Variable Refrigerant
Flow (VRF)
Is the HOT TOPIC in High-rises
From Sick Building to Silver Certified
In 2002, a 15-story
high-rise in Maryland
became vacant.
It sat vacant for 10
years and was
declared a sick
building.
In 2012 Caves Valley
Partners bought the
building and brought
it back to life.
The building got a
new electrical
system, glass curtain
façade, and variable
refrigerant flow
(VRF) HVAC system.
The VRF system gave
is LEED points
toward a silver
certification.
The building is now
happily occupied by
Towson University
and MileOne
Automotive.
What do
high-rises
need from
HVAC?
Properly
controlled HVAC
is essential for
high-rises.
There are
multiple tenants
with different
comfort needs.
The HVAC needs
to be quiet, low
maintenance,
and healthy.
What HVAC issues do high-rises have?
Multiple tenants
with different
comfort needs.
Inefficiently
designed HVAC
systems.
Poor Indoor Air
Quality (IAQ).
Inconsistent
airflow.
High HVAC
costs.
Sick Building Syndrome
What is a sick building?
Sick building syndrome is a
condition that affects office
workers, giving them
headaches and respiratory
problems due to poor
ventilation and air quality.
01
Up to 30% of high-rises and
other office buildings have
poor IAQ, according to the
World Health Organization
(WHO).
02
Sick buildings become sick
due to flawed HVAC design.
03
Common issues are mold,
improper exhaust
ventilation, or lack of
adequate ventilation.
04
Wrong Sized
Ducts
• The wrong sized ducts causes the majority of sick
building issues.
• Noise is caused by ducts that are too small. The
ducts rattle because of airflow restrictions.
• Uneven heating is caused by ducts that are too big.
• Improperly sized ducts can cause 60% less efficiency.
• Lost efficiency will increase utility costs and make
the system work harder, causing higher
maintenance bills.
• Wrong-sized ducts will decrease the lifespan of the
HVAC system.
HVAC Systems Account for 40-60% of
utility costs.
What do high-rises need in an HVAC system?
Minimized maintenance
costs
Personalized control per
unit
Flexibility to accommodate
changing tenants
Reliability
Variable
Refrigerant
Flow (VRF)
• Benefits of VRF systems
• Mostly ductless, saving space.
• Uses a condenser unit that works with multiple
units.
• No need for water piping, requiring only refrigerant
piping.
• Lower utility costs.
• Less space used.
• Better individual temperature control.
How does a VRF
system work?
Like a Ductless Multi-split System, But Better
• How does a VRF system work?
• VRF’s have multiple indoor evaporator units connected to one outdoor
condensing unit.
• The condensers work only as needed, providing energy savings from partial
load conditions.
• VRFs are predicted to provide 50% energy savings on average over the
lifetime of the system.
VRF Systems = Low Maintenance
Generally, VRF systems
only need filters
changed and coils
cleaned.
They are easier to
install because they are
modular, lightweight,
and smaller.
They are ideal for new
construction or retrofit.
Smaller piping, allowing
the system to fit into
standard size walls with
more usable space
What can you expect when you have a VRF
HVAC system?
Georgia Institute of
Technology (2013) found
that Chicago office
buildings save 46.5% on
energy bills with a VRF
system.
VRF HVAC systems are
3.2% cheaper than regular
HVAC systems over the
lifetime of the system.
Slide deck by:
Sarah Noel Block, Director of
Marketing at Education with
The Moran Group
1
Read more about Variable
Refrigerant Flow (VRF) HVAC
systems and sick buildings
here.
2

Contenu connexe

Tendances

VRF Systems comaprison
VRF Systems comaprisonVRF Systems comaprison
VRF Systems comaprisonmusab173
 
Life cycle analysis of hvac desining multi split vrf system
Life cycle analysis of hvac desining multi split vrf systemLife cycle analysis of hvac desining multi split vrf system
Life cycle analysis of hvac desining multi split vrf systemSYED KHURSHID ALAM ARZOO
 
Vrviii new presentation revised4
Vrviii new presentation revised4Vrviii new presentation revised4
Vrviii new presentation revised4Mahmoud Ezz
 
Comparetion vrv daikin & york digital scroll r1 v.2003
Comparetion vrv daikin & york digital scroll r1 v.2003Comparetion vrv daikin & york digital scroll r1 v.2003
Comparetion vrv daikin & york digital scroll r1 v.2003Vee Amnattham
 
