and private hire trade
£200bn of freight is moved on London's
roads every year
We operate the Congestion Charging and
Low Emission Zone
Number of journeys made in London in 2013/14
2.4 bn
Buses
1.5 m
Dial-a-ride
Rivers
8.6 m
Santander cycles
8.2 m
Emirates Air Line
DLR
101.6 m
205.3 m
135.7 m
Tramlink
31.2 m
1.26 bn
London Underground
Cycling
Taxi and PHV
147.5 m
3.65 bn
Roads (minus Taxi/PHV)
1.4 m
London Overground
Sources of funding – 2015/16
Total income £11bn
42% 17% 8% 6% 20% 7%
Fares Grant Crossrail grant Commercial &
Congestion
Charge
Cash and
borrowing
Business
Rate
Retention
3
Where the money is spent – 2015/16
All income is spent on running and improving transport services. Because of
this, there is no 'retained profit'.
4
Investment Running the network£11bn34% 66%
How far we have come
5
We are faced with the huge challenge of a rapidly rising
population
20% population growth
14% employment growth
2011 - 2031
6
Ensuring population growth is productive growth
London is already one of the most productive world cities and therefore vital
to the UK economy – its growth will be accommodated by further increasing
the density of new development.
7
1.6m
New
Londoners
0.6m
New jobs
Population Employment
Rapid job creation has driven population growth but
undersupply of housing is a threat to future growth
8
25,000 average units
Delivered each year
(2001-2011)
9
Transport links are critical to unlocking housing
development
Upper Lea
Valley
City
Fringe
Stratford &
Olympic Park
Stanmore,
Edgware &
Colindale
Wembley
Islington
/ Seven
Sisters
Tower
Hamlets &
Greenwich
Rate of housing delivery within OAs
along the Thames in East London has
been slow – to speed this up requires
substantial upfront investment in
infrastructure and land remediation
Finding new sources of funding
• The way transport infrastructure is funded is changing – transport
investment need not all come from the Exchequer
• Crossrail is two-thirds funded from London sources and the Northern Line
Extension received only a loan guarantee from the Treasury. Both will
deliver a major boost to the economy and generate new tax revenue for
the Exchequer
• Major projects will need to maximise non-government sources of funding
in future – these packages are best assembled at city level and need to
deliver connectivity as well as affordable homes
10
This will help London deliver a projected fiscal surplus of around
£100bn by 2025, up from £36bn today
Transport capacity
AgglomerationIncreased productivity
‘Payback’
Transport Opportunities to support east and
south east London
11
Recap - three decades of transformation
12
Crossrail will serve Opportunity Areas across London
13
Crossrail Opportunities
14
15
Trams 2030 Strategy
Long-term DLR upgrade aspirations
New capacity in central
London
• Very long-term ambition to
extend west from Bank
• Increases rail capacity in
central London at fraction of
cost of new line
• Complementary to Crossrail 2
Lewisham ‘orbital gateway’
• Potential for major station upgrade
• High-frequency DLR and Bakerloo
line services
• Metro-style Southeastern services
• Integrated with local buses
Beckton Depot
• More depot space is
needed if DLR is to
support growth
• This is potential for a
combined DLR,
highway and bus depot
• This could make
efficient use of space
under or above the
proposed Gallions
Crossing
Connecting the eastern
Royals
• Potential extensions from
Gallions Reach towards
Barking town centre &
Thamesmead could
support thousands of
new homes
• They would link much of
NE & SE London to
30,000+ jobs planned in
the Royal Docks
• Could be delivered in
stages just like DLR’s
Woolwich to Stratford
link
Stratford ‘orbital gateway’
• New flagship transport hub &
emerging city centre
• Major uplifts in DLR frequencies
to Stratford are possible
• This would complement
improvements to Crossrail,
