BIM is an intelligent model-based process that supports the
execution of planning, designing, constructing, and
managing buildings and infrastructure projects.
The model serves as a shared knowledge base, and source
of information about a built asset, forming a reliable basis for
decision making during its lifecycle from inception onwards.
BIM generates value from the combined
efforts of people, process and technology.
The BIM processes is a sharing workflow
between the different layers of
stakeholders involved and it is only fully
achieved engineering to enable
collaboration and communication.
Concept to Execution and Beyond
BIM in the Project Lifecycle
The Architect - Interprets the client vision and creates
MEP + Structural - Bring the buildings to life focus on the design (including schematic and detailed Design)
MEP Engineers design the spaces for the Mechanical, electrical and public health systems.
Structural engineers create conceptual designs and ensure that the structure can be built and is stable and durable.
Contractor: - Execute the designs
Concept - The project design team come together. The Architect will begin building the design model in Revit Architecture. At an agreed upon time,
the Architect will send his model to the Structural and MEP Engineers.
Accuracy at this point is vital to make the process more predictable and avoid any costly redesign works.
Collaboration between the architect and engineers enabling better decision making, improved quality and less risk.
Each discipline will link the architecture model into their own work space within the discipline version of Revit of their choice (i.e.Revit MEP or Revit
Structure). Telling their own discipline versions of Revit to connect to the model that the architect sent and show it graphically within the same
space.
Once linked in, each discipline will begin their own work inserting, for the Structural Engineers, beams, trusses and columns and, for MEP Engineers,
ducts, pipes and electrical connections. Next the engineers will send their individual models back to the Architect s
This will then be looked over once again by the architect with further amendments if necessary this process is repeated until all design parties/owner
are happy and then this is passed on to the contractor to execute
Construction
Due to careful early planning team members are able to use less materials therefore creating less cost and less operational revenue lost. Construct can
be completed on schedule and in budget.
FM/Operation and Maintenance
can enjoy better quality assurance on their completed project and are provided with a complete virtual inventory of their building for operational and
renovation purposes.
BIM So ftwa re
• The most commonly used BIM software is Autodesk Revit which have three versions that covers
the major disciplines (Architecture, Structure and MEP). It can be used by the Architects,
Structural and MEP designers/contractors.
• Being able to use IT software to illustrate a project lifecycle gives a more sustainable and
effective business method than traditional pen to paper
• Revit uses geometry (Geometry is the visual study of shapes, sizes, patterns, and positions) to
help form the 3D model
BIM includes software such as Ecotect and Green Building Studio to detail the efficiency of
the design with regards to the environmental impact on it and its impact of the environment
BI M Cat egories
• 3D – Three-dimensional is based in computer-generated representations. 3D
modelling typically refers to data-rich Model Components generated through one of
many BIM Software Tools. The 3D also allow mains other BIM uses (e.g., 3D
Coordination, Design Reviews, Mechanical Analyses, etc.).
• 4D - The fourth dimension refers to 3D + time. A model or a modelling workflow is
considered to be 4D when the time is added to model objects to allow Construction
Scheduling and simulation.
• 5D - The fifth modelling dimension (5D) refers to 4D + cost. That is, a model (or
modelling workflow) is considered to be 5D when cost is linked/embedded within BIM
models and Model Components. 5D is used for the purposes of generating Cost
Estimates and practicing Target Value Design
• 6D – The 6D dimension is considered an "as-built" model delivered to the owner or
facility manager as the project is completed. The 6D BIM is updated to record any on-
site design variations, and populated with relevant building component data including
operation and maintenance manuals, product details, warranty and replacement data,
photos, links to relevant websites, etc. The 6D BIM, when integrated with BIM aware
facility management systems can aid the facility manager in optimising retro-fitting,
operations and maintenance through the buildings life-cycle.
O p p o r t u n i t i e s f o r A l l e n & Yo r k
• As BIM is a relatively new technology companies will either need to
provide training to their staff or recruit BIM specialists
• Due to the efficiency of BIM projects will finish with better results /
time / cost leading to repeat business and more profit = new
projects/more $taff
• Fits in beautifully with the AY sustainability focus as this tool
optimises this area for projects

