Project Management(PM)
A project is a temporary endeavor undertaken
to accomplish a unique product, service or
result.
•1-
•The context of project management
Project Attributes/Characteristics
•The context of project management
Project Attributes/Characteristics
•1-
•The Triple Constraint
•1-
•Project Management
•Project management is the application of knowledge, skills, tools, and
techniques to project activities in order to meet or exceed stakeholder
needs and expectations from a project.
– PM is disciple of organizing, staffing, controlling, communicating,
coordinating and managing resources to bring about successful
completion of project.
–Goals of PM
•Optimizing use of available resources- time , money. Scope
•Planning , scheduling and monitoring progress
•Risk management
–Characteristics of PM
–Manager is the head
–Point of convergence
–Integrate all efforts and skills
–Rewards, results and outcomes
–Brings all departments into action
•Standish group survey(done in 1994
&updated since then)
•Project success:completed within time &
budget with all functions n feature.
• Project challenged: completed & operational
but over budget & time with fewer feature n
functions.
•Project fails: project is cancelled at some
time during PLC
•1-
•TCS MAJOR REASONS BEHIND PROJECT FAILURE
1.62% Failed for Schedule
2.49 % Budget Overruns
3.47 % Maintenance cost
4.41 Failed to deliver ROI(return on investment)
• Approaches of Improving IT Project Success
1.User involvement
2.Executive management support
3.Clear requirements and Business Objectives
4.Proper Planning
5.Realistic expectations
6.Emotional Maturity-Deliver Bad news, accept Criticism
7.Skilled Resources-Competent staff
8.Project Management Expertise-Hard working focused team
9.Standard tools & infrastructure
10.Agile Process
•1-
•Reasons for Failure
Concept of 4 P’s
The effective software project management Focuses
on four P’s:
The People
The Product
The Process
The Project
People
The following categories of people are involved in the S/W
Process.
Senior Manager
Project Managers
Practitioners
Customers
End Users
The Process
Here the important thing is to select an appropriate
process model to develop the software.
There are different process models available.
They are Water fall model, Iterative water fall
model,Prototyping model,Evolutionary
model,RAD(Rapid Application Development) model,
Spiral model.
In practice we may use any one of the above
models or a combination of the above models.
The Product
Before a software project is planned, the product
objectives and scope should be established.
Technical and management constraints should be
identified.
Without this information it is impossible to define a
reasonable cost, amount of risk involved, the project
schedule etc.
A software project scope must be unambiguous and
understandable at the management and technical levels.
In order to manage a successful software project, we
must understand what can go wrong (so that
problems can be Avoided) and how to do it right.
A project is a series of steps where we need to
make accurate decision.
Project
W5HH Principle
THE W5HH PRINCIPLE
In an excellent paper on software process and projects,
Barry Boehm states:
“you need an organizing principle that scales down to
provide simple plans for simple projects.”
Boehm suggests an approach that addresses project
objectives, milestones, schedules, responsibilities,
management and technical approaches, and required
resources.
W5HH Approach
Why is the system being developed?
The answer to this question enables all parties to assess the
validity of business reasons for the software work. Stated in
another way, does the business purpose justify the expenditure of
people, time, and money?
What will be done, by when?
The answers to these questions help the team to establish a
project schedule by identifying key project tasks and the
milestones that are required by the customer.
Who is responsible for a function?
We know that the role and responsibility of each member of
the software team must be defined.
Where are they organizationally located?
Not all roles and responsibilities reside within the software
team itself. The customer, users, and other stakeholders also
have responsibilities
How will the job be done technically and
managerially?
Management and technical strategy must be
defined.
How much of each resource is needed?
Develop estimation.
The W5HH is applicable to all software
projects regardless of size or complexity.
Need for Project Management
Project management is important because it ensures what is
being delivered, is right, and will deliver real value against the
business opportunity.
Leadership. ...
Clear Focus & Objectives. ...
Realistic Project Planning. ...
Quality Control. ...
Risk Management. ...
Orderly Process. ...
Etc..
Project Life Cycle(PLC)
•Phases of PLC
PMBOK Knowledge Areas
•1-
•Project Management
Body of Knowledge
•Project Management
Knowledge Areas
Key Knowledge areas
1.Project integration management
2.Project scope management
3.Project time management
4.Project cost management
5.Project quality management
6. Project human resource mgmt.
7. Project communication mgmt.
8. Project risk management
9. Project procurement mgmt.
Also Project Stake holders mgmt
Project Integration management is a collection of
processes required to ensure that the various elements of the
projects are properly coordinated. It involves making trade-
offs among competing objectives and alternatives to meet or
exceed stakeholder needs and expectations.
Project scope management is a process that helps in
determining and documenting the list of all the project goals,
tasks, deliverables, deadlines, and budget as a part of the
planning process.
Project time management is about using the amount
of time allocated to a project wisely in order to meet scheduled
deliverables and conclude all work by or before
the project completion date is compulsory for a successful project.
Project cost management is the process of estimating, budgeting
and controlling costs throughout the project life cycle, with the