Overground and new services to
the Upper Lea Valley (STAR)
New DLR trains
• Replacing and expanding
the DLR fleet is essential
to Docklands growth
• Without doing this, we
cannot increase capacity
on DLR or extend it
• Trains and depot space are
the two most significant
constraints to enhancing
DLR capacity
There were significant improvements in CP4
CP5 investment is underway, though some has been deferred
as a result of the Hendy review
TfL and NR are working to identify the next generation of
improvements: higher capacity radial routes
1919
West Coast
• More 12-car trains
• Preparation for HS2 at
Euston and Old Oak
South Western
• Prep for CR2
• South London
Heathrow Rail
Link
• +4tph Windsor
lines
• Extra fast line
frequency from
grade separation
at Basingstoke
and Woking
South Central
• BML upgrade: two extra
platforms at East
Croydon, remodelled
Windmill Jn, all trains 12-
car
Great Northern
• Increase peak frequency into
Moorgate by signal changes
Great Western
• Hex / Crossrail / T5
• Western rail access
to LHR
• Old Oak interchange
South Eastern
• Frequency improvements
Bexley Riverside / Dartford /
Ebbsfleet / Gravesend
High Speed 1
• More fully length 12-
car trains
West Anglia
• More frequency, lengthening
• 4-track Lea Valley line to add
paths and prep for CR2
Chiltern
• Longer trains
• Greater
connectivity to
Old Oak
Common
Great Eastern
• +2tph GE outers
Bakerloo Line Extension
20
East and Southeast London River Crossings
21
There is a need to address connectivity across the River Thames
22
The TfL River Crossings programme
a) Silvertown Tunnel
b) A new crossing from Thamesmead – Beckton (Gallions Reach)
c) A new crossing from Belvedere - Rainham
23
Silvertown Tunnel
• Twin-bore road tunnel between
Greenwich Peninsula and Tidal Basin
• Links A2/A102 corridor with
Docklands
• Requires user charging of the new
crossing and the Blackwall tunnel
• User charging will manage demand
and pay for the new infrastructure
• Opportunity for significant bus
network crossing the river
• DCO application submitted April 2016
• Pending consent, the tunnel could be
open by 2022/23
24
Development Consent Order process
25
Key milestones for Silvertown tunnel
• Spring 2016 – Submit Development Consent Order (DCO) application
• Spring/Summer 2016 – Public and stakeholders can submit a response to
Planning Inspectorate
• May 2016 – TfL industry day
• Summer 2016 – Examination period begins
• Autumn 2017 – DCO decision expected
• 2018 – Award contract
• 2019 – Construction begins
• 2022/23 – Tunnel opens
26
Gallions Reach and Belvedere river crossings
27
Consultation
• Ran between 2 Dec and 12 February
• Almost 90 percent supported at least
one new crossing
• 77 per cent supported both
• We collected valuable information on
how people think they may use the
crossing
• This will help us to decide how to
incorporate public transport –
including new and extended bus
routes, and possibly a new rail link
28
Are they bridges or tunnels?
• We are considering the feasibility of bridges or tunnels for both crossings
• There’s still more work to be done before a decision can be made
• Factors that could influence this decision include
– What form of public transport is proposed?
– What would the land and property impacts be for each crossing?
– What would the environmental impacts be?
– What would the impact on other infrastructure be, i.e. river traffic and London
City Airport?
– Which option would be most cost effective given the questions above?
29
Indicative public transport connections
30
Next steps
• Summer 2016 – discussions with the Mayor
• Late 2016 – Carry out more detailed assessments
• 2017 – Agreement on funding and decision to proceed
• 2017/18 – Statutory consultation
• 2018 – Submit application for the powers to build the scheme
• 2021 – Contract award
• 2025 – Estimated completion
31
Questions / Discussion
32

