SlideShare une entreprise Scribd logo
1  sur  15
Project Management
Process
Final Term 4-1
Syed Saqib Raza Rizvi
Introduction
• When you build a product or system, it's important to go through a
series of predictable steps.
• The road map that you follow is called a 'software process‘.
• Software engineers and their managers adapt the process to their
needs and then follow it.
• It provides stability, control, and organization to an activity that can, if
left uncontrolled, become quite chaotic.
What is the Project Life Cycle ?
• Every project has certain phases of development.
• A clear understanding of these phases allows managers and executives to
maintain control of the project more efficiently.
• By definition, a project has a beginning and an end and passes through
several phases of development known as life cycle phases.
• These phases are varied depending upon the industry involved but all follow
the same basic steps.
• It is important to realize that the project life cycle for each project may
differ, in both the number of phases it may have and the detail within each
of these phases.
The five main phases of the project life
cycle
• According to PMI, “project management is the application of
knowledge, skills, tools, and techniques to a broad range of activities
in order to meet the requirements of a particular project.”
• There are five phases of project management and if the lifecycle
provides a high-level view of the project, the phases are the
roadmap to accomplishing it.
Phase 1: Project Initiation
• This is the start of the project, and the goal of this phase is to define
the project at a broad level. This phase usually begins with a business
case. This is when you will research whether the project is feasible
and if it should be undertaken.
• If feasibility testing needs to be done, this is the stage of the project
in which that will be completed.
• Important stakeholders will do their due diligence to help decide if
the project is a “go.” If it is given the green light, you will need to
create a project charter or a project initiation document (PID) that
outlines the purpose and requirements of the project. It should
include business needs, stakeholders, and the business case.
Phase 2: Project Planning
• This phase is key to successful project management and focuses on developing a
roadmap that everyone will follow. This phase typically begins with setting goals.
Two of the more popular methods for setting goals are S.M.A.R.T. and CLEAR:
• S.M.A.R.T. Goals – This method helps ensure that the goals have been thoroughly
implemented. It also provides a way to clearly understand the implications of the
goal-setting process.
• Specific –answer the following questions: who, what, where, when, which, and why.
• Measurable – Create criteria that you can use to Measure the success of a goal.
• Attainable – Identify the most important goals and what it will take to achieve
them.
• Realistic – You should be willing and able to work toward a particular goal.
• Timely – Create a timeframe to achieve the goal.
Phase 2: Project Planning
• C.L.E.A.R. Goals – A newer method for setting goals that takes into
consideration the environment of today’s fast-paced businesses.
• Collaborative – The goal should encourage employees to work together.
• Limited – They should be limited in scope and time to keep it manageable.
• Emotional – Goals should tap into the passion of employees and be something
they can form an emotional connection to. This can optimize the quality of
work.
• Appreciable – Break larger goals into smaller tasks that can be quickly
achieved.
• Refinable – As new situations arise, be flexible and refine goals as needed.
Phase 2: Project Planning
• During this phase, the scope of the project is defined and a project management
plan is developed.
• It involves identifying the cost, quality, available resources, and a realistic
timetable. The project plans also includes establishing baselines or performance
measures. These are generated using the scope, schedule and cost of a project. A
baseline is essential to determine if a project is on track.
• At this time, roles and responsibilities are clearly defined, so everyone involved
knows what they are accountable for. Here are some of the documents a PM will
create during this phase to ensure the project will stay on track:
• Scope Statement – A document that clearly defines the business need, benefits of
the project, objectives, deliverables, and key milestones. A scope statement may
change during the project, but it shouldn’t be done without the approval of the
project manager and the sponsor.
Phase 2: Project Planning
• Work Breakdown Schedule (WBS) –This is a visual representation that breaks
down the scope of the project into manageable sections for the team.
• Milestones – Identify high-level goals that need to be met throughout the
project and include them in the Gantt chart.
• Gantt Chart – A visual timeline that you can use to plan out tasks and visualize
your project timeline.
• Communication Plan – This is of particular importance if your project involves
outside stakeholders. Develop the proper messaging around the project and
create a schedule of when to communicate with team members based on
deliverables and milestones.
• Risk Management Plan – Identify all foreseeable risks. Common risks include
unrealistic time and cost estimates, customer review cycle, budget cuts,
changing requirements, and lack of committed resources.
Phase 3: Project Execution
• This is the phase where deliverables are developed and completed.
This often feels like the meat of the project since a lot is happening
during this time, like status reports and meetings, development
updates, and performance reports.
• A “kick-off” meeting usually marks the start of the Project Execution
phase where the teams involved are informed of their
responsibilities.
Phase 3: Project Execution
Tasks completed during the Execution Phase include:
• Develop team
• Assign resources
• Execute project management plans
• Procurement management if needed
• PM directs and manages project execution
• Set up tracking systems
• Task assignments are executed
• Status meetings
• Update project schedule
• Modify project plans as needed
Phase 4: Project Performance/Monitoring
• This is all about measuring project progression and performance and ensuring that
everything happening aligns with the project management plan.
• Project managers will use key performance indicators (KPIs) to determine if the
project is on track. A PM will typically pick two to five of these KPIs to measure
project performance:
• Project Objectives: Measuring if a project is on schedule and budget is an
indication if the project will meet stakeholder objectives.
• Quality Deliverables: This determines if specific task deliverables are being met.
• Effort and Cost Tracking: PMs will account for the effort and cost of resources to
see if the budget is on track. This type of tracking informs if a project will meet its
completion date based on current performance.
• Project Performance: This monitors changes in the project. It takes into
consideration the amount and types of issues that arise and how quickly they are
addressed. These can occur from unforeseen hurdles and scope changes.
Phase 5: Project Closure
• This phase represents the completed project. Contractors hired to
work specifically on the project are terminated at this time. Valuable
team members are recognized. Some PMs even organize small work
events for people who participated in the project to thank them for
their efforts.
• Once a project is complete, a PM will often hold a meeting –
sometimes referred to as a “post mortem” – to evaluate what went
well in a project and identify project failures. This is especially helpful
to understand lessons learned so that improvements can be made
for future projects.
Phase 5: Project Closure
• PMs still have a few tasks to complete. They will need to create a
project punch list of things that didn’t get accomplished during the
project and work with team members to complete them.
• Perform a final project budget and prepare a final project report.
• Finally, they will need to collect all project documents and
deliverables and store them in a single place.
•Thank You