objective of keeping expenditures within the approved budget, for
a project to be called successful, it's necessary.
Project quality management is the process through
which quality is managed and maintained throughout a PLC. This
responsibility ensures quality expectations are met.
Project human resource management involves organizing
and managing a project team. The team is usually made up of
people with specific skills and responsibilities. Project human
resource management processes include human resource planning,
acquiring the project team, developing the project team
and managing the team.
Project communication management is a collection of processes
that helps to make sure the right messages are sent, received, and
understood by the right people
Project Risk management is a process that allows individual risk
events and overall risk to be understood and managed proactively,
optimizing success by minimizing.
Project procurement management is to establish and maintain
relationships with vendors of goods and services during
the project life cycle. This unique function is an essential part
of project management, which is concerned with overseeing
designated sets of temporary operations
Project Stakeholder management is the project manager's
responsibility to manage and even influence key stakeholders'
expectations as well as requirements. Suppose if
key stakeholders aren't happy, the project is a failure. This is
why project stakeholder management is crucial for project success.
ITPM
(IT Project Methodology)
Phase 1: Conceptualize and Initialize
Define Project Goal
Provides business value to organization
How will we know if the project is successful given
the time, money, and resources invested?
⮚Deliverable : Business Case
�Business case is a deliverable that documents projects
goal as well several alternatives
�Cost feasibility,benefits, risks
�Organisation funds
�strategic
Project Charter: how project organized and how
approved alternative will be implemented.
Project plan is tactical details concerning who will carry
out work n when
who is manager?
team? scope? cost? time? Resources? Technology?
⮚Deliverable : Project Charter and plan
�Phase 3: Execute and Control the Project using approach
such as the SDLC
oAnalysis
oDesign
oCoding
oTesting
oMaintenance
�Phase 4: Close Project
�Deliverable :
oFinal project report and documentation
�Phase 5: Evaluate Project Success
◦Post mortem by project manager and team of entire project
◦Evaluation of team members by project manager
◦Evaluate project’s organizational value
Business Case
⮚It provides the 1st deliverable in the IT Project Life Cycle.
⮚Definition :
• Business Case provides an analysis of the organizational value, feasibility, costs,
benefits and risks of several proposed alternatives.
⮚It is not a budget or project plan.
⮚Attributes of a good Business Case
▪Details all possible impacts, costs, benefits
▪Clearly compares alternatives
▪Objectively includes all pertinent information
▪Systematic in terms of summarizing findings
Process for Developing the Business Case
Step I: Select the Core Team
A core team is recruited.
⮚The core team includes:
•Managers
•Business Specialist
•IT Specialist
•Other stakeholders that are affected by the project or involved
in its delivery.
⮚Advantages:
-Credibility
-Alignment with organizational goals
-Access to the real costs
-Ownership
-Agreement
-Bridge building
Step II: Define Measurable Organizational
Value (MOV)
⮚The Project’s overall goal and measure of success is referred as
the Project’s overall Measurable Organizational Value .
⮚Aligns IT project with the organization and supports the
Organization’s goal, mission and objectives.
⮚The MOV must:
✔Be measurable
✔Provides value to the organization
✔Must be agreed upon
✔Must be verifiable at the end of the project
Step III: Identify Alternatives
⮚Options identified in the Business Case are the strategies
for achieving the MOV.
⮚Base Case Alternatives:
•It describes how the organization would perform if it
maintained the status quo- i.e. if it did not pursue any of the
options described in the business case.
⮚Possible Alternative Strategies
•Change existing process without investing in IT
•Adopt/Adapt systems from other organizational areas
•Reengineer Existing System
•Purchase off-the-shelf Applications package
•Custom Build New Solution
Step IV: Define Feasibility and Asses
Risk
Feasibilty:
Focuses on whether a particular alternative is doable and
worth doing.
Types:
i.Economic feasibility:Cost/Benefit Analysis of alternatives
ii.Technical feasibility:Focuses on existing technical
infrastructure
iii.Organizational feasibility:Considers the impact on the
organization
iv.Other feasibilities:Issues like operational,legal and ethical
feasibility
Risk:
⮚An uncertain event that has a positive or negative effect
on the project’s objective.
⮚It focuses on what can go wrong and what must go
right.
⮚Risk deals with:
oIdentification: What can go wrong ?What must go
right?
oAssessment: What is the impact of each risk?
oResponse: How to avoid or minimize the risk?
Step V: Define Total Cost of
Ownership(TCO)
⮚It refers to the total cost of acquiring ,developing,
maintaining and supporting the application system over its
useful life.
⮚TCO includes costs as:
1.Direct/Up-Front costs- Initial purchase of h/w , s/w &
telecom equipments installation cost etc.
2.Ongoing cost- Salaries ,training,upgrades,maintenance etc.
3.Indirect Cost- time lost by users when the system is
down,quality assurance etc.
⮚TCO goes beyond the original purchase or development
costs.
Step VI: Define Total Benefits of
Ownership(TBO)
⮚It should address the benefits of an alternative over the
course of its useful life.
⮚It must include all of the direct,ongoing and indirect
benefits associated with each proposed alternative.
⮚Benefits can arise from:
oIncreasing high-value work
oImproving accuracy and efficiency
oImproving decision-making
oImproving customer service
Step VII: Analyze Alternatives using
Financial models and Scoring models
•All the Alternatives are compared with each other consistently.
•The most common ways are :