Contenu connexe

Tendances

Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRCAkanksha Chopra
 
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYS
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYSMANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYS
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYSBrahmaV1
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro ProjectASHISH SINGH
 
Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)lochan Shrestha
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project ManagementAnurag Sureka
 
Road sector in India
Road sector in IndiaRoad sector in India
Road sector in Indiasharifishere
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
RISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITERISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITEPratham Sharma
 
Light rail transit system
Light rail transit systemLight rail transit system
Light rail transit systemashik ks
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed RailwaysNabh Agrawal
 
Railway station-design
Railway station-designRailway station-design
Railway station-designTehreem Saher
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluationgouravranjan27
 
Ahmedabad metro rail project (amrc) deepen
Ahmedabad metro rail project (amrc)   deepenAhmedabad metro rail project (amrc)   deepen
Ahmedabad metro rail project (amrc) deepenDeepen Upadhyay
 
Transport planning and Modeling by ephrem alemu.pptx
Transport planning and Modeling by ephrem alemu.pptxTransport planning and Modeling by ephrem alemu.pptx
Transport planning and Modeling by ephrem alemu.pptxEphremAlemu6
 

Tendances (20)

Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
 
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYS
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYSMANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYS
MANUAL OF SPECIFICATIONS AND STANDARDS FOR EXPRESSWAYS
 
GCC Railway
GCC RailwayGCC Railway
GCC Railway
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project Management
 
Road sector in India
Road sector in IndiaRoad sector in India
Road sector in India
 
PPP in Modal Transport
PPP in Modal TransportPPP in Modal Transport
PPP in Modal Transport
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
RISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITERISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITE
 
Light rail transit system
Light rail transit systemLight rail transit system
Light rail transit system
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 
Railway station-design
Railway station-designRailway station-design
Railway station-design
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
Ahmedabad metro rail project (amrc) deepen
Ahmedabad metro rail project (amrc)   deepenAhmedabad metro rail project (amrc)   deepen
Ahmedabad metro rail project (amrc) deepen
 
Transport planning and Modeling by ephrem alemu.pptx
Transport planning and Modeling by ephrem alemu.pptxTransport planning and Modeling by ephrem alemu.pptx
Transport planning and Modeling by ephrem alemu.pptx
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 

Similaire à TFL Presentation

London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challengesInstitute for Transport Studies (ITS)
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
GTR 2018 Timetable Proposals
GTR 2018 Timetable Proposals GTR 2018 Timetable Proposals
GTR 2018 Timetable Proposals rrdrua
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentationFBE Manchester
 
Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Association for Project Management
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017Association for Project Management
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsIPPAI
 
PlaceEXPO: City Region Investment Strategies: High Speed 2
PlaceEXPO: City Region Investment Strategies: High Speed 2PlaceEXPO: City Region Investment Strategies: High Speed 2
PlaceEXPO: City Region Investment Strategies: High Speed 2Place North West
 
RRDRUA Timetable Meeting Presetnation
RRDRUA Timetable Meeting PresetnationRRDRUA Timetable Meeting Presetnation
RRDRUA Timetable Meeting Presetnationrrdrua
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014SCVTA
 
South East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINALSouth East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINALSteve Knight
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 
BigHertsBigIdeas for Business Network Event 31/1/14
BigHertsBigIdeas for Business Network Event 31/1/14BigHertsBigIdeas for Business Network Event 31/1/14
BigHertsBigIdeas for Business Network Event 31/1/14Stephen Lloyd Jones
 
"KEYNOTE PRESENTATION Easing Sydney’s Congestion – developing a road network...
"KEYNOTE PRESENTATION  Easing Sydney’s Congestion – developing a road network..."KEYNOTE PRESENTATION  Easing Sydney’s Congestion – developing a road network...
"KEYNOTE PRESENTATION Easing Sydney’s Congestion – developing a road network...JumpingJaq
 

Similaire à TFL Presentation (20)

Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challenges
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
London residential summit
London residential summitLondon residential summit
London residential summit
 
GTR 2018 Timetable Proposals
GTR 2018 Timetable Proposals GTR 2018 Timetable Proposals
GTR 2018 Timetable Proposals
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
 
PlaceEXPO: City Region Investment Strategies: High Speed 2
PlaceEXPO: City Region Investment Strategies: High Speed 2PlaceEXPO: City Region Investment Strategies: High Speed 2
PlaceEXPO: City Region Investment Strategies: High Speed 2
 
RRDRUA Timetable Meeting Presetnation
RRDRUA Timetable Meeting PresetnationRRDRUA Timetable Meeting Presetnation
RRDRUA Timetable Meeting Presetnation
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
South East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINALSouth East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINAL
 
Transport in london
 Transport in london  Transport in london
Transport in london
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
WesternVision
WesternVisionWesternVision
WesternVision
 
BigHertsBigIdeas for Business Network Event 31/1/14
BigHertsBigIdeas for Business Network Event 31/1/14BigHertsBigIdeas for Business Network Event 31/1/14
BigHertsBigIdeas for Business Network Event 31/1/14
 
"KEYNOTE PRESENTATION Easing Sydney’s Congestion – developing a road network...
"KEYNOTE PRESENTATION  Easing Sydney’s Congestion – developing a road network..."KEYNOTE PRESENTATION  Easing Sydney’s Congestion – developing a road network...
"KEYNOTE PRESENTATION Easing Sydney’s Congestion – developing a road network...
 

