Soran University
Faculty of Engineering
Civil Engineering Department
HORIZONTAL DISTANCE
MEASUREMENT
BY AUTOMATIC LEVEL
Student: Sarchia Khursheed
Group: E
Date: 13.10.2015
Supervisor: Eng. Anwar Jabbar
2
Introduction
An Automatic Level is a professional leveling tool used by
contractors, builders, land surveing professionals, or the
engineers who demands accurate leveling every time. Auto
levels set up fast, are easy to use, and save time and money
on every job. Some auto levels come in kits that include the
grade rod and tripod. Auto levels are great for fence
builders, foundation installer, excavations, deck builders,
landscaping pros, swimming pol builders, home builders,
roadwork jobs, ... etc.
In order to do the job properly, be it setting a line for laying
concrete blocks, or setting the grade on a driveway or farm
road, the right auto level must be chosen. Be sure to
understand what the job is and what the different levels can
do.
There are different types of automatic levels, each one
designed for a specific job type:
Auto level
type
Uses
Dumpy level General survey work such as setting property
lines; laying out highways, power lines, and
other large area construction where horizontal
measurements are essential.
Builders auto
level
Good for most general survey work, as well as
setting horizontal markers for masonary work,
such as brick and block laying; useful in setting
foundations and installing subflooring in
residental and industural construction.
Laser level Most useful when laying out foundations;
masonary work; other jobs where a 360 degree
reference line is needed.
Digital level Useful for general survey and most
construction projects but with the added
3
benefit of more precise data collection and the
ability to record.
Laser line
level
The choice of carpenters, handymen, weekend
warriors, and tinkerers of all sorts, great for
small projects like hanging shelves and picture,
and professional jobs like mounting
thermostats, electrical receptacles, and light
switches.
Equipments
List of equipments and tools need to completing the test:
 Automatic level
 Tripod
 Staff
Procedure
Steps and instructions to set up an automatic level and
measuring horizontal distances:
1. Setup tripod as level as possible, step on tripod legs to
drive into the ground.
2. Attach auto level to the tripod.
3. Adjust level so bubble is centered in vial.
4. Adjust resital util crosshairs are clear.
5. Adjust the objective lense until object you are sighting
on is clear.
6. Select two points (A and B) to measuring the distance
between them.
7. Place the auto level over point A and the staff over
point B. Take the reading.
8. Shift the instrument (auto level and tripod) to point B
and staff to point A, and take the reading again.
4
9. The distance between two points (at there A and B) can
be determind by this equation:
(Upper reading – Lower reading) × 100 = Distance
between A and B
Calculation
Reading
Upper 133.1
Lower 122.8
Result and Conclusion
Using an automatic level can improve the accuracy needed
when grading a roadway or setting the foundationof an new
home. Just as important to the individual, automatic levels
can make doing smaller jobs better, such as hanging
pictures, shelving, and shower curtain rods.
From the data of previous table the result can be determine,
by this equation:
Distance between A and B = (133.1− 122.8) × 100 = 1030 𝑐𝑚

Contenu connexe

Tendances

Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
Mohammed_82
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
Ehab AL-Timimi
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
Est
 

Tendances (20)

Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-report
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
2.2 linear measurement
2.2 linear measurement2.2 linear measurement
2.2 linear measurement
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Lecture 05 distance measurement
Lecture 05 distance measurementLecture 05 distance measurement
Lecture 05 distance measurement
 
Total station
Total station Total station
Total station
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Setting Out Works in Surveying
Setting Out Works in SurveyingSetting Out Works in Surveying
Setting Out Works in Surveying
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 

En vedette

ڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکانڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکان
Mechanical engineer
 

En vedette (20)

ڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکانڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکان
 
کوردم ئەمن
کوردم ئەمنکوردم ئەمن
کوردم ئەمن
 
پەرتووکی گینس بۆ ڕیکۆردە جیھانییە ئەندازیارییەکان
پەرتووکی گینس بۆ ڕیکۆردە جیھانییە ئەندازیارییەکانپەرتووکی گینس بۆ ڕیکۆردە جیھانییە ئەندازیارییەکان
پەرتووکی گینس بۆ ڕیکۆردە جیھانییە ئەندازیارییەکان
 
Renusi Kurdi - ڕێنووسی زمانی كوردی
Renusi Kurdi - ڕێنووسی زمانی كوردیRenusi Kurdi - ڕێنووسی زمانی كوردی
Renusi Kurdi - ڕێنووسی زمانی كوردی
 