Contenu connexe

Tendances

Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Dania Abdel-aziz
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management PiyushKumar621
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 

Tendances (20)

Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Project controls
Project controlsProject controls
Project controls
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Risk Management in Project Management
Risk Management in Project ManagementRisk Management in Project Management
Risk Management in Project Management
 

En vedette

Project management final 15_aug2014
Project management final 15_aug2014Project management final 15_aug2014
Project management final 15_aug2014chenyiching
 
Leveraging Olympic Investments at the 2008 Beijing Olympic Park
Leveraging Olympic Investments at the 2008 Beijing Olympic ParkLeveraging Olympic Investments at the 2008 Beijing Olympic Park
Leveraging Olympic Investments at the 2008 Beijing Olympic ParkAnnie Bidgood
 
Avraham Glattman-Story of the Hudson Yards
Avraham Glattman-Story of the Hudson YardsAvraham Glattman-Story of the Hudson Yards
Avraham Glattman-Story of the Hudson YardsAvraham Glattman
 
Financial management - final project group presentation
Financial management - final project group presentationFinancial management - final project group presentation
Financial management - final project group presentationSarah Lee
 
Research and development methods - ethnography study of library employees
Research and development methods - ethnography study of library employeesResearch and development methods - ethnography study of library employees
Research and development methods - ethnography study of library employeesSarah Lee
 
Final Group Presentation for Project Management
Final Group Presentation for Project ManagementFinal Group Presentation for Project Management
Final Group Presentation for Project ManagementAlexander Lund
 
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...IBA - Institute of Business Administration
 

En vedette (7)

Project management final 15_aug2014
Project management final 15_aug2014Project management final 15_aug2014
Project management final 15_aug2014
 
Leveraging Olympic Investments at the 2008 Beijing Olympic Park
Leveraging Olympic Investments at the 2008 Beijing Olympic ParkLeveraging Olympic Investments at the 2008 Beijing Olympic Park
Leveraging Olympic Investments at the 2008 Beijing Olympic Park
 
Avraham Glattman-Story of the Hudson Yards
Avraham Glattman-Story of the Hudson YardsAvraham Glattman-Story of the Hudson Yards
Avraham Glattman-Story of the Hudson Yards
 
Financial management - final project group presentation
Financial management - final project group presentationFinancial management - final project group presentation
Financial management - final project group presentation
 
Research and development methods - ethnography study of library employees
Research and development methods - ethnography study of library employeesResearch and development methods - ethnography study of library employees
Research and development methods - ethnography study of library employees
 
Final Group Presentation for Project Management
Final Group Presentation for Project ManagementFinal Group Presentation for Project Management
Final Group Presentation for Project Management
 
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...
Coca Cola Company Strategic Management Project ( A Comprehensive Analysis on ...
 