Contenu connexe

Similaire à INTRO.pptx

Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabcChandrasekhar Reddy
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management Siva Teja Boddeti
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6Amit Gupta
 
5 Forces Model - SWOT, PESTEL presentation.pptx
5 Forces Model - SWOT, PESTEL presentation.pptx5 Forces Model - SWOT, PESTEL presentation.pptx
5 Forces Model - SWOT, PESTEL presentation.pptxjalal879
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment helpassignmenthelpp
 
Project management
Project managementProject management
Project managementBiswa Prusty
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management ServicesSSCG Consulting
 

Similaire à INTRO.pptx (20)

Project management
Project managementProject management
Project management
 
Project management
Project managementProject management
Project management
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabc
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
PAE Ch-1 2023 Presentation1.pptx
PAE Ch-1 2023 Presentation1.pptxPAE Ch-1 2023 Presentation1.pptx
PAE Ch-1 2023 Presentation1.pptx
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
5 Forces Model - SWOT, PESTEL presentation.pptx
5 Forces Model - SWOT, PESTEL presentation.pptx5 Forces Model - SWOT, PESTEL presentation.pptx
5 Forces Model - SWOT, PESTEL presentation.pptx
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Project management
Project managementProject management
Project management
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Pmbok
PmbokPmbok
Pmbok
 
6396901
63969016396901
6396901
 
2) PMT & PIM.pptx
2) PMT & PIM.pptx2) PMT & PIM.pptx
2) PMT & PIM.pptx
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 

Plus de Sankalp Sharma

TSBSL_ZLD-Part-B-TVR.pptx
TSBSL_ZLD-Part-B-TVR.pptxTSBSL_ZLD-Part-B-TVR.pptx
TSBSL_ZLD-Part-B-TVR.pptxSankalp Sharma
 
Initiating_Projects.pptx
Initiating_Projects.pptxInitiating_Projects.pptx
Initiating_Projects.pptxSankalp Sharma
 
EXTRACTION OF ESSENTIAL OILS FROM CASHEW NUTS (VEDANT LAL)ppt.pptx
EXTRACTION OF ESSENTIAL OILS FROM CASHEW  NUTS (VEDANT LAL)ppt.pptxEXTRACTION OF ESSENTIAL OILS FROM CASHEW  NUTS (VEDANT LAL)ppt.pptx
EXTRACTION OF ESSENTIAL OILS FROM CASHEW NUTS (VEDANT LAL)ppt.pptxSankalp Sharma
 