Dernier

sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sampleCasey Keith
 
Mathura Call Girls 8250077686 Service Offer VIP Hot Model
Mathura Call Girls 8250077686 Service Offer VIP Hot ModelMathura Call Girls 8250077686 Service Offer VIP Hot Model
Mathura Call Girls 8250077686 Service Offer VIP Hot ModelDeiva Sain Call Girl
 
ITALY - Visa Options for expats and digital nomads
ITALY - Visa Options for expats and digital nomadsITALY - Visa Options for expats and digital nomads
ITALY - Visa Options for expats and digital nomadsMarco Mazzeschi
 
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls AgencyHire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls AgencyNitya salvi
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sampleCasey Keith
 
Hire 8617697112 Call Girls Udhampur For an Amazing Night
Hire 8617697112 Call Girls Udhampur For an Amazing NightHire 8617697112 Call Girls Udhampur For an Amazing Night
Hire 8617697112 Call Girls Udhampur For an Amazing NightNitya salvi
 
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot Model
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot ModelBhubaneswar Call Girls 8250077686 Service Offer VIP Hot Model
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot ModelDeiva Sain Call Girl
 
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service AvailableKolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service AvailableNitya salvi
 
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Diu Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call GirlsDeiva Sain Call Girl
 
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot ModelAndheri Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.Nitya salvi
 
Sample sample sample sample sample sample
Sample sample sample sample sample sampleSample sample sample sample sample sample
Sample sample sample sample sample sampleCasey Keith
 
Top places to visit, top tourist destinations
Top places to visit, top tourist destinationsTop places to visit, top tourist destinations
Top places to visit, top tourist destinationsswarajdm34
 
IATA GEOGRAPHY AREAS in the world, HM111
IATA GEOGRAPHY AREAS in the world, HM111IATA GEOGRAPHY AREAS in the world, HM111
IATA GEOGRAPHY AREAS in the world, HM1112022472524
 
Ooty call girls 📞 8617697112 At Low Cost Cash Payment Booking
Ooty call girls 📞 8617697112 At Low Cost Cash Payment BookingOoty call girls 📞 8617697112 At Low Cost Cash Payment Booking
Ooty call girls 📞 8617697112 At Low Cost Cash Payment BookingNitya salvi
 
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)Delhi Call girls
 
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceKanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in DarjeelingWhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in DarjeelingNitya salvi
 
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.Nitya salvi
 

Dernier (20)

sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
Mathura Call Girls 8250077686 Service Offer VIP Hot Model
Mathura Call Girls 8250077686 Service Offer VIP Hot ModelMathura Call Girls 8250077686 Service Offer VIP Hot Model
Mathura Call Girls 8250077686 Service Offer VIP Hot Model
 
ITALY - Visa Options for expats and digital nomads
ITALY - Visa Options for expats and digital nomadsITALY - Visa Options for expats and digital nomads
ITALY - Visa Options for expats and digital nomads
 
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls AgencyHire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
Hire 8617697112 Call Girls Udhampur For an Amazing Night
Hire 8617697112 Call Girls Udhampur For an Amazing NightHire 8617697112 Call Girls Udhampur For an Amazing Night
Hire 8617697112 Call Girls Udhampur For an Amazing Night
 
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot Model
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot ModelBhubaneswar Call Girls 8250077686 Service Offer VIP Hot Model
Bhubaneswar Call Girls 8250077686 Service Offer VIP Hot Model
 
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service AvailableKolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
 
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Diu Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Diu Escorts call Girls
 
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot ModelAndheri Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Andheri Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
 
Sample sample sample sample sample sample
Sample sample sample sample sample sampleSample sample sample sample sample sample
Sample sample sample sample sample sample
 
