2
Introduction
Traverse Surveying is a popular method of surveying. This
method used in the field of surveying to establish control
networks. It is also used in geodesy. Traverse networks
involve placing survey stations along a line or path of travel,
and then using the previously surveyed points as a base for
observing the next point.
There are two types of Traverse Surveying; closed traverse
and open traverse, the closed traverse starts at a point and
ends at the same point or at a point whose relative position
is known. The surveyor adjusts the measurements by
computations to minimize the effect of accidental errors
made in the measurements. Large errors are corrected. This
type of traverse is suitable for locating the boundaries of
lakes, woods, etc and for survey of large areas. the open
traverse is suitable for surveying a long narrow strip of land
as required for a road of canal or the coast line.
Equipments
List of equipments and tools need to completing the test:
 Auto Level
 Staff
 Tripod
 Pen, Paper, and Calculator
Procedure
Steps of the test:
3
1. Select a place (point) as benchmark, and take the
reading of the point as the first station.
2. Move the staff to another points around benchmark and
take readings of some points.
3. After taking some points move the level to the new
position, in this time the staff should not be moved.
4. During the test move the level to some different places,
and taking readings, finally reading the benchmark
again.
Calculation
Station BS IS FS HI RL
1 (BM) 143.9 101.439 100
2 181.2 99.627
3 (TP1) 121.5 231.1 100.343 99.128
4 146.1 98.882
5 161.9 98.724
6 134 99.003
7 116.6 99.177
8 109.1 99.252
9 (TP2) 108 107.1 101.052 99.272
10 83.2 92.732
11 36.1 97.442
∑ BS = 3.734
∑ FS = 6.992
4
∑ BS – ∑ FS = – 3.258
Diff in RL of 1 and 11 = 97.442 – 100 = – 2.558
Result and Conclusion
In this fieldwork, we were required to carry out a closed
traverse survey .Closed loop traverse is a traverse starts
and ends at the same point, forming a closed geometric
figure called a polygon which is the boundary lines of a tract
land.
Overall, this fieldwork has taught us a lot of hands-on
knowledge about the surveying. We are more understand
that a land surveyor required to measure distances in order
to build level, sound buildings or determine the boundaries
of a piece of land. This profession, typically held by
individuals with a degree in civil engineering, is a very
important one that has existed for all of recorded human
history.

Contenu connexe

Tendances

Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - ReportSarchia Khursheed
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levellingYASMINE HASLAN
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-reportFelix Vong
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreportKiplimoCalvin
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Riezat Zainal
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations Awais Ahmad
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESBahzad5
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling Darren Lee
 

Tendances (20)

Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Traversing
TraversingTraversing
Traversing
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
Fw2
Fw2Fw2
Fw2
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 

Similaire à Closed Traverse Surveying - Report

Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traversesEst
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyRione Drevale
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. Ahmed Nassar
 
Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveysbrett_grocock
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)Chee Lee
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINEKiplimoCalvin
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii마 이환
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-reportirwandavid
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1Lam Yu
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done w ss
 

Similaire à Closed Traverse Surveying - Report (20)

Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS.
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveys
 
Surveying pdf
Surveying pdfSurveying pdf
Surveying pdf
 
Leveling report
Leveling reportLeveling report
Leveling report
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Levelling
LevellingLevelling
Levelling
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-report
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 

Plus de Sarchia Khursheed

How to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportHow to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportSarchia Khursheed
 
Electronic Distance Measurement (EDM) - Report
Electronic Distance Measurement (EDM)  - ReportElectronic Distance Measurement (EDM)  - Report
Electronic Distance Measurement (EDM) - ReportSarchia Khursheed
 
Coordinates (Surveying) - Report
Coordinates (Surveying) - ReportCoordinates (Surveying) - Report
Coordinates (Surveying) - ReportSarchia Khursheed
 
Angle determination - Report
Angle determination - ReportAngle determination - Report
Angle determination - ReportSarchia Khursheed
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSarchia Khursheed
 
Non-Destructive testing - Report
Non-Destructive testing - ReportNon-Destructive testing - Report
Non-Destructive testing - ReportSarchia Khursheed
 
Batching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - ReportBatching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - ReportSarchia Khursheed
 
Layout of a House Plan Foundation - Report
Layout of a House Plan Foundation - ReportLayout of a House Plan Foundation - Report
Layout of a House Plan Foundation - ReportSarchia Khursheed
 
Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportSarchia Khursheed
 
Horizontal Distance Measurement (HDM) by Automatic Level - Report
Horizontal Distance Measurement (HDM) by Automatic Level - ReportHorizontal Distance Measurement (HDM) by Automatic Level - Report
Horizontal Distance Measurement (HDM) by Automatic Level - ReportSarchia Khursheed
 
Strength of Hydraulic Cement
Strength of Hydraulic CementStrength of Hydraulic Cement
Strength of Hydraulic CementSarchia Khursheed
 
Specific gravity of Coarse aggregate
Specific gravity of Coarse  aggregateSpecific gravity of Coarse  aggregate
Specific gravity of Coarse aggregateSarchia Khursheed
 