Layout of a House Plan Foundation - Report
Layout of a House Plan Foundation - ReportLayout of a House Plan Foundation - Report
Layout of a House Plan Foundation - Report
 
General Keyboard Shortcuts
General Keyboard ShortcutsGeneral Keyboard Shortcuts
General Keyboard Shortcuts
 
Coordinates (Surveying) - Report
Coordinates (Surveying) - ReportCoordinates (Surveying) - Report
Coordinates (Surveying) - Report
 
Microsoft Mathematics
Microsoft MathematicsMicrosoft Mathematics
Microsoft Mathematics
 
Azimuth angles - Report
Azimuth angles - ReportAzimuth angles - Report
Azimuth angles - Report
 
Gastritis
GastritisGastritis
Gastritis
 
ڕێبەری بەشە ئەندازەییەکان
ڕێبەری بەشە ئەندازەییەکانڕێبەری بەشە ئەندازەییەکان
ڕێبەری بەشە ئەندازەییەکان
 
Absorption of Coarse Aggregate
Absorption of Coarse AggregateAbsorption of Coarse Aggregate
Absorption of Coarse Aggregate
 
Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - Report
 
Angle determination - Report
Angle determination - ReportAngle determination - Report
Angle determination - Report
 
Strength of Hydraulic Cement
Strength of Hydraulic CementStrength of Hydraulic Cement
Strength of Hydraulic Cement
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Specific Gravity of Cement
Specific Gravity of CementSpecific Gravity of Cement
Specific Gravity of Cement
 
Specific gravity of Coarse aggregate
Specific gravity of Coarse  aggregateSpecific gravity of Coarse  aggregate
Specific gravity of Coarse aggregate
 
Non-Destructive testing - Report
Non-Destructive testing - ReportNon-Destructive testing - Report
Non-Destructive testing - Report
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 

Similaire à Horizontal Distance Measurement (HDM) by Automatic Level - Report

TOTAL STATION btech civil ..........pptx
TOTAL STATION btech civil ..........pptxTOTAL STATION btech civil ..........pptx
TOTAL STATION btech civil ..........pptx
Ayushsharma131736
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptx
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptxWeldingn Arm Robot Prototyping with one component(motor) presentation.pptx
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptx
hakxcore
 
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Wong Chin Yung
 

Similaire à Horizontal Distance Measurement (HDM) by Automatic Level - Report (20)

Total Station surveying
Total Station surveyingTotal Station surveying
Total Station surveying
 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment ppt
 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptx
 
TOTAL STATION btech civil ..........pptx
TOTAL STATION btech civil ..........pptxTOTAL STATION btech civil ..........pptx
TOTAL STATION btech civil ..........pptx
 
Leveling report
Leveling reportLeveling report
Leveling report
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
Total station, digital self leveling levels,
Total station, digital self leveling levels,Total station, digital self leveling levels,
Total station, digital self leveling levels,
 
Lecture total Station Theory
Lecture total Station TheoryLecture total Station Theory
Lecture total Station Theory
 
Total station
Total stationTotal station
Total station
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
 
Total station
Total stationTotal station
Total station
 
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptx
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptxWeldingn Arm Robot Prototyping with one component(motor) presentation.pptx
Weldingn Arm Robot Prototyping with one component(motor) presentation.pptx
 
Advance surveying equipments
Advance surveying equipmentsAdvance surveying equipments
Advance surveying equipments
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
 
Robot programming , accuracy ,repeatability and application
Robot programming , accuracy ,repeatability  and applicationRobot programming , accuracy ,repeatability  and application
Robot programming , accuracy ,repeatability and application
 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
 

Plus de Sarchia Khursheed

Advantages and disadvantages of concrete
Advantages and disadvantages of concreteAdvantages and disadvantages of concrete
Advantages and disadvantages of concrete
Sarchia Khursheed
 

Plus de Sarchia Khursheed (15)

Iraqi Kurdistan Map
Iraqi Kurdistan MapIraqi Kurdistan Map
Iraqi Kurdistan Map
 
How to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportHow to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - Report
 
Electronic Distance Measurement (EDM) - Report
Electronic Distance Measurement (EDM)  - ReportElectronic Distance Measurement (EDM)  - Report
Electronic Distance Measurement (EDM) - Report
 