Top places to visit, top tourist destinations
Top places to visit, top tourist destinationsTop places to visit, top tourist destinations
Top places to visit, top tourist destinations
 
IATA GEOGRAPHY AREAS in the world, HM111
IATA GEOGRAPHY AREAS in the world, HM111IATA GEOGRAPHY AREAS in the world, HM111
IATA GEOGRAPHY AREAS in the world, HM111
 
Ooty call girls 📞 8617697112 At Low Cost Cash Payment Booking
Ooty call girls 📞 8617697112 At Low Cost Cash Payment BookingOoty call girls 📞 8617697112 At Low Cost Cash Payment Booking
Ooty call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
 
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceKanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
 
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in DarjeelingWhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
 
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.
❤Personal Contact Number Varanasi Call Girls 8617697112💦✅.
 

TFL Presentation

  • 1. Transport challenges and priorities for east and south east London
  • 2. What we do 2 More than 30 million journeys every day Public transport mode share for London has increased by 10.6% since 2000 We are delivering one of the world's largest investment programmes We manage 580km of London's busiest roads and all 6,200 traffic signals We regulate taxis and private hire trade £200bn of freight is moved on London's roads every year We operate the Congestion Charging and Low Emission Zone Number of journeys made in London in 2013/14 2.4 bn Buses 1.5 m Dial-a-ride Rivers 8.6 m Santander cycles 8.2 m Emirates Air Line DLR 101.6 m 205.3 m 135.7 m Tramlink 31.2 m 1.26 bn London Underground Cycling Taxi and PHV 147.5 m 3.65 bn Roads (minus Taxi/PHV) 1.4 m London Overground
  • 3. Sources of funding – 2015/16 Total income £11bn 42% 17% 8% 6% 20% 7% Fares Grant Crossrail grant Commercial & Congestion Charge Cash and borrowing Business Rate Retention 3
  • 4. Where the money is spent – 2015/16 All income is spent on running and improving transport services. Because of this, there is no 'retained profit'. 4 Investment Running the network£11bn34% 66%
  • 5. How far we have come 5
  • 6. We are faced with the huge challenge of a rapidly rising population 20% population growth 14% employment growth 2011 - 2031 6
  • 7. Ensuring population growth is productive growth London is already one of the most productive world cities and therefore vital to the UK economy – its growth will be accommodated by further increasing the density of new development. 7 1.6m New Londoners 0.6m New jobs Population Employment
  • 8. Rapid job creation has driven population growth but undersupply of housing is a threat to future growth 8 25,000 average units Delivered each year (2001-2011)
  • 9. 9 Transport links are critical to unlocking housing development Upper Lea Valley City Fringe Stratford & Olympic Park Stanmore, Edgware & Colindale Wembley Islington / Seven Sisters Tower Hamlets & Greenwich Rate of housing delivery within OAs along the Thames in East London has been slow – to speed this up requires substantial upfront investment in infrastructure and land remediation
  • 10. Finding new sources of funding • The way transport infrastructure is funded is changing – transport investment need not all come from the Exchequer • Crossrail is two-thirds funded from London sources and the Northern Line Extension received only a loan guarantee from the Treasury. Both will deliver a major boost to the economy and generate new tax revenue for the Exchequer • Major projects will need to maximise non-government sources of funding in future – these packages are best assembled at city level and need to deliver connectivity as well as affordable homes 10 This will help London deliver a projected fiscal surplus of around £100bn by 2025, up from £36bn today Transport capacity AgglomerationIncreased productivity ‘Payback’
  • 11. Transport Opportunities to support east and south east London 11
  • 12. Recap - three decades of transformation 12
  • 13. Crossrail will serve Opportunity Areas across London 13