Absorption of Coarse Aggregate
Absorption of Coarse AggregateAbsorption of Coarse Aggregate
Absorption of Coarse AggregateSarchia Khursheed
 

Plus de Sarchia Khursheed (20)

Iraqi Kurdistan Map
Iraqi Kurdistan MapIraqi Kurdistan Map
Iraqi Kurdistan Map
 
How to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportHow to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - Report
 
Electronic Distance Measurement (EDM) - Report
Electronic Distance Measurement (EDM)  - ReportElectronic Distance Measurement (EDM)  - Report
Electronic Distance Measurement (EDM) - Report
 
Coordinates (Surveying) - Report
Coordinates (Surveying) - ReportCoordinates (Surveying) - Report
Coordinates (Surveying) - Report
 
Azimuth angles - Report
Azimuth angles - ReportAzimuth angles - Report
Azimuth angles - Report
 
Angle determination - Report
Angle determination - ReportAngle determination - Report
Angle determination - Report
 
Slump Test - Report
Slump Test - ReportSlump Test - Report
Slump Test - Report
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
 
Non-Destructive testing - Report
Non-Destructive testing - ReportNon-Destructive testing - Report
Non-Destructive testing - Report
 
Batching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - ReportBatching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - Report
 
Road construction
Road constructionRoad construction
Road construction
 
Layout of a House Plan Foundation - Report
Layout of a House Plan Foundation - ReportLayout of a House Plan Foundation - Report
Layout of a House Plan Foundation - Report
 
Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - Report
 
Horizontal Distance Measurement (HDM) by Automatic Level - Report
Horizontal Distance Measurement (HDM) by Automatic Level - ReportHorizontal Distance Measurement (HDM) by Automatic Level - Report
Horizontal Distance Measurement (HDM) by Automatic Level - Report
 
Concrete Plant
Concrete PlantConcrete Plant
Concrete Plant
 
Strength of Hydraulic Cement
Strength of Hydraulic CementStrength of Hydraulic Cement
Strength of Hydraulic Cement
 
Specific gravity of Coarse aggregate
Specific gravity of Coarse  aggregateSpecific gravity of Coarse  aggregate
Specific gravity of Coarse aggregate
 
Specific Gravity of Cement
Specific Gravity of CementSpecific Gravity of Cement
Specific Gravity of Cement
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 
Absorption of Coarse Aggregate
Absorption of Coarse AggregateAbsorption of Coarse Aggregate
Absorption of Coarse Aggregate
 

Dernier

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Dernier (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Closed Traverse Surveying - Report

  • 1. 1 Soran University Faculty of Engineering Civil Engineering Department CLOSED TRAVERSE SURVEYING Student: Sarchia Khursheed Group: E Date: 27.10.2015 Supervisor: Eng. Anwar Jabbar
  • 2. 2 Introduction Traverse Surveying is a popular method of surveying. This method used in the field of surveying to establish control networks. It is also used in geodesy. Traverse networks involve placing survey stations along a line or path of travel, and then using the previously surveyed points as a base for observing the next point. There are two types of Traverse Surveying; closed traverse and open traverse, the closed traverse starts at a point and ends at the same point or at a point whose relative position is known. The surveyor adjusts the measurements by computations to minimize the effect of accidental errors made in the measurements. Large errors are corrected. This type of traverse is suitable for locating the boundaries of lakes, woods, etc and for survey of large areas. the open traverse is suitable for surveying a long narrow strip of land as required for a road of canal or the coast line. Equipments List of equipments and tools need to completing the test:  Auto Level  Staff  Tripod  Pen, Paper, and Calculator Procedure Steps of the test:
  • 3. 3 1. Select a place (point) as benchmark, and take the reading of the point as the first station. 2. Move the staff to another points around benchmark and take readings of some points. 3. After taking some points move the level to the new position, in this time the staff should not be moved. 4. During the test move the level to some different places, and taking readings, finally reading the benchmark again. Calculation Station BS IS FS HI RL 1 (BM) 143.9 101.439 100 2 181.2 99.627 3 (TP1) 121.5 231.1 100.343 99.128 4 146.1 98.882 5 161.9 98.724 6 134 99.003 7 116.6 99.177 8 109.1 99.252 9 (TP2) 108 107.1 101.052 99.272 10 83.2 92.732 11 36.1 97.442 ∑ BS = 3.734 ∑ FS = 6.992
  • 4. 4 ∑ BS – ∑ FS = – 3.258 Diff in RL of 1 and 11 = 97.442 – 100 = – 2.558 Result and Conclusion In this fieldwork, we were required to carry out a closed traverse survey .Closed loop traverse is a traverse starts and ends at the same point, forming a closed geometric figure called a polygon which is the boundary lines of a tract land. Overall, this fieldwork has taught us a lot of hands-on knowledge about the surveying. We are more understand that a land surveyor required to measure distances in order to build level, sound buildings or determine the boundaries of a piece of land. This profession, typically held by individuals with a degree in civil engineering, is a very important one that has existed for all of recorded human history.