Contenu connexe

Tendances

David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty
Informa Australia
 

Tendances (19)

Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
BIM comp
BIM compBIM comp
BIM comp
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty
 
BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
BIM - A New Concept in Practice
BIM - A New Concept in PracticeBIM - A New Concept in Practice
BIM - A New Concept in Practice
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
BIM
BIM BIM
BIM
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiBim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
 
Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017
 
Building Information Modeling
Building Information ModelingBuilding Information Modeling
Building Information Modeling
 
Bim ifma besix_web
Bim ifma besix_webBim ifma besix_web
Bim ifma besix_web
 
BUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGBUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLING
 
BIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital constructionBIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital construction
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
BIM Technology Knowledge & Implementation
BIM Technology Knowledge & ImplementationBIM Technology Knowledge & Implementation
BIM Technology Knowledge & Implementation
 

En vedette

Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
Building a Better Knowledgebase: An Investigation of Current Practical Uses a...Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
NASIG
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
Le Zhang
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
FitBlar Mit
 

En vedette (20)

Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominative
 
Building the Global Open Knowledgebase (ER&L 2013)
Building the Global Open Knowledgebase (ER&L 2013)Building the Global Open Knowledgebase (ER&L 2013)
Building the Global Open Knowledgebase (ER&L 2013)
 
Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
Building a Better Knowledgebase: An Investigation of Current Practical Uses a...Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
Building a Better Knowledgebase: An Investigation of Current Practical Uses a...
 
Laura Lee
Laura LeeLaura Lee
Laura Lee
 
The Global Open Knowledgebase (GOKb): open, linked data supporting library el...
The Global Open Knowledgebase (GOKb): open, linked data supporting library el...The Global Open Knowledgebase (GOKb): open, linked data supporting library el...
The Global Open Knowledgebase (GOKb): open, linked data supporting library el...
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialists
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
 
Data Modelling and Knowledge Engineering for the Internet of Things
Data Modelling and Knowledge Engineering for the Internet of ThingsData Modelling and Knowledge Engineering for the Internet of Things
Data Modelling and Knowledge Engineering for the Internet of Things
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotمحاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
 
The Reality of the Employee Experience
The Reality of the Employee ExperienceThe Reality of the Employee Experience
The Reality of the Employee Experience
 
3D and bim technology for construction safety - track 2
3D and bim technology for construction safety  -  track 23D and bim technology for construction safety  -  track 2
3D and bim technology for construction safety - track 2
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014
CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014
CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014
 
The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 

Similaire à Building Information Modelling (BIM)

BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVIT
nilesh masne
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
Sandy .
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
VandanaBrahmani1
 

Similaire à Building Information Modelling (BIM) (20)

BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVIT
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
What is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in constructionWhat is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in construction
 
Bimarabia2en
Bimarabia2enBimarabia2en
Bimarabia2en
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
3 d modeling using bim ppt
3 d modeling using bim ppt3 d modeling using bim ppt
3 d modeling using bim ppt
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
BIM Benefits Abu Dhabi
BIM Benefits Abu DhabiBIM Benefits Abu Dhabi
BIM Benefits Abu Dhabi
 
Top 8 Benefits of Revit for Structural Engineering.pdf
Top 8 Benefits of Revit for Structural Engineering.pdfTop 8 Benefits of Revit for Structural Engineering.pdf
Top 8 Benefits of Revit for Structural Engineering.pdf
 
Building Information Modeling BIM Training Course in Dubai.pdf
Building Information Modeling BIM Training Course in Dubai.pdfBuilding Information Modeling BIM Training Course in Dubai.pdf
Building Information Modeling BIM Training Course in Dubai.pdf
 
BEST REVIT ARCHITECTURE COURSE-BURRAQ ENGINEERING SOLUTIONS.pdf
BEST REVIT ARCHITECTURE COURSE-BURRAQ ENGINEERING SOLUTIONS.pdfBEST REVIT ARCHITECTURE COURSE-BURRAQ ENGINEERING SOLUTIONS.pdf
BEST REVIT ARCHITECTURE COURSE-BURRAQ ENGINEERING SOLUTIONS.pdf
 
BIM ppt
BIM pptBIM ppt
BIM ppt
 
BIM
BIMBIM
BIM
 

Building Information Modelling (BIM)