2022-07-29_Equalizastion Tank_10pm.pptx
2022-07-29_Equalizastion Tank_10pm.pptx2022-07-29_Equalizastion Tank_10pm.pptx
2022-07-29_Equalizastion Tank_10pm.pptxSankalp Sharma
 
2022-08-01_Equalizastion Tank_Diagram_6pm.pptx
2022-08-01_Equalizastion Tank_Diagram_6pm.pptx2022-08-01_Equalizastion Tank_Diagram_6pm.pptx
2022-08-01_Equalizastion Tank_Diagram_6pm.pptxSankalp Sharma
 
Plastic Pollution presentation .pptx
Plastic Pollution presentation .pptxPlastic Pollution presentation .pptx
Plastic Pollution presentation .pptxSankalp Sharma
 
2022-08-25_EqT and CT_Diagram_3pm.pptx
2022-08-25_EqT and CT_Diagram_3pm.pptx2022-08-25_EqT and CT_Diagram_3pm.pptx
2022-08-25_EqT and CT_Diagram_3pm.pptxSankalp Sharma
 

Plus de Sankalp Sharma (8)

TSBSL_ZLD-Part-B-TVR.pptx
TSBSL_ZLD-Part-B-TVR.pptxTSBSL_ZLD-Part-B-TVR.pptx
TSBSL_ZLD-Part-B-TVR.pptx
 
Initiating_Projects.pptx
Initiating_Projects.pptxInitiating_Projects.pptx
Initiating_Projects.pptx
 
EXTRACTION OF ESSENTIAL OILS FROM CASHEW NUTS (VEDANT LAL)ppt.pptx
EXTRACTION OF ESSENTIAL OILS FROM CASHEW  NUTS (VEDANT LAL)ppt.pptxEXTRACTION OF ESSENTIAL OILS FROM CASHEW  NUTS (VEDANT LAL)ppt.pptx
EXTRACTION OF ESSENTIAL OILS FROM CASHEW NUTS (VEDANT LAL)ppt.pptx
 
2022-07-29_Equalizastion Tank_10pm.pptx
2022-07-29_Equalizastion Tank_10pm.pptx2022-07-29_Equalizastion Tank_10pm.pptx
2022-07-29_Equalizastion Tank_10pm.pptx
 
2022-08-01_Equalizastion Tank_Diagram_6pm.pptx
2022-08-01_Equalizastion Tank_Diagram_6pm.pptx2022-08-01_Equalizastion Tank_Diagram_6pm.pptx
2022-08-01_Equalizastion Tank_Diagram_6pm.pptx
 
WBT revised.pptx
WBT revised.pptxWBT revised.pptx
WBT revised.pptx
 
Plastic Pollution presentation .pptx
Plastic Pollution presentation .pptxPlastic Pollution presentation .pptx
Plastic Pollution presentation .pptx
 
2022-08-25_EqT and CT_Diagram_3pm.pptx
2022-08-25_EqT and CT_Diagram_3pm.pptx2022-08-25_EqT and CT_Diagram_3pm.pptx
2022-08-25_EqT and CT_Diagram_3pm.pptx
 

Dernier

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Dernier (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