Slump Test - Report
Slump Test - ReportSlump Test - Report
Slump Test - Report
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
 
Batching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - ReportBatching, mixing, placing, and curing of concrete - Report
Batching, mixing, placing, and curing of concrete - Report
 
Road construction
Road constructionRoad construction
Road construction
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
Concrete Plant
Concrete PlantConcrete Plant
Concrete Plant
 
Computing for Engineering - Lecture 03
Computing for Engineering - Lecture 03Computing for Engineering - Lecture 03
Computing for Engineering - Lecture 03
 
Computing for Engineering - Lecture 02
Computing for Engineering - Lecture 02Computing for Engineering - Lecture 02
Computing for Engineering - Lecture 02
 
Computing for Engineering - Lecture 01
Computing for Engineering - Lecture 01Computing for Engineering - Lecture 01
Computing for Engineering - Lecture 01
 
Advantages and disadvantages of concrete
Advantages and disadvantages of concreteAdvantages and disadvantages of concrete
Advantages and disadvantages of concrete
 
English Grammar in Kurdish | ڕێزمانی ئینگلیزی
English Grammar in Kurdish | ڕێزمانی ئینگلیزیEnglish Grammar in Kurdish | ڕێزمانی ئینگلیزی
English Grammar in Kurdish | ڕێزمانی ئینگلیزی
 
... تەنھا لە
... تەنھا لە... تەنھا لە
... تەنھا لە
 

Dernier

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Dernier (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Horizontal Distance Measurement (HDM) by Automatic Level - Report

  • 1. 1 Soran University Faculty of Engineering Civil Engineering Department HORIZONTAL DISTANCE MEASUREMENT BY AUTOMATIC LEVEL Student: Sarchia Khursheed Group: E Date: 13.10.2015 Supervisor: Eng. Anwar Jabbar
  • 2. 2 Introduction An Automatic Level is a professional leveling tool used by contractors, builders, land surveing professionals, or the engineers who demands accurate leveling every time. Auto levels set up fast, are easy to use, and save time and money on every job. Some auto levels come in kits that include the grade rod and tripod. Auto levels are great for fence builders, foundation installer, excavations, deck builders, landscaping pros, swimming pol builders, home builders, roadwork jobs, ... etc. In order to do the job properly, be it setting a line for laying concrete blocks, or setting the grade on a driveway or farm road, the right auto level must be chosen. Be sure to understand what the job is and what the different levels can do. There are different types of automatic levels, each one designed for a specific job type: Auto level type Uses Dumpy level General survey work such as setting property lines; laying out highways, power lines, and other large area construction where horizontal measurements are essential. Builders auto level Good for most general survey work, as well as setting horizontal markers for masonary work, such as brick and block laying; useful in setting foundations and installing subflooring in residental and industural construction. Laser level Most useful when laying out foundations; masonary work; other jobs where a 360 degree reference line is needed. Digital level Useful for general survey and most construction projects but with the added
  • 3. 3 benefit of more precise data collection and the ability to record. Laser line level The choice of carpenters, handymen, weekend warriors, and tinkerers of all sorts, great for small projects like hanging shelves and picture, and professional jobs like mounting thermostats, electrical receptacles, and light switches. Equipments List of equipments and tools need to completing the test:  Automatic level  Tripod  Staff Procedure Steps and instructions to set up an automatic level and measuring horizontal distances: 1. Setup tripod as level as possible, step on tripod legs to drive into the ground. 2. Attach auto level to the tripod. 3. Adjust level so bubble is centered in vial. 4. Adjust resital util crosshairs are clear. 5. Adjust the objective lense until object you are sighting on is clear. 6. Select two points (A and B) to measuring the distance between them. 7. Place the auto level over point A and the staff over point B. Take the reading. 8. Shift the instrument (auto level and tripod) to point B and staff to point A, and take the reading again.
  • 4. 4 9. The distance between two points (at there A and B) can be determind by this equation: (Upper reading – Lower reading) × 100 = Distance between A and B Calculation Reading Upper 133.1 Lower 122.8 Result and Conclusion Using an automatic level can improve the accuracy needed when grading a roadway or setting the foundationof an new home. Just as important to the individual, automatic levels can make doing smaller jobs better, such as hanging pictures, shelving, and shower curtain rods. From the data of previous table the result can be determine, by this equation: Distance between A and B = (133.1− 122.8) × 100 = 1030 𝑐𝑚