Similaire à Project Management Process

MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxGagan331641
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniquesssuser8e973a
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project managementprakashnachnani
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
 
Module 1.pptx
Module 1.pptxModule 1.pptx
Module 1.pptxVinish P
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxchikuverma1
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management Siva Teja Boddeti
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheederKarin Rheeder
 

Similaire à Project Management Process (20)

MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniques
 
PAE Ch-1 2023 Presentation1.pptx
PAE Ch-1 2023 Presentation1.pptxPAE Ch-1 2023 Presentation1.pptx
PAE Ch-1 2023 Presentation1.pptx
 
Project Implementation.pptx
Project Implementation.pptxProject Implementation.pptx
Project Implementation.pptx
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectively
 
Module 1.pptx
Module 1.pptxModule 1.pptx
Module 1.pptx
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management
 
Project Management
Project ManagementProject Management
Project Management
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheeder
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 

Plus de Saqib Raza

The Design and Analysis of Algorithms.pdf
The Design and Analysis of Algorithms.pdfThe Design and Analysis of Algorithms.pdf
The Design and Analysis of Algorithms.pdfSaqib Raza
 
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...Saqib Raza
 
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdf
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdfData_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdf
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdfSaqib Raza
 
Social Impacts of Artificial intelligence
Social Impacts of Artificial intelligenceSocial Impacts of Artificial intelligence
Social Impacts of Artificial intelligenceSaqib Raza
 
Professional Practice Course Outline
Professional Practice Course OutlineProfessional Practice Course Outline
Professional Practice Course OutlineSaqib Raza
 
Ethical hacking
Ethical hackingEthical hacking
Ethical hackingSaqib Raza
 
12 security policies
12 security policies12 security policies
12 security policiesSaqib Raza
 
11 Computer Privacy
11 Computer Privacy11 Computer Privacy
11 Computer PrivacySaqib Raza
 
Software Engineering Code Of Ethics And Professional Practice
Software Engineering Code Of Ethics And Professional PracticeSoftware Engineering Code Of Ethics And Professional Practice
Software Engineering Code Of Ethics And Professional Practice Saqib Raza
 
7 Engineering Profession
7 Engineering Profession7 Engineering Profession
7 Engineering ProfessionSaqib Raza
 
6 software contracts
6 software contracts6 software contracts
6 software contractsSaqib Raza
 
Introduction to Intellectual Property
Introduction to Intellectual PropertyIntroduction to Intellectual Property
Introduction to Intellectual PropertySaqib Raza
 
Itroduction to Business Ethics
Itroduction to Business EthicsItroduction to Business Ethics
Itroduction to Business EthicsSaqib Raza
 
Types of Ethics
Types of EthicsTypes of Ethics
Types of EthicsSaqib Raza
 
Introduction to ethics
Introduction to ethicsIntroduction to ethics
Introduction to ethicsSaqib Raza
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management ConceptsSaqib Raza
 
Software Re-Engineering
Software Re-EngineeringSoftware Re-Engineering
Software Re-EngineeringSaqib Raza
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality AssuranceSaqib Raza
 
User Interface Analysis and Design
User Interface Analysis and DesignUser Interface Analysis and Design
User Interface Analysis and Design Saqib Raza
 
Architecture Design
Architecture DesignArchitecture Design
Architecture DesignSaqib Raza
 

Plus de Saqib Raza (20)

The Design and Analysis of Algorithms.pdf
The Design and Analysis of Algorithms.pdfThe Design and Analysis of Algorithms.pdf
The Design and Analysis of Algorithms.pdf
 
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...
An Introduction to the Analysis of Algorithms (2nd_Edition_Robert_Sedgewick,_...
 