  • 16. Long-term DLR upgrade aspirations New capacity in central London • Very long-term ambition to extend west from Bank • Increases rail capacity in central London at fraction of cost of new line • Complementary to Crossrail 2 Lewisham ‘orbital gateway’ • Potential for major station upgrade • High-frequency DLR and Bakerloo line services • Metro-style Southeastern services • Integrated with local buses Beckton Depot • More depot space is needed if DLR is to support growth • This is potential for a combined DLR, highway and bus depot • This could make efficient use of space under or above the proposed Gallions Crossing Connecting the eastern Royals • Potential extensions from Gallions Reach towards Barking town centre & Thamesmead could support thousands of new homes • They would link much of NE & SE London to 30,000+ jobs planned in the Royal Docks • Could be delivered in stages just like DLR’s Woolwich to Stratford link Stratford ‘orbital gateway’ • New flagship transport hub & emerging city centre • Major uplifts in DLR frequencies to Stratford are possible • This would complement improvements to Crossrail, Overground and new services to the Upper Lea Valley (STAR) New DLR trains • Replacing and expanding the DLR fleet is essential to Docklands growth • Without doing this, we cannot increase capacity on DLR or extend it • Trains and depot space are the two most significant constraints to enhancing DLR capacity
  • 17. There were significant improvements in CP4
  • 18. CP5 investment is underway, though some has been deferred as a result of the Hendy review
  • 19. TfL and NR are working to identify the next generation of improvements: higher capacity radial routes 1919 West Coast • More 12-car trains • Preparation for HS2 at Euston and Old Oak South Western • Prep for CR2 • South London Heathrow Rail Link • +4tph Windsor lines • Extra fast line frequency from grade separation at Basingstoke and Woking South Central • BML upgrade: two extra platforms at East Croydon, remodelled Windmill Jn, all trains 12- car Great Northern • Increase peak frequency into Moorgate by signal changes Great Western • Hex / Crossrail / T5 • Western rail access to LHR • Old Oak interchange South Eastern • Frequency improvements Bexley Riverside / Dartford / Ebbsfleet / Gravesend High Speed 1 • More fully length 12- car trains West Anglia • More frequency, lengthening • 4-track Lea Valley line to add paths and prep for CR2 Chiltern • Longer trains • Greater connectivity to Old Oak Common Great Eastern • +2tph GE outers
  • 21. East and Southeast London River Crossings 21
  • 22. There is a need to address connectivity across the River Thames 22
  • 23. The TfL River Crossings programme a) Silvertown Tunnel b) A new crossing from Thamesmead – Beckton (Gallions Reach) c) A new crossing from Belvedere - Rainham 23
  • 24. Silvertown Tunnel • Twin-bore road tunnel between Greenwich Peninsula and Tidal Basin • Links A2/A102 corridor with Docklands • Requires user charging of the new crossing and the Blackwall tunnel • User charging will manage demand and pay for the new infrastructure • Opportunity for significant bus network crossing the river • DCO application submitted April 2016 • Pending consent, the tunnel could be open by 2022/23 24
  • 26. Key milestones for Silvertown tunnel • Spring 2016 – Submit Development Consent Order (DCO) application • Spring/Summer 2016 – Public and stakeholders can submit a response to Planning Inspectorate • May 2016 – TfL industry day • Summer 2016 – Examination period begins • Autumn 2017 – DCO decision expected • 2018 – Award contract • 2019 – Construction begins • 2022/23 – Tunnel opens 26
  • 27. Gallions Reach and Belvedere river crossings 27
  • 28. Consultation • Ran between 2 Dec and 12 February • Almost 90 percent supported at least one new crossing • 77 per cent supported both • We collected valuable information on how people think they may use the crossing • This will help us to decide how to incorporate public transport – including new and extended bus routes, and possibly a new rail link 28
  • 29. Are they bridges or tunnels? • We are considering the feasibility of bridges or tunnels for both crossings • There’s still more work to be done before a decision can be made • Factors that could influence this decision include – What form of public transport is proposed? – What would the land and property impacts be for each crossing? – What would the environmental impacts be? – What would the impact on other infrastructure be, i.e. river traffic and London City Airport? – Which option would be most cost effective given the questions above? 29
  • 30. Indicative public transport connections 30
  • 31. Next steps • Summer 2016 – discussions with the Mayor • Late 2016 – Carry out more detailed assessments • 2017 – Agreement on funding and decision to proceed • 2017/18 – Statutory consultation • 2018 – Submit application for the powers to build the scheme • 2021 – Contract award • 2025 – Estimated completion 31