13 Us Vrv Vrv S Us Installs
13 Us Vrv Vrv S Us Installs13 Us Vrv Vrv S Us Installs
13 Us Vrv Vrv S Us InstallsTNIFTP
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemSocheat Veng
 
Dvm s full catalog
Dvm s full catalogDvm s full catalog
Dvm s full catalogHaluk TOSUN
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GBArjang Ahmadi
 
HVAC Cent vs decent ac systems
HVAC Cent vs decent ac systemsHVAC Cent vs decent ac systems
HVAC Cent vs decent ac systemsvarunsingh383
 
Air cooled chiller brochure
Air cooled chiller brochureAir cooled chiller brochure
Air cooled chiller brochureKamlesh Ahirwar
 
Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Overbury
 
Cooling tower, chilling plants ppt
Cooling tower, chilling plants pptCooling tower, chilling plants ppt
Cooling tower, chilling plants pptRajesh Patil
 
Compresor tornillo 125 200 HP
Compresor tornillo 125 200 HPCompresor tornillo 125 200 HP
Compresor tornillo 125 200 HPAlmacenes JJ S.A.
 
14 Vrv Global Applications
14 Vrv Global Applications14 Vrv Global Applications
14 Vrv Global ApplicationsTNIFTP
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSMohammad Azam Khan
 
CAREL solutions for propane retail applications
CAREL solutions for propane retail applicationsCAREL solutions for propane retail applications
CAREL solutions for propane retail applicationsCAREL Industries S.p.A
 

Tendances (20)

VRF Systems comaprison
VRF Systems comaprisonVRF Systems comaprison
VRF Systems comaprison
 
Life cycle analysis of hvac desining multi split vrf system
Life cycle analysis of hvac desining multi split vrf systemLife cycle analysis of hvac desining multi split vrf system
Life cycle analysis of hvac desining multi split vrf system
 
Vrviii new presentation revised4
Vrviii new presentation revised4Vrviii new presentation revised4
Vrviii new presentation revised4
 
Comparetion vrv daikin & york digital scroll r1 v.2003
Comparetion vrv daikin & york digital scroll r1 v.2003Comparetion vrv daikin & york digital scroll r1 v.2003
Comparetion vrv daikin & york digital scroll r1 v.2003
 
13 Us Vrv Vrv S Us Installs
13 Us Vrv Vrv S Us Installs13 Us Vrv Vrv S Us Installs
13 Us Vrv Vrv S Us Installs
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF System
 
Dvm s full catalog
Dvm s full catalogDvm s full catalog
Dvm s full catalog
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GB
 
HVAC Cent vs decent ac systems
HVAC Cent vs decent ac systemsHVAC Cent vs decent ac systems
HVAC Cent vs decent ac systems
 
Air cooled chiller brochure
Air cooled chiller brochureAir cooled chiller brochure
Air cooled chiller brochure
 
Air handling units
Air handling unitsAir handling units
Air handling units
 
Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14
 
Practical benefits of VRV VRF system compare to other systems by Eng. Juma_Ge...
Practical benefits of VRV VRF system compare to other systems by Eng. Juma_Ge...Practical benefits of VRV VRF system compare to other systems by Eng. Juma_Ge...
Practical benefits of VRV VRF system compare to other systems by Eng. Juma_Ge...
 
LG VRF MULTI V
LG VRF MULTI VLG VRF MULTI V
LG VRF MULTI V
 
Cooling tower, chilling plants ppt
Cooling tower, chilling plants pptCooling tower, chilling plants ppt
Cooling tower, chilling plants ppt
 
Compresor tornillo 125 200 HP
Compresor tornillo 125 200 HPCompresor tornillo 125 200 HP
Compresor tornillo 125 200 HP
 
HVAC: New chiller requirements
HVAC: New chiller requirementsHVAC: New chiller requirements
HVAC: New chiller requirements
 
14 Vrv Global Applications
14 Vrv Global Applications14 Vrv Global Applications
14 Vrv Global Applications
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMS
 
CAREL solutions for propane retail applications
CAREL solutions for propane retail applicationsCAREL solutions for propane retail applications
CAREL solutions for propane retail applications
 

Similaire à How VRF HVAC Systems Transform High-Rises and Eliminate Sick Building Syndrome

Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systemsmichaeljmack
 
HVAC Presentation.pptx
HVAC Presentation.pptxHVAC Presentation.pptx
HVAC Presentation.pptxYoussefEssam27
 
searchlocalpro.com-What is VFD in HVAC.pdf
searchlocalpro.com-What is VFD in HVAC.pdfsearchlocalpro.com-What is VFD in HVAC.pdf
searchlocalpro.com-What is VFD in HVAC.pdfAhmad Affan
 