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdf
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdfData_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdf
Data_Mining: Practical Machine Learning Tools and Techniques 2ndEd.pdf
 
Social Impacts of Artificial intelligence
Social Impacts of Artificial intelligenceSocial Impacts of Artificial intelligence
Social Impacts of Artificial intelligence
 
Professional Practice Course Outline
Professional Practice Course OutlineProfessional Practice Course Outline
Professional Practice Course Outline
 
Ethical hacking
Ethical hackingEthical hacking
Ethical hacking
 
12 security policies
12 security policies12 security policies
12 security policies
 
11 Computer Privacy
11 Computer Privacy11 Computer Privacy
11 Computer Privacy
 
Software Engineering Code Of Ethics And Professional Practice
Software Engineering Code Of Ethics And Professional PracticeSoftware Engineering Code Of Ethics And Professional Practice
Software Engineering Code Of Ethics And Professional Practice
 
7 Engineering Profession
7 Engineering Profession7 Engineering Profession
7 Engineering Profession
 
6 software contracts
6 software contracts6 software contracts
6 software contracts
 
Introduction to Intellectual Property
Introduction to Intellectual PropertyIntroduction to Intellectual Property
Introduction to Intellectual Property
 
Itroduction to Business Ethics
Itroduction to Business EthicsItroduction to Business Ethics
Itroduction to Business Ethics
 
Types of Ethics
Types of EthicsTypes of Ethics
Types of Ethics
 
Introduction to ethics
Introduction to ethicsIntroduction to ethics
Introduction to ethics
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Software Re-Engineering
Software Re-EngineeringSoftware Re-Engineering
Software Re-Engineering
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
 
User Interface Analysis and Design
User Interface Analysis and DesignUser Interface Analysis and Design
User Interface Analysis and Design
 
Architecture Design
Architecture DesignArchitecture Design
Architecture Design
 

Dernier

call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Modelsaagamshah0812
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdfWave PLM
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsArshad QA
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...panagenda
 
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxHand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxbodapatigopi8531
 
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceanilsa9823
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerThousandEyes
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfkalichargn70th171
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comFatema Valibhai
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...OnePlan Solutions
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...kellynguyen01
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...Health
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionSolGuruz
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfkalichargn70th171
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Steffen Staab
 
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsAlberto González Trastoy
 

Dernier (20)

call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview Questions
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxHand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
 