  • 1. Building Information Modelling (BIM) BIM is an intelligent model-based process that supports the execution of planning, designing, constructing, and managing buildings and infrastructure projects. The model serves as a shared knowledge base, and source of information about a built asset, forming a reliable basis for decision making during its lifecycle from inception onwards.
  • 2. BIM generates value from the combined efforts of people, process and technology. The BIM processes is a sharing workflow between the different layers of stakeholders involved and it is only fully achieved engineering to enable collaboration and communication.
  • 3. Concept to Execution and Beyond BIM in the Project Lifecycle The Architect - Interprets the client vision and creates MEP + Structural - Bring the buildings to life focus on the design (including schematic and detailed Design) MEP Engineers design the spaces for the Mechanical, electrical and public health systems. Structural engineers create conceptual designs and ensure that the structure can be built and is stable and durable. Contractor: - Execute the designs Concept - The project design team come together. The Architect will begin building the design model in Revit Architecture. At an agreed upon time, the Architect will send his model to the Structural and MEP Engineers. Accuracy at this point is vital to make the process more predictable and avoid any costly redesign works. Collaboration between the architect and engineers enabling better decision making, improved quality and less risk. Each discipline will link the architecture model into their own work space within the discipline version of Revit of their choice (i.e.Revit MEP or Revit Structure). Telling their own discipline versions of Revit to connect to the model that the architect sent and show it graphically within the same space. Once linked in, each discipline will begin their own work inserting, for the Structural Engineers, beams, trusses and columns and, for MEP Engineers, ducts, pipes and electrical connections. Next the engineers will send their individual models back to the Architect s This will then be looked over once again by the architect with further amendments if necessary this process is repeated until all design parties/owner are happy and then this is passed on to the contractor to execute Construction Due to careful early planning team members are able to use less materials therefore creating less cost and less operational revenue lost. Construct can be completed on schedule and in budget. FM/Operation and Maintenance can enjoy better quality assurance on their completed project and are provided with a complete virtual inventory of their building for operational and renovation purposes.
  • 4. BIM So ftwa re • The most commonly used BIM software is Autodesk Revit which have three versions that covers the major disciplines (Architecture, Structure and MEP). It can be used by the Architects, Structural and MEP designers/contractors. • Being able to use IT software to illustrate a project lifecycle gives a more sustainable and effective business method than traditional pen to paper • Revit uses geometry (Geometry is the visual study of shapes, sizes, patterns, and positions) to help form the 3D model BIM includes software such as Ecotect and Green Building Studio to detail the efficiency of the design with regards to the environmental impact on it and its impact of the environment
  • 5. BI M Cat egories • 3D – Three-dimensional is based in computer-generated representations. 3D modelling typically refers to data-rich Model Components generated through one of many BIM Software Tools. The 3D also allow mains other BIM uses (e.g., 3D Coordination, Design Reviews, Mechanical Analyses, etc.). • 4D - The fourth dimension refers to 3D + time. A model or a modelling workflow is considered to be 4D when the time is added to model objects to allow Construction Scheduling and simulation. • 5D - The fifth modelling dimension (5D) refers to 4D + cost. That is, a model (or modelling workflow) is considered to be 5D when cost is linked/embedded within BIM models and Model Components. 5D is used for the purposes of generating Cost Estimates and practicing Target Value Design • 6D – The 6D dimension is considered an "as-built" model delivered to the owner or facility manager as the project is completed. The 6D BIM is updated to record any on- site design variations, and populated with relevant building component data including operation and maintenance manuals, product details, warranty and replacement data, photos, links to relevant websites, etc. The 6D BIM, when integrated with BIM aware facility management systems can aid the facility manager in optimising retro-fitting, operations and maintenance through the buildings life-cycle.
  • 6.
  • 7. O p p o r t u n i t i e s f o r A l l e n & Yo r k • As BIM is a relatively new technology companies will either need to provide training to their staff or recruit BIM specialists • Due to the efficiency of BIM projects will finish with better results / time / cost leading to repeat business and more profit = new projects/more $taff • Fits in beautifully with the AY sustainability focus as this tool optimises this area for projects