Air conditioning if its not clean - its not green - ACT smart 4th sept 2014
Air conditioning   if its not clean - its not green - ACT smart 4th sept 2014Air conditioning   if its not clean - its not green - ACT smart 4th sept 2014
Air conditioning if its not clean - its not green - ACT smart 4th sept 2014Phil Wilkinson F.AIRAH F.IEAust M.ASHRAE
 
Five Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsFive Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsRahulJaykar21
 
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptx
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptxThe Benefits of Installing VRF AC Systems in Commercial Buildings.pptx
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptxleelindesy
 
The Benefits of VRF Air Conditioning for Commercial Spaces
The Benefits of VRF Air Conditioning for Commercial SpacesThe Benefits of VRF Air Conditioning for Commercial Spaces
The Benefits of VRF Air Conditioning for Commercial Spacesaeileenalice
 
brochure_Kelvion_Polacel CMDIF 2016-Eng
brochure_Kelvion_Polacel CMDIF 2016-Engbrochure_Kelvion_Polacel CMDIF 2016-Eng
brochure_Kelvion_Polacel CMDIF 2016-EngGrégory Le Frene
 
ASHRAE Providing Care for MOB JB
ASHRAE Providing Care for MOB JBASHRAE Providing Care for MOB JB
ASHRAE Providing Care for MOB JBJeff Blaevoet
 
Ashrae CRC presentation doas with chilled beam
Ashrae CRC presentation doas with chilled beamAshrae CRC presentation doas with chilled beam
Ashrae CRC presentation doas with chilled beambostjanpeterman
 
kitchen.services-5 Common Types of Commercial Air Conditioning.pdf
kitchen.services-5 Common Types of Commercial Air Conditioning.pdfkitchen.services-5 Common Types of Commercial Air Conditioning.pdf
kitchen.services-5 Common Types of Commercial Air Conditioning.pdfAhmad Affan
 
HVAC Understandings before Design it
HVAC Understandings before Design itHVAC Understandings before Design it
HVAC Understandings before Design itSakhawatAli44
 
Mechanical systems
Mechanical systemsMechanical systems
Mechanical systemsSunil Surya
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfDaniel Donatelli
 

Similaire à How VRF HVAC Systems Transform High-Rises and Eliminate Sick Building Syndrome (20)

Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systems
 
hvac-systems-components (1).ppt
hvac-systems-components (1).ppthvac-systems-components (1).ppt
hvac-systems-components (1).ppt
 
HVAC Presentation.pptx
HVAC Presentation.pptxHVAC Presentation.pptx
HVAC Presentation.pptx
 
searchlocalpro.com-What is VFD in HVAC.pdf
searchlocalpro.com-What is VFD in HVAC.pdfsearchlocalpro.com-What is VFD in HVAC.pdf
searchlocalpro.com-What is VFD in HVAC.pdf
 
Air conditioning if its not clean - its not green - ACT smart 4th sept 2014
Air conditioning   if its not clean - its not green - ACT smart 4th sept 2014Air conditioning   if its not clean - its not green - ACT smart 4th sept 2014
Air conditioning if its not clean - its not green - ACT smart 4th sept 2014
 
Five Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsFive Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building Components
 
Airius brochure V2.2
Airius brochure V2.2Airius brochure V2.2
Airius brochure V2.2
 
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptx
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptxThe Benefits of Installing VRF AC Systems in Commercial Buildings.pptx
The Benefits of Installing VRF AC Systems in Commercial Buildings.pptx
 
The Benefits of VRF Air Conditioning for Commercial Spaces
The Benefits of VRF Air Conditioning for Commercial SpacesThe Benefits of VRF Air Conditioning for Commercial Spaces
The Benefits of VRF Air Conditioning for Commercial Spaces
 
Techfest
TechfestTechfest
Techfest
 
brochure_Kelvion_Polacel CMDIF 2016-Eng
brochure_Kelvion_Polacel CMDIF 2016-Engbrochure_Kelvion_Polacel CMDIF 2016-Eng
brochure_Kelvion_Polacel CMDIF 2016-Eng
 
ASHRAE Providing Care for MOB JB
ASHRAE Providing Care for MOB JBASHRAE Providing Care for MOB JB
ASHRAE Providing Care for MOB JB
 
MCE 2016 - G.Tonin - CAREL
MCE 2016 - G.Tonin - CARELMCE 2016 - G.Tonin - CAREL
MCE 2016 - G.Tonin - CAREL
 