INTRO.pptx

  • 2. A project is a temporary endeavor undertaken to accomplish a unique product, service or result.
  • 4. •The context of project management Project Attributes/Characteristics
  • 5. •The context of project management Project Attributes/Characteristics
  • 7. •1- •Project Management •Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project. – PM is disciple of organizing, staffing, controlling, communicating, coordinating and managing resources to bring about successful completion of project. –Goals of PM •Optimizing use of available resources- time , money. Scope •Planning , scheduling and monitoring progress •Risk management –Characteristics of PM –Manager is the head –Point of convergence –Integrate all efforts and skills –Rewards, results and outcomes –Brings all departments into action
  • 8. •Standish group survey(done in 1994 &updated since then) •Project success:completed within time & budget with all functions n feature. • Project challenged: completed & operational but over budget & time with fewer feature n functions. •Project fails: project is cancelled at some time during PLC •1-
  • 9. •TCS MAJOR REASONS BEHIND PROJECT FAILURE 1.62% Failed for Schedule 2.49 % Budget Overruns 3.47 % Maintenance cost 4.41 Failed to deliver ROI(return on investment)
  • 10. • Approaches of Improving IT Project Success 1.User involvement 2.Executive management support 3.Clear requirements and Business Objectives 4.Proper Planning 5.Realistic expectations 6.Emotional Maturity-Deliver Bad news, accept Criticism 7.Skilled Resources-Competent staff 8.Project Management Expertise-Hard working focused team 9.Standard tools & infrastructure 10.Agile Process
  • 12. Concept of 4 P’s
  • 13. The effective software project management Focuses on four P’s: The People The Product The Process The Project
  • 14. People The following categories of people are involved in the S/W Process. Senior Manager Project Managers Practitioners Customers End Users
  • 15. The Process Here the important thing is to select an appropriate process model to develop the software. There are different process models available. They are Water fall model, Iterative water fall model,Prototyping model,Evolutionary model,RAD(Rapid Application Development) model, Spiral model. In practice we may use any one of the above models or a combination of the above models.
  • 16. The Product Before a software project is planned, the product objectives and scope should be established. Technical and management constraints should be identified. Without this information it is impossible to define a reasonable cost, amount of risk involved, the project schedule etc. A software project scope must be unambiguous and understandable at the management and technical levels.
  • 17. In order to manage a successful software project, we must understand what can go wrong (so that problems can be Avoided) and how to do it right. A project is a series of steps where we need to make accurate decision. Project
  • 19. THE W5HH PRINCIPLE In an excellent paper on software process and projects, Barry Boehm states: “you need an organizing principle that scales down to provide simple plans for simple projects.” Boehm suggests an approach that addresses project objectives, milestones, schedules, responsibilities, management and technical approaches, and required resources.
  • 20. W5HH Approach Why is the system being developed? The answer to this question enables all parties to assess the validity of business reasons for the software work. Stated in another way, does the business purpose justify the expenditure of people, time, and money? What will be done, by when? The answers to these questions help the team to establish a project schedule by identifying key project tasks and the milestones that are required by the customer.
  • 21. Who is responsible for a function? We know that the role and responsibility of each member of the software team must be defined. Where are they organizationally located? Not all roles and responsibilities reside within the software team itself. The customer, users, and other stakeholders also have responsibilities
  • 22. How will the job be done technically and managerially? Management and technical strategy must be defined. How much of each resource is needed? Develop estimation. The W5HH is applicable to all software projects regardless of size or complexity.
  • 23. Need for Project Management Project management is important because it ensures what is being delivered, is right, and will deliver real value against the business opportunity. Leadership. ... Clear Focus & Objectives. ... Realistic Project Planning. ... Quality Control. ... Risk Management. ... Orderly Process. ... Etc..
  • 28. •Project Management Knowledge Areas Key Knowledge areas 1.Project integration management 2.Project scope management 3.Project time management 4.Project cost management 5.Project quality management
  • 29. 6. Project human resource mgmt. 7. Project communication mgmt. 8. Project risk management 9. Project procurement mgmt. Also Project Stake holders mgmt
  • 30. Project Integration management is a collection of processes required to ensure that the various elements of the projects are properly coordinated. It involves making trade- offs among competing objectives and alternatives to meet or exceed stakeholder needs and expectations. Project scope management is a process that helps in determining and documenting the list of all the project goals, tasks, deliverables, deadlines, and budget as a part of the planning process.
  • 31. Project time management is about using the amount of time allocated to a project wisely in order to meet scheduled deliverables and conclude all work by or before the project completion date is compulsory for a successful project. Project cost management is the process of estimating, budgeting and controlling costs throughout the project life cycle, with the objective of keeping expenditures within the approved budget, for a project to be called successful, it's necessary. Project quality management is the process through which quality is managed and maintained throughout a PLC. This responsibility ensures quality expectations are met.