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
 

Project Management Process

  • 1. Project Management Process Final Term 4-1 Syed Saqib Raza Rizvi
  • 2. Introduction • When you build a product or system, it's important to go through a series of predictable steps. • The road map that you follow is called a 'software process‘. • Software engineers and their managers adapt the process to their needs and then follow it. • It provides stability, control, and organization to an activity that can, if left uncontrolled, become quite chaotic.
  • 3. What is the Project Life Cycle ? • Every project has certain phases of development. • A clear understanding of these phases allows managers and executives to maintain control of the project more efficiently. • By definition, a project has a beginning and an end and passes through several phases of development known as life cycle phases. • These phases are varied depending upon the industry involved but all follow the same basic steps. • It is important to realize that the project life cycle for each project may differ, in both the number of phases it may have and the detail within each of these phases.
  • 4. The five main phases of the project life cycle • According to PMI, “project management is the application of knowledge, skills, tools, and techniques to a broad range of activities in order to meet the requirements of a particular project.” • There are five phases of project management and if the lifecycle provides a high-level view of the project, the phases are the roadmap to accomplishing it.
  • 5. Phase 1: Project Initiation • This is the start of the project, and the goal of this phase is to define the project at a broad level. This phase usually begins with a business case. This is when you will research whether the project is feasible and if it should be undertaken. • If feasibility testing needs to be done, this is the stage of the project in which that will be completed. • Important stakeholders will do their due diligence to help decide if the project is a “go.” If it is given the green light, you will need to create a project charter or a project initiation document (PID) that outlines the purpose and requirements of the project. It should include business needs, stakeholders, and the business case.
  • 6. Phase 2: Project Planning • This phase is key to successful project management and focuses on developing a roadmap that everyone will follow. This phase typically begins with setting goals. Two of the more popular methods for setting goals are S.M.A.R.T. and CLEAR: • S.M.A.R.T. Goals – This method helps ensure that the goals have been thoroughly implemented. It also provides a way to clearly understand the implications of the goal-setting process. • Specific –answer the following questions: who, what, where, when, which, and why. • Measurable – Create criteria that you can use to Measure the success of a goal. • Attainable – Identify the most important goals and what it will take to achieve them. • Realistic – You should be willing and able to work toward a particular goal. • Timely – Create a timeframe to achieve the goal.
  • 7. Phase 2: Project Planning • C.L.E.A.R. Goals – A newer method for setting goals that takes into consideration the environment of today’s fast-paced businesses. • Collaborative – The goal should encourage employees to work together. • Limited – They should be limited in scope and time to keep it manageable. • Emotional – Goals should tap into the passion of employees and be something they can form an emotional connection to. This can optimize the quality of work. • Appreciable – Break larger goals into smaller tasks that can be quickly achieved. • Refinable – As new situations arise, be flexible and refine goals as needed.
  • 8. Phase 2: Project Planning • During this phase, the scope of the project is defined and a project management plan is developed. • It involves identifying the cost, quality, available resources, and a realistic timetable. The project plans also includes establishing baselines or performance measures. These are generated using the scope, schedule and cost of a project. A baseline is essential to determine if a project is on track. • At this time, roles and responsibilities are clearly defined, so everyone involved knows what they are accountable for. Here are some of the documents a PM will create during this phase to ensure the project will stay on track: • Scope Statement – A document that clearly defines the business need, benefits of the project, objectives, deliverables, and key milestones. A scope statement may change during the project, but it shouldn’t be done without the approval of the project manager and the sponsor.
  • 9. Phase 2: Project Planning • Work Breakdown Schedule (WBS) –This is a visual representation that breaks down the scope of the project into manageable sections for the team. • Milestones – Identify high-level goals that need to be met throughout the project and include them in the Gantt chart. • Gantt Chart – A visual timeline that you can use to plan out tasks and visualize your project timeline. • Communication Plan – This is of particular importance if your project involves outside stakeholders. Develop the proper messaging around the project and create a schedule of when to communicate with team members based on deliverables and milestones. • Risk Management Plan – Identify all foreseeable risks. Common risks include unrealistic time and cost estimates, customer review cycle, budget cuts, changing requirements, and lack of committed resources.
  • 10. Phase 3: Project Execution • This is the phase where deliverables are developed and completed. This often feels like the meat of the project since a lot is happening during this time, like status reports and meetings, development updates, and performance reports. • A “kick-off” meeting usually marks the start of the Project Execution phase where the teams involved are informed of their responsibilities.
  • 11. Phase 3: Project Execution Tasks completed during the Execution Phase include: • Develop team • Assign resources • Execute project management plans • Procurement management if needed • PM directs and manages project execution • Set up tracking systems • Task assignments are executed • Status meetings • Update project schedule • Modify project plans as needed
  • 12. Phase 4: Project Performance/Monitoring • This is all about measuring project progression and performance and ensuring that everything happening aligns with the project management plan. • Project managers will use key performance indicators (KPIs) to determine if the project is on track. A PM will typically pick two to five of these KPIs to measure project performance: • Project Objectives: Measuring if a project is on schedule and budget is an indication if the project will meet stakeholder objectives. • Quality Deliverables: This determines if specific task deliverables are being met. • Effort and Cost Tracking: PMs will account for the effort and cost of resources to see if the budget is on track. This type of tracking informs if a project will meet its completion date based on current performance. • Project Performance: This monitors changes in the project. It takes into consideration the amount and types of issues that arise and how quickly they are addressed. These can occur from unforeseen hurdles and scope changes.
  • 13. Phase 5: Project Closure • This phase represents the completed project. Contractors hired to work specifically on the project are terminated at this time. Valuable team members are recognized. Some PMs even organize small work events for people who participated in the project to thank them for their efforts. • Once a project is complete, a PM will often hold a meeting – sometimes referred to as a “post mortem” – to evaluate what went well in a project and identify project failures. This is especially helpful to understand lessons learned so that improvements can be made for future projects.
  • 14. Phase 5: Project Closure • PMs still have a few tasks to complete. They will need to create a project punch list of things that didn’t get accomplished during the project and work with team members to complete them. • Perform a final project budget and prepare a final project report. • Finally, they will need to collect all project documents and deliverables and store them in a single place.