Ashrae CRC presentation doas with chilled beam
Ashrae CRC presentation doas with chilled beamAshrae CRC presentation doas with chilled beam
Ashrae CRC presentation doas with chilled beam
 
Boreas AHU [EN]
Boreas AHU [EN]Boreas AHU [EN]
Boreas AHU [EN]
 
kitchen.services-5 Common Types of Commercial Air Conditioning.pdf
kitchen.services-5 Common Types of Commercial Air Conditioning.pdfkitchen.services-5 Common Types of Commercial Air Conditioning.pdf
kitchen.services-5 Common Types of Commercial Air Conditioning.pdf
 
HVAC Understandings before Design it
HVAC Understandings before Design itHVAC Understandings before Design it
HVAC Understandings before Design it
 
VRF.pptx
VRF.pptxVRF.pptx
VRF.pptx
 
Mechanical systems
Mechanical systemsMechanical systems
Mechanical systems
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdf
 

Dernier

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Dernier (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

How VRF HVAC Systems Transform High-Rises and Eliminate Sick Building Syndrome

  • 1. Variable Refrigerant Flow (VRF) Is the HOT TOPIC in High-rises
  • 2. From Sick Building to Silver Certified In 2002, a 15-story high-rise in Maryland became vacant. It sat vacant for 10 years and was declared a sick building. In 2012 Caves Valley Partners bought the building and brought it back to life. The building got a new electrical system, glass curtain façade, and variable refrigerant flow (VRF) HVAC system. The VRF system gave is LEED points toward a silver certification. The building is now happily occupied by Towson University and MileOne Automotive.
  • 3. What do high-rises need from HVAC? Properly controlled HVAC is essential for high-rises. There are multiple tenants with different comfort needs. The HVAC needs to be quiet, low maintenance, and healthy.
  • 4. What HVAC issues do high-rises have? Multiple tenants with different comfort needs. Inefficiently designed HVAC systems. Poor Indoor Air Quality (IAQ). Inconsistent airflow. High HVAC costs.
  • 6. What is a sick building? Sick building syndrome is a condition that affects office workers, giving them headaches and respiratory problems due to poor ventilation and air quality. 01 Up to 30% of high-rises and other office buildings have poor IAQ, according to the World Health Organization (WHO). 02 Sick buildings become sick due to flawed HVAC design. 03 Common issues are mold, improper exhaust ventilation, or lack of adequate ventilation. 04
  • 7. Wrong Sized Ducts • The wrong sized ducts causes the majority of sick building issues. • Noise is caused by ducts that are too small. The ducts rattle because of airflow restrictions. • Uneven heating is caused by ducts that are too big. • Improperly sized ducts can cause 60% less efficiency. • Lost efficiency will increase utility costs and make the system work harder, causing higher maintenance bills. • Wrong-sized ducts will decrease the lifespan of the HVAC system.
  • 8. HVAC Systems Account for 40-60% of utility costs.
  • 9. What do high-rises need in an HVAC system? Minimized maintenance costs Personalized control per unit Flexibility to accommodate changing tenants Reliability
  • 10. Variable Refrigerant Flow (VRF) • Benefits of VRF systems • Mostly ductless, saving space. • Uses a condenser unit that works with multiple units. • No need for water piping, requiring only refrigerant piping. • Lower utility costs. • Less space used. • Better individual temperature control.
  • 11. How does a VRF system work?
  • 12. Like a Ductless Multi-split System, But Better • How does a VRF system work? • VRF’s have multiple indoor evaporator units connected to one outdoor condensing unit. • The condensers work only as needed, providing energy savings from partial load conditions. • VRFs are predicted to provide 50% energy savings on average over the lifetime of the system.
  • 13. VRF Systems = Low Maintenance Generally, VRF systems only need filters changed and coils cleaned. They are easier to install because they are modular, lightweight, and smaller. They are ideal for new construction or retrofit. Smaller piping, allowing the system to fit into standard size walls with more usable space
  • 14. What can you expect when you have a VRF HVAC system? Georgia Institute of Technology (2013) found that Chicago office buildings save 46.5% on energy bills with a VRF system. VRF HVAC systems are 3.2% cheaper than regular HVAC systems over the lifetime of the system.
  • 15. Slide deck by: Sarah Noel Block, Director of Marketing at Education with The Moran Group 1 Read more about Variable Refrigerant Flow (VRF) HVAC systems and sick buildings here. 2