  • 32. Project human resource management involves organizing and managing a project team. The team is usually made up of people with specific skills and responsibilities. Project human resource management processes include human resource planning, acquiring the project team, developing the project team and managing the team. Project communication management is a collection of processes that helps to make sure the right messages are sent, received, and understood by the right people Project Risk management is a process that allows individual risk events and overall risk to be understood and managed proactively, optimizing success by minimizing.
  • 33. Project procurement management is to establish and maintain relationships with vendors of goods and services during the project life cycle. This unique function is an essential part of project management, which is concerned with overseeing designated sets of temporary operations Project Stakeholder management is the project manager's responsibility to manage and even influence key stakeholders' expectations as well as requirements. Suppose if key stakeholders aren't happy, the project is a failure. This is why project stakeholder management is crucial for project success.
  • 35.
  • 36. Phase 1: Conceptualize and Initialize Define Project Goal Provides business value to organization How will we know if the project is successful given the time, money, and resources invested? ⮚Deliverable : Business Case
  • 37. �Business case is a deliverable that documents projects goal as well several alternatives �Cost feasibility,benefits, risks �Organisation funds �strategic
  • 38. Project Charter: how project organized and how approved alternative will be implemented. Project plan is tactical details concerning who will carry out work n when who is manager? team? scope? cost? time? Resources? Technology? ⮚Deliverable : Project Charter and plan
  • 39. �Phase 3: Execute and Control the Project using approach such as the SDLC oAnalysis oDesign oCoding oTesting oMaintenance �Phase 4: Close Project �Deliverable : oFinal project report and documentation
  • 40. �Phase 5: Evaluate Project Success ◦Post mortem by project manager and team of entire project ◦Evaluation of team members by project manager ◦Evaluate project’s organizational value
  • 41. Business Case ⮚It provides the 1st deliverable in the IT Project Life Cycle. ⮚Definition : • Business Case provides an analysis of the organizational value, feasibility, costs, benefits and risks of several proposed alternatives. ⮚It is not a budget or project plan. ⮚Attributes of a good Business Case ▪Details all possible impacts, costs, benefits ▪Clearly compares alternatives ▪Objectively includes all pertinent information ▪Systematic in terms of summarizing findings
  • 42. Process for Developing the Business Case
  • 43. Step I: Select the Core Team A core team is recruited. ⮚The core team includes: •Managers •Business Specialist •IT Specialist •Other stakeholders that are affected by the project or involved in its delivery. ⮚Advantages: -Credibility -Alignment with organizational goals -Access to the real costs -Ownership -Agreement -Bridge building
  • 44. Step II: Define Measurable Organizational Value (MOV) ⮚The Project’s overall goal and measure of success is referred as the Project’s overall Measurable Organizational Value . ⮚Aligns IT project with the organization and supports the Organization’s goal, mission and objectives. ⮚The MOV must: ✔Be measurable ✔Provides value to the organization ✔Must be agreed upon ✔Must be verifiable at the end of the project
  • 45. Step III: Identify Alternatives ⮚Options identified in the Business Case are the strategies for achieving the MOV. ⮚Base Case Alternatives: •It describes how the organization would perform if it maintained the status quo- i.e. if it did not pursue any of the options described in the business case. ⮚Possible Alternative Strategies •Change existing process without investing in IT •Adopt/Adapt systems from other organizational areas •Reengineer Existing System •Purchase off-the-shelf Applications package •Custom Build New Solution
  • 46. Step IV: Define Feasibility and Asses Risk Feasibilty: Focuses on whether a particular alternative is doable and worth doing. Types: i.Economic feasibility:Cost/Benefit Analysis of alternatives ii.Technical feasibility:Focuses on existing technical infrastructure iii.Organizational feasibility:Considers the impact on the organization iv.Other feasibilities:Issues like operational,legal and ethical feasibility
  • 47. Risk: ⮚An uncertain event that has a positive or negative effect on the project’s objective. ⮚It focuses on what can go wrong and what must go right. ⮚Risk deals with: oIdentification: What can go wrong ?What must go right? oAssessment: What is the impact of each risk? oResponse: How to avoid or minimize the risk?
  • 48. Step V: Define Total Cost of Ownership(TCO) ⮚It refers to the total cost of acquiring ,developing, maintaining and supporting the application system over its useful life. ⮚TCO includes costs as: 1.Direct/Up-Front costs- Initial purchase of h/w , s/w & telecom equipments installation cost etc. 2.Ongoing cost- Salaries ,training,upgrades,maintenance etc. 3.Indirect Cost- time lost by users when the system is down,quality assurance etc. ⮚TCO goes beyond the original purchase or development costs.
  • 49. Step VI: Define Total Benefits of Ownership(TBO) ⮚It should address the benefits of an alternative over the course of its useful life. ⮚It must include all of the direct,ongoing and indirect benefits associated with each proposed alternative. ⮚Benefits can arise from: oIncreasing high-value work oImproving accuracy and efficiency oImproving decision-making oImproving customer service
  • 50. Step VII: Analyze Alternatives using Financial models and Scoring models •All the Alternatives are compared with each other consistently. •The